SlideShare a Scribd company logo
1 of 17
Download to read offline
Personnel Productivity System
Thomas J. Bronack, president
Data Center Assistance Group, Inc.
15180 20th Avenue
Whitestone, New York 11357
Phone: (718) 591-5553 Cell: (917) 673-6992
Email: bronackt@dcag.com
This document is the property of the Data Center Assistance Group, Inc. (DCAG). Any use of the material contained
within this document without the written permission of DCAG will be construed as an infringement on the Intellectual
Property of DCAG, resulting in appropriate actions being taken. Contact DCAG should you want to utilize any of the
data or concepts contained within this document.
Origination Date: October 12, 2000
New Release Date: June 6, 2013
“Combining Workflow Management, Forms Management, Personnel
Training, and Recruitment to better meet the needs of Business.”
Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
6/6/2013 (c) Data Center Assistance Group, Inc. 2
Abstract
 The two things people will always need are:
 Training, and
 A Job.
 The two things most responsible for making a business successful
are:
 The quality of its staff, and
 Controlling how work flows within its organization.
 Now that technology enhancements to productivity are not returning
the same percentage of improvements as in the past, companies
must look inside for performance gains.
 This presentations shows how you can achieve productivity gains by
utilizing current technologies to optimize Workflow, Personnel
Productivity, and Business Profit Margins.
Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
6/6/2013 (c) Data Center Assistance Group, Inc. 3
Workflow is increasing and new technologies
require training
 Workflow is increasing as new applications and technologies are adopted into the
IT Production Environment through the Systems Development Life Cycle (SDLC).
 New technologies and procedures must be maintained to reflect changes and new
functional responsibilities.
 Problems and Enhancements can overburden the Maintenance process, especially
since personnel are already struggling to maintain development efforts.
 Version and Release Management adherence is suffering due to overworked
personnel, which can result in more problems due to procedure mistakes and out-
of-date information causing loss of confidence in documentation.
 A method for matching personnel training levels and preparedness must be created
to better respond to workload and new technology demands.
 Employee skills levels must be documented and their career path desires listed so
that every effort can be made to assist personnel achieve their goals, thereby
insuring a happy staff and the retention of skilled personnel through company
loyalty.
Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
6/6/2013 (c) Data Center Assistance Group, Inc. 4
Systems Development Lifecycle Workflow overview
(The many tasks performed in developing and maintaining applications and the IT Environment)
Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
6/6/2013 (c) Data Center Assistance Group, Inc. 5
Request Processing Phases and Steps
Schedule
Request
Interfaces Between Applications, QA, and Production Groups.
Create
Service
Request
Perform
Technical
Assessment
Perform
Business
Assessment
Perform
Requested
Work
Application
Group
Testing
Return
to
Submitter
Create QA
Turnover
Package
Submit to
Production
Control
Successful
Successful
No Yes
No
Create
Production
Control
Turnover
Package
QA Review
And
Accept
Yes
Error Loop
Error
Loop
APPLICATIONS GROUP
QA GROUP
TESTING and QA
Turnover Package Components:_________
• Service Form and results from
Assessments,
• Change & Release Notes,
• Test Scenarios & Scripts,
• Messages & Codes, and Recoveries,
• Data for Regression and Normal Testing,
• Application Group Testing Results,
• Documentation.
PRODUCTION CONTROL
Turnover Package Components:
• Explanation and Narrative,
• Files to be released,
• Predecessor Scheduling,
• Special Instructions,
• Risk Analysis,
• Authorizations.
Perform
Requested
Work
QA
Review
Meeting
Perform
Post-
Mortem
CP #
1
CP #
2
CP #
3
Perform
User
Acceptance
Testing
Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
Checkpoints review past accomplishment and make go / no-go
decisions regarding continuing work or changing directives.
6/6/2013 (c) Data Center Assistance Group, Inc. 6
The Problem and Your Most Valuable Resource
 Organizations aren’t implementing Business Imperatives efficiently, due to
employee awareness, training, and workflow deficiencies.
 Cost overruns inhibit organizations, delaying productivity improvements, and
reducing profit margins.
 Personnel Productivity isn’t being measured and reported on, causing
management decisions to be based on reactive and not proactive directives.
 Workflow optimization methodologies are not being implemented, even
though they would improve profits and enhance personnel productivity.
 Service Level Agreements and Service Level Reporting methodologies should
be expanded to include Personnel Productivity remedies that ensure optimal
performance and business profit margins, while satisfying client service and
revenue desires.
 Companies should concentrate on employee needs more, to improve morale,
productivity, and retention. After all, your employees are your most valuable
resource.
Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
6/6/2013 (c) Data Center Assistance Group, Inc. 7
Combining Workflow Management With Personnel and
Training Systems to Optimize Productivity
Workflow
Management
System
Automated
Training System
Automated
Personnel System
Forms Origination through Completion,
with Analysis and Reporting. Links to
Personnel Training and Recruiting when
new tools, procedures, and/or workloads
mandate updating training or staff.
Awareness, New Tools or Procedures.
Provides certifications via vendor groups
and accreditations through universities.
Can assist employees achieve their career
goals and improve retention and loyalty.
Increased Workloads mandate staff
increase / supplementation. Automating
personnel requests and interfacing between
recruitment and hiring managers will speed
process and reduce costs.
Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
6/6/2013 (c) Data Center Assistance Group, Inc. 8
Workflow Management / Training System Interfaces & Flow
(Request through fulfillment, with staffing increases and training as deemed necessary)
6/6/2013 (c) Data Center Assistance Group, Inc. 9
Workflow Management System
Intranet Interface
Applid / Userid / Pswd
Workflow
Management System
Log Assign Track Measure Analyze Report
Tracking
Library
Future
Current
Past
Userid
Pswd
Responsibilities
Restrictions
Tables
Queries
Forms
Reports
Programs
• Development
• Maintenance
(Enhancements
and Problems)
• Userid
• Responsibility
• Routing
• Origin to End
• User Interface
• Audit Trail
• Events
• Duration
• Problems
• Normal Process
• Problems
• Durations
• Comparisons
• Management
• Technical
• Checkpoint
• Trending
• Future Analysis
Automated Personnel
System
Automated Training
System
User Profiles DBMS Library
Documentation
Library
Standards,
Procedures,
Manuals, etc.
Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
6/6/2013 (c) Data Center Assistance Group, Inc. 10
Forms Management and Control System
Work Order
Forms Library Forms Router Personnel Matrix
On-Going,
or New
Skills
Training &
Scheduling
Recruitment &
Placement
Learning
Skills
Index (LSI)
Certifications
Accreditations
Vendors
Universities
