ADVANTAGES OF CHOOSING SURATGARH FOR
THERMAL PLANT SETUP
 Availability of large amount of clean cooling water
required for the station.
 Location of station on broad gauge main Railway line.
 Constant power supply.
 Proximity to M.P. Coal fields.
 Transmission and Grid substation are quite nearer to the
site.
CONTENTS OF THE PRESENTATION
 INTRODUCTION.
 BLOCK DIAGRAM AND PROCESS OF STEAM
GENERATION.
 COAL HANDLING PLANT.
 BOILER PROCESS AND ITS SPECIFICATION.
 TURBINE AND TURBO GENERATOR.
 CONDENSER.
 ASH HANDLING PLANT.
 COOLING TOWERS AND PONDS.
 PROTECTION AND SWTICHING (CONTROL PANEL).
Introduction Of SSTPS
o Location:
 situated near village riyanwali about 25km from
Suratgarh town
o Installed capacity:
 1500 MW.
 7th Unit of 250MW is under construction.
o Favorable conditions:
 Availability of large amount of water.
 Location at broad gauge Delhi-Mumbai railway.
 Concentration of load.
 Constant water supply.
 Transmission and grid sub station are quit near.
Unit Number DOC Installed Capacity(MW)
 1 May,1998 250
 2 Mar,2000 250
 3 Oct,2001 250
 4 Mar,2002 250
 5 June,2003 250
 6 May,2010 250
BLOCK DIAGRAM OF THERMAL POWER PLANT
PROCESS OF STEAM GENERATION
OVERVIEW OF COAL HANDLING PLANT
Row coal from
bharat coal ltd.
Dhanbad &
bilaspur(MP)
To SSTPS from gurla via a
single railway track
Wagon trippler
Bunkers Crusher house Hoppers
Row coal feeders Coal mills
(pulverization)
Boiler furnace ( tangential firing of pulverized
coal)
BOILER PROCESS
stack
Flue gases
Boiler
furnace
Air from
environment
via draft fans
Pulverized
coal
Ash
handling
plant
Super
heated
steam
DM water
TECHNICAL SPECIFICATION OF BOILER
 1.TYPE Water tube ,pulverized fuel
fired, single drum type,
tangential firing system
 2. MAKE BHEL
 3. CAPACITY 680tonnes /hour(250MW)
 4. PRESSURE 155 Kg./cm2 [G]
 5.TEMPERATURE 540 degree
TURBINE
 Turbine is a machine in which a shaft is rotated
steadily by impact of steam it converts heat energy
into mechanical energy.
TURBINE
High
pressure
Intermediate
Low
pressure
TURBO GENERATOR
 Designed for continuous operation at the rated output.
 Driven by directly coupled steam
 turbine at a speed of 3000 r.p.m.
 Have two main parts:
• Rotor
• Stator
 A temperature detector is provided
 to maintain the temperature.
 Temperature of windings is
 maintain by H2 coolant.
CONDENSER
The condenser does the job of condensing the steam exhausted from
turbine.
Steam after rotating
steam turbine comes to
condenser. Water is
drawn from a natural
source of supply such as
river,canel or lack and is
circulated through the
condenser. The
circulating water takes
up the heat of the
exhausted steam and
itself becomes hot. This
hot water coming out
from the condenser is
discharged down the
river.
ROTOR
 Smooth cylindrical type
 Rotor shaft made of single piece alloy steel
forging of high mechanical and magnetic
properties.
 The cylindrical structure gives better
balance , less losses
 To avoid excessive peripheral velocity
rotors have small diameter.
 The slip rings are made of forged
steel. They are located at either side of
Generator Shaft.
ASH HANDLING PLANT
 Electrostatic Precipitator(ESP).
 Chimney.
 Ash
 Fly ash (80%).
 Used for making bricks.
 Cement.
 Bottom ash (20%)
 Used to improve fertility.
 Roads.
To collect ash two ponds of capacity 150 & 230 hact. Are available
`
FURNACE
FLY ASH & FLUE GASES (80%)
ESP
DRY & WET ASH(20%)
HOPPERS
TRANSPORTED TO
CEMENT
FACTORIES ETC.
BLOCK DIAGRAM OF ASH HANLING PLANT
COOLING TOWERS AND PONDS
o A condenser needs huge quantity of water to condense the steam .
o Typically a 2000MW plant needs about 1500MGallon of water.
oMost plants use a closed cooling system where warm water coming from condenser is
cooled and reused
oSmall plants use spray ponds and medium and large plants use cooling towers.
oCooling tower is a steel or concrete hyperbolic structure having a reservoir at the base
for storage of cooled water
oHeight of the cooling tower may be 150 m or so and diameter at the base is 150 m
PROTECTION & SWITCHING
 Circuit breakers
 Isolators
 Lightning arrestors
 Current transformer
 Potential transformer
Control panel
 CIRCUIT BREAKERS:
 Bus coupler is provided with minimum
oil circuit breaker of BHEL make.
 ISOLATOR:
 All the isolators are provided in 220 KV
switchyard and are motor operated.
 CURRENT TRANSFORMER:
 All the 220 KV current transformers are
provided for measuring and protection.
 POTENTIAL TRANSFORMER:
 Each of 220 KV buses is provided with three P.T.’S are core for each phase of
BHEL make.
 LIGHTENING ARRESTOR:
 For protection against lightening each if line feeder, generator transformer,
station transformer has been provided three L.A. (One for each phase).
CONTROL PANEL
Turbine desk
Fan control
desk Fuel control
desk
Generator
control desk
Steam pressure &
control desk
It is good to have good will..
It is good to have enthusiasm..
But it is essential to have “Training”..

