http://www.iaeme.com/IJCIET/index.asp 399 editor@iaeme.com
International Journal of Civil Engineering and Technology (IJCIET)
Volume 10, Issue 06, June 2019, pp. 399-410, Article ID: IJCIET_10_06_038
Available online at http://www.iaeme.com/ijciet/issues.asp?JType=IJCIET&VType=10&IType=06
ISSN Print: 0976-6308 and ISSN Online: 0976-6316
© IAEME Publication
POSSIBILITY OF BIM TECHNOLOGY IN SITE
SAFETY ANALYSIS AT IRAQI CONSTRUCTION
INDUSTRY
Hayder Rezzaq Abed
Postgraduate Student, Department of Civil Engineering, University of Diyala, Baquba,
Diyala, Iraq
Wadhah Amer Hatem
Assistant Professor, Baquba Technical Institute, Middle Technical University, Baquba,
Diyala, Iraq
Nidal Adnan Jasim
Assistant Professor, Department of Civil Engineering, University of Diyala,
Baquba, Diyala, Iraq
ABSTRACT
Too many workers are exposed to injury and death in the construction industry each
year, due either to the weakness and neglect of the application of health and safety
measures or weaknesses in the identification of risks related to the construction site.
The approach to safety risk assessment and the development of site safety plans is based
on 2D drawings and handwritten, fragmented and uncoordinated notes. BIM is
characterized by its ability to create a virtual environment similar to reality based on
concepts of visualization and simulation. The purpose of this research is to study how
this technology can be used in Iraqi construction industry to identify risks at different
project stages and to find appropriate mitigation strategies. The results of comparing
the site safety plan by using a traditional method with the BIM technique showed that
the BIM technique is more accuracy in management and analysis of the work site.
Finally, the BIM technology showed that the application of the safety measures in site
will increase the duration of the project by (3.66%). Analytical study.
Keyword head: Safety, Risk, BIM, Visualization, Traditional approach, 4D.
Cite this Article: Hayder Rezzaq Abed, Wadhah Amer Hatem and Nidal Adnan
Jasim, Possibility of Bim Technology in Site Safety Analysis at Iraqi Construction
Industry. International Journal of Civil Engineering and Technology, 10(06), 2019,
pp. 399-410
http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=10&IType=06
Hayder Rezzaq Abed, Wadhah Amer Hatem and Nidal Adnan Jasim
http://www.iaeme.com/IJCIET/index.asp 400 editor@iaeme.com
1. INTRODUCTION
Health and Safety of the workplace is a global challenge to civilization and sustainable
development [1]. In fact, the weakness of government support in the implementation of safety
measures and the poor culture of workers in the importance of safety in construction sites is an
important cause of a large number of injuries [2]. Construction management tends to ignore
safety constraints during the construction process; therefore, unless making good integration
between construction management and safety management, any construction project cannot
arrive optimum benefits of the vital objectives i.e. cost, time [3].
Usually, contractors use CAD drawings in construction to plan safety. CAD system
provides isolated and static design process. These CAD model provide specific architectural
features, topological description of buildings, they are not suitable to identify hazards in job
site [4]. So according to the changing nature and complicated of the construction project,
manual checking is often error-prone and labor-intensive [5].
BIM is a process works on a single virtual model that provide more efficiently and
accurately than traditional process, also offers more collaborative among team member (client,
architect, contractor, engineer, suppliers) [6].
The advantage of BIM starting through using it in an early conceptual design stage, where
the owner will have benefit from that. BIM can help the owner through provides a conceptual
design based on his budget and target. Without any complex design team, the feasibility of the
project can be analyzed depending on developing the conceptual design. When the conceptual
design is decided, cost estimation can be calculated. Depending on the cost of the project and
its feasibility the modification of the concept and design of the project will be easy without any
additional costs or create multi design ideas and compared between them to improve the
building [7].
The employment of BIM technologies can effect in improving occupational safety by mean
of connecting the safety issues to construction planning, providing methods to manage and
visualize up-to-date plans, and site status information. The use of BIM encourages other project
stakeholders to share in both planning and risk assessment [8].
There is a certain belief that BIM technology is always useful in identifying and
communicating risks to the project team because BIM technology allows simulation of the real
conditions of the site [9].
2. MATERIALS & EXPERIMENTAL PROCEDURES
In this research, the researcher adopted on case study approach in analyzing safety problems
and with a view to being able to use benefit from the possibilities that BIM technology offered
to generate a platform that helps in identifying, managing multiple hazards depending on the
concept of visualization and simulation, through creating a 4D BIM model that is somewhat
consistent with the realistic work site, then linking the safety guidelines (OSHA rules
(Occupational Safety and Health Adminstration,US), Iraqi Safety Blog) to this model. For this
research, the researcher used the following technology in site safety analysis:
 Visualization.
 Simulation.
 Animation.
The software uses for this research is: Revit software which consider one of the best
software in modeling, to model the case study, Synchro software, which is one of the best
Possibility of Bim Technology in Site Safety Analysis at Iraqi Construction Industry
http://www.iaeme.com/IJCIET/index.asp 401 editor@iaeme.com
programs used in the field of 4D planning and safety analysis, MS project to create scheduling.
Figure (1) explains the framework of the safety analysis workflow:
Figure 1. Shows framework of the safety analysis workflow
2.1. Creating 3D Model of Case Study
For this research, Secondary School Building (16 Class) in Thi-qar province was adopted as a
case study. This type of project considers widespread in Iraq. This case consists of seven
buildings. Each building differs from another in dimensions. The total area of the project is
(8848 m2). The other details about the project summarized as following:
 Start date: January 2014
 The project is incomplete and stalled due to the economic crisis in the country
 Type of Contract is unit price contract.
 Height of (classrooms, Administration, Laboratory) Buildings is 7.36m
 Height of Assembly building 6.18m
 Height of (students’ toilets, guard room) is 3m
 Ground floor begins from level (0.5) to level (3.68)
 First Level begins from level (3.68) to level (7.36)
Figure (2) explain the 3D model of the secondary school building created by Revit
software:
Figure 2. Shows 3D BIM model of case study
Hayder Rezzaq Abed, Wadhah Amer Hatem and Nidal Adnan Jasim
http://www.iaeme.com/IJCIET/index.asp 402 editor@iaeme.com
2.2. Creating Time Schedules