(Responsible for assigning work tasks to the right person at every project phase, while
ensuring that skill requirements are met and the highest possible quality is achieved)
WORK DEFINITIONS
• Selection,
• Form Definition,
• Data Validation,
• Authorization,
• Assignment,
• Routing (1st to Last),
• Tracking & Logging,
• Interactive
Communications,
• Changes & History,
• Completion,
• Acceptance,
• Charge-Back,
• Accounting,
• Reporting.
FORM LIFE-CYCLE(Contains all forms
and their usage guides
along with data entry
validation for all form
fields). Guarantees that
Forms are completed
properly and that personnel
understand the forms
meaning.
• Job Title,
• Job Description,
• Functional
Responsibilities,
• Tools used and
Skill Level needs,
• Documentation
Needs,
• Current Skill Level,
• Skill improvement
needs,
• Training Needs &
Scheduling, and
• Career Path.
PERSONNEL ENTRY
(Assign Form to the
person responsible for
work task and track)
(All work is grouped
as Current On-Going,
or New, with Skills
needed to perform tasks).
Availability
& Pooling
(Agreements are
made with Vendors
and Universities to
supply courses.
Certification are
provided when
Successfully completed)
User Interface is provided to assist user
in selecting appropriate form needed
to accomplish desired work request.
Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
6/6/2013 (c) Data Center Assistance Group, Inc. 11
Connecting Workflow Management with Personnel Recruitment
Project / Department
Manager
Project / Department
Hiring Manager
Search, by Geography / Skill
Job Fairs to Recruit People
Recruiting Companies
Advertise
by
Newspapers
Advertise by
Internet
Projects and
Work Requests
Staffing
Requirements
Staffing
Requirements
Business Department
FIRE
WALL
Human Resource Management
Personnel Department
Human Resource Management
Personnel Department
INTRANET INTERNET
COMPANY
INTERNAL
EXTERNAL
TO THE
COMPANY
STAFF
REQUEST
STAFF
REQUEST
CLIENT
DCAG
AREA
DIRECT
SEARCH
ADs
Workflow
Management
System
Automated
Personnel
System
Hiring
Base
Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
6/6/2013 (c) Data Center Assistance Group, Inc. 12
Process description
 Planning session is conducted to define new projects, enhancements, and
maintenance requirements.
 Available Resources are examined to determine if the skills and availability needed
to support project requirements is present.
 A determination is made for a consultant, permanent hire, or career path training
is to be performed to meet resource requirements.
 Consultants and new hires are sent to personnel hiring system, while career path
resources are sent to the training system so that they can be trained in time to meet
project time frames.
 Resumes are sent to Hiring Manager, along with course completion certifications
for personnel going through career path training, so that he can make the
appropriate selection of resources needed to support project and workflow needs.
 Personnel are assigned to projects or work functions to meet increased workloads
or new technology requirements.
 Functional Responsibilities and Job Descriptions are upgraded along with all
required documentation to support new workloads and technologies.
Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
Why use this approach
 Product and Service growth is supported to maintain client
satisfaction;
 Personnel growth is controlled in an efficient manner that
best responds to needs while reducing the workload on
existing staff;
 Personnel satisfaction and loyalty is improved through
career path satisfaction;
 A happier and more loyal staff is achieved through these
procedures, while workload and new technology demands
are met in an efficient manner.
 Management directives are better met and the company
reputation is enhanced by loyal staff and clients.
Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
6/6/2013 (c) Data Center Assistance Group, Inc. 13
6/6/2013 (c) Data Center Assistance Group, Inc. 14
Benefits Derived from PPS Implementation
 Reduced training costs and enhanced personnel skills.
 Workflow Management and Control System to manage and report on
WORK REQUEST FORMS from origination through completion, thereby
allowing for optimization and benefiting from lessons learned.
 Personnel Performance Analysis and Load Balancing Reports to help
management determine personnel needs, in advance, so that PROACTIVE
SOLUTIONS can be applied.
 Quicker response to Business Imperatives and a higher degree of quality
associated with deliverables.
 More efficient employee performance evaluations through reports detailing
skills and workflow achievements.
 Better employee retention, job performance, and career planning, through
system features and facilities that help employees achieve their career goals.
 Optimal business productivity and profit margins.
 Learning lessons from past work achievements are gained, so you can
improve work flow and procedures, thereby optimizing performance.
Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
Sample Automated Personnel System
6/6/2013 (c) Data Center Assistance Group, Inc. 15
Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
Automated Personnel System Features
 Relational database system that ties jobs to clients to candidates, while
allowing candidates to be connected to multiple jobs.
 Detailed records for Clients and Candidates.
 Keyword Skills Search for resumes in database.
 Databases can be searched in order of free (submitted by candidate
directly) or fee paid basis (submitted by other firms).
 Job records tie job to client and candidate, with job description and
history notes. Revenue projections are associated with client records.
 Work is sorted by Next Action Date and Priority, so staff simply takes
top record off of list, performs work, and documents results.
 Drop-down list for clients and candidates to quickly locate desired
information.
 Complete reporting system to generate revenue projections and status
reports for salesmen and recruiters.
 Management dashboard to monitor activity and supply assistance as
needed to speed up response to client demands.
6/6/2013 (c) Data Center Assistance Group, Inc. 16
Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
6/6/2013 (c) Data Center Assistance Group, Inc. 17
Goals and Objectives
 Conduct a NEEDS ANALYSIS to define: the organizational structure, employee job
descriptions and workloads, employee skill requirements, and employee training
requirements. Compare current training to needed training to evaluate staff skill
levels. Then ensure the proper training of employees on all tools and procedures
associated with their job tasks, define work form requirements and life cycles, and the
reporting requirements needed to track workloads, skills, and training.
 Create a STATEMENT OF WORK to implement the Personnel Productivity
System (PPS) and optimize Employee Skills, Performance, and Work Flow
Management.
 Implement Learning Skills Index (LSI) for personnel that defines their present skills
and future training requirements, based on job definitions and workloads.
 Connect personnel to Computer Based Training modules needed to develop skills
associated with their current positions and career paths.
 Provide Accreditation and Certifications from universities and vendors.
 Route Work Requests to personnel and track forms from inception to completion.
 Provide reports on lifecycle and personnel performance associated with tasks needed to
complete Work Request forms.
Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance

More Related Content

What's hot

Implementing an enterprise architecture
Implementing an enterprise architectureImplementing an enterprise architecture
Implementing an enterprise architectureKevin Kempton
 
Srrk it limited business proposal
Srrk it limited business proposalSrrk it limited business proposal
Srrk it limited business proposalMohammad Sayem
 
HR Software Buyers Guide
HR Software Buyers GuideHR Software Buyers Guide
HR Software Buyers GuideSage HRMS
 
HR Management by Spreadsheet: Is there a Better Way?
HR Management by Spreadsheet: Is there a Better Way?HR Management by Spreadsheet: Is there a Better Way?
HR Management by Spreadsheet: Is there a Better Way?Sage HRMS
 
Human resource consultancy vital entity behind achievement of small and mid...
Human resource consultancy   vital entity behind achievement of small and mid...Human resource consultancy   vital entity behind achievement of small and mid...
Human resource consultancy vital entity behind achievement of small and mid...Praveen Rangi
 
HOW TO IMPROVE THE CURRENT POSITION OF THE COMPANY
HOW TO IMPROVE THE CURRENT POSITION OF THE COMPANYHOW TO IMPROVE THE CURRENT POSITION OF THE COMPANY
HOW TO IMPROVE THE CURRENT POSITION OF THE COMPANYyoyoey markyoes
 
HRIS Implementation and Change Management
HRIS Implementation and Change ManagementHRIS Implementation and Change Management
HRIS Implementation and Change ManagementThu Nandi Nwe
 
HR Survey Whitepaper
HR Survey WhitepaperHR Survey Whitepaper
HR Survey WhitepaperChelsea Rusk
 
Exenta HRMS brochure
Exenta HRMS brochureExenta HRMS brochure
Exenta HRMS brochureJoe Winston
 
Data Management Process Improvement
Data Management Process ImprovementData Management Process Improvement
Data Management Process ImprovementMNI08072014
 
How Can Better Collaboration Between HR and Finance Help High -Bandwidth Opt...
How Can Better Collaboration Between HR and Finance  Help High -Bandwidth Opt...How Can Better Collaboration Between HR and Finance  Help High -Bandwidth Opt...
How Can Better Collaboration Between HR and Finance Help High -Bandwidth Opt...Bhupesh Chaurasia
 
Role Of HR In Organizational Design PowerPoint Presentation Slides
Role Of HR In Organizational Design PowerPoint Presentation SlidesRole Of HR In Organizational Design PowerPoint Presentation Slides
Role Of HR In Organizational Design PowerPoint Presentation SlidesSlideTeam
 
Sage HRMS Brochure
Sage HRMS BrochureSage HRMS Brochure
Sage HRMS BrochureSage HRMS
 
ERP and CRM Integration for Quality Service Delivery
ERP and CRM Integration for Quality Service DeliveryERP and CRM Integration for Quality Service Delivery
ERP and CRM Integration for Quality Service DeliveryMarkos Mulat G
 
SharePoint Governance
SharePoint GovernanceSharePoint Governance
SharePoint GovernancePeter1020
 

What's hot (20)

Implementing an enterprise architecture
Implementing an enterprise architectureImplementing an enterprise architecture
Implementing an enterprise architecture
 
HRIS and cloud
HRIS and cloudHRIS and cloud
HRIS and cloud
 
Srrk it limited business proposal
Srrk it limited business proposalSrrk it limited business proposal
Srrk it limited business proposal
 
Innovate your company with PRESTO Digital Enterprise
Innovate your company with PRESTO Digital EnterpriseInnovate your company with PRESTO Digital Enterprise
Innovate your company with PRESTO Digital Enterprise
 
HR Software Buyers Guide
HR Software Buyers GuideHR Software Buyers Guide
HR Software Buyers Guide
 
HR Management by Spreadsheet: Is there a Better Way?
HR Management by Spreadsheet: Is there a Better Way?HR Management by Spreadsheet: Is there a Better Way?
HR Management by Spreadsheet: Is there a Better Way?
 
Human resource consultancy vital entity behind achievement of small and mid...
Human resource consultancy   vital entity behind achievement of small and mid...Human resource consultancy   vital entity behind achievement of small and mid...
Human resource consultancy vital entity behind achievement of small and mid...
 
HOW TO IMPROVE THE CURRENT POSITION OF THE COMPANY
HOW TO IMPROVE THE CURRENT POSITION OF THE COMPANYHOW TO IMPROVE THE CURRENT POSITION OF THE COMPANY
HOW TO IMPROVE THE CURRENT POSITION OF THE COMPANY
 
HRIS Implementation and Change Management
HRIS Implementation and Change ManagementHRIS Implementation and Change Management
HRIS Implementation and Change Management
 
HR Survey Whitepaper
HR Survey WhitepaperHR Survey Whitepaper
HR Survey Whitepaper
 
Exenta HRMS brochure
Exenta HRMS brochureExenta HRMS brochure
Exenta HRMS brochure
 
Data Management Process Improvement
Data Management Process ImprovementData Management Process Improvement
Data Management Process Improvement
 
How Can Better Collaboration Between HR and Finance Help High -Bandwidth Opt...
How Can Better Collaboration Between HR and Finance  Help High -Bandwidth Opt...How Can Better Collaboration Between HR and Finance  Help High -Bandwidth Opt...
How Can Better Collaboration Between HR and Finance Help High -Bandwidth Opt...
 
HCM 2.0
HCM 2.0HCM 2.0
HCM 2.0
 
Role Of HR In Organizational Design PowerPoint Presentation Slides
Role Of HR In Organizational Design PowerPoint Presentation SlidesRole Of HR In Organizational Design PowerPoint Presentation Slides
Role Of HR In Organizational Design PowerPoint Presentation Slides
 
HR in the Cloud
HR in the CloudHR in the Cloud
HR in the Cloud
 
Sage HRMS Brochure
Sage HRMS BrochureSage HRMS Brochure
Sage HRMS Brochure
 
ERP and CRM Integration for Quality Service Delivery
ERP and CRM Integration for Quality Service DeliveryERP and CRM Integration for Quality Service Delivery
ERP and CRM Integration for Quality Service Delivery
 
SharePoint Governance
SharePoint GovernanceSharePoint Governance
SharePoint Governance
 
HR in the Cloud
HR in the CloudHR in the Cloud
HR in the Cloud
 

Viewers also liked

Executive Presentation on adhering to Healthcare Industry compliance
Executive Presentation on adhering to Healthcare Industry complianceExecutive Presentation on adhering to Healthcare Industry compliance
Executive Presentation on adhering to Healthcare Industry complianceThomas Bronack
 
Article on Emergency Management and Corporate Certification
Article on Emergency Management and Corporate CertificationArticle on Emergency Management and Corporate Certification
Article on Emergency Management and Corporate CertificationThomas Bronack
 
Exec Presentation on Achieving Enterprise Resiliency and Corporate Certification
Exec Presentation on Achieving Enterprise Resiliency and Corporate CertificationExec Presentation on Achieving Enterprise Resiliency and Corporate Certification
Exec Presentation on Achieving Enterprise Resiliency and Corporate CertificationThomas Bronack
 
Recovery and Compliance Services provided by Tom Bronack
Recovery and Compliance Services provided by Tom BronackRecovery and Compliance Services provided by Tom Bronack
Recovery and Compliance Services provided by Tom BronackThomas Bronack
 
Asset Management (Acquisition, Redeployment, and Termination)(
Asset Management (Acquisition, Redeployment, and Termination)(Asset Management (Acquisition, Redeployment, and Termination)(
Asset Management (Acquisition, Redeployment, and Termination)(Thomas Bronack
 
Smaller Presentation on Enterprise Resiliency and Corporate Certification
Smaller Presentation on Enterprise Resiliency and Corporate CertificationSmaller Presentation on Enterprise Resiliency and Corporate Certification
Smaller Presentation on Enterprise Resiliency and Corporate CertificationThomas Bronack
 
Updated Healthcare Industry Compliance Presentation
Updated Healthcare Industry Compliance PresentationUpdated Healthcare Industry Compliance Presentation
Updated Healthcare Industry Compliance PresentationThomas Bronack
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual DictionaryAsphalt
 
Optimizing the IT and Business Environment
Optimizing the IT and Business EnvironmentOptimizing the IT and Business Environment
Optimizing the IT and Business EnvironmentThomas Bronack
 
Personnel Productivity System - Exec Pres
Personnel Productivity System - Exec PresPersonnel Productivity System - Exec Pres
Personnel Productivity System - Exec PresThomas Bronack
 
Auditing contingency Plans
Auditing contingency PlansAuditing contingency Plans
Auditing contingency PlansThomas Bronack
 
Application migration guideline document
Application migration guideline documentApplication migration guideline document
Application migration guideline documentThomas Bronack
 
Utilizing Dashboards to improve efficiency
Utilizing Dashboards to improve efficiencyUtilizing Dashboards to improve efficiency
Utilizing Dashboards to improve efficiencyThomas Bronack
 
Dcag training on VMware DR Process
Dcag training on VMware DR ProcessDcag training on VMware DR Process
Dcag training on VMware DR ProcessThomas Bronack
 
Achieving enterprise resiliency and corporate certification through the use o...
Achieving enterprise resiliency and corporate certification through the use o...Achieving enterprise resiliency and corporate certification through the use o...
Achieving enterprise resiliency and corporate certification through the use o...Thomas Bronack
 
Tape vaulting audit and encryption usage analysis
Tape vaulting audit and encryption usage analysisTape vaulting audit and encryption usage analysis
Tape vaulting audit and encryption usage analysisThomas Bronack
 
Optimizing the it and business environment through dashboards
Optimizing the it and business environment through dashboardsOptimizing the it and business environment through dashboards
Optimizing the it and business environment through dashboardsThomas Bronack
 
Achieving Enterprise Resiliency and Corporate Certification
Achieving Enterprise Resiliency and Corporate CertificationAchieving Enterprise Resiliency and Corporate Certification
Achieving Enterprise Resiliency and Corporate CertificationThomas Bronack
 

Viewers also liked (18)

Executive Presentation on adhering to Healthcare Industry compliance
Executive Presentation on adhering to Healthcare Industry complianceExecutive Presentation on adhering to Healthcare Industry compliance
Executive Presentation on adhering to Healthcare Industry compliance
 
Article on Emergency Management and Corporate Certification
Article on Emergency Management and Corporate CertificationArticle on Emergency Management and Corporate Certification
Article on Emergency Management and Corporate Certification
 
Exec Presentation on Achieving Enterprise Resiliency and Corporate Certification
Exec Presentation on Achieving Enterprise Resiliency and Corporate CertificationExec Presentation on Achieving Enterprise Resiliency and Corporate Certification
Exec Presentation on Achieving Enterprise Resiliency and Corporate Certification
 
Recovery and Compliance Services provided by Tom Bronack
Recovery and Compliance Services provided by Tom BronackRecovery and Compliance Services provided by Tom Bronack
Recovery and Compliance Services provided by Tom Bronack
 
Asset Management (Acquisition, Redeployment, and Termination)(
Asset Management (Acquisition, Redeployment, and Termination)(Asset Management (Acquisition, Redeployment, and Termination)(
Asset Management (Acquisition, Redeployment, and Termination)(
 
Smaller Presentation on Enterprise Resiliency and Corporate Certification
Smaller Presentation on Enterprise Resiliency and Corporate CertificationSmaller Presentation on Enterprise Resiliency and Corporate Certification
Smaller Presentation on Enterprise Resiliency and Corporate Certification
 
Updated Healthcare Industry Compliance Presentation
Updated Healthcare Industry Compliance PresentationUpdated Healthcare Industry Compliance Presentation
Updated Healthcare Industry Compliance Presentation
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 
Optimizing the IT and Business Environment
Optimizing the IT and Business EnvironmentOptimizing the IT and Business Environment
Optimizing the IT and Business Environment
 
Personnel Productivity System - Exec Pres
Personnel Productivity System - Exec PresPersonnel Productivity System - Exec Pres
Personnel Productivity System - Exec Pres
 
Auditing contingency Plans
Auditing contingency PlansAuditing contingency Plans
Auditing contingency Plans
 
Application migration guideline document
Application migration guideline documentApplication migration guideline document
Application migration guideline document
 
Utilizing Dashboards to improve efficiency
Utilizing Dashboards to improve efficiencyUtilizing Dashboards to improve efficiency
Utilizing Dashboards to improve efficiency
 
Dcag training on VMware DR Process
Dcag training on VMware DR ProcessDcag training on VMware DR Process
Dcag training on VMware DR Process
 
Achieving enterprise resiliency and corporate certification through the use o...
Achieving enterprise resiliency and corporate certification through the use o...Achieving enterprise resiliency and corporate certification through the use o...
Achieving enterprise resiliency and corporate certification through the use o...
 
Tape vaulting audit and encryption usage analysis
Tape vaulting audit and encryption usage analysisTape vaulting audit and encryption usage analysis
Tape vaulting audit and encryption usage analysis
 
Optimizing the it and business environment through dashboards
Optimizing the it and business environment through dashboardsOptimizing the it and business environment through dashboards
Optimizing the it and business environment through dashboards
 
Achieving Enterprise Resiliency and Corporate Certification
Achieving Enterprise Resiliency and Corporate CertificationAchieving Enterprise Resiliency and Corporate Certification
Achieving Enterprise Resiliency and Corporate Certification
 

Similar to Personnel Productivity System - Updated 6-6-2013

Full Presentation Sales Slideware
Full Presentation   Sales SlidewareFull Presentation   Sales Slideware
Full Presentation Sales Slidewareanilaphale
 
Ferdie Macatangay
Ferdie Macatangay Ferdie Macatangay
Ferdie Macatangay Ivanha Paz
 
Improve Employee Self Service With Bolt On Applications
Improve Employee Self Service With Bolt On Applications Improve Employee Self Service With Bolt On Applications
Improve Employee Self Service With Bolt On Applications LBi Software
 
How HR Technology Saves Time & Money
How HR Technology Saves Time & MoneyHow HR Technology Saves Time & Money
How HR Technology Saves Time & MoneyTom Daly
 
Business Chalenges for IT Sector
Business Chalenges for IT SectorBusiness Chalenges for IT Sector
Business Chalenges for IT SectorPeopleWorks IN
 
Mina_Meawad_DIR_Resume
Mina_Meawad_DIR_ResumeMina_Meawad_DIR_Resume
Mina_Meawad_DIR_ResumeMina Meawad
 
Reengineering helpdesk
Reengineering helpdeskReengineering helpdesk
Reengineering helpdeskloujswz
 
Nasanna tam lawler resume
Nasanna tam lawler resumeNasanna tam lawler resume
Nasanna tam lawler resumeNasanna Lawler
 
Adam Grant Resume
Adam Grant Resume Adam Grant Resume
Adam Grant Resume Adam Grant
 