More Related Content

What's hot

GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training Report
Utsav Yagnik
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
sagnikchoudhury
 
TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant
vishal patel
 
thermal power plant PTTP Parichha
thermal power plant PTTP Parichhathermal power plant PTTP Parichha
thermal power plant PTTP Parichha
Gagandeep Maan
 
Thermal Power Station
Thermal Power StationThermal Power Station
Thermal Power Station
Raji Kumar
 
Jindal Steel
Jindal SteelJindal Steel
Jindal Steel
Rehan Fazal
 
A best ppt on kota super thermal power station
A best ppt on kota super thermal power stationA best ppt on kota super thermal power station
A best ppt on kota super thermal power station
Naveen Kumar
 
Training report on thermal power plant
Training report on thermal power plantTraining report on thermal power plant
Training report on thermal power plant
lovely professional university
 
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
AKHILESH KUMAR
 
training report
training reporttraining report
training report
Ajay Chauhan
 
Training presentation-BHILAI STEEL PLANT
Training presentation-BHILAI STEEL PLANTTraining presentation-BHILAI STEEL PLANT
Training presentation-BHILAI STEEL PLANT
KHAGENDRA KUMAR DEWANGAN
 
GSECL TPS SIKKA
GSECL TPS SIKKAGSECL TPS SIKKA
GSECL TPS SIKKA
MukundrayMakwana
 
C ktps training-report
C ktps training-reportC ktps training-report
C ktps training-report
Anil Saharan
 
Thermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit HingeThermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit Hinge
amit307
 
BHILAI STEEL PLANT VOCATIONAL TRAINING
BHILAI STEEL PLANT VOCATIONAL TRAININGBHILAI STEEL PLANT VOCATIONAL TRAINING
BHILAI STEEL PLANT VOCATIONAL TRAINING
Vikash Kumar
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
Rahul Jalan
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC ppt
kirbadh
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
Abha Tripathi
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
HARI GOVIND SINGH
 
Sinter Plant,Lime & Dolo Plant industrial Training Report
Sinter Plant,Lime & Dolo Plant industrial Training ReportSinter Plant,Lime & Dolo Plant industrial Training Report
Sinter Plant,Lime & Dolo Plant industrial Training Report
Shani Kumar Singh
 

What's hot (20)

GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training Report
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant
 
thermal power plant PTTP Parichha
thermal power plant PTTP Parichhathermal power plant PTTP Parichha
thermal power plant PTTP Parichha
 
Thermal Power Station
Thermal Power StationThermal Power Station
Thermal Power Station
 
Jindal Steel
Jindal SteelJindal Steel
Jindal Steel
 
A best ppt on kota super thermal power station
A best ppt on kota super thermal power stationA best ppt on kota super thermal power station
A best ppt on kota super thermal power station
 
Training report on thermal power plant
Training report on thermal power plantTraining report on thermal power plant
Training report on thermal power plant
 
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
 
training report
training reporttraining report
training report
 
Training presentation-BHILAI STEEL PLANT
Training presentation-BHILAI STEEL PLANTTraining presentation-BHILAI STEEL PLANT
Training presentation-BHILAI STEEL PLANT
 
GSECL TPS SIKKA
GSECL TPS SIKKAGSECL TPS SIKKA
GSECL TPS SIKKA
 
C ktps training-report
C ktps training-reportC ktps training-report
C ktps training-report
 
Thermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit HingeThermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit Hinge
 