The researcher created a time schedule of the projects by using M.S project software (Microsoft
project) which considers one of the important software in construction management, which
includes activities description, duration of activities and the relationship between them.
2.3. Creating 4D Model of Case Study
The researcher imports SPX file that exported from Revit software to Synchro software. The
time schedule was imported as an XML file to Synchro Software, then transforming the 3D
model to the 4D model to create a virtual simulation for the construction sequences, and adding
animation for workers and machines to be the site more reality Figure (3) shows 4D model:
Figure 3. Shows 4D model of case study
3. SITE SAFETY ANALYSIS AND MANAGEMENT BY BIM AND
TRADITIONAL APPROACH
In this research, the researcher depends upon five safety executors, their experience ranging
from 3 to 13 years. The HSE (Health and Safety Executors) suggested that two plans be
prepared to study site safety analysis:
1. Site safety arrangements: for traffic, storage, entrances, and site fencing.
2. Emergency response plan for the site.
The HSE will prepare traditional site safety plans by using 2D drawings to identify any
hazards or any necessary arrangement related to the construction project, then shows the 4D
model as dynamic model for them to identify hazards and to compare results of 2D with results
of 4D, to see which one is a better approach in identifying hazards and using a suitable safety
equipment.
4. RESULTS OF SITE SAFETY ANALYSIS
4.1. Site Safety Arrangement
The HSE will prepare a construction site plan which shows how the site area will be used for
arranging the required construction operations, then analyzing and identifying the hazards
relating to this arrangement. According to OSHA and Iraqi Safety Blog, the site layout plan
should include:
 Site preparation (location and number of office facilities).
Possibility of Bim Technology in Site Safety Analysis at Iraqi Construction Industry
http://www.iaeme.com/IJCIET/index.asp 403 editor@iaeme.com
 Construction of storage areas for building materials and loading away from workers'
movement.
 Organizing the traffic inside the site during the different stages of the work to ensure
the safety of workers from the movement of vehicles
 Keep the site clean by collecting and removing work waste that may be hazardous
to workers
Figure (4) shows the traditional site safety plan depending on 2D drawings:
Figure 4. Shows traditional site safety plan
When compared this plan with the 4D BIM model, the results were the followings:
1. They explained the 4D model is more realistic than 2D drawings, that can help in
the daily training of workers on the details of the site that maybe change during any
period of time. Figures (5), (6) show that:
Figure 5. Shows installing exterior temporary fence
Figure 6. Shows changing in details of the site in different period
Hayder Rezzaq Abed, Wadhah Amer Hatem and Nidal Adnan Jasim
http://www.iaeme.com/IJCIET/index.asp 404 editor@iaeme.com
2. With the help of the 4D BIM model, the HSE noted that 29 days after the project
began, there would be a conflict between the location of the caravan No. 3 and the
excavator used to drill the footing of the outer fence, and therefore the presence of
the caravan at this place would endanger the lives of its occupants. Figure (7) shows
that:
Figure 7. Explain conflict the excavator with caravan no.3
3. They found that the road between the buildings will be narrow over a certain period
of time due to excavation work and because of the use of safety barriers around
these excavations, where the 4D model shows that the width of this road may reach
less than 3m; therefore, the machines cannot move safely because of maybe lead to
overturning in the excavations. Figure (8) shows that:
Figure 8. Shows narrow roads of the site between the buildings
Then, they found after (86 day) from beginning the project, it is possible to increase the
width of the road after finishing backfilling works, figure (9) shows that, while the road
between the assembly building and the administration building cannot use it until finishing
installation works of steel structure because of the danger from the crane machines, figure (10)
shows that:
Possibility of Bim Technology in Site Safety Analysis at Iraqi Construction Industry
http://www.iaeme.com/IJCIET/index.asp 405 editor@iaeme.com
Figure 9. Increase width of road Figure 10. Explain hazard in this part of road between
classrooms and laboratory between assembly building and administration
4. According to the problems that appeared in point 1, 2, the HSE found it necessary
to create new arrangements for the site. With helping of 4DBIM model, they found
an ability to create a new entrance between the administration building and the
building of the classrooms, and they proposed to make this entrance just for workers
and placing a caravan no. 3 in the new entrance to check the workers' wearing of
safety equipment. Figure (11) shows that:
Figure 11. Shows the new proposed entrance for workers
Since it was difficult to use the previous entrance due to excavation work and subsequent
installation works of the steel structure and to minimize the movement of the machines inside
the site to maintain workers' safety, the HSE proposed creating a new entrance allowing only
the mechanisms to reach for the administration building and guard room. Figure (12) shows
that:
Figure 12. Shows the proposed entrance reach to Administration building
Hayder Rezzaq Abed, Wadhah Amer Hatem and Nidal Adnan Jasim
http://www.iaeme.com/IJCIET/index.asp 406 editor@iaeme.com
5. Through the 4D model, the HSE found that the storage space of the materials
installed in the 2D drawings can be adopted because it does not conflict with the
site's works at all time, and create a special entrance for materials trucks. Figure
(13) shows that:
Figure 13. Shows the temporary fence around materials inside site
6. The HSE believes that the BIM 4D model is more accurate in showing all the details
of the site, especially showing the lighting of the location and the monitoring
system, which is somewhat inaccurate and unclear in the 2D drawings, where these
things are often handwritten notes. Figure (14), (15) show that:
Figure 14. Shows the location of cameras Figure 15. Shows location of lighting
7. During the 4D model, traffic can be organized at the site during different project
durations, while that would be complex or may be impossible in the 2D model
because of that need multiple schemes for each scenario, while in the 4D model all
scenarios in a single model. Figure (16) (17) show that:
Figure 16. Shows the traffic barriers during Figure 17. Shows location of traffic
cast of footing for safe site. barriers to explain hazard from machine
Possibility of Bim Technology in Site Safety Analysis at Iraqi Construction Industry
http://www.iaeme.com/IJCIET/index.asp 407 editor@iaeme.com
4.2. Emergency Response Plan
According to Iraqi safety blog and OSHA, the emergency plan should have:
 Prepare copies of the emergency plan to ensure the safety of workers.
 These copies should explain the exit routes and places of emergency equipment and
first aids.
 Identifying materials which are potential fire hazards.
 Two exit routes at least must be available in the workplace to allow prompt
evacuation of workers
 Provides training to workers with regard to fire hazards or other hazards which they
may be exposed.
Figure (18) explains the emergency action plan in 2D drawings was:
Figure 18. Emergency response plan by traditional approach
Where the HSE drawings show the escape routes and the location of the signs of the exits,
in addition, show the places of fire extinguishers, first aids in the site. The results from
comparison with the 4D BIM model were:
8. Through the 4D model, the HSE have found the possibility of using the workers'
entrance as the third exit for emergencies. The 4D model is more realistic for
emergency roads compared to 2D schemes. Figure (19) shows emergency route
with red color, and figure (20) shows emergency signs.
Figure 19. Shows the emergency routes Figure 20. Shows the emergency sign
9. The 4D model explained that during the first month of the project there is one place
containing first- aid and fire extinguishers (other caravans were not installed due to
excavation works). Figure (21) explains that. Then, in February month, fire
extinguishers and first-aid are providing at each caravan and near storage of
Hayder Rezzaq Abed, Wadhah Amer Hatem and Nidal Adnan Jasim
http://www.iaeme.com/IJCIET/index.asp 408 editor@iaeme.com
materials. This will make workers aware of emergency equipment places during
project times. Figure (22) explain that:
Figure 21. show the first aid and extinguishers Figure 22. Show first aid and extinguishers in in
first month February month
10. After (6 months) from beginning the project, the HSE discovered through the 4D
BIM model, that during the timber framework of the first floor of the buildings there
is a danger of the exposure of these timbers for fires, so they found it necessary to
use the escape ladder for each building and put an emergency sign to explain that it
is only for emergencies. The reason for using the emergency ladder and not relying
on the building stair is contains the wooden columns that support the roof shuttering
figures (23), (24) show that:
Figure 23. Shows emergency ladder for Figure 24. Shows emergency ladder for
administration building classroom building
11. The HSE engineers find that the 4D model can be used to train workers on how to
use emergency routes, first-aid places, and fire extinguishers at any time in the
project, through create training movie, while in the 2D drawings will be so difficult.
Figures (25) shows creating animation movie for a project during different times:
Possibility of Bim Technology in Site Safety Analysis at Iraqi Construction Industry
http://www.iaeme.com/IJCIET/index.asp 409 editor@iaeme.com
Figure 25. Shows ability of the software in record training movies for safe arrangement of site to train
workers
4.3. Effect Safety Analysis on Total Time of Project
In fact, the implementation of the safety measures led to an increase in the time of the project.
The planning engineers found it difficult to determine the increase based on the traditional
methods due to the overlap of works and changes in the site, while they found that it is very
easy to calculate the exact additional time the 4D model. Table 1 show this increase:
Table 1 Shows effect of safety procedure on the project time
No. Description Details
1 Duration of project without safety procedure 300
2 Duration of project with safety procedure 311
3 The percentage of increase of time 3.66%
Note: percentage of increase = ((duration with safety - duration without safety)/ duration
without safety) * 100%
= ((311-300)/300) *100% = 3.666%
5. CONCLUSION
In Iraq, the construction industry has caused more injuries and deaths than in other industries.
This is due to the weakness of knowledge of the concept of safety by designers, which results
in many of the safety hazards inherent in the project drawings. In fact, it is difficult for
contractors to identify all safety risks at the planning and pre-construction stage of a project.
BIM technology can help to create an environment that is similar to the real environment
through which the problems related to the safety of workers and equipment will be solved and
provide a safe working environment. For this reason, BIM technology can help improve site
safety by linking the four-dimensional BIM model to safety regulations (OSHA and Iraqi
Safety Blog).
This research seeks to demonstrate the weakness of traditional risk management methods
based on 2D drawings, and to improve workplace safety through the use of BIM technology to
assist safety managers in accurately identifying risks to different phases of the project, finding
appropriate strategies for site safety and preventing any conflicts or Delay due to the application
of safety measures. Safety managers through comparisons, explain that BIM was more accurate
and more realistic in identifying risks to the workplace and it will be a good tool to solve all
Hayder Rezzaq Abed, Wadhah Amer Hatem and Nidal Adnan Jasim
http://www.iaeme.com/IJCIET/index.asp 410 editor@iaeme.com
safety problem in the planning stage before physical build. Finally, the BIM technology
explained that the application of the safety measures at the site will increase the project duration
by (3.66%).
REFERENCES
[1] Peter Uchenna Okoye, John Ugochukwu Ezeokonkwo, Fidelis Okechukwu Ezeokoli.
Building Construction Workers’ Health and Safety Knowledge and Compliance on Site.
Journal of Safety Engineering, 5(1), 2016, pp 17-26.
[2] Hatem, W, A., Evaluation of Safety Systems in Iraqi Construction Projects, International
Journal of Applied Engineering Research. 12, 2017, pp. 11714-11726.
[3] Vacharapoom Benjaoran, Sdhabhon Bhokha. An Integrated Safety Management with
Construction Management Using 4D CAD Model. Journal of Safety Science, 48, 2009, pp
395-403.
[4] Rozenfeld, O., Sacks, R. and Rozenfeld, J. Construction Hazard Assessment with Spatial
and Temporal Exposure. Journal of Construction Management and Economics, 27(7),
2009, pp 625-638.
[5] Zhang, S., Teizer, J., Lee, J.-K., Eastman, C.M., Venugopal, M. Building information
modeling (BIM) and safety: automatic safety checking of construction models and
schedules. Journal Automation in Construction. 29, 2013, pp 183–195.
[6] Azhar, K., Khalfan, & M., Maqsood, T., Building Information Modelling (BIM): Now and
Beyond. Australasian Journal of Construction Economics and Building. 12 (4), 2012, pp
15-28.
[7] Estman, C., Teicholz, P., Sacks, R. and Liston, K. BIM Handbook: AGuide to Building
Information Modeling for Owners, Managers, Designers, Engineers and Constructors, 2nd
ed. John Wiley and Sons, NY, 2011.
[8] Sulvankivi, K.; Teizer, J., Kiviniemi, M.; Eastman, C.M., Zhang, S., and Kim, K.
Framework for integrating safety into Building Information Modelling. Proceeding of the
CIB W099 International Conference on “Modelling and Building Health and Safety”,
2012, Singapore, pp 93-100.
[9] Azhar, S., Behringer, A., Sattineni, A., & Mqsood, T. BIM for Facilitating Construction
Safety Planning and Management at Jobsites. In Proceedings of the CIB-W099
International Conference: Modelling and Building Safety, Singapore, 2012, pp 82-92

More Related Content

What's hot

3D and bim technology for construction safety morning section final version...
3D and bim technology for construction safety   morning section final version...3D and bim technology for construction safety   morning section final version...
3D and bim technology for construction safety morning section final version...Stephen Au
 
Mechanical Engineers in Corporate world
Mechanical Engineers in Corporate worldMechanical Engineers in Corporate world
Mechanical Engineers in Corporate worldvivatechijri
 
A Review on Challenges Involved in Implementing Building Information Modeling...
A Review on Challenges Involved in Implementing Building Information Modeling...A Review on Challenges Involved in Implementing Building Information Modeling...
A Review on Challenges Involved in Implementing Building Information Modeling...IRJET Journal
 
IRJET- Safety Management in Construction Sites – Fall From Height
IRJET- Safety Management in Construction Sites – Fall From HeightIRJET- Safety Management in Construction Sites – Fall From Height
IRJET- Safety Management in Construction Sites – Fall From HeightIRJET Journal
 
IRJET- Building Information Modeling (BIM) Survey in Surat,Gujarat
IRJET-  	  Building Information Modeling (BIM) Survey in Surat,GujaratIRJET-  	  Building Information Modeling (BIM) Survey in Surat,Gujarat
IRJET- Building Information Modeling (BIM) Survey in Surat,GujaratIRJET Journal
 
Courses in engineering
Courses in engineeringCourses in engineering
Courses in engineeringAmit Kumar
 
Mechanical engineers and society
Mechanical engineers and societyMechanical engineers and society
Mechanical engineers and societyVeerakumar S
 
Natural Gas & Oil Industry: CAD Skills and Career Opportunities
Natural Gas & Oil Industry: CAD Skills and Career OpportunitiesNatural Gas & Oil Industry: CAD Skills and Career Opportunities
Natural Gas & Oil Industry: CAD Skills and Career OpportunitiesPittsburgh Technical Institute
 
E0371019024
E0371019024E0371019024
E0371019024theijes
 
Importance of Teaching Automation
Importance of Teaching AutomationImportance of Teaching Automation
Importance of Teaching AutomationPramod Raichurkar
 
IRJET- Comparative Study of 3D Printer
IRJET- Comparative Study of 3D PrinterIRJET- Comparative Study of 3D Printer
IRJET- Comparative Study of 3D PrinterIRJET Journal
 
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at NagapattinamIRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at NagapattinamIRJET Journal
 
IRJET- Study of Innovative Technologies for Effective Construction and Manage...
IRJET- Study of Innovative Technologies for Effective Construction and Manage...IRJET- Study of Innovative Technologies for Effective Construction and Manage...
IRJET- Study of Innovative Technologies for Effective Construction and Manage...IRJET Journal
 
Benefits and Barriers of BIM Adoption in the Iraqi Construction Firms
Benefits and Barriers of BIM Adoption in the Iraqi Construction FirmsBenefits and Barriers of BIM Adoption in the Iraqi Construction Firms
Benefits and Barriers of BIM Adoption in the Iraqi Construction FirmsAM Publications
 
Augmented Reality to Access Dam Cracks Information
Augmented Reality to Access Dam Cracks InformationAugmented Reality to Access Dam Cracks Information
Augmented Reality to Access Dam Cracks InformationIJERA Editor
 
Engineering v drafting
Engineering v draftingEngineering v drafting
Engineering v draftingShelly Wilke
 
IRJET- Literature Review on Use of Simulation Modeling for Scheduling in ...
IRJET-  	  Literature Review on Use of Simulation Modeling for Scheduling in ...IRJET-  	  Literature Review on Use of Simulation Modeling for Scheduling in ...
IRJET- Literature Review on Use of Simulation Modeling for Scheduling in ...IRJET Journal
 

What's hot (20)

3D and bim technology for construction safety morning section final version...
3D and bim technology for construction safety   morning section final version...3D and bim technology for construction safety   morning section final version...
3D and bim technology for construction safety morning section final version...
 
Mechanical Engineers in Corporate world
Mechanical Engineers in Corporate worldMechanical Engineers in Corporate world
Mechanical Engineers in Corporate world
 
A Review on Challenges Involved in Implementing Building Information Modeling...
A Review on Challenges Involved in Implementing Building Information Modeling...A Review on Challenges Involved in Implementing Building Information Modeling...
A Review on Challenges Involved in Implementing Building Information Modeling...
 
IRJET- Safety Management in Construction Sites – Fall From Height
IRJET- Safety Management in Construction Sites – Fall From HeightIRJET- Safety Management in Construction Sites – Fall From Height
IRJET- Safety Management in Construction Sites – Fall From Height
 
IRJET- Building Information Modeling (BIM) Survey in Surat,Gujarat
IRJET-  	  Building Information Modeling (BIM) Survey in Surat,GujaratIRJET-  	  Building Information Modeling (BIM) Survey in Surat,Gujarat
IRJET- Building Information Modeling (BIM) Survey in Surat,Gujarat
 
Courses in engineering
Courses in engineeringCourses in engineering
Courses in engineering
 
Mechanical engineers and society
Mechanical engineers and societyMechanical engineers and society
Mechanical engineers and society
 
Natural Gas & Oil Industry: CAD Skills and Career Opportunities
Natural Gas & Oil Industry: CAD Skills and Career OpportunitiesNatural Gas & Oil Industry: CAD Skills and Career Opportunities
Natural Gas & Oil Industry: CAD Skills and Career Opportunities
 
E0371019024
E0371019024E0371019024
E0371019024
 
Importance of Teaching Automation
Importance of Teaching AutomationImportance of Teaching Automation
Importance of Teaching Automation
 
IRJET- Comparative Study of 3D Printer
IRJET- Comparative Study of 3D PrinterIRJET- Comparative Study of 3D Printer
IRJET- Comparative Study of 3D Printer
 
afolabi391-1
afolabi391-1afolabi391-1
afolabi391-1
 
Review on Application of Augmented Reality in Civil Engineering
Review on Application of Augmented Reality in Civil EngineeringReview on Application of Augmented Reality in Civil Engineering
Review on Application of Augmented Reality in Civil Engineering
 
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at NagapattinamIRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
 
IRJET- Study of Innovative Technologies for Effective Construction and Manage...
IRJET- Study of Innovative Technologies for Effective Construction and Manage...IRJET- Study of Innovative Technologies for Effective Construction and Manage...
IRJET- Study of Innovative Technologies for Effective Construction and Manage...
 
Bim adoptation to sri lanka
Bim adoptation to sri lanka Bim adoptation to sri lanka
Bim adoptation to sri lanka
 
Benefits and Barriers of BIM Adoption in the Iraqi Construction Firms
Benefits and Barriers of BIM Adoption in the Iraqi Construction FirmsBenefits and Barriers of BIM Adoption in the Iraqi Construction Firms
Benefits and Barriers of BIM Adoption in the Iraqi Construction Firms
 
Augmented Reality to Access Dam Cracks Information
Augmented Reality to Access Dam Cracks InformationAugmented Reality to Access Dam Cracks Information
Augmented Reality to Access Dam Cracks Information
 
Engineering v drafting
Engineering v draftingEngineering v drafting
Engineering v drafting
 
IRJET- Literature Review on Use of Simulation Modeling for Scheduling in ...
IRJET-  	  Literature Review on Use of Simulation Modeling for Scheduling in ...IRJET-  	  Literature Review on Use of Simulation Modeling for Scheduling in ...
IRJET- Literature Review on Use of Simulation Modeling for Scheduling in ...
 

Similar to POSSIBILITY OF BIM TECHNOLOGY IN SITE SAFETY ANALYSIS AT IRAQI CONSTRUCTION INDUSTRY

BIM as a Design and Safety Tool for Construction Projects
BIM as a Design and Safety Tool for Construction ProjectsBIM as a Design and Safety Tool for Construction Projects
BIM as a Design and Safety Tool for Construction ProjectsIRJET Journal
 
IRJET- Artificial Intelligence Enabled Safety for Construction Sites
IRJET- Artificial Intelligence Enabled Safety for Construction SitesIRJET- Artificial Intelligence Enabled Safety for Construction Sites
IRJET- Artificial Intelligence Enabled Safety for Construction SitesIRJET Journal
 
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET Journal
 
4D_BIM_for_Construction_Planning_and_Environmental.pdf
4D_BIM_for_Construction_Planning_and_Environmental.pdf4D_BIM_for_Construction_Planning_and_Environmental.pdf
4D_BIM_for_Construction_Planning_and_Environmental.pdfSemra D.
 
Application of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectIRJET Journal
 
Application Of Building Information Modeling (BIM) To Civil Engineering Projects
Application Of Building Information Modeling (BIM) To Civil Engineering ProjectsApplication Of Building Information Modeling (BIM) To Civil Engineering Projects
Application Of Building Information Modeling (BIM) To Civil Engineering ProjectsMichele Thomas
 
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...IRJET Journal
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET Journal
 
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET Journal
 
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...IRJET Journal
 
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET Journal
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
Construction Cost Prediction by Using Building Information Modeling
Construction Cost Prediction by Using Building Information ModelingConstruction Cost Prediction by Using Building Information Modeling
Construction Cost Prediction by Using Building Information ModelingIJERA Editor
 
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...IRJET Journal
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling reportKiran Birdi
 
Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...IRJET Journal
 
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit ModelIRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit ModelIRJET Journal
 
Web Development in Advanced Threat Prevention
Web Development in Advanced Threat PreventionWeb Development in Advanced Threat Prevention
Web Development in Advanced Threat PreventionIRJET Journal
 

Similar to POSSIBILITY OF BIM TECHNOLOGY IN SITE SAFETY ANALYSIS AT IRAQI CONSTRUCTION INDUSTRY (20)

BIM as a Design and Safety Tool for Construction Projects
BIM as a Design and Safety Tool for Construction ProjectsBIM as a Design and Safety Tool for Construction Projects
BIM as a Design and Safety Tool for Construction Projects
 
IRJET- Artificial Intelligence Enabled Safety for Construction Sites
IRJET- Artificial Intelligence Enabled Safety for Construction SitesIRJET- Artificial Intelligence Enabled Safety for Construction Sites
IRJET- Artificial Intelligence Enabled Safety for Construction Sites
 
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
 
4D_BIM_for_Construction_Planning_and_Environmental.pdf
4D_BIM_for_Construction_Planning_and_Environmental.pdf4D_BIM_for_Construction_Planning_and_Environmental.pdf
4D_BIM_for_Construction_Planning_and_Environmental.pdf
 
Application of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction Project
 
Application Of Building Information Modeling (BIM) To Civil Engineering Projects
Application Of Building Information Modeling (BIM) To Civil Engineering ProjectsApplication Of Building Information Modeling (BIM) To Civil Engineering Projects
Application Of Building Information Modeling (BIM) To Civil Engineering Projects
 
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
 
Ijebea14 244
Ijebea14 244Ijebea14 244
Ijebea14 244
 
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
 
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...
 
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
 
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
 
Construction Cost Prediction by Using Building Information Modeling
Construction Cost Prediction by Using Building Information ModelingConstruction Cost Prediction by Using Building Information Modeling
Construction Cost Prediction by Using Building Information Modeling
 
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling report
 
Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...
 
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit ModelIRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
 
Web Development in Advanced Threat Prevention
Web Development in Advanced Threat PreventionWeb Development in Advanced Threat Prevention
Web Development in Advanced Threat Prevention
 

More from IAEME Publication

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME Publication
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...IAEME Publication
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSIAEME Publication
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSIAEME Publication
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSIAEME Publication
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSIAEME Publication
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOIAEME Publication
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IAEME Publication
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYIAEME Publication
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...IAEME Publication
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEIAEME Publication
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...IAEME Publication
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...IAEME Publication
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...IAEME Publication
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...IAEME Publication
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...IAEME Publication
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...IAEME Publication
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...IAEME Publication
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...IAEME Publication
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTIAEME Publication
 

More from IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
 

Recently uploaded

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 

Recently uploaded (20)

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 

POSSIBILITY OF BIM TECHNOLOGY IN SITE SAFETY ANALYSIS AT IRAQI CONSTRUCTION INDUSTRY

  • 1. http://www.iaeme.com/IJCIET/index.asp 399 editor@iaeme.com International Journal of Civil Engineering and Technology (IJCIET) Volume 10, Issue 06, June 2019, pp. 399-410, Article ID: IJCIET_10_06_038 Available online at http://www.iaeme.com/ijciet/issues.asp?JType=IJCIET&VType=10&IType=06 ISSN Print: 0976-6308 and ISSN Online: 0976-6316 © IAEME Publication POSSIBILITY OF BIM TECHNOLOGY IN SITE SAFETY ANALYSIS AT IRAQI CONSTRUCTION INDUSTRY Hayder Rezzaq Abed Postgraduate Student, Department of Civil Engineering, University of Diyala, Baquba, Diyala, Iraq Wadhah Amer Hatem Assistant Professor, Baquba Technical Institute, Middle Technical University, Baquba, Diyala, Iraq Nidal Adnan Jasim Assistant Professor, Department of Civil Engineering, University of Diyala, Baquba, Diyala, Iraq ABSTRACT Too many workers are exposed to injury and death in the construction industry each year, due either to the weakness and neglect of the application of health and safety measures or weaknesses in the identification of risks related to the construction site. The approach to safety risk assessment and the development of site safety plans is based on 2D drawings and handwritten, fragmented and uncoordinated notes. BIM is characterized by its ability to create a virtual environment similar to reality based on concepts of visualization and simulation. The purpose of this research is to study how this technology can be used in Iraqi construction industry to identify risks at different project stages and to find appropriate mitigation strategies. The results of comparing the site safety plan by using a traditional method with the BIM technique showed that the BIM technique is more accuracy in management and analysis of the work site. Finally, the BIM technology showed that the application of the safety measures in site will increase the duration of the project by (3.66%). Analytical study. Keyword head: Safety, Risk, BIM, Visualization, Traditional approach, 4D. Cite this Article: Hayder Rezzaq Abed, Wadhah Amer Hatem and Nidal Adnan Jasim, Possibility of Bim Technology in Site Safety Analysis at Iraqi Construction Industry. International Journal of Civil Engineering and Technology, 10(06), 2019, pp. 399-410 http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=10&IType=06
  • 2. Hayder Rezzaq Abed, Wadhah Amer Hatem and Nidal Adnan Jasim http://www.iaeme.com/IJCIET/index.asp 400 editor@iaeme.com 1. INTRODUCTION Health and Safety of the workplace is a global challenge to civilization and sustainable development [1]. In fact, the weakness of government support in the implementation of safety measures and the poor culture of workers in the importance of safety in construction sites is an important cause of a large number of injuries [2]. Construction management tends to ignore safety constraints during the construction process; therefore, unless making good integration between construction management and safety management, any construction project cannot arrive optimum benefits of the vital objectives i.e. cost, time [3]. Usually, contractors use CAD drawings in construction to plan safety. CAD system provides isolated and static design process. These CAD model provide specific architectural features, topological description of buildings, they are not suitable to identify hazards in job site [4]. So according to the changing nature and complicated of the construction project, manual checking is often error-prone and labor-intensive [5]. BIM is a process works on a single virtual model that provide more efficiently and accurately than traditional process, also offers more collaborative among team member (client, architect, contractor, engineer, suppliers) [6]. The advantage of BIM starting through using it in an early conceptual design stage, where the owner will have benefit from that. BIM can help the owner through provides a conceptual design based on his budget and target. Without any complex design team, the feasibility of the project can be analyzed depending on developing the conceptual design. When the conceptual design is decided, cost estimation can be calculated. Depending on the cost of the project and its feasibility the modification of the concept and design of the project will be easy without any additional costs or create multi design ideas and compared between them to improve the building [7]. The employment of BIM technologies can effect in improving occupational safety by mean of connecting the safety issues to construction planning, providing methods to manage and visualize up-to-date plans, and site status information. The use of BIM encourages other project stakeholders to share in both planning and risk assessment [8]. There is a certain belief that BIM technology is always useful in identifying and communicating risks to the project team because BIM technology allows simulation of the real conditions of the site [9]. 2. MATERIALS & EXPERIMENTAL PROCEDURES In this research, the researcher adopted on case study approach in analyzing safety problems and with a view to being able to use benefit from the possibilities that BIM technology offered to generate a platform that helps in identifying, managing multiple hazards depending on the concept of visualization and simulation, through creating a 4D BIM model that is somewhat consistent with the realistic work site, then linking the safety guidelines (OSHA rules (Occupational Safety and Health Adminstration,US), Iraqi Safety Blog) to this model. For this research, the researcher used the following technology in site safety analysis:  Visualization.  Simulation.  Animation. The software uses for this research is: Revit software which consider one of the best software in modeling, to model the case study, Synchro software, which is one of the best
  • 3. Possibility of Bim Technology in Site Safety Analysis at Iraqi Construction Industry http://www.iaeme.com/IJCIET/index.asp 401 editor@iaeme.com programs used in the field of 4D planning and safety analysis, MS project to create scheduling. Figure (1) explains the framework of the safety analysis workflow: Figure 1. Shows framework of the safety analysis workflow 2.1. Creating 3D Model of Case Study For this research, Secondary School Building (16 Class) in Thi-qar province was adopted as a case study. This type of project considers widespread in Iraq. This case consists of seven buildings. Each building differs from another in dimensions. The total area of the project is (8848 m2). The other details about the project summarized as following:  Start date: January 2014  The project is incomplete and stalled due to the economic crisis in the country  Type of Contract is unit price contract.  Height of (classrooms, Administration, Laboratory) Buildings is 7.36m  Height of Assembly building 6.18m  Height of (students’ toilets, guard room) is 3m  Ground floor begins from level (0.5) to level (3.68)  First Level begins from level (3.68) to level (7.36) Figure (2) explain the 3D model of the secondary school building created by Revit software: Figure 2. Shows 3D BIM model of case study
  • 4. Hayder Rezzaq Abed, Wadhah Amer Hatem and Nidal Adnan Jasim http://www.iaeme.com/IJCIET/index.asp 402 editor@iaeme.com 2.2. Creating Time Schedules The researcher created a time schedule of the projects by using M.S project software (Microsoft project) which considers one of the important software in construction management, which includes activities description, duration of activities and the relationship between them. 2.3. Creating 4D Model of Case Study The researcher imports SPX file that exported from Revit software to Synchro software. The time schedule was imported as an XML file to Synchro Software, then transforming the 3D model to the 4D model to create a virtual simulation for the construction sequences, and adding animation for workers and machines to be the site more reality Figure (3) shows 4D model: Figure 3. Shows 4D model of case study 3. SITE SAFETY ANALYSIS AND MANAGEMENT BY BIM AND TRADITIONAL APPROACH In this research, the researcher depends upon five safety executors, their experience ranging from 3 to 13 years. The HSE (Health and Safety Executors) suggested that two plans be prepared to study site safety analysis: 1. Site safety arrangements: for traffic, storage, entrances, and site fencing. 2. Emergency response plan for the site. The HSE will prepare traditional site safety plans by using 2D drawings to identify any hazards or any necessary arrangement related to the construction project, then shows the 4D model as dynamic model for them to identify hazards and to compare results of 2D with results of 4D, to see which one is a better approach in identifying hazards and using a suitable safety equipment. 4. RESULTS OF SITE SAFETY ANALYSIS 4.1. Site Safety Arrangement The HSE will prepare a construction site plan which shows how the site area will be used for arranging the required construction operations, then analyzing and identifying the hazards relating to this arrangement. According to OSHA and Iraqi Safety Blog, the site layout plan should include:  Site preparation (location and number of office facilities).
  • 5. Possibility of Bim Technology in Site Safety Analysis at Iraqi Construction Industry http://www.iaeme.com/IJCIET/index.asp 403 editor@iaeme.com  Construction of storage areas for building materials and loading away from workers' movement.  Organizing the traffic inside the site during the different stages of the work to ensure the safety of workers from the movement of vehicles  Keep the site clean by collecting and removing work waste that may be hazardous to workers Figure (4) shows the traditional site safety plan depending on 2D drawings: Figure 4. Shows traditional site safety plan When compared this plan with the 4D BIM model, the results were the followings: 1. They explained the 4D model is more realistic than 2D drawings, that can help in the daily training of workers on the details of the site that maybe change during any period of time. Figures (5), (6) show that: Figure 5. Shows installing exterior temporary fence Figure 6. Shows changing in details of the site in different period
  • 6. Hayder Rezzaq Abed, Wadhah Amer Hatem and Nidal Adnan Jasim http://www.iaeme.com/IJCIET/index.asp 404 editor@iaeme.com 2. With the help of the 4D BIM model, the HSE noted that 29 days after the project began, there would be a conflict between the location of the caravan No. 3 and the excavator used to drill the footing of the outer fence, and therefore the presence of the caravan at this place would endanger the lives of its occupants. Figure (7) shows that: Figure 7. Explain conflict the excavator with caravan no.3 3. They found that the road between the buildings will be narrow over a certain period of time due to excavation work and because of the use of safety barriers around these excavations, where the 4D model shows that the width of this road may reach less than 3m; therefore, the machines cannot move safely because of maybe lead to overturning in the excavations. Figure (8) shows that: Figure 8. Shows narrow roads of the site between the buildings Then, they found after (86 day) from beginning the project, it is possible to increase the width of the road after finishing backfilling works, figure (9) shows that, while the road between the assembly building and the administration building cannot use it until finishing installation works of steel structure because of the danger from the crane machines, figure (10) shows that:
  • 7. Possibility of Bim Technology in Site Safety Analysis at Iraqi Construction Industry http://www.iaeme.com/IJCIET/index.asp 405 editor@iaeme.com Figure 9. Increase width of road Figure 10. Explain hazard in this part of road between classrooms and laboratory between assembly building and administration 4. According to the problems that appeared in point 1, 2, the HSE found it necessary to create new arrangements for the site. With helping of 4DBIM model, they found an ability to create a new entrance between the administration building and the building of the classrooms, and they proposed to make this entrance just for workers and placing a caravan no. 3 in the new entrance to check the workers' wearing of safety equipment. Figure (11) shows that: Figure 11. Shows the new proposed entrance for workers Since it was difficult to use the previous entrance due to excavation work and subsequent installation works of the steel structure and to minimize the movement of the machines inside the site to maintain workers' safety, the HSE proposed creating a new entrance allowing only the mechanisms to reach for the administration building and guard room. Figure (12) shows that: Figure 12. Shows the proposed entrance reach to Administration building
  • 8. Hayder Rezzaq Abed, Wadhah Amer Hatem and Nidal Adnan Jasim http://www.iaeme.com/IJCIET/index.asp 406 editor@iaeme.com 5. Through the 4D model, the HSE found that the storage space of the materials installed in the 2D drawings can be adopted because it does not conflict with the site's works at all time, and create a special entrance for materials trucks. Figure (13) shows that: Figure 13. Shows the temporary fence around materials inside site 6. The HSE believes that the BIM 4D model is more accurate in showing all the details of the site, especially showing the lighting of the location and the monitoring system, which is somewhat inaccurate and unclear in the 2D drawings, where these things are often handwritten notes. Figure (14), (15) show that: Figure 14. Shows the location of cameras Figure 15. Shows location of lighting 7. During the 4D model, traffic can be organized at the site during different project durations, while that would be complex or may be impossible in the 2D model because of that need multiple schemes for each scenario, while in the 4D model all scenarios in a single model. Figure (16) (17) show that: Figure 16. Shows the traffic barriers during Figure 17. Shows location of traffic cast of footing for safe site. barriers to explain hazard from machine
  • 9. Possibility of Bim Technology in Site Safety Analysis at Iraqi Construction Industry http://www.iaeme.com/IJCIET/index.asp 407 editor@iaeme.com 4.2. Emergency Response Plan According to Iraqi safety blog and OSHA, the emergency plan should have:  Prepare copies of the emergency plan to ensure the safety of workers.  These copies should explain the exit routes and places of emergency equipment and first aids.  Identifying materials which are potential fire hazards.  Two exit routes at least must be available in the workplace to allow prompt evacuation of workers  Provides training to workers with regard to fire hazards or other hazards which they may be exposed. Figure (18) explains the emergency action plan in 2D drawings was: Figure 18. Emergency response plan by traditional approach Where the HSE drawings show the escape routes and the location of the signs of the exits, in addition, show the places of fire extinguishers, first aids in the site. The results from comparison with the 4D BIM model were: 8. Through the 4D model, the HSE have found the possibility of using the workers' entrance as the third exit for emergencies. The 4D model is more realistic for emergency roads compared to 2D schemes. Figure (19) shows emergency route with red color, and figure (20) shows emergency signs. Figure 19. Shows the emergency routes Figure 20. Shows the emergency sign 9. The 4D model explained that during the first month of the project there is one place containing first- aid and fire extinguishers (other caravans were not installed due to excavation works). Figure (21) explains that. Then, in February month, fire extinguishers and first-aid are providing at each caravan and near storage of
  • 10. Hayder Rezzaq Abed, Wadhah Amer Hatem and Nidal Adnan Jasim http://www.iaeme.com/IJCIET/index.asp 408 editor@iaeme.com materials. This will make workers aware of emergency equipment places during project times. Figure (22) explain that: Figure 21. show the first aid and extinguishers Figure 22. Show first aid and extinguishers in in first month February month 10. After (6 months) from beginning the project, the HSE discovered through the 4D BIM model, that during the timber framework of the first floor of the buildings there is a danger of the exposure of these timbers for fires, so they found it necessary to use the escape ladder for each building and put an emergency sign to explain that it is only for emergencies. The reason for using the emergency ladder and not relying on the building stair is contains the wooden columns that support the roof shuttering figures (23), (24) show that: Figure 23. Shows emergency ladder for Figure 24. Shows emergency ladder for administration building classroom building 11. The HSE engineers find that the 4D model can be used to train workers on how to use emergency routes, first-aid places, and fire extinguishers at any time in the project, through create training movie, while in the 2D drawings will be so difficult. Figures (25) shows creating animation movie for a project during different times:
  • 11. Possibility of Bim Technology in Site Safety Analysis at Iraqi Construction Industry http://www.iaeme.com/IJCIET/index.asp 409 editor@iaeme.com Figure 25. Shows ability of the software in record training movies for safe arrangement of site to train workers 4.3. Effect Safety Analysis on Total Time of Project In fact, the implementation of the safety measures led to an increase in the time of the project. The planning engineers found it difficult to determine the increase based on the traditional methods due to the overlap of works and changes in the site, while they found that it is very easy to calculate the exact additional time the 4D model. Table 1 show this increase: Table 1 Shows effect of safety procedure on the project time No. Description Details 1 Duration of project without safety procedure 300 2 Duration of project with safety procedure 311 3 The percentage of increase of time 3.66% Note: percentage of increase = ((duration with safety - duration without safety)/ duration without safety) * 100% = ((311-300)/300) *100% = 3.666% 5. CONCLUSION In Iraq, the construction industry has caused more injuries and deaths than in other industries. This is due to the weakness of knowledge of the concept of safety by designers, which results in many of the safety hazards inherent in the project drawings. In fact, it is difficult for contractors to identify all safety risks at the planning and pre-construction stage of a project. BIM technology can help to create an environment that is similar to the real environment through which the problems related to the safety of workers and equipment will be solved and provide a safe working environment. For this reason, BIM technology can help improve site safety by linking the four-dimensional BIM model to safety regulations (OSHA and Iraqi Safety Blog). This research seeks to demonstrate the weakness of traditional risk management methods based on 2D drawings, and to improve workplace safety through the use of BIM technology to assist safety managers in accurately identifying risks to different phases of the project, finding appropriate strategies for site safety and preventing any conflicts or Delay due to the application of safety measures. Safety managers through comparisons, explain that BIM was more accurate and more realistic in identifying risks to the workplace and it will be a good tool to solve all
  • 12. Hayder Rezzaq Abed, Wadhah Amer Hatem and Nidal Adnan Jasim http://www.iaeme.com/IJCIET/index.asp 410 editor@iaeme.com safety problem in the planning stage before physical build. Finally, the BIM technology explained that the application of the safety measures at the site will increase the project duration by (3.66%). REFERENCES [1] Peter Uchenna Okoye, John Ugochukwu Ezeokonkwo, Fidelis Okechukwu Ezeokoli. Building Construction Workers’ Health and Safety Knowledge and Compliance on Site. Journal of Safety Engineering, 5(1), 2016, pp 17-26. [2] Hatem, W, A., Evaluation of Safety Systems in Iraqi Construction Projects, International Journal of Applied Engineering Research. 12, 2017, pp. 11714-11726. [3] Vacharapoom Benjaoran, Sdhabhon Bhokha. An Integrated Safety Management with Construction Management Using 4D CAD Model. Journal of Safety Science, 48, 2009, pp 395-403. [4] Rozenfeld, O., Sacks, R. and Rozenfeld, J. Construction Hazard Assessment with Spatial and Temporal Exposure. Journal of Construction Management and Economics, 27(7), 2009, pp 625-638. [5] Zhang, S., Teizer, J., Lee, J.-K., Eastman, C.M., Venugopal, M. Building information modeling (BIM) and safety: automatic safety checking of construction models and schedules. Journal Automation in Construction. 29, 2013, pp 183–195. [6] Azhar, K., Khalfan, & M., Maqsood, T., Building Information Modelling (BIM): Now and Beyond. Australasian Journal of Construction Economics and Building. 12 (4), 2012, pp 15-28. [7] Estman, C., Teicholz, P., Sacks, R. and Liston, K. BIM Handbook: AGuide to Building Information Modeling for Owners, Managers, Designers, Engineers and Constructors, 2nd ed. John Wiley and Sons, NY, 2011. [8] Sulvankivi, K.; Teizer, J., Kiviniemi, M.; Eastman, C.M., Zhang, S., and Kim, K. Framework for integrating safety into Building Information Modelling. Proceeding of the CIB W099 International Conference on “Modelling and Building Health and Safety”, 2012, Singapore, pp 93-100. [9] Azhar, S., Behringer, A., Sattineni, A., & Mqsood, T. BIM for Facilitating Construction Safety Planning and Management at Jobsites. In Proceedings of the CIB-W099 International Conference: Modelling and Building Safety, Singapore, 2012, pp 82-92