Chesapeake IT ConsultantsBusiness Analysis and Syste
Chesapeake IT ConsultantsBusiness Analysis and SysteChesapeake IT ConsultantsBusiness Analysis and Syste
Chesapeake IT ConsultantsBusiness Analysis and SysteJinElias52
 
8 Benefits of Automated Performance Management
8 Benefits of Automated Performance Management8 Benefits of Automated Performance Management
8 Benefits of Automated Performance ManagementGroSum
 
Entitlements Management Strategy-White Paper
Entitlements Management Strategy-White PaperEntitlements Management Strategy-White Paper
Entitlements Management Strategy-White PaperAxis Technology, LLC
 
12 Guidelines For Success in Data Quality Projects
12 Guidelines For Success in Data Quality Projects12 Guidelines For Success in Data Quality Projects
12 Guidelines For Success in Data Quality ProjectsInnovative_Systems
 
Presentation Tms Webinar V08
Presentation Tms Webinar V08Presentation Tms Webinar V08
Presentation Tms Webinar V08CarolaMoore
 
Presentation Tms Webinar V08
Presentation Tms Webinar V08Presentation Tms Webinar V08
Presentation Tms Webinar V08CarolaMoore
 
Resume: Francine Wolfe 2009
Resume:  Francine Wolfe 2009Resume:  Francine Wolfe 2009
Resume: Francine Wolfe 2009fswolfe
 
Dev3 Presentation (Short)
Dev3 Presentation (Short)Dev3 Presentation (Short)
Dev3 Presentation (Short)ScottFriends
 

Similar to Personnel Productivity System - Updated 6-6-2013 (20)

5.11 lowry
5.11 lowry5.11 lowry
5.11 lowry
 
Full Presentation Sales Slideware
Full Presentation   Sales SlidewareFull Presentation   Sales Slideware
Full Presentation Sales Slideware
 
Ferdie Macatangay
Ferdie Macatangay Ferdie Macatangay
Ferdie Macatangay
 
Improve Employee Self Service With Bolt On Applications
Improve Employee Self Service With Bolt On Applications Improve Employee Self Service With Bolt On Applications
Improve Employee Self Service With Bolt On Applications
 
How HR Technology Saves Time & Money
How HR Technology Saves Time & MoneyHow HR Technology Saves Time & Money
How HR Technology Saves Time & Money
 
Business Chalenges for IT Sector
Business Chalenges for IT SectorBusiness Chalenges for IT Sector
Business Chalenges for IT Sector
 
Mina_Meawad_DIR_Resume
Mina_Meawad_DIR_ResumeMina_Meawad_DIR_Resume
Mina_Meawad_DIR_Resume
 
Reengineering helpdesk
Reengineering helpdeskReengineering helpdesk
Reengineering helpdesk
 
Nasanna tam lawler resume
Nasanna tam lawler resumeNasanna tam lawler resume
Nasanna tam lawler resume
 
Adam Grant Resume
Adam Grant Resume Adam Grant Resume
Adam Grant Resume
 
Chesapeake IT ConsultantsBusiness Analysis and Syste
Chesapeake IT ConsultantsBusiness Analysis and SysteChesapeake IT ConsultantsBusiness Analysis and Syste
Chesapeake IT ConsultantsBusiness Analysis and Syste
 
FastClose_EN
FastClose_ENFastClose_EN
FastClose_EN
 
8 Benefits of Automated Performance Management
8 Benefits of Automated Performance Management8 Benefits of Automated Performance Management
8 Benefits of Automated Performance Management
 
Entitlements Management Strategy-White Paper
Entitlements Management Strategy-White PaperEntitlements Management Strategy-White Paper
Entitlements Management Strategy-White Paper
 
KChronister_Resume_2016
KChronister_Resume_2016KChronister_Resume_2016
KChronister_Resume_2016
 
12 Guidelines For Success in Data Quality Projects
12 Guidelines For Success in Data Quality Projects12 Guidelines For Success in Data Quality Projects
12 Guidelines For Success in Data Quality Projects
 
Presentation Tms Webinar V08
Presentation Tms Webinar V08Presentation Tms Webinar V08
Presentation Tms Webinar V08
 
Presentation Tms Webinar V08
Presentation Tms Webinar V08Presentation Tms Webinar V08
Presentation Tms Webinar V08
 
Resume: Francine Wolfe 2009
Resume:  Francine Wolfe 2009Resume:  Francine Wolfe 2009
Resume: Francine Wolfe 2009
 
Dev3 Presentation (Short)
Dev3 Presentation (Short)Dev3 Presentation (Short)
Dev3 Presentation (Short)
 

Recently uploaded

Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 

Recently uploaded (20)

Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 

Personnel Productivity System - Updated 6-6-2013

  • 1. Personnel Productivity System Thomas J. Bronack, president Data Center Assistance Group, Inc. 15180 20th Avenue Whitestone, New York 11357 Phone: (718) 591-5553 Cell: (917) 673-6992 Email: bronackt@dcag.com This document is the property of the Data Center Assistance Group, Inc. (DCAG). Any use of the material contained within this document without the written permission of DCAG will be construed as an infringement on the Intellectual Property of DCAG, resulting in appropriate actions being taken. Contact DCAG should you want to utilize any of the data or concepts contained within this document. Origination Date: October 12, 2000 New Release Date: June 6, 2013 “Combining Workflow Management, Forms Management, Personnel Training, and Recruitment to better meet the needs of Business.” Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
  • 2. 6/6/2013 (c) Data Center Assistance Group, Inc. 2 Abstract  The two things people will always need are:  Training, and  A Job.  The two things most responsible for making a business successful are:  The quality of its staff, and  Controlling how work flows within its organization.  Now that technology enhancements to productivity are not returning the same percentage of improvements as in the past, companies must look inside for performance gains.  This presentations shows how you can achieve productivity gains by utilizing current technologies to optimize Workflow, Personnel Productivity, and Business Profit Margins. Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
  • 3. 6/6/2013 (c) Data Center Assistance Group, Inc. 3 Workflow is increasing and new technologies require training  Workflow is increasing as new applications and technologies are adopted into the IT Production Environment through the Systems Development Life Cycle (SDLC).  New technologies and procedures must be maintained to reflect changes and new functional responsibilities.  Problems and Enhancements can overburden the Maintenance process, especially since personnel are already struggling to maintain development efforts.  Version and Release Management adherence is suffering due to overworked personnel, which can result in more problems due to procedure mistakes and out- of-date information causing loss of confidence in documentation.  A method for matching personnel training levels and preparedness must be created to better respond to workload and new technology demands.  Employee skills levels must be documented and their career path desires listed so that every effort can be made to assist personnel achieve their goals, thereby insuring a happy staff and the retention of skilled personnel through company loyalty. Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
  • 4. 6/6/2013 (c) Data Center Assistance Group, Inc. 4 Systems Development Lifecycle Workflow overview (The many tasks performed in developing and maintaining applications and the IT Environment) Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
  • 5. 6/6/2013 (c) Data Center Assistance Group, Inc. 5 Request Processing Phases and Steps Schedule Request Interfaces Between Applications, QA, and Production Groups. Create Service Request Perform Technical Assessment Perform Business Assessment Perform Requested Work Application Group Testing Return to Submitter Create QA Turnover Package Submit to Production Control Successful Successful No Yes No Create Production Control Turnover Package QA Review And Accept Yes Error Loop Error Loop APPLICATIONS GROUP QA GROUP TESTING and QA Turnover Package Components:_________ • Service Form and results from Assessments, • Change & Release Notes, • Test Scenarios & Scripts, • Messages & Codes, and Recoveries, • Data for Regression and Normal Testing, • Application Group Testing Results, • Documentation. PRODUCTION CONTROL Turnover Package Components: • Explanation and Narrative, • Files to be released, • Predecessor Scheduling, • Special Instructions, • Risk Analysis, • Authorizations. Perform Requested Work QA Review Meeting Perform Post- Mortem CP # 1 CP # 2 CP # 3 Perform User Acceptance Testing Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance Checkpoints review past accomplishment and make go / no-go decisions regarding continuing work or changing directives.
  • 6. 6/6/2013 (c) Data Center Assistance Group, Inc. 6 The Problem and Your Most Valuable Resource  Organizations aren’t implementing Business Imperatives efficiently, due to employee awareness, training, and workflow deficiencies.  Cost overruns inhibit organizations, delaying productivity improvements, and reducing profit margins.  Personnel Productivity isn’t being measured and reported on, causing management decisions to be based on reactive and not proactive directives.  Workflow optimization methodologies are not being implemented, even though they would improve profits and enhance personnel productivity.  Service Level Agreements and Service Level Reporting methodologies should be expanded to include Personnel Productivity remedies that ensure optimal performance and business profit margins, while satisfying client service and revenue desires.  Companies should concentrate on employee needs more, to improve morale, productivity, and retention. After all, your employees are your most valuable resource. Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
  • 7. 6/6/2013 (c) Data Center Assistance Group, Inc. 7 Combining Workflow Management With Personnel and Training Systems to Optimize Productivity Workflow Management System Automated Training System Automated Personnel System Forms Origination through Completion, with Analysis and Reporting. Links to Personnel Training and Recruiting when new tools, procedures, and/or workloads mandate updating training or staff. Awareness, New Tools or Procedures. Provides certifications via vendor groups and accreditations through universities. Can assist employees achieve their career goals and improve retention and loyalty. Increased Workloads mandate staff increase / supplementation. Automating personnel requests and interfacing between recruitment and hiring managers will speed process and reduce costs. Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
  • 8. Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance 6/6/2013 (c) Data Center Assistance Group, Inc. 8 Workflow Management / Training System Interfaces & Flow (Request through fulfillment, with staffing increases and training as deemed necessary)
  • 9. 6/6/2013 (c) Data Center Assistance Group, Inc. 9 Workflow Management System Intranet Interface Applid / Userid / Pswd Workflow Management System Log Assign Track Measure Analyze Report Tracking Library Future Current Past Userid Pswd Responsibilities Restrictions Tables Queries Forms Reports Programs • Development • Maintenance (Enhancements and Problems) • Userid • Responsibility • Routing • Origin to End • User Interface • Audit Trail • Events • Duration • Problems • Normal Process • Problems • Durations • Comparisons • Management • Technical • Checkpoint • Trending • Future Analysis Automated Personnel System Automated Training System User Profiles DBMS Library Documentation Library Standards, Procedures, Manuals, etc. Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
  • 10. 6/6/2013 (c) Data Center Assistance Group, Inc. 10 Forms Management and Control System Work Order Forms Library Forms Router Personnel Matrix On-Going, or New Skills Training & Scheduling Recruitment & Placement Learning Skills Index (LSI) Certifications Accreditations Vendors Universities (Responsible for assigning work tasks to the right person at every project phase, while ensuring that skill requirements are met and the highest possible quality is achieved) WORK DEFINITIONS • Selection, • Form Definition, • Data Validation, • Authorization, • Assignment, • Routing (1st to Last), • Tracking & Logging, • Interactive Communications, • Changes & History, • Completion, • Acceptance, • Charge-Back, • Accounting, • Reporting. FORM LIFE-CYCLE(Contains all forms and their usage guides along with data entry validation for all form fields). Guarantees that Forms are completed properly and that personnel understand the forms meaning. • Job Title, • Job Description, • Functional Responsibilities, • Tools used and Skill Level needs, • Documentation Needs, • Current Skill Level, • Skill improvement needs, • Training Needs & Scheduling, and • Career Path. PERSONNEL ENTRY (Assign Form to the person responsible for work task and track) (All work is grouped as Current On-Going, or New, with Skills needed to perform tasks). Availability & Pooling (Agreements are made with Vendors and Universities to supply courses. Certification are provided when Successfully completed) User Interface is provided to assist user in selecting appropriate form needed to accomplish desired work request. Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
  • 11. 6/6/2013 (c) Data Center Assistance Group, Inc. 11 Connecting Workflow Management with Personnel Recruitment Project / Department Manager Project / Department Hiring Manager Search, by Geography / Skill Job Fairs to Recruit People Recruiting Companies Advertise by Newspapers Advertise by Internet Projects and Work Requests Staffing Requirements Staffing Requirements Business Department FIRE WALL Human Resource Management Personnel Department Human Resource Management Personnel Department INTRANET INTERNET COMPANY INTERNAL EXTERNAL TO THE COMPANY STAFF REQUEST STAFF REQUEST CLIENT DCAG AREA DIRECT SEARCH ADs Workflow Management System Automated Personnel System Hiring Base Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
  • 12. 6/6/2013 (c) Data Center Assistance Group, Inc. 12 Process description  Planning session is conducted to define new projects, enhancements, and maintenance requirements.  Available Resources are examined to determine if the skills and availability needed to support project requirements is present.  A determination is made for a consultant, permanent hire, or career path training is to be performed to meet resource requirements.  Consultants and new hires are sent to personnel hiring system, while career path resources are sent to the training system so that they can be trained in time to meet project time frames.  Resumes are sent to Hiring Manager, along with course completion certifications for personnel going through career path training, so that he can make the appropriate selection of resources needed to support project and workflow needs.  Personnel are assigned to projects or work functions to meet increased workloads or new technology requirements.  Functional Responsibilities and Job Descriptions are upgraded along with all required documentation to support new workloads and technologies. Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
  • 13. Why use this approach  Product and Service growth is supported to maintain client satisfaction;  Personnel growth is controlled in an efficient manner that best responds to needs while reducing the workload on existing staff;  Personnel satisfaction and loyalty is improved through career path satisfaction;  A happier and more loyal staff is achieved through these procedures, while workload and new technology demands are met in an efficient manner.  Management directives are better met and the company reputation is enhanced by loyal staff and clients. Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance 6/6/2013 (c) Data Center Assistance Group, Inc. 13
  • 14. 6/6/2013 (c) Data Center Assistance Group, Inc. 14 Benefits Derived from PPS Implementation  Reduced training costs and enhanced personnel skills.  Workflow Management and Control System to manage and report on WORK REQUEST FORMS from origination through completion, thereby allowing for optimization and benefiting from lessons learned.  Personnel Performance Analysis and Load Balancing Reports to help management determine personnel needs, in advance, so that PROACTIVE SOLUTIONS can be applied.  Quicker response to Business Imperatives and a higher degree of quality associated with deliverables.  More efficient employee performance evaluations through reports detailing skills and workflow achievements.  Better employee retention, job performance, and career planning, through system features and facilities that help employees achieve their career goals.  Optimal business productivity and profit margins.  Learning lessons from past work achievements are gained, so you can improve work flow and procedures, thereby optimizing performance. Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
  • 15. Sample Automated Personnel System 6/6/2013 (c) Data Center Assistance Group, Inc. 15 Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
  • 16. Automated Personnel System Features  Relational database system that ties jobs to clients to candidates, while allowing candidates to be connected to multiple jobs.  Detailed records for Clients and Candidates.  Keyword Skills Search for resumes in database.  Databases can be searched in order of free (submitted by candidate directly) or fee paid basis (submitted by other firms).  Job records tie job to client and candidate, with job description and history notes. Revenue projections are associated with client records.  Work is sorted by Next Action Date and Priority, so staff simply takes top record off of list, performs work, and documents results.  Drop-down list for clients and candidates to quickly locate desired information.  Complete reporting system to generate revenue projections and status reports for salesmen and recruiters.  Management dashboard to monitor activity and supply assistance as needed to speed up response to client demands. 6/6/2013 (c) Data Center Assistance Group, Inc. 16 Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance
  • 17. 6/6/2013 (c) Data Center Assistance Group, Inc. 17 Goals and Objectives  Conduct a NEEDS ANALYSIS to define: the organizational structure, employee job descriptions and workloads, employee skill requirements, and employee training requirements. Compare current training to needed training to evaluate staff skill levels. Then ensure the proper training of employees on all tools and procedures associated with their job tasks, define work form requirements and life cycles, and the reporting requirements needed to track workloads, skills, and training.  Create a STATEMENT OF WORK to implement the Personnel Productivity System (PPS) and optimize Employee Skills, Performance, and Work Flow Management.  Implement Learning Skills Index (LSI) for personnel that defines their present skills and future training requirements, based on job definitions and workloads.  Connect personnel to Computer Based Training modules needed to develop skills associated with their current positions and career paths.  Provide Accreditation and Certifications from universities and vendors.  Route Work Requests to personnel and track forms from inception to completion.  Provide reports on lifecycle and personnel performance associated with tasks needed to complete Work Request forms. Personnel Productivity System (PPS) Thomas Bronack Optimize Personnel Performance