BHILAI STEEL PLANT VOCATIONAL TRAINING
BHILAI STEEL PLANT VOCATIONAL TRAININGBHILAI STEEL PLANT VOCATIONAL TRAINING
BHILAI STEEL PLANT VOCATIONAL TRAINING
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Sinter Plant,Lime & Dolo Plant industrial Training Report
Sinter Plant,Lime & Dolo Plant industrial Training ReportSinter Plant,Lime & Dolo Plant industrial Training Report
Sinter Plant,Lime & Dolo Plant industrial Training Report
 

Similar to Ppt of ajeet on suratgarh super thermal power station

Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
Prakash Jarotia
 
kstps training report
kstps training reportkstps training report
kstps training report
Omprakash Choudhary
 
Attachment.doc
Attachment.docAttachment.doc
Attachment.doc
CHANDAN JAISWAL
 
ppt on kstps 2016
ppt on kstps 2016ppt on kstps 2016
ppt on kstps 2016
Apoorva Sharma
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
DurgSingh
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
ParulChandna6
 
MTPS Bappa main
MTPS Bappa mainMTPS Bappa main
MTPS Bappa main
Báppådìtÿâ Màîtÿ
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
Baibhav Saha
 
Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plant
R G Sanjay Prakash
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plant
Rama Charan
 
Ppt on power generation(thermal), transmission & distribution
Ppt on power generation(thermal), transmission & distributionPpt on power generation(thermal), transmission & distribution
Ppt on power generation(thermal), transmission & distribution
SuvamSahu2
 
KSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxKSTPS PPT Astha.pptx
KSTPS PPT Astha.pptx
ssuser4c2635
 
Kota super thermal power plant seminar
Kota super thermal power plant seminarKota super thermal power plant seminar
Kota super thermal power plant seminar
Century Rayon
 
Ppt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingPpt on btps bokaro industrial training
Ppt on btps bokaro industrial training
Radhe Shyam
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal power
Shishupal03012015
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpur
Shrey Dhasmana
 
KTPS
KTPSKTPS
Presentation 1 (2).pptx
Presentation 1 (2).pptxPresentation 1 (2).pptx
Presentation 1 (2).pptx
NaveenJarwal1
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator Training
Vedant Sumaria
 
Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT
Abhijeet Thakur
 

Similar to Ppt of ajeet on suratgarh super thermal power station (20)

Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
kstps training report
kstps training reportkstps training report
kstps training report
 
Attachment.doc
Attachment.docAttachment.doc
Attachment.doc
 
ppt on kstps 2016
ppt on kstps 2016ppt on kstps 2016
ppt on kstps 2016
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
 
MTPS Bappa main
MTPS Bappa mainMTPS Bappa main
MTPS Bappa main
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 
Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plant
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plant
 
Ppt on power generation(thermal), transmission & distribution
Ppt on power generation(thermal), transmission & distributionPpt on power generation(thermal), transmission & distribution
Ppt on power generation(thermal), transmission & distribution
 
KSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxKSTPS PPT Astha.pptx
KSTPS PPT Astha.pptx
 
Kota super thermal power plant seminar
Kota super thermal power plant seminarKota super thermal power plant seminar
Kota super thermal power plant seminar
 
Ppt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingPpt on btps bokaro industrial training
Ppt on btps bokaro industrial training
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal power
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpur
 
KTPS
KTPSKTPS
KTPS
 
Presentation 1 (2).pptx
Presentation 1 (2).pptxPresentation 1 (2).pptx
Presentation 1 (2).pptx
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator Training
 
Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT
 

Recently uploaded

哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 

Recently uploaded (20)

哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 

Ppt of ajeet on suratgarh super thermal power station

  • 1. AT SURATGARH SUPER THERMAL POWER STATION (16-May-2017 to 16 July-2017) BY AJEET SINGH KURI 14ESNME001 DEPARTMENT OF MECHANICAL ENGINEERING SINE INTERNATIONAL INSTITUTE OF TECHNOLOGY, JAIPUR
  • 2. ADVANTAGES OF CHOOSING SURATGARH FOR THERMAL PLANT SETUP  Availability of large amount of clean cooling water required for the station.  Location of station on broad gauge main Railway line.  Constant power supply.  Proximity to M.P. Coal fields.  Transmission and Grid substation are quite nearer to the site.
  • 3. CONTENTS OF THE PRESENTATION  INTRODUCTION.  BLOCK DIAGRAM AND PROCESS OF STEAM GENERATION.  COAL HANDLING PLANT.  BOILER PROCESS AND ITS SPECIFICATION.  TURBINE AND TURBO GENERATOR.  CONDENSER.  ASH HANDLING PLANT.  COOLING TOWERS AND PONDS.  PROTECTION AND SWTICHING (CONTROL PANEL).
  • 4. Introduction Of SSTPS o Location:  situated near village riyanwali about 25km from Suratgarh town o Installed capacity:  1500 MW.  7th Unit of 250MW is under construction. o Favorable conditions:  Availability of large amount of water.  Location at broad gauge Delhi-Mumbai railway.  Concentration of load.  Constant water supply.  Transmission and grid sub station are quit near.
  • 5. Unit Number DOC Installed Capacity(MW)  1 May,1998 250  2 Mar,2000 250  3 Oct,2001 250  4 Mar,2002 250  5 June,2003 250  6 May,2010 250
  • 6. BLOCK DIAGRAM OF THERMAL POWER PLANT
  • 7. PROCESS OF STEAM GENERATION
  • 8. OVERVIEW OF COAL HANDLING PLANT Row coal from bharat coal ltd. Dhanbad & bilaspur(MP) To SSTPS from gurla via a single railway track Wagon trippler Bunkers Crusher house Hoppers Row coal feeders Coal mills (pulverization) Boiler furnace ( tangential firing of pulverized coal)
  • 9. BOILER PROCESS stack Flue gases Boiler furnace Air from environment via draft fans Pulverized coal Ash handling plant Super heated steam DM water
  • 10. TECHNICAL SPECIFICATION OF BOILER  1.TYPE Water tube ,pulverized fuel fired, single drum type, tangential firing system  2. MAKE BHEL  3. CAPACITY 680tonnes /hour(250MW)  4. PRESSURE 155 Kg./cm2 [G]  5.TEMPERATURE 540 degree
  • 11. TURBINE  Turbine is a machine in which a shaft is rotated steadily by impact of steam it converts heat energy into mechanical energy. TURBINE High pressure Intermediate Low pressure
  • 12. TURBO GENERATOR  Designed for continuous operation at the rated output.  Driven by directly coupled steam  turbine at a speed of 3000 r.p.m.  Have two main parts: • Rotor • Stator  A temperature detector is provided  to maintain the temperature.  Temperature of windings is  maintain by H2 coolant.
  • 13. CONDENSER The condenser does the job of condensing the steam exhausted from turbine. Steam after rotating steam turbine comes to condenser. Water is drawn from a natural source of supply such as river,canel or lack and is circulated through the condenser. The circulating water takes up the heat of the exhausted steam and itself becomes hot. This hot water coming out from the condenser is discharged down the river.
  • 14. ROTOR  Smooth cylindrical type  Rotor shaft made of single piece alloy steel forging of high mechanical and magnetic properties.  The cylindrical structure gives better balance , less losses  To avoid excessive peripheral velocity rotors have small diameter.  The slip rings are made of forged steel. They are located at either side of Generator Shaft.
  • 15. ASH HANDLING PLANT  Electrostatic Precipitator(ESP).  Chimney.  Ash  Fly ash (80%).  Used for making bricks.  Cement.  Bottom ash (20%)  Used to improve fertility.  Roads. To collect ash two ponds of capacity 150 & 230 hact. Are available `
  • 16. FURNACE FLY ASH & FLUE GASES (80%) ESP DRY & WET ASH(20%) HOPPERS TRANSPORTED TO CEMENT FACTORIES ETC. BLOCK DIAGRAM OF ASH HANLING PLANT
  • 17. COOLING TOWERS AND PONDS o A condenser needs huge quantity of water to condense the steam . o Typically a 2000MW plant needs about 1500MGallon of water. oMost plants use a closed cooling system where warm water coming from condenser is cooled and reused oSmall plants use spray ponds and medium and large plants use cooling towers. oCooling tower is a steel or concrete hyperbolic structure having a reservoir at the base for storage of cooled water oHeight of the cooling tower may be 150 m or so and diameter at the base is 150 m
  • 18. PROTECTION & SWITCHING  Circuit breakers  Isolators  Lightning arrestors  Current transformer  Potential transformer Control panel
  • 19.  CIRCUIT BREAKERS:  Bus coupler is provided with minimum oil circuit breaker of BHEL make.  ISOLATOR:  All the isolators are provided in 220 KV switchyard and are motor operated.  CURRENT TRANSFORMER:  All the 220 KV current transformers are provided for measuring and protection.
  • 20.  POTENTIAL TRANSFORMER:  Each of 220 KV buses is provided with three P.T.’S are core for each phase of BHEL make.  LIGHTENING ARRESTOR:  For protection against lightening each if line feeder, generator transformer, station transformer has been provided three L.A. (One for each phase).
  • 21. CONTROL PANEL Turbine desk Fan control desk Fuel control desk Generator control desk Steam pressure & control desk