SlideShare a Scribd company logo
1 of 31
PLUMBING DESIGN
© Copyright 2008 HVAC Design Solutions 1
Essential Design Programs
with Accurate Sizing Calculations
help to “Streamline Your Design”
HVAC DESIGN SOLUTIONS
ENGINEERING SOFTWARE
 “Plumbing Design” from HVAC Design
Solutions is a package of software programs for
most of the Plumbing Designer’s sizing tasks:
 Fixture Unit/GPM Calcs
 Water System Sizing
 Waste & Vent System Sizing
 Roof Drain System Sizing
 Natural Gas System Sizing
 Water Heater Sizing
 Extensive Help Files, and “Extras”
© Copyright 2008 HVAC Design Solutions 2
 Reduce your dependence on Reference Books,
Charts, Graphs, and “Rules of Thumb”.
 Eliminate many of the usual Plumbing
Design Tasks
 Reduce common errors and mistakes
 Create an easy-to-follow, step-by-step
“Procedure for Plumbing Design” for all
projects.
© Copyright 2008 HVAC Design Solutions 3
Software Package contains most of
the sizing calculations and
procedures for typical projects
© Copyright 2008 HVAC Design Solutions 4
indexp2.XLS#'WASTE-SCHED'!B10
indexp2.XLS#'VENT-SCHED'!B10
indexp2.XLS#'ROOFDR-SCHED'!E3
indexp2.XLS#'STORMPIPE-SCHED'!D4
indexp2.XLS#'WATERHTR-CALCS'!C6
indexp2.XLS#'GAS-SCHED1'!F3
indexp2.XLS#'GAS-SCHED2'!F3
JUMP TO FILE
indexp2.XLS#INDEX!C10
BASIC PROJECT INPUT SHEET
WASTE AND VENT PIPE SIZING
ROOF DRAINS, VERTICAL AND HORIZONTAL PIPE SIZING
PROJECT INFORMATION
PLUMBING CALCS DESIGN
indexp2.XLS#'WATER-SCHED1'!B10
indexp2.XLS#'WATER-SCHED2'!A10
indexp2.XLS#'GASPIPE-DIAG.'!E1
indexp1.XLS#INDEX!C10
indexp1.XLS#'FU-CALCS'!B4
MEDICAL GAS PIPING CALCULATIONS - PRELIMINARY
indexp1.XLS#PIPESIZE!B10
indexp1.XLS#'W&V SIZES'!B3
indexp1.XLS#ROOFDR!G4
indexp1.XLS#MEDGAS!D10
FIXTURE UNIT CALCULATIONS
WATER PIPE SIZING CALCULATIONS
NATURAL GAS PIPE SIZING SCHEDULE - LOW PRESSURE
NATURAL GAS PIPE SIZING SCHEDULE - MEDIUM PRESSURE
PRELIMINARY WATER PIPE SIZING SCHEDULE
HORIZONTAL ROOF DRAINAGE PIPING SCHEDULE
GAS PIPE SIZING DIAGRAM
WATER PIPE SIZING SCHEDULE
WASTE PIPE SIZING SCHEDULE
VENT PIPE SIZING SCHEDULE
ROOF DRAIN, LEADER, OR VERTICAL PIPE SCHEDULE
WATER HEATER SIZING CALCULATIONS
CONTENTS
indexp1.XLS#'FU-GPM'!A5
PLUMBING SCHEDULE DESIGN
INDEXP.xls#INDEX!C10
INDEXP.xls#PROJ.INFO!D2
WATER FIXTURE UNIT TO GPM CONVERSIONS
AIR COMPRESSOR CALCULATIONS indexp1.XLS#AIRCOMP!B11
Quick Links to
all calculation
programs
“Any One of these
programs is worth the cost
of the Entire Package!”
© Copyright 2008 HVAC Design Solutions 5
HELP
BASIC PROJECT INFORMATION
PROJECT NAME :
PROJECT NUMBER :
PROJECT LOCATION :
DATE :
TYPE OF BUILDING :
SUMMER OUTDOOR DESIGN DRY BULB TEMP. (DEG. F):
WINTER OUTDOOR DESIGN DRY BULB TEMP. (DEG. F):
INDOOR DESIGN TEMP. - SUMMER (DEG. F) :
INDOOR DESIGN TEMP. - WINTER (DEG. F) :
PROJECT ELEVATION (FEET) :
PROJECT MANAGER :
PROJECT ENGINEER :
CLIENT :
CLIENT CONTACT NAME:
75.0
-6.0
OAKPARK OFFICE BLDG. 3
134-08
CHICAGO, IL
05/06/08
JOHN GOREMANN
"YOUR COMPANY NAME"
OFFICE
91.0
ADS ARCHITECTS
70.0
670
BILL REECE
JIM EDMOND
Begin with Basic Project
Information input
Information automatically
transfers to all programs
Design Conditions are
used in some calculations
© Copyright 2008 HVAC Design Solutions 6
FLUSH VALVES = 1, FLUSH TANKS = 2 1
FU EACH TOTAL FU FU EACH TOTAL FU
BATHTUB OR COMBINATION BATH/SHOWER 2 3.0 6.0 3.0 6.0
BATHTUB WITH 3/4" FILL VALVE 8.0 0.0 8.0 0.0
BIDET 1.0 0.0 1.0 0.0
CLOTHES WASHER, DOMESTIC 3.0 0.0 3.0 0.0
DENTAL UNIT, CUSPIDOR 1.0 0.0 1.0 0.0
DISHWASHER, DOMESTIC 1.5 0.0 1.5 0.0
DRINKING FOUNTAIN OR WATERCOOLER 3 0.5 1.5 0.0 0.0
FIXTURE UNIT CALCULATIONS
FIXTURE TYPE QUANTITY
PROJECT NAME:
DATE:
PROJECT NUMBER:
COLD WATER FIXTURE UNITS
*
HOT WATER FIXTURE UNITS *
PRINT
RESET/CLEAR
Count the Fixtures for the project and
input the quantities of each type
Fixture Unit Values may be edited to
meet local Codes
© Copyright 2008 HVAC Design Solutions 7
SINKS - SERVICE OR MOP BASIN, 3" DRAIN 2 2.5 5.0 2.5 5.0
SINKS - SERVICE, FLUSHING RIM 20.0 0.0 0.0 0.0
SINKS - SPECIAL PURPOSE, 2" DRAIN 2.5 0.0 2.5 0.0
SINKS - SPECIAL PURPOSE, 3" DRAIN 2.5 0.0 2.5 0.0
SINKS - WASHUP, EACH SET OF FAUCETS 1.5 0.0 1.5 0.0
URINAL, 1.0 GPF FLUSH VALVE 4 13.3 53.0 0.0 0.0
URINAL, GREATER THAN 1.0 GPF FLUSH VALVE 0.0 0.0 0.0 0.0
URINAL, FLUSH TANK 2.0 0.0 0.0 0.0
WASHFOUNTAIN, 1-1/2" DRAIN 3.0 0.0 3.0 0.0
WASHFOUNTAIN, 2" DRAIN 3.0 0.0 3.0 0.0
WATER CLOSET - 1.6 GPF GRAVITYTANK 2.5 0.0 0.0 0.0
WATER CLOSET - 1.6 GPF FLUSHOMETER TANK 2.5 0.0 0.0 0.0
WATER CLOSET - 1.6 GPF FLUSH VALVE 6 20.8 125.0 0.0 0.0
WATER CLOSET - GREATER THAN 1.6 GPF TANK 5.5 0.0 0.0 0.0
WATER CLOSET - GREATER THAN 1.6 GPF VALVE 0.0 0.0 0.0 0.0
KITCHEN EQUIPMENT - WATER GPM
TOTALS 201.5 17.0
COLD WATER
FU
HOT WATER
FU
Input Fixture Quantities, and the Total
FU and Total GPM are calculated, per
Local Code requirements
© Copyright 2008 HVAC Design Solutions 8
FLUSH VALVES = 1, FLUSH TANKS = 2 1
SIZE MAX. GPM VEL.
DEMAND FLOW RATE (GPM) 94 1/2 2 1.4
WATER MAIN PRESSURE (PSIG) 100 3/4 6 3.2
PRESSURE DROP THRU METER (PSIG) 7 1 11 3.9
PRESSURE REDUCING VALVE - PRESSURE (IF REQUIRED) 80 1 1/4 24 5.2
PRESSURE DROP THRU BACKFLOW PREVENTER (PSIG) 5 1 1/2 32 5.6
STATIC HEIGHT OF HIGHEST FIXTURE ABOVE MAIN (FT) 30 13 2 67 6.2
PRESSURE DROP THROUGH WATER TREATMENT (PSIG) 10 2 1/2 110 7
RESIDUAL PRESSURE REQUIRED AT LAST OUTLET (PSIG) 25 3 180 6.5
PRESSURE AVAILABLE FOR PIPING LOSS (PSIG) 27 4 300 8
PRESSURE BOOSTER PUMP (IF REQUIRED) (PSIG) 0 5 460 6.8
TOTAL DEVELOPED LENGTH OF LONGEST PIPE RUN (FT) 600 6 700 8
MAXIMUM ALLOWABLE PIPE PRESS. DROP (PSIG/100 FT) 4.5 8 1200 8.2
PROJECT NUMBER:
DATE:
AVAILABLE WATER PRESSURE CALCULATIONS PIPE SIZE SCHEDULE (@ MAX. ALLOWABLE P
PROJECT NAME:
PRINTTotal Demand transferred
from Fixture Unit Totals
Adding Project specific
information…...
Results in Allowable
Pipe Pressure Drop/100’
for “Longest Run” sizing
© Copyright 2008 HVAC Design Solutions 9
ERROR
FROM TO
1 2 4 0 4 3/4 4 1
2 3 42 0 25 1 1/2 2
3 4 250 100 2 1/2 3
4 5 475 135 2 1/2 2
0 0
0 0
PROJECT NUMBER:
PROJECT NAME:
FLUSH TANK
FIXTURE UNITS
(FU)
FLUSH VALVE
FIXTURE UNITS
(FU)
FLOW RATE
(GPM)
90 DEG.
STANDARD
ELBOW
DATE:
PIPE SECTION
MAXIMUM ALLOWABLE PRESSURE
DROP - LONGEST RUN (PSIG/100 FT.)
45 DEG.
STANDARD
ELBOW
NOTE: INPUT EITHER FLUSH TANK OR FLUSH
VALVE, NOT BOTH.
PIPE SIZES
FOR MAIN
(LONGEST
RUN)
NUMBER OF EACH TYPE FITTING IN THE
90 DEG.
STANDARD TEE
(FLOW TURNS)
PRELIMINARY WATER PIPE SIZING SCHEDULE
4.5
PRINT
RESET/CLEAR
Max. Allowable PD/100’
Automatically transferred to
Pipe Section Sizing Calcs
Input FU values for
each pipe section
Input fittings and
valves for each
pipe section
© Copyright 2008 HVAC Design Solutions 10
ERROR
FROM TO
1 2 4 0 4 3/4 2.2 2.7
2 3 42 0 25 1 1/2 2.5 4.5
3 4 0 120 72 2 1/2 1.7 5.0
4 5 0 250 100 2 1/2 2.9 7.0
0 0 0.0 0.0
0 0 0.0 0.0
WATER PIPE SIZING SCHEDULE
4.5
PIPE SECTION
MAXIMUM ALLOWABLE PRESSURE DROP -
LONGEST RUN (PSIG/100 FT.)
MAIN SIZE
VELOCITY
(FT./SEC.)
NOTE: INPUT EITHER FLUSH TANK OR FLUSH
VALVE, NOT BOTH.
PROJECT NAME:
FLUSH TANK
FIXTURE UNITS
(FU)
FLUSH VALVE
FIXTURE UNITS
(FU)
FLOW RATE
(GPM) MAIN SIZE
(INCHES)
MAIN SIZE PD
(PSI/100 FT.)
DATE:
PIPE SIZES FOR MAIN (LONGEST RUN)
PROJECT NUMBER:
PRINT
RESET/CLEAR
Final, Accurate Pipe
Section sizing, after
corrections for actual
fittings and valves
Accurate Pipe sizing, NOT
based on Rule-of-Thumb,
like “add 50% for Fittings”!!
© Copyright 2008 HVAC Design Solutions 11
WASTE FIXTURE UNITS (FU): 30
WASTE SLOPE (1/4=1, OR 1/8=2): 1 2 1/2
WASTE VERTICAL LENGTH (FT.): 65 3
VENT FIXTURE UNITS (FU): 30
VENT TOTAL LENGTH (FT.): 46 2 1/2
VENT HORIZONTAL LENGTH (FT.): 12
SIZES
1 1/4 1 1/2 2 2 1/2 3 4
MAXIMUM UNITS
DRAINAGE PIPING (#1)
VERTICAL 1 2 (#2) 16 (#3) 32 (#3) 48 (#4) 256
HORIZONTAL @ 1/4"/FT. SLOPE 1 1 8 (#3) 14 (#3) 35 (#4) 216 (#5)
HORIZONTAL @ 1/8"/FT. SLOPE N/A N/A N/A N/A N/A 172 (#5)
MAXIMUM UNIT LOADING AND MAXIMUM LENGTH OF DRAINAGE AND VE
WASTE & VENT SIZING AND MAX. LENGTHS
WASTE SIZE - VERT.:
VENT SIZE:
WASTE SIZE - HORIZ.:
Quick input of pipe
section loading and
lengths (W and/or V)
Resulting sizes for the section
Cross reference in chart form
© Copyright 2008 HVAC Design Solutions 12
HELP
FROM TO
1 2 6 4 2 2 4 0
2 3 12 4 2 2 1/2 4 0
3 4 22 4 3 3 4 1
4 5 34 4 4 4 4 4
WASTE PIPE SIZING SCHEDULE
WASTE PIPE SECTION
WASTE FIXTURE
UNITS (FU)
WASTE PIPE
VERTICAL
LENGTH
(FT.)
WASTE PIPE
SIZE -
VERTICAL
WASTE PIPE
SIZE AT
1/4"/FT.
SLOPE
WASTE PIPE
SIZE AT
1/8"/FT.
SLOPE
NUMBER OF
WATER
CLOSETS ON
PIPE SECTION
PROJECT NAME:
PROJECT NUMBER:
DATE:
OAKPARK OFFICE BLDG. 3
134-08
05/06/08
RESET/CLEAR
PRINT
Input W-FU and vertical length
for each pipe section
Required sizes at different slopes
are calculated automatically
© Copyright 2008 HVAC Design Solutions 13
HELP
CAUTION
FROM TO
1 2 20 110 35 2 0 0
2 3 30 190 55 0 3 0
3 4 45 100 70 0 0 3
4 5 65 30 8 4 0 0
5 6 150 60 20 5 0 0
PROJECT NAME:
PROJECT NUMBER:
DATE:
OAKPARK OFFICE BLDG. 3
134-08
VENT PIPE SECTION
VENT FIXTURE
UNITS (FU)
VENT PIPE
TOTAL
LENGTH
(FT.)
VENT PIPE
HORIZONTAL
LENGTH
(FT.)
VENT PIPE SIZE
(IF TOTAL AND
HORIZ. LEN.
LESS THAN
ALLOWABLE
LENGTH)
VENT PIPE SIZE
(IF TOTAL LEN.
MORE THAN
ALLOWABLE
LENGTH)
VENT PIPE SIZE
(IF HORIZ. LEN.
MORE THAN 1/3
OF ALLOWABLE
TOTAL LENGTH)
VENT PIPE SIZING SCHEDULE
EITHER TOTAL LENGTH OR
HORIZONTAL LENGTH
EXCEEDS CODE MAXIMUM
ALLOWABLE. SIZE HAS BEEN
INCREASED BYONE PIPE
SIZE.
05/06/08
RESET/CLEAR
PRINT
Input V-FU, total length,
and horizontal length for
each pipe section
Required sizes are
calculated automatically
© Copyright 2008 HVAC Design Solutions 14
HELP
3.00
1 1500 1000 2000 3 67 2147
2 2500 1200 2920 4 144 4613
3 3000 2500 3875 4 144 4613
4 1000 1000 3 67 2147
FLOW RATE
(GPM)
DRAIN
NUMBER
ROOF AREA
(SQ. FT.)
(1) ADJACENT
WALL - AREA
(SQ. FT.)
PROJECT NUMBER: 134-08
DATE: 05/06/08
(2) ADJACENT
WALLS - AREA
(SQ. FT.)
TOTAL AREA -
ROOF + WALLS
(SQ. FT.)
MAXIMUM AREA
DRAIN OR PIPE
SIZE CAN CARRY
(SQ. FT.)
SIZE OF ROOF
DRAIN, LEADER,
OR VERTICAL
PIPE (IN.)
PROJECT NAME: OAKPARK OFFICE BLDG. 3RAINFALL RATE FOR 100 YEAR, 60
MINUTE DURATION STORM IN
LOCAL AREA (INCHES/HR.):
ROOF DRAIN, LEADER, OR VERTICAL PIPE SCHEDULE
PRINT
RESET/CLEAR
Input Roof Area
served by Roof Drain
Input Local
Rainfall Rate
Roof Drain size or
Vertical Pipe sizes
are calculated
Input Adjacent Wall Area
where applicable
© Copyright 2008 HVAC Design Solutions 15
FROM TO
1 2 3500 1200 4100 5 139
2 3 2000 3000 3050 5 139
3 4 5500 4500 7075 6 222
4 5 3000 3000 5 139
RAINFALL RATE FOR 100 YEAR,
60 MINUTE DURATION STORM IN
LOCAL AREA (INCHES/HR.):
3.00
(1) ADJACENT
WALL - AREA
(SQ. FT.)
HORIZ. PIPE
SIZE AT 1/8"/FT.
SLOPE
(INCHES)
TOTAL AREA -
ROOF + WALLS
(SQ. FT.)
PIPE SECTION
ROOF AREA
(SQ. FT.)
FLOW RATE
AT 1/8"/FT.
SLOPE
(GPM)
PROJECT NAME:
PROJECT NUMBER:
(2) ADJACENT
WALLS - AREA
(SQ. FT.)
DATE:
HORIZONTAL ROOF DRAINAGE PIPING SCHEDULE
PRINT
RESET/CLEAR
Input Local
Rainfall Rate
Input Roof Area served
by Pipe Section
Input Adjacent Wall Area
where applicable
Horizontal Roof Drainage
Pipe Section sizes are
calculated for 1/8”, 1/4”,
and 1/2” pipe slopes
© Copyright 2008 HVAC Design Solutions 16
TYPE OF BUILDING OR FACILITY:
FACILITYINCLUDE FULL KITCHEN? 1 = YES, 2 = NO 1
GPH EACH TOTAL GPH
BATHTUB FILL (EXCLUDING WHIRLPOOL TUBS) 20 0
BATHTUB AND SHOWER 5 75 375
BIDET 1 5 5
DISHWASHER - DOMESTIC UNDERCOUNTER 15 0
FOOT BASIN 3 0
LAUNDRY- DOMESTIC, STATIONARYTUB 28 0
LAVATORY- PRIVATE 2 0
LAVATORY- PUBLIC 6 0
SHOWER - SINGLE HEAD 3 75 225
20 x 20 IN. RACKS
18 x 18 IN. RACKS
UNDERCOUNTER TYPE
SINGLE TANK
DISHWASHER - CONVEYOR TYPE - WITHOUT INTE
MULTIPLE TANK (DISHES FLAT)
PLUMBING FIXTURE TYPE QUANTITY
KITCHEN FIXTURE TYPE
(ASSUMING SEPARATE BOOSTER
HEATER FOR 140 DEG. F TO 180 DEG.
F HOT WATER WHERE REQUIRED)
PROJECT NAME:
PROJECT NUMBER:
DISHWASHER - DOOR TYPE - WITHOUT INTERN
DATE:
PROJECT ELEVATION:
KITCHENS:GENERAL PLUMBING FIXTURES:
DISHWASHER - FROM MANUFACTURER, IF AVAIL.
HOT WATER - GALLONS PER
HOUR AT 140 DEG. F
16 x 16 IN. RACKS
WATER HEATER SIZING CALCULATIONS
PRINT
RESET/CLEAR
HOSPITAL Select Type of Facility
from drop-down list
Input quantity of each
Fixture Type
© Copyright 2008 HVAC Design Solutions 17
LAVATORY- PUBLIC 1 8 8
SHOWER - GENERAL 50 0
SHOWER - THERAPEUTIC 400 0
SINK - BARIUM 1 15 15
SINK - CLEANUP ROOM 1 15 15
SINK - CENTRAL SUPPLY 1 15 15
SINK - CLINICAL 1 10 10
SINK - CLINICAL, BEDPAN HOSE 15 0
SINK - LABORATORY 2 5 10
SINK - PHARMACY 1 5 5
SINK - PLASTER 1 15 15
SINK - SCRUB-UP 2 10 20
1424
1919
0.25
480
0.60
288STORAGE TANK CAPACITY(GALLONS):
POSSIBLE TOTAL MAXIMUM DEMAND (GPH):
DEMAND FACTOR:
PROBABLE MAXIMUM DEMAND (GPH):
STORAGE CAPACITYFACTOR:
POSSIBLE MAXIMUM DEMAND - FIXTURES (GPH):
75 0
139 0
1 8 8
60 0
240 0
1 45 45
180 0
40 0
1 30 30
1 90 90
1 45 45
495
1.00
359669
0.70
411
SINGLE POT SINK
TRIPLE POT SINK
VEGETABLE SINK
PREFLUSH (CLOSED TYPE)
PREFLUSH (HAND-OPERATED)
PRESCRAPPER (OPEN TYPE)
RECIRCULATING PREFLUSH
UTINSIL WASHERS
DISHWASHER MAKEUP WATER REQ.
HAND SINK
DOUBLE POT SINK
KITCHEN FIXTURES:
POSSIBLE MAXIMUM DEMAND - KITCHEN (GPH):
ALTITUDE CORRECTION FACTOR (IF ANY):
REQUIRED WATER HEATER OUTPUT (AT 140 DEG. F) (BTUH):
USABLE STORAGE CAPACITYFACTOR:
REQUIRED STORAGE TANK CAPACITY(GALLONS):
Input Kitchen Fixtures,
as applicable
Demand Factor and
Storage Factor are applied
to Max. Demand, based
on Type of Facility
Resulting in required Water Heater Output
and required Storage Tank Capacity
© Copyright 2008 HVAC Design Solutions 18
Start with a sketch of
the Gas Piping system
© Copyright 2008 HVAC Design Solutions 19
28.00 1.00 (PSI)
2.00 0.07 (PSI)
0.60 1.000 (SG MULT)
FROM TO
1 2 150 570 1 0 2
2 3 450 570 1 1/2 0
3 4 750 570 2 0 2
4 5 2500 570 3 0
5 6 2565 570 3 0 2
2 7 300 0 500 1 1/4 1
3 8 300 0 460 1 1/4
4 9 1750 0 420 3
5 10 65 0 320 3/4
PIPE SIZES FOR
BRANCH
NUMBER OF EACH FITMEASURED LENGTH
BRANCH - FROM
METER (WITHOUT
FITTINGS) (FEET)
GAS FLOW
RATE (CFH)
MEASURED LENGTH
MAIN - LONGEST RUN
(WITHOUT FITTINGS)
(FEET)
PIPE SIZES
FOR MAIN
(LONGEST
RUN)
PIPE SECTION
NATURAL GAS PIPE SIZING SCHEDULE (LOW PRESSURE - BELO
90 DEG.
STANDARD
ELBOW
INITIAL GAS PRESSURE (IN. WC) (28" WC PER PSI)
ALLOWABLE PRESSURE DROP (IN. WC)
GAS SPECIFIC GRAVITY PRINT
RESET/CLEAR
1. Input Local
Gas conditions
2. Input Flow Rate and
Lengths for “Longest
Run” and Branches
3. Input Fittings
and Valves for
each section
4. Sizes are
calculated for
each Section
© Copyright 2008 HVAC Design Solutions 20
QUANTITY DIVERSITYFACTOR
PSI PER 100 FT. IN. HG PER 100 FT. PERCENT (%)
OXYGEN (O2)
NUMBER OF STANDARD OUTLETS 24 1.00 --- 33
NUMBER OF RESPIRATORYVENTILATORS 8 1.00 --- 100
NITROUS OXIDE (N2O)
NUMBER OF STANDARD OUTLETS 18 1.00 --- 50
NITROGEN (N2)
NUMBER OF STANDARD OUTLETS 18 2.00 --- 75
MEDICAL AIR (MA)
NUMBER OF STANDARD OUTLETS 24 1.00 --- 60
MEDICAL VACUUM (VAC)
NUMBER OF STANDARD OUTLETS 18 --- 1.00 60
NUMBER OF MAJOR SURGERYROOMS 4 --- 1.00 100
NUMBER OF INTENSIVE CARE BEDS 6 --- 1.00 50
MEDICAL GAS SERVICE TYPE
DESIGN FRICTION LOSS 1
Initial Pipe Sizing for Med.
Gas Systems
© Copyright 2008 HVAC Design Solutions 21
FREE AIR USAGE AT 90 PSIG
(CFM)
1
AIR HOIST - 1,000 LB. OR LESS 7 0.8
AIR HOIST - 2,000 LB. TO 10,000 LB 2 35 0.8
AIR HOIST - 10,000 LB. AND LARGER 1 105 0.8
ANGLE NUT SETTER - TO 5/16" (WEIGH 8 LBS.) 6 20 0.8
ANGLE NUT SETTER - 1/2" TO 3/4" (WEIGH 18 LBS.) 2 30 0.8
BLOWGUNS 1 25 0.8
BUSHING TOOLS (MONUMENTAL) 25 0.8
CARVING TOOLS (MONUMENTAL) 15 0.8
CHIPPING HAMMERS (WEIGH 2 - 4 LBS.) 3 12 0.8
CHIPPING HAMMERS (WEIGH 10 - 13 LBS.) 30 0.8
CHIPPING HAMMERS (HEAVYWEIGHT) 39 0.8
CONCRETE VIBRATORS 30 0.8
FILE AND BURR MACHINES 1 18 0.8
GREASE GUN 3 4 0.8
GRINDERS - HORIZONTAL (1-1/2" WHEELS AND UNDER) 10 0.8
GRINDERS - HORIZONTAL (2" AND 2-1/2" WHEELS) 2 20 0.8
TOOL OR EQUIPMENT QUANTITY USE FACTOR2
Calculates Total Anticipated Usage &
Recommended Receiver Volume
© Copyright 2008 HVAC Design Solutions 22
Extensive “Quality
Control” Plumbing
Checklists are available
in a separate “Plumbing
Peer Review” Software
Package
Coordination Between Disciplines
Contents: (Click on hyperlink to jump to the sheet checklist)
A Preliminary Review of Plans and Specifications
B Demolition Plans
C Architect and/or Owner Coordination
D Structural Coordination
E Mechanical Coordination
F Plumbing Coordination
G Civil Engineering Coordination
H Electrical Coordination
A Preliminary Review of Plans and Specifications
1 Quickly review all Drawings in the Construction Document set, including Architectural,
Structural, Civil, Landscaping, Mechanical, Plumbing, Fire Protection, Electrical, Food
Service, and any other discipline. Spend not more than one minute per sheet, average.
2 Make a list of any apparent discrepancies or questions while reviewing the set, and add
‘flags’ to sheets where there are significant questions.
3 Quickly review the Specifications by reading through the Table of Contents for
Mechanical and Plumbing work. Check the Table of Contents against the actual
Specification sections to verify all sections have been included. Make a list of questions
that may come up during the cursory review.
4 Review Architectural Title Sheet, or first sheet in the set, and make a list of the Project
Square Footage, Building Occupancy Type, Building Construction Type, Governing
Codes, Index of Drawings, and any other information that relates to Mechanical or
Plumbing work.
5 Check for consistent appearance of Title Blocks, Drawing Scales, North Arrows,
Professional Stamps, Company Logos, Sheet Numbers, Sheet Titles, Issue Dates, and
Issue Revisions on all sheets.
B Demolition Plans
1 Verify that Demolition Symbols (cross-hatching, etc.) are clear and complete, and are
coordinated with other disciplines.
2 Verify there are notes regarding potential hazardous materials (asbestos, lead paint,
etc.), and coordinate with Architect or other Prime Consultant and Owner.
Over (70) Pages of
Checklists and
Spreadsheets for a
thorough review of
Plumbing Construction
Documents
Plumbing Plan Review Items
Contents: (Click on hyperlink to jump to the sheet checklist)
A Preliminary Review of Plans and Specifications
B Legend and Symbols, and Fixture Calculations Sheet
C Schedule Sheets
D Plumbing Site Plan
E Plumbing Demolition Plans
F Plumbing Underground Floor Plan
G Plumbing Floor Plans
H Plumbing Roof Plans
I Plumbing Medical/Lab/Process Piping Plans
J Central Plant Plumbing Plans
K Plumbing Riser Diagram Sheets
L Plumbing Detail Drawings
© Copyright 2008 HVAC Design Solutions 23
C Plumbing Underground Floor Plan Return to Table of Contents
1 Read all Sheet Notes and verify they are clear and appropriate.
2 Verify all References are correct. Follow references to indicated sheets.
3 Coordinate Plumbing Underground Plan with Structural Grade Plan. Verify that
below-slab Footings and Grade Beams have been shown on the Plumbing
Underground Floor Plan, for underground pipe coordination. (If Footings and Grade
Beams are not on Plumbing Underground Plan, they should be added to the
‘background’).
4 Verify that any pipes passing over, under, or through Footings or Grade Beams have
been coordinated with Structural Plans. Check on provisions for sleeving beams, etc.
Verify depth of Footings and Grade Beams below floor slab, to check for any
potential conflicts.
5 Verify that Footings and Grade Beams are not directly below Plumbing Fixture
outlets, Floor Drains, Floor Sinks, Plumbing Chases, or pipe drops, such as Storm
Drains and Overflow Drains. Verify coordination with pipes at Columns, such as
Sanitary Vents and Trap Primer water pipes, to avoid conflicts with Footings at
Columns.
6 Check for locations of building expansion joints or seismic joints, and verify that pipes
have been designed to accommodate expansion joints.
7 Follow all Waste Pipe risers up to floors above. Place a pencil check-mark on each
riser as it is verified to continue on the floor above (or roof). Check for coordinated
locations from floor to floor on each pipe riser.
8 After following each Waste pipe riser to the top, follow horizontally to the most remote
fixture or drain connection point. Pencil in Fixture Units (FU) for all Fixtures and
Drains served by each Waste riser. Sum the flow rates (FU) from the remote fixtures
or drains, back to the risers. Pencil in the accumulated FU on the plans adjacent to
the pipes. Verify that Fixture Units are listed for all fixtures or drains and that
Schedules for each fixture are complete.
9 If the Floor Plan has references to larger scale plans (such as Enlarged Toilet Room
Partial Plans), follow to the referenced Enlarged Plan. Verify all pipe sizes are
coordinated from Floor Plan to Enlarged Partial Plan. Verify the Floor Plan and
Enlarged Plan have the same background and are current with the latest
Architectural plans. Pencil in the Fixture Unit value for each Fixture or Drain on the
Enlarged Plan, and sum the FU to the extent of the Enlarged Scale Plan. Transfer
the total flow rates back to the original Floor Plan, for continuation.
Example of Quality
Control Check List
Items
© Copyright 2008 HVAC Design Solutions 24
FLUSH VALVES = 1, FLUSH TANKS = 2 1
SIZE MAX. GPM VEL.
DEMAND FLOW RATE (GPM) 96 1/2 2 1.4
WATER MAIN PRESSURE (PSIG) 100 3/4 6 3.2
PRESSURE DROP THRU METER (PSIG) 7 1 11 3.9
PRESSURE REDUCING VALVE - PRESSURE (IF REQUIRED) 80 1 1/4 24 5.2
PRESSURE DROP THRU BACKFLOW PREVENTER (PSIG) 5 1 1/2 32 5.6
STATIC HEIGHT OF HIGHEST FIXTURE ABOVE MAIN (FT) 30 13 2 67 6.2
PRESSURE DROP THROUGH WATER TREATMENT (PSIG) 10 2 1/2 110 7.0
RESIDUAL PRESSURE REQUIRED AT LAST OUTLET (PSIG) 25 3 180 6.5
PRESSURE AVAILABLE FOR PIPING LOSS (PSIG) 27 4 300 8.0
PRESSURE BOOSTER PUMP (IF REQUIRED) (PSIG) 0 0 5 460 6.8
TOTAL DEVELOPED LENGTH OF LONGEST PIPE RUN (FT) 600 6 700 8.0
MAXIMUM ALLOWABLE PIPE PRESS. DROP (PSIG/100 FT) 4.5 8 1200 8.2
AVAILABLE WATER PRESSURE CALCULATIONS PIPE SIZE SCHEDULE (@ MAX. ALLOWABLE PD/100 FT)
PROJECT NUMBER:
DATE:
WATER PIPE SIZING CALCULATIONS
PROJECT NAME:
After completing input and
calculations, Output and
Sizing Documents can be
printed for submittal to
building department
officials and for addition to
drawings and schedules
© Copyright 2008 HVAC Design Solutions 25
Extensive Plumbing Programs
MEDICAL GAS PIPING CALCULATIONS -
PRELIMINARY
WATER FIXTURE UNIT TO GPM CONVERSION
ROOF DRAINS, VERTICAL AND HORIZONTAL
PIPE SIZINGROOFDR
MEDGAS
FU-GPM
AIRCOMP
AIR COMPRESSOR CALCULATIONS
PIPESIZE
W&V SIZES
FU-CALCS
FIXTURE UNIT CALCULATIONS
WATER PIPE SIZING CALCULATIONS
WASTE AND VENT PIPE SIZING
HORIZONTAL ROOF DRAINAGE PIPING SCHEDULE
WATER HEATER SIZING CALCULATIONS
ROOF DRAIN, LEADER, OR VERTICAL PIPE
SCHEDULE
GAS-SCHED1
NATURAL GAS PIPE SIZING SCHEDULE - LOW
PRESSURE (BELOW 1.5 PSI)
GAS-SCHED2
NATURAL GAS PIPE SIZING SCHEDULE -
MEDIUM PRESSURE (ABOVE 1.5 PSI)
ROOFDR-SCHED
STORMPIPE-SCHED
WATERHTR-CALCS
WASTE-SCHED
VENT-SCHED
WASTE PIPE SIZING SCHEDULE
VENT PIPE SIZING SCHEDULE
WATER-SCHED2
WATER PIPE SIZING SCHEDULE
GASPIPE-DIAG.
GAS PIPE SIZING DIAGRAM
 Straightforward takeoff and input allows easy
calculation and sizing of Plumbing Systems.
 Extensive procedures, formulas, charts, and
tables as prescribed by Plumbing Codes and
as recommended by ASPE and ASHRAE have
been included and have been used to establish
the “Accurate” Plumbing System Sizes.
 Multiple Programs are included, covering
most of the typical Plumbing Design Tasks for
most projects.
© Copyright 2008 HVAC Design Solutions 26
 Significantly reduces “Reference Material
Dependence” which can save a great deal of
time and effort.
 Output in the form of Compliance
Documents or System Sizing Summaries for
submittal to appropriate code enforcement
officials or building departments.
 Extensive “Help Files” that are hyperlinked to
each program, form, or table.
© Copyright 2008 HVAC Design Solutions 27
 Limited time “Special Pricing” available at our
website www.hvacdesignsolutions.com
 Plumbing Design Package
Original Price: $250 US, Special Price: $189 US
 Plumbing Peer Review Package
Original Price: $200 US, Special Price: $148 US
© Copyright 2008 HVAC Design Solutions 28
 Current Version: 2.16, with latest update
(03/31/2008) Free updates, as available.
 To purchase Plumbing Design or Plumbing
Peer Review, visit our website at
www.hvacdesignsolutions.com and go to the
Prices/Orders page
 Software can be downloaded for immediate
installation (with password) after purchase is
confirmed
© Copyright 2008 HVAC Design Solutions 29
 OS: Windows® 98, 2000, XP, 2003, Vista
 Processor: Pentium® or equivalent
 Ram: 512MB (minimum recommended)
 Disk Space: 100 MB (recommended)
 Software: MS Word®, MS Excel®
© Copyright 2008 HVAC Design Solutions 30
 Thank you for taking your time to review
our Plumbing Design software packages
 If you have any questions or comments, you
can e-mail to:
steve”at”hvacdesignsolutions.com , or
support”at”hvacdesignsolutions.com
 We also have an interactive demo of our
Plumbing Design software that can be
delivered, on request, via e-mail.
© Copyright 2008 HVAC Design Solutions 31

More Related Content

What's hot

Building drainage system
Building drainage systemBuilding drainage system
Building drainage systemDipesh Jain
 
Water supply appurtenances
Water supply appurtenancesWater supply appurtenances
Water supply appurtenancesAjay B.K
 
water supply scheme
water supply schemewater supply scheme
water supply schemesunil9666
 
WATER DISTRIBUTION SYSTEM DESIGN REPORT UET LAHORE by envian
WATER DISTRIBUTION SYSTEM DESIGN REPORT UET LAHORE by envianWATER DISTRIBUTION SYSTEM DESIGN REPORT UET LAHORE by envian
WATER DISTRIBUTION SYSTEM DESIGN REPORT UET LAHORE by envianMuhammad Usman
 
Laying, jointing and testing of pipes
Laying, jointing and testing of pipesLaying, jointing and testing of pipes
Laying, jointing and testing of pipessathyan s
 
Hot water-plumbing-system
Hot water-plumbing-systemHot water-plumbing-system
Hot water-plumbing-systemnhmurad
 
Valve and fittings
Valve and fittingsValve and fittings
Valve and fittingsYogesh SN
 
Interceptors and manholes
Interceptors and manholesInterceptors and manholes
Interceptors and manholesJem Ganacia
 
Intake structures
Intake structures Intake structures
Intake structures Sachin PatiL
 
PIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINES
PIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINESPIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINES
PIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINESMehul Gohil
 
Hot water-supply-system-presentation-slides(1)
Hot water-supply-system-presentation-slides(1)Hot water-supply-system-presentation-slides(1)
Hot water-supply-system-presentation-slides(1)Jackytiongleesong
 
Sewer appurtenances
Sewer appurtenances Sewer appurtenances
Sewer appurtenances SitalParajuli
 
Canal outlets and modules
Canal outlets and modulesCanal outlets and modules
Canal outlets and modulesbhalinder singh
 
Plumbing system for training, 22.01.2017
Plumbing system for training, 22.01.2017Plumbing system for training, 22.01.2017
Plumbing system for training, 22.01.2017Krishnandu Barma
 
Sanitary Fittings - Building services
Sanitary Fittings -  Building servicesSanitary Fittings -  Building services
Sanitary Fittings - Building servicesFaizan Ahmad
 
PPT OF PLUMBING AND COMPONETS | PPT on Plumbing
PPT OF PLUMBING AND COMPONETS | PPT on PlumbingPPT OF PLUMBING AND COMPONETS | PPT on Plumbing
PPT OF PLUMBING AND COMPONETS | PPT on PlumbingAbhijeetCreation
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildingsSimarpreet Singh
 

What's hot (20)

House Drainage System
House Drainage SystemHouse Drainage System
House Drainage System
 
Building drainage system
Building drainage systemBuilding drainage system
Building drainage system
 
Water supply appurtenances
Water supply appurtenancesWater supply appurtenances
Water supply appurtenances
 
water supply scheme
water supply schemewater supply scheme
water supply scheme
 
Plumbing
PlumbingPlumbing
Plumbing
 
WATER DISTRIBUTION SYSTEM DESIGN REPORT UET LAHORE by envian
WATER DISTRIBUTION SYSTEM DESIGN REPORT UET LAHORE by envianWATER DISTRIBUTION SYSTEM DESIGN REPORT UET LAHORE by envian
WATER DISTRIBUTION SYSTEM DESIGN REPORT UET LAHORE by envian
 
Laying, jointing and testing of pipes
Laying, jointing and testing of pipesLaying, jointing and testing of pipes
Laying, jointing and testing of pipes
 
Hot water-plumbing-system
Hot water-plumbing-systemHot water-plumbing-system
Hot water-plumbing-system
 
Valve and fittings
Valve and fittingsValve and fittings
Valve and fittings
 
Interceptors and manholes
Interceptors and manholesInterceptors and manholes
Interceptors and manholes
 
Intake structures
Intake structures Intake structures
Intake structures
 
PIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINES
PIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINESPIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINES
PIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINES
 
Hot water-supply-system-presentation-slides(1)
Hot water-supply-system-presentation-slides(1)Hot water-supply-system-presentation-slides(1)
Hot water-supply-system-presentation-slides(1)
 
Sewer appurtenances
Sewer appurtenances Sewer appurtenances
Sewer appurtenances
 
Canal outlets and modules
Canal outlets and modulesCanal outlets and modules
Canal outlets and modules
 
Plumbing system for training, 22.01.2017
Plumbing system for training, 22.01.2017Plumbing system for training, 22.01.2017
Plumbing system for training, 22.01.2017
 
Sanitary Fittings - Building services
Sanitary Fittings -  Building servicesSanitary Fittings -  Building services
Sanitary Fittings - Building services
 
PPT OF PLUMBING AND COMPONETS | PPT on Plumbing
PPT OF PLUMBING AND COMPONETS | PPT on PlumbingPPT OF PLUMBING AND COMPONETS | PPT on Plumbing
PPT OF PLUMBING AND COMPONETS | PPT on Plumbing
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildings
 
Waterproofing
WaterproofingWaterproofing
Waterproofing
 

Similar to Plumbing Design

HVAC - Wetside Design
HVAC - Wetside DesignHVAC - Wetside Design
HVAC - Wetside DesignSteveMillerPE
 
HVAC - Airside Design
HVAC - Airside DesignHVAC - Airside Design
HVAC - Airside DesignSteveMillerPE
 
AIChE Smart Stack Damper Design Provides Better Control of Fired Heaters
AIChE Smart Stack Damper Design Provides Better Control of Fired HeatersAIChE Smart Stack Damper Design Provides Better Control of Fired Heaters
AIChE Smart Stack Damper Design Provides Better Control of Fired HeatersAshutosh Garg
 
CatFT(r) Fischer-Tropsch Process presentation
CatFT(r) Fischer-Tropