PMBOK® GUIDE 5TH EDITION - 47 PROJECT MANAGEMENT PROCESSES
INITIATING
STAKEHOLDER

INTEGRATION

4.1

EXECUTING

13.1

Develop Project Charter

HUMAN RESOURCE

Identify Stakeholders

9.2

HUMAN RESOURCE

Acquire Project Team

PLANNING

9.3

Develop Project Team

7.1

SCOPE

Collect Requirements

COMMUNICATIONS

STAKEHOLDER

Define Scope

7.2

Estimate Costs

COST

7.3

Determine Budget

8.1 Plan Quality Management

Plan Schedule
Management

Develop Project
Management Plan

4.2

TIME

6.2

Plan Human Resource
Management

STAKEHOLDER

Plan Procurement
Management

12.1

6.5

Estimate Activity
Durations

Plan Stakeholder
Management

13.2

RISK

11.1

Estimate Activity
Resources

6.4

TIME

RISK

11.2

11.4

Perform Qualitative
Risk Analysis

11.3

Identify Risks

Perform Quantitative
Risk Analysis

TIME

6.6

Plan Risk Management

RISK

TIME

Sequence Activities

Plan Communications
Management

10.1

PROCUREMENT

Define Activities

6.3

RISK

Develop Schedule

RISK

11.5

Plan Risk Responses

MONITORING & CONTROLLING

CLOSING
INTEGRATION

Close Project or Phase

COMMUNICATIONS

TIME

TIME

4.6

9.1

INTEGRATION

Create WBS

6.1

HUMAN RESOURCE

QUALITY

SCOPE

5.4

Manage Stakeholder
Engagement

13.3

COST

SCOPE

5.3

Conduct Procurements

Direct and Manage
Project Work

4.3

Plan Cost Management

12.2

INTEGRATION

10.2 Manage Communications

5.2

Manage Project Team

PROCUREMENT

COST

SCOPE

Plan Scope Management

9.4

QUALITY

8.2 Perform Quality Assurance

5.1

HUMAN RESOURCE

QUALITY

SCOPE

5.5

8.3

Validate Scope

Control Quality
COMMUNICATIONS

PROCUREMENT

12.4

Close Procurements

5.6

10.3 Control Communications

INTEGRATION

SCOPE

4.4

Control Scope

Monitor and Control
Project Work

RISK

11.6
INTEGRATION

TIME

6.7

4.5

Control Schedule

Perform Integrated
Change Control

PROCUREMENT

12.3
COST

7.4

Control Risks

Control Costs

Control Procurements

STAKEHOLDER

13.4

Control Stakeholder
Engagement

PMBOK® GUIDE 5TH EDITION - 47 PROJECT MANAGEMENT PROCESSES
Based on the PMBOK® Guide 5th Edition (English Version)
Copyright: Project Management Institute, A Guide to the Project Management Body of Knowledge - Fifth Edition (PMBOK® Guide), Project Management Institute, Inc.,
(2013). Copyright and all rights reserved. The material from this publication has been reproduced with the permission of PMI.
Explanatory Note: The represented process flow is based on figures of the PMBOK® Guide. Only a few connections are depicted in the flow. To see the detailed
relationships, please recall the process data flow diagrams in the PMBOK® Guide. This flow does not replace the need for reading the PMBOK® Guide. The PMBOK® Guide
contains a deep explanation of all processes including Inputs, Tools & Techniques and Outputs that are not listed in this flow.
Adaptation: Ricardo Viana Vargas, MSc, CSM, PRINCE2® Practitioner, PMI-RMP, PMI-SP, PMP
Review: Wagner Maxsen, Kaplan-Norton BSC Certified Graduate, PMP, PRINCE2 Practitioner, PMI-RMP
Graphic Design: Sérgio Jardim, PMP

Become a member of PMI and download
the PMBOK Guide 5th Edition and all other
PMI Standards at www.pmi.org

www.ricardo-vargas.com

Pmbok flow 5_process

  • 1.
    PMBOK® GUIDE 5THEDITION - 47 PROJECT MANAGEMENT PROCESSES INITIATING STAKEHOLDER INTEGRATION 4.1 EXECUTING 13.1 Develop Project Charter HUMAN RESOURCE Identify Stakeholders 9.2 HUMAN RESOURCE Acquire Project Team PLANNING 9.3 Develop Project Team 7.1 SCOPE Collect Requirements COMMUNICATIONS STAKEHOLDER Define Scope 7.2 Estimate Costs COST 7.3 Determine Budget 8.1 Plan Quality Management Plan Schedule Management Develop Project Management Plan 4.2 TIME 6.2 Plan Human Resource Management STAKEHOLDER Plan Procurement Management 12.1 6.5 Estimate Activity Durations Plan Stakeholder Management 13.2 RISK 11.1 Estimate Activity Resources 6.4 TIME RISK 11.2 11.4 Perform Qualitative Risk Analysis 11.3 Identify Risks Perform Quantitative Risk Analysis TIME 6.6 Plan Risk Management RISK TIME Sequence Activities Plan Communications Management 10.1 PROCUREMENT Define Activities 6.3 RISK Develop Schedule RISK 11.5 Plan Risk Responses MONITORING & CONTROLLING CLOSING INTEGRATION Close Project or Phase COMMUNICATIONS TIME TIME 4.6 9.1 INTEGRATION Create WBS 6.1 HUMAN RESOURCE QUALITY SCOPE 5.4 Manage Stakeholder Engagement 13.3 COST SCOPE 5.3 Conduct Procurements Direct and Manage Project Work 4.3 Plan Cost Management 12.2 INTEGRATION 10.2 Manage Communications 5.2 Manage Project Team PROCUREMENT COST SCOPE Plan Scope Management 9.4 QUALITY 8.2 Perform Quality Assurance 5.1 HUMAN RESOURCE QUALITY SCOPE 5.5 8.3 Validate Scope Control Quality COMMUNICATIONS PROCUREMENT 12.4 Close Procurements 5.6 10.3 Control Communications INTEGRATION SCOPE 4.4 Control Scope Monitor and Control Project Work RISK 11.6 INTEGRATION TIME 6.7 4.5 Control Schedule Perform Integrated Change Control PROCUREMENT 12.3 COST 7.4 Control Risks Control Costs Control Procurements STAKEHOLDER 13.4 Control Stakeholder Engagement PMBOK® GUIDE 5TH EDITION - 47 PROJECT MANAGEMENT PROCESSES Based on the PMBOK® Guide 5th Edition (English Version) Copyright: Project Management Institute, A Guide to the Project Management Body of Knowledge - Fifth Edition (PMBOK® Guide), Project Management Institute, Inc., (2013). Copyright and all rights reserved. The material from this publication has been reproduced with the permission of PMI. Explanatory Note: The represented process flow is based on figures of the PMBOK® Guide. Only a few connections are depicted in the flow. To see the detailed relationships, please recall the process data flow diagrams in the PMBOK® Guide. This flow does not replace the need for reading the PMBOK® Guide. The PMBOK® Guide contains a deep explanation of all processes including Inputs, Tools & Techniques and Outputs that are not listed in this flow. Adaptation: Ricardo Viana Vargas, MSc, CSM, PRINCE2® Practitioner, PMI-RMP, PMI-SP, PMP Review: Wagner Maxsen, Kaplan-Norton BSC Certified Graduate, PMP, PRINCE2 Practitioner, PMI-RMP Graphic Design: Sérgio Jardim, PMP Become a member of PMI and download the PMBOK Guide 5th Edition and all other PMI Standards at www.pmi.org www.ricardo-vargas.com