• Identifies a subset of project management that is generally
recognized as good practice
• Different from a methodology but a foundation upon which
methodology, policies, procedures, rules, tools and techniques,
and life cycle phases can be built
• Based on the Standard for Project Management (similar to
Standards for Portfolio and Program Management)
Purpose of The PMBOK® Guide
• Initially distributed in 1996
• Five (5) process groups (Initiating, Planning, Estimating, Controlling and Closing)
• Nine (9) knowledge areas
• Thirty-seven (37) processes
• Revised about every four years
• Third Edition (2004) – changed to Monitoring and Controlling
• Fourth Edition (2008) – 42 processes
• Fifth Edition (2013) – 47 processes
• First time a new knowledge area has been added
• Sixth Edition (2017) – 49 processes
• Incorporates Agile and Business Analysis concepts
• Harmonization of terminology with other standards
History of The PMBOK® Guide
Overall Changes to the Sixth Edition
• First three sections completely revised
• Section 1 – Project approaches
• Section 3 – Role of project manager
• Knowledge area name changes
• Project Time Management is now Project Schedule Management
• Project Human Resource Management is now Project Resource Management
• New Processes
• Manage Project Knowledge
• Implement Risk Responses
• Control Resources
• Deleted Process
• Close Procurement
• Minor change
• Estimate Activity Resources moved to Project Resource Management
• Overview and purpose of the guide
• Foundational elements
• Relationship of project, program, portfolio and operations management
• Importance of project management
• Project and development life cycles
• Predictive
• Iterative
• Incremental
• Adaptive
• Hybrid
• Components of the guide
• Tailoring for usage in organizations
• Project Management Business Documents
• Project Business Case
• Project Benefits Management Plan
• Project Charter and Project Management Plan
• Project Success Measures
Chapter 1 - Introduction
• Enterprise Environmental Factors
• Internal to the organization
• External to the organization
• Organizational Process Assets
• Processes, policies and procedures
• Organizational knowledge repositories
• Organizational systems
• Organizational governance frameworks
• Alignment, Risk, Performance, Communication
• Management elements
• Organizational structure types
• Organic, Functional, Multidivisional, Matrix,
Project-oriented, Virtual, Hybrid, PMO
Chapter 2 – Environment in Which Projects
Operate
• Definition of a Project Manager
• Project Manager’s sphere of influence
• Project
• Organization
• Industry
• Professional discipline
• Across disciplines
• Project Manager Competences
• Technical
• Strategic and business management
• Leadership
• Comparison of leadership and management
• Performing Integration
• Performing at process level
• Integration at cognitive level
• Integration at context level
• Integration and complexity
Chapter 3 – Role of the Project Manager
• Introduction
• Projects and Project Management
• Project Success and Benefits Management
• Project Life Cycle
• Project Stakeholders
• Role of Project Manager
• Project Management Knowledge Areas
• Project Management Process Groups
• EEFs and OPAs
• Tailoring the Project Artifacts
• Each process group includes:
• Processes
• Project management plan components
• Project documents examples
• Project management plan/documents updates
Part 2 – The Standard for Project
Management
• Usage described in Appendix X3 for agile, adaptive, iterative
and hybrid approaches
• Each knowledge area includes a subsection called
Considerations for Adaptive Environments
Incorporation of Agile
PMBOK 5th Edition PMBOK 6th Edition
Perform Quality Assurance  Manage Quality
Plan Human Resource Management  Plan Resource Management
Acquire Project Team  Acquire Resources
Develop Project Team  Develop Team
Manage Project Team  Manage Team
Control Communications  Monitor Communications
Control Risks  Monitor Risks
Plan Stakeholder Management  Plan Stakeholder Engagement
Control Stakeholder Engagement  Monitor Stakeholder Engagement
Process Name Changes
• Key concepts
• Trends and emerging practices
• Tailoring considerations
Knowledge Area Information
• Each process is identified as:
• Process used once or at predefined points in the project
• Process that is done periodically as needed
• Process that is done continually throughout the project
• Explained further in Section 1.2.4.4
Process Categories
• Grouped by purpose
• Data gathering
• Data analysis
• Decision making
• Communication
• Interpersonal and team skills
• Identified in Appendix X6 by group, where appropriate, and lists the
processes where they are used
Tools and Techniques
• Entire project management plan listed rather than individual
components
• Individual component listed where created
• Input specifics identified in textual description
• Other project documents
• Individual document identified in process where created
• Subsequent processes refer to the inclusive name, project documents
Project Documents
• New process – Manage Project Knowledge
• Output – Lessons learned register
• Input to many processes
• Updated as output in many Executing and Monitoring and Controlling processes
• At project end, transferred to become an OPA
• Referred to as a lessons learned repository
Lessons Learned
• Key concepts
• Trends and emerging practices
• Tailoring considerations
• Considerations for agile/adaptive environments
Knowledge Area Front Material
• New process
• Manage Project Knowledge
• New inputs
• Business Case
• Projects Benefits Management Plan
• New tools
• Data analysis
• Data gathering
• Decision making
• Interpersonal and team skills
• Knowledge management
• Information management
• New outputs
• Assumption log
• Lessons learned register
• Procurement documentation
Project Integration Management
• New inputs
• Business documents
• New tools
• Data analysis
• Data gathering
• Interpersonal and team skills
• New outputs
• None
Project Scope Management
• Process moved
• Estimate Activity Resources (moved to Resource Management)
• New inputs
• None
• New tools
• Bottom-up estimating
• Critical path method
• Data analysis
• Agile release planning
• New outputs
• None
Project Schedule Management
• New inputs
• Business documents
• New tools
• Data analysis
• Decision making
• Financing
• New outputs
• None
Project Cost Management
• New inputs
• Project charter
• New tools
• Data analysis
• Data gathering
• Decision making
• Design for X
• Problem solving
• Quality improvement methods
• Test and inspection planning
• Testing/Product evaluations
• New outputs
• Quality reports
• Test and evaluation documents
Project Quality Management
Project Resource Management
(name change)
• New process
• Estimate Activity Resources (moved from Time)
• Control Resources
• New inputs
• None
• New tools
• Data analysis
• Colocation/Virtual teams
• Communication technology
• Individual and team assessment
• Problem solving
• New outputs
• Team charter
Project Communication Management
(name change)
• Name changes
• Communications is technology; communication is human
• New inputs
• None
• New tools
• Data analysis
• Interpersonal and team skills
• Communication technology
• New outputs
• None
Project Risk Management
• New process
• Implement Risk Responses
• Process name change
• Control Risks to Monitor Risks
• New inputs
• None
• New tools
• Data analysis
• Data gathering
• Prompt list (risk categories)
• PESTLE, TECOP, VUCA
• Representations of uncertainty
• Resource allocation
• New outputs
• Risk report
Project Procurement Management
• Deleted process
• Close Procurements
• New inputs
• Business documents
• New tools
• Data analysis
• Data gathering
• Source selection analysis
• New outputs
• Procurement strategy
• Bid documents
• Independent cost estimates
• Closed procurements
• Procurement documentation updates
Project Stakeholder Management
• Name changes
• Plan Stakeholder Management to Plan Stakeholder Engagement
• Control Stakeholder Engagement to Monitor Stakeholder Engagement
• New inputs
• Business documents
• New tools
• Data analysis
• Data gathering
• Inspection
• Interpersonal and team skills
• Ground rules
• New outputs
• None
Changes to the Certification Exams
• PMP® and PMI-ACP® exams will change beginning March 26, 2018
• CAPM® exams will change end of May, 2018
Should you push to complete before this date or wait?
Watch the Live Demonstration
Watch the recorded webinar here!
We manage learning.
“Building an Innovative Learning Organization. A Framework to Build a Smarter Workforce, Adapt to Change, and Drive Growth”. Download now!
NetCom Learning offers a comprehensive portfolio for Business Process training and
below is the course for PMP training
» Project Management Professional (PMP)® - Class scheduled on Feb 26
Recommended Course:
http://www.netcomlearning.com
Our live webinars will help you to touch base a wide variety of IT, soft skills and
business productivity topics; and keep you up to date on the latest IT industry trends.
Register now for our upcoming webinars:
How to build a solid IT foundation with NEW CompTIA Network+ Certification
Microsoft Excel 101: What you must know
5 Things You Should Know About Big Data
The 7 Unknown (And Awesome) Tips for AutoCAD Users
Orchestrating DevOps with Azure Services for CMS application
We manage learning.
“Building an Innovative Learning Organization. A Framework to Build a Smarter Workforce, Adapt to Change, and Drive Growth”. Download now!
Special Promotion
Trial Version & 10% First Time User discount on Soft Skills
E-Learning Courses
(Limited Period Offer, Register NOW)
Log onto www.sarderlearning.com
Coupon Code: SARDER10
3500+ BYTE SIZE
VIDEOS
200+
MENTORS
100+ COURSES
Leadership focused programs across
Functions, Management levels, &
Industries
Business Productivity programs enabling
professionals master the latest concepts
Soft skills programs ensuring the basics
of management success
Best selling books focused programs
covering all aspects of professional &
personal lives
Premium programs such as Board-Series
www.sarderlearning.com
Course Categories
Anywhere Anytime Learning across
Devices & Operating Systems
Media Platform with a blend of Charlie
Rose & TED
Headquartered in New York, the platform
publishes Exclusive High Quality Video
Content from Fortune 1000 Corporate
Leaders, Best Selling Authors & Ivy League
Professors
With a purpose to "Promote Learning", the
Platform is based on the Core values of
Continuous Learning, Innovation &
Performance.
Get the latest insights on Management,
Strategy, Marketing, Sales, Innovation and
Entrepreneurship.
www.sardertv.com
To get the latest insights on the Business World
To get latest technology updates, please follow our social media pages!
We manage learning.
“Building an Innovative Learning Organization. A Framework to Build a Smarter Workforce, Adapt to Change, and Drive Growth”. Download now!
We manage learning.
“Building an Innovative Learning Organization. A Framework to Build a Smarter Workforce, Adapt to Change, and Drive Growth”. Download now!
THANK YOU !!!

NetCom Learning :The Ultimate Key to Project Managers Success - PMBOK Guide

  • 1.
    The Ultimate Keyto Project Managers Success - PMBOK Guide
  • 2.
  • 3.
    NetCom Learning –Managed Learning Services
  • 5.
    • Identifies asubset of project management that is generally recognized as good practice • Different from a methodology but a foundation upon which methodology, policies, procedures, rules, tools and techniques, and life cycle phases can be built • Based on the Standard for Project Management (similar to Standards for Portfolio and Program Management) Purpose of The PMBOK® Guide
  • 6.
    • Initially distributedin 1996 • Five (5) process groups (Initiating, Planning, Estimating, Controlling and Closing) • Nine (9) knowledge areas • Thirty-seven (37) processes • Revised about every four years • Third Edition (2004) – changed to Monitoring and Controlling • Fourth Edition (2008) – 42 processes • Fifth Edition (2013) – 47 processes • First time a new knowledge area has been added • Sixth Edition (2017) – 49 processes • Incorporates Agile and Business Analysis concepts • Harmonization of terminology with other standards History of The PMBOK® Guide
  • 7.
    Overall Changes tothe Sixth Edition • First three sections completely revised • Section 1 – Project approaches • Section 3 – Role of project manager • Knowledge area name changes • Project Time Management is now Project Schedule Management • Project Human Resource Management is now Project Resource Management • New Processes • Manage Project Knowledge • Implement Risk Responses • Control Resources • Deleted Process • Close Procurement • Minor change • Estimate Activity Resources moved to Project Resource Management
  • 8.
    • Overview andpurpose of the guide • Foundational elements • Relationship of project, program, portfolio and operations management • Importance of project management • Project and development life cycles • Predictive • Iterative • Incremental • Adaptive • Hybrid • Components of the guide • Tailoring for usage in organizations • Project Management Business Documents • Project Business Case • Project Benefits Management Plan • Project Charter and Project Management Plan • Project Success Measures Chapter 1 - Introduction
  • 9.
    • Enterprise EnvironmentalFactors • Internal to the organization • External to the organization • Organizational Process Assets • Processes, policies and procedures • Organizational knowledge repositories • Organizational systems • Organizational governance frameworks • Alignment, Risk, Performance, Communication • Management elements • Organizational structure types • Organic, Functional, Multidivisional, Matrix, Project-oriented, Virtual, Hybrid, PMO Chapter 2 – Environment in Which Projects Operate
  • 10.
    • Definition ofa Project Manager • Project Manager’s sphere of influence • Project • Organization • Industry • Professional discipline • Across disciplines • Project Manager Competences • Technical • Strategic and business management • Leadership • Comparison of leadership and management • Performing Integration • Performing at process level • Integration at cognitive level • Integration at context level • Integration and complexity Chapter 3 – Role of the Project Manager
  • 11.
    • Introduction • Projectsand Project Management • Project Success and Benefits Management • Project Life Cycle • Project Stakeholders • Role of Project Manager • Project Management Knowledge Areas • Project Management Process Groups • EEFs and OPAs • Tailoring the Project Artifacts • Each process group includes: • Processes • Project management plan components • Project documents examples • Project management plan/documents updates Part 2 – The Standard for Project Management
  • 12.
    • Usage describedin Appendix X3 for agile, adaptive, iterative and hybrid approaches • Each knowledge area includes a subsection called Considerations for Adaptive Environments Incorporation of Agile
  • 13.
    PMBOK 5th EditionPMBOK 6th Edition Perform Quality Assurance  Manage Quality Plan Human Resource Management  Plan Resource Management Acquire Project Team  Acquire Resources Develop Project Team  Develop Team Manage Project Team  Manage Team Control Communications  Monitor Communications Control Risks  Monitor Risks Plan Stakeholder Management  Plan Stakeholder Engagement Control Stakeholder Engagement  Monitor Stakeholder Engagement Process Name Changes
  • 14.
    • Key concepts •Trends and emerging practices • Tailoring considerations Knowledge Area Information
  • 15.
    • Each processis identified as: • Process used once or at predefined points in the project • Process that is done periodically as needed • Process that is done continually throughout the project • Explained further in Section 1.2.4.4 Process Categories
  • 16.
    • Grouped bypurpose • Data gathering • Data analysis • Decision making • Communication • Interpersonal and team skills • Identified in Appendix X6 by group, where appropriate, and lists the processes where they are used Tools and Techniques
  • 17.
    • Entire projectmanagement plan listed rather than individual components • Individual component listed where created • Input specifics identified in textual description • Other project documents • Individual document identified in process where created • Subsequent processes refer to the inclusive name, project documents Project Documents
  • 18.
    • New process– Manage Project Knowledge • Output – Lessons learned register • Input to many processes • Updated as output in many Executing and Monitoring and Controlling processes • At project end, transferred to become an OPA • Referred to as a lessons learned repository Lessons Learned
  • 19.
    • Key concepts •Trends and emerging practices • Tailoring considerations • Considerations for agile/adaptive environments Knowledge Area Front Material
  • 20.
    • New process •Manage Project Knowledge • New inputs • Business Case • Projects Benefits Management Plan • New tools • Data analysis • Data gathering • Decision making • Interpersonal and team skills • Knowledge management • Information management • New outputs • Assumption log • Lessons learned register • Procurement documentation Project Integration Management
  • 21.
    • New inputs •Business documents • New tools • Data analysis • Data gathering • Interpersonal and team skills • New outputs • None Project Scope Management
  • 22.
    • Process moved •Estimate Activity Resources (moved to Resource Management) • New inputs • None • New tools • Bottom-up estimating • Critical path method • Data analysis • Agile release planning • New outputs • None Project Schedule Management
  • 23.
    • New inputs •Business documents • New tools • Data analysis • Decision making • Financing • New outputs • None Project Cost Management
  • 24.
    • New inputs •Project charter • New tools • Data analysis • Data gathering • Decision making • Design for X • Problem solving • Quality improvement methods • Test and inspection planning • Testing/Product evaluations • New outputs • Quality reports • Test and evaluation documents Project Quality Management
  • 25.
    Project Resource Management (namechange) • New process • Estimate Activity Resources (moved from Time) • Control Resources • New inputs • None • New tools • Data analysis • Colocation/Virtual teams • Communication technology • Individual and team assessment • Problem solving • New outputs • Team charter
  • 26.
    Project Communication Management (namechange) • Name changes • Communications is technology; communication is human • New inputs • None • New tools • Data analysis • Interpersonal and team skills • Communication technology • New outputs • None
  • 27.
    Project Risk Management •New process • Implement Risk Responses • Process name change • Control Risks to Monitor Risks • New inputs • None • New tools • Data analysis • Data gathering • Prompt list (risk categories) • PESTLE, TECOP, VUCA • Representations of uncertainty • Resource allocation • New outputs • Risk report
  • 28.
    Project Procurement Management •Deleted process • Close Procurements • New inputs • Business documents • New tools • Data analysis • Data gathering • Source selection analysis • New outputs • Procurement strategy • Bid documents • Independent cost estimates • Closed procurements • Procurement documentation updates
  • 29.
    Project Stakeholder Management •Name changes • Plan Stakeholder Management to Plan Stakeholder Engagement • Control Stakeholder Engagement to Monitor Stakeholder Engagement • New inputs • Business documents • New tools • Data analysis • Data gathering • Inspection • Interpersonal and team skills • Ground rules • New outputs • None
  • 30.
    Changes to theCertification Exams • PMP® and PMI-ACP® exams will change beginning March 26, 2018 • CAPM® exams will change end of May, 2018 Should you push to complete before this date or wait?
  • 31.
    Watch the LiveDemonstration Watch the recorded webinar here! We manage learning. “Building an Innovative Learning Organization. A Framework to Build a Smarter Workforce, Adapt to Change, and Drive Growth”. Download now!
  • 32.
    NetCom Learning offersa comprehensive portfolio for Business Process training and below is the course for PMP training » Project Management Professional (PMP)® - Class scheduled on Feb 26 Recommended Course: http://www.netcomlearning.com
  • 33.
    Our live webinarswill help you to touch base a wide variety of IT, soft skills and business productivity topics; and keep you up to date on the latest IT industry trends. Register now for our upcoming webinars: How to build a solid IT foundation with NEW CompTIA Network+ Certification Microsoft Excel 101: What you must know 5 Things You Should Know About Big Data The 7 Unknown (And Awesome) Tips for AutoCAD Users Orchestrating DevOps with Azure Services for CMS application We manage learning. “Building an Innovative Learning Organization. A Framework to Build a Smarter Workforce, Adapt to Change, and Drive Growth”. Download now!
  • 34.
    Special Promotion Trial Version& 10% First Time User discount on Soft Skills E-Learning Courses (Limited Period Offer, Register NOW) Log onto www.sarderlearning.com Coupon Code: SARDER10
  • 35.
    3500+ BYTE SIZE VIDEOS 200+ MENTORS 100+COURSES Leadership focused programs across Functions, Management levels, & Industries Business Productivity programs enabling professionals master the latest concepts Soft skills programs ensuring the basics of management success Best selling books focused programs covering all aspects of professional & personal lives Premium programs such as Board-Series www.sarderlearning.com Course Categories Anywhere Anytime Learning across Devices & Operating Systems
  • 36.
    Media Platform witha blend of Charlie Rose & TED Headquartered in New York, the platform publishes Exclusive High Quality Video Content from Fortune 1000 Corporate Leaders, Best Selling Authors & Ivy League Professors With a purpose to "Promote Learning", the Platform is based on the Core values of Continuous Learning, Innovation & Performance. Get the latest insights on Management, Strategy, Marketing, Sales, Innovation and Entrepreneurship. www.sardertv.com To get the latest insights on the Business World
  • 37.
    To get latesttechnology updates, please follow our social media pages! We manage learning. “Building an Innovative Learning Organization. A Framework to Build a Smarter Workforce, Adapt to Change, and Drive Growth”. Download now!
  • 38.
    We manage learning. “Buildingan Innovative Learning Organization. A Framework to Build a Smarter Workforce, Adapt to Change, and Drive Growth”. Download now!
  • 39.

Editor's Notes

  • #6 1-5
  • #7 1-6
  • #9 1-8
  • #10 1-9
  • #11 1-10
  • #15 1-14
  • #16 1-15
  • #17 1-16
  • #19 1-18
  • #35 Further, if your interested in “Learning from the Top American Leaders”, please logon to the e-learning platform - www.sarderlearning.com. Avail the special promotion meant for FIRST TIME USERS. Use your coupon code – SARDER10 and begin your leadership journey. Now!!
  • #36 Sarder Learning is a micro-learning knowledge platform that brings the world’s best Fortune 500 companies CXOs, Ivy League professors and best selling authors together to share industry –wide best practices related to leadership & management. Sarder Learning under 13 different categories has a rapidly growing course library relevant across multiple domains with well defined specific learning paths and scenario –based learning. An intuitive and responsive learning management system environment makes it easy to track one’s learning journey take courses at convinence
  • #37 To get your dose of Latest Business Insights FROM Corporate America, logonto Sardertv.com. Don’t forget to register for our newsletter.