Project Mgmt.

   Time Management
(Getting it done on Time)
Time Management

    •   Figuring out work
    •   Priorities the work
    •   Judge complexity
    •   Judge resources you have / Skills
    •   Estimate the efforts
    •   Assign resource and time
    •   Controlling schedule




http://www.radiantminds.co.in
Exercise

    • Arrange this in proper order

        1)   Schedule Control
        2)   Activity Duration Estimating
        3)   Schedule Development
        4)   Activity Sequencing
        5)   Activity Definition
        6)   Activity Resource Estimating




http://www.radiantminds.co.in
Exercise – Proper Sequence

    1)   Activity List
    2)   Activity Sequencing
    3)   Activity Resource Estimating
    4)   Activity Duration Estimation
    5)   Schedule Development
    6)   Schedule Control




http://www.radiantminds.co.in
Activity Planning (WBS)

    • Activity List (lower level WBS)

    • Activity Attributes (Predecessor, Successor,
      Constraints)

    • Identify Milestones (IMP Checkpoint)

    • Request Change (Internal)




http://www.radiantminds.co.in
Activity Sequencing

    • Wedding Planning - Activities

        –   Booking
        –   Food
        –   Invitations
        –   Purchases




http://www.radiantminds.co.in
Activity Planning
    START


    Hall Booking      Food            Invitations        Purchases


    Location          Find Caterer    Guest List         Readymade


    Parking           Finalize Menu   Print              Tailoring
                                      Invitations

    Cost              # of guests     Mail Invitations   Gifts
    (Constraints)     (Constraints)

    (Finalize)        Reception ?     Wait for RSVP      Guest List
                                                         (Constraints)
http://www.radiantminds.co.in
Activity Sequencing

    •   Exercise ->

        –   Finish to Start
        –   Start to Start
        –   Start to Finish
        –   Finish to Finish


    •   Lead Time & Lag Time

    • Gantt Chart



http://www.radiantminds.co.in
How long project will take

    •   Activity list
    •   Activity attributes
    •   Resource Calendar
    •   Resource Requirements
    •   Project scope statement
    •   Activity duration estimate




http://www.radiantminds.co.in
Estimation Techniques

    • Expert Judgment

    • Function Point Analysis

    •   Cocomo

    • Delphi




http://www.radiantminds.co.in
Critical Path Method

    • It is string of activities that will delay the whole
      project if anyone of them gets delayed
        1)   Create a guest list
        2)   Print invitations
        3)   Mail invitations
        4)   Wait for RSVP
        5)   Finalize the Menu
        6)   Cater the wedding




http://www.radiantminds.co.in
Network Diagram

                                Act-C
                   Act-A
                                2
                   4

     Start
                                Act-B   Finish
     0
                                7


                   Act-D
                                Act-E
                   3
                                5



http://www.radiantminds.co.in
Network Diagram

    • How to Find Critical Path

    • Start->A ->C -> Finish
    • Start->A ->B -> Finish
    • Start->D ->E -> Finish

    • Add Durations (Time) for each




http://www.radiantminds.co.in
Critical Path

    •    Critical Path is the one with longest duration (Ex.
        11 in above diagram)

    •   Finding Float / Slack time for each activity

    •    Shows – how much play you have in your
        schedule without affecting the end date




http://www.radiantminds.co.in
Critical Path

    • Float for any activity on the critical path is zero

    • We are not covering –
        – Early start / Early Finish
        – Late start / Late Finish
        – Lead and Lag time




http://www.radiantminds.co.in
C
                B
        A               7
                1
        3

Start                       Finish

 0                  E
        D
                    3
        4


                        G
            F
                        2
            2
Float for an activity

    •   Start – A – B – C – Finish = 11

    •   Start – D – E – Finish = 7

    •   Start - D – F – G – Finish = 8

    • Critical path = duration 11




http://www.radiantminds.co.in
Float for an activity

    •  Float for each of the activity on critical path is
      zero
    • For A, B, C Float = 0

    • Find the next longest path
    • D-F-G = 8
    • Subtract its duration from the duration of critical
      path (11-8 = 3)
    • Float for D, F, G is 3



http://www.radiantminds.co.in
Float for an activity

    • Do the same for the next longest path

    • Float for activity D is 3 and E is 4




http://www.radiantminds.co.in

More Related Content

Viewers also liked (6)

Pm 2 planning
Pm 2 planningPm 2 planning
Pm 2 planning
 
Pm 8 cost_management
Pm 8 cost_managementPm 8 cost_management
Pm 8 cost_management
 
E business cms
E business cmsE business cms
E business cms
 
Pm 9 quality
Pm 9 qualityPm 9 quality
Pm 9 quality
 
ISM 2
ISM 2ISM 2
ISM 2
 
ISM-1
ISM-1ISM-1
ISM-1
 

Similar to Pm 5 time

Stanford DrupalCamp 2014 - A Perfect Launch, Every Time
Stanford DrupalCamp 2014 - A Perfect Launch, Every TimeStanford DrupalCamp 2014 - A Perfect Launch, Every Time
Stanford DrupalCamp 2014 - A Perfect Launch, Every Time
Suzanne Aldrich
 
Scrum Scalability: Advanced Techniques for Managing Distributed Agile Teams
Scrum Scalability: Advanced Techniques for Managing Distributed Agile TeamsScrum Scalability: Advanced Techniques for Managing Distributed Agile Teams
Scrum Scalability: Advanced Techniques for Managing Distributed Agile Teams
Belatrix Software
 
PMP Training - 06 project time management2
PMP Training - 06 project time management2PMP Training - 06 project time management2
PMP Training - 06 project time management2
ejlp12
 
Aminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf_P7-Ch.9_Project management-32.pptxAminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf
 
Aminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf_P7-Ch.9_Project management-32.pptxAminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf
 

Similar to Pm 5 time (20)

Project Management 3.1 time
Project Management 3.1 timeProject Management 3.1 time
Project Management 3.1 time
 
Test folder.pptx
Test folder.pptxTest folder.pptx
Test folder.pptx
 
Stanford DrupalCamp 2014 - A Perfect Launch, Every Time
Stanford DrupalCamp 2014 - A Perfect Launch, Every TimeStanford DrupalCamp 2014 - A Perfect Launch, Every Time
Stanford DrupalCamp 2014 - A Perfect Launch, Every Time
 
06 projecttimemanagement
06 projecttimemanagement06 projecttimemanagement
06 projecttimemanagement
 
ABCs Of Project Time Management Planning Slides
ABCs Of Project Time Management Planning SlidesABCs Of Project Time Management Planning Slides
ABCs Of Project Time Management Planning Slides
 
5. PMP Training - Time management
5. PMP Training - Time management5. PMP Training - Time management
5. PMP Training - Time management
 
Introduction to Software Engineering
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software Engineering
 
Al Nelson on Project Management for Game Developers
Al Nelson on Project Management for Game DevelopersAl Nelson on Project Management for Game Developers
Al Nelson on Project Management for Game Developers
 
Pmp time chapter 6
Pmp time chapter 6Pmp time chapter 6
Pmp time chapter 6
 
Scrum Scalability: Advanced Techniques for Managing Distributed Agile Teams
Scrum Scalability: Advanced Techniques for Managing Distributed Agile TeamsScrum Scalability: Advanced Techniques for Managing Distributed Agile Teams
Scrum Scalability: Advanced Techniques for Managing Distributed Agile Teams
 
Dealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 MeetingDealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
 
Project management.pptx
Project management.pptxProject management.pptx
Project management.pptx
 
PMP Training - 06 project time management2
PMP Training - 06 project time management2PMP Training - 06 project time management2
PMP Training - 06 project time management2
 
Scrum Process For Offshore Team
Scrum Process For Offshore TeamScrum Process For Offshore Team
Scrum Process For Offshore Team
 
C03.05-Scheduling.key.pdf
C03.05-Scheduling.key.pdfC03.05-Scheduling.key.pdf
C03.05-Scheduling.key.pdf
 
08. Project Time Management Upload
08. Project Time Management Upload08. Project Time Management Upload
08. Project Time Management Upload
 
PERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTPERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENT
 
Aminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf_P7-Ch.9_Project management-32.pptxAminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf_P7-Ch.9_Project management-32.pptx
 
Ch09 (1).pptx
Ch09 (1).pptxCh09 (1).pptx
Ch09 (1).pptx
 
Aminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf_P7-Ch.9_Project management-32.pptxAminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf_P7-Ch.9_Project management-32.pptx
 

More from Radiant Minds

E business n_tier_arch
E business n_tier_archE business n_tier_arch
E business n_tier_arch
Radiant Minds
 
E business edi_messaging
E business edi_messagingE business edi_messaging
E business edi_messaging
Radiant Minds
 
E business edi_basics
E business edi_basicsE business edi_basics
E business edi_basics
Radiant Minds
 
E business internet fraud
E business internet fraudE business internet fraud
E business internet fraud
Radiant Minds
 
E business intro_toseo
E business intro_toseoE business intro_toseo
E business intro_toseo
Radiant Minds
 
E business internet_basics
E business internet_basicsE business internet_basics
E business internet_basics
Radiant Minds
 
E business case-studies
E business case-studiesE business case-studies
E business case-studies
Radiant Minds
 
Pm 8 cost_management
Pm 8 cost_managementPm 8 cost_management
Pm 8 cost_management
Radiant Minds
 

More from Radiant Minds (20)

Corona virus and mental health
Corona virus and mental healthCorona virus and mental health
Corona virus and mental health
 
Campus 2 Corporate
Campus 2 CorporateCampus 2 Corporate
Campus 2 Corporate
 
E business scm_crm
E business scm_crmE business scm_crm
E business scm_crm
 
E business n_tier_arch
E business n_tier_archE business n_tier_arch
E business n_tier_arch
 
E business edi_vads
E business edi_vadsE business edi_vads
E business edi_vads
 
E business edi_messaging
E business edi_messagingE business edi_messaging
E business edi_messaging
 
E business edi_basics
E business edi_basicsE business edi_basics
E business edi_basics
 
E business internet fraud
E business internet fraudE business internet fraud
E business internet fraud
 
E business intro_toseo
E business intro_toseoE business intro_toseo
E business intro_toseo
 
E business internet_basics
E business internet_basicsE business internet_basics
E business internet_basics
 
E business case-studies
E business case-studiesE business case-studies
E business case-studies
 
Ism 4
Ism 4Ism 4
Ism 4
 
Ism 3
Ism 3Ism 3
Ism 3
 
Pm 3 approach
Pm 3 approachPm 3 approach
Pm 3 approach
 
Pm 4 scope
Pm 4 scopePm 4 scope
Pm 4 scope
 
Pm 6 testing
Pm 6 testingPm 6 testing
Pm 6 testing
 
Pm 7 risk-man
Pm 7 risk-manPm 7 risk-man
Pm 7 risk-man
 
Pm 10 procurement
Pm 10 procurementPm 10 procurement
Pm 10 procurement
 
Pm 9 quality
Pm 9 qualityPm 9 quality
Pm 9 quality
 
Pm 8 cost_management
Pm 8 cost_managementPm 8 cost_management
Pm 8 cost_management
 

Recently uploaded

Recently uploaded (20)

Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
What is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptxWhat is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
dusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningdusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learning
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Economic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesEconomic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food Additives
 
VAMOS CUIDAR DO NOSSO PLANETA! .
VAMOS CUIDAR DO NOSSO PLANETA!                    .VAMOS CUIDAR DO NOSSO PLANETA!                    .
VAMOS CUIDAR DO NOSSO PLANETA! .
 
Play hard learn harder: The Serious Business of Play
Play hard learn harder:  The Serious Business of PlayPlay hard learn harder:  The Serious Business of Play
Play hard learn harder: The Serious Business of Play
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 
UGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdf
UGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdfUGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdf
UGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdf
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 

Pm 5 time

  • 1. Project Mgmt. Time Management (Getting it done on Time)
  • 2. Time Management • Figuring out work • Priorities the work • Judge complexity • Judge resources you have / Skills • Estimate the efforts • Assign resource and time • Controlling schedule http://www.radiantminds.co.in
  • 3. Exercise • Arrange this in proper order 1) Schedule Control 2) Activity Duration Estimating 3) Schedule Development 4) Activity Sequencing 5) Activity Definition 6) Activity Resource Estimating http://www.radiantminds.co.in
  • 4. Exercise – Proper Sequence 1) Activity List 2) Activity Sequencing 3) Activity Resource Estimating 4) Activity Duration Estimation 5) Schedule Development 6) Schedule Control http://www.radiantminds.co.in
  • 5. Activity Planning (WBS) • Activity List (lower level WBS) • Activity Attributes (Predecessor, Successor, Constraints) • Identify Milestones (IMP Checkpoint) • Request Change (Internal) http://www.radiantminds.co.in
  • 6. Activity Sequencing • Wedding Planning - Activities – Booking – Food – Invitations – Purchases http://www.radiantminds.co.in
  • 7. Activity Planning START Hall Booking Food Invitations Purchases Location Find Caterer Guest List Readymade Parking Finalize Menu Print Tailoring Invitations Cost # of guests Mail Invitations Gifts (Constraints) (Constraints) (Finalize) Reception ? Wait for RSVP Guest List (Constraints) http://www.radiantminds.co.in
  • 8. Activity Sequencing • Exercise -> – Finish to Start – Start to Start – Start to Finish – Finish to Finish • Lead Time & Lag Time • Gantt Chart http://www.radiantminds.co.in
  • 9. How long project will take • Activity list • Activity attributes • Resource Calendar • Resource Requirements • Project scope statement • Activity duration estimate http://www.radiantminds.co.in
  • 10. Estimation Techniques • Expert Judgment • Function Point Analysis • Cocomo • Delphi http://www.radiantminds.co.in
  • 11. Critical Path Method • It is string of activities that will delay the whole project if anyone of them gets delayed 1) Create a guest list 2) Print invitations 3) Mail invitations 4) Wait for RSVP 5) Finalize the Menu 6) Cater the wedding http://www.radiantminds.co.in
  • 12. Network Diagram Act-C Act-A 2 4 Start Act-B Finish 0 7 Act-D Act-E 3 5 http://www.radiantminds.co.in
  • 13. Network Diagram • How to Find Critical Path • Start->A ->C -> Finish • Start->A ->B -> Finish • Start->D ->E -> Finish • Add Durations (Time) for each http://www.radiantminds.co.in
  • 14. Critical Path • Critical Path is the one with longest duration (Ex. 11 in above diagram) • Finding Float / Slack time for each activity • Shows – how much play you have in your schedule without affecting the end date http://www.radiantminds.co.in
  • 15. Critical Path • Float for any activity on the critical path is zero • We are not covering – – Early start / Early Finish – Late start / Late Finish – Lead and Lag time http://www.radiantminds.co.in
  • 16. C B A 7 1 3 Start Finish 0 E D 3 4 G F 2 2
  • 17. Float for an activity • Start – A – B – C – Finish = 11 • Start – D – E – Finish = 7 • Start - D – F – G – Finish = 8 • Critical path = duration 11 http://www.radiantminds.co.in
  • 18. Float for an activity • Float for each of the activity on critical path is zero • For A, B, C Float = 0 • Find the next longest path • D-F-G = 8 • Subtract its duration from the duration of critical path (11-8 = 3) • Float for D, F, G is 3 http://www.radiantminds.co.in
  • 19. Float for an activity • Do the same for the next longest path • Float for activity D is 3 and E is 4 http://www.radiantminds.co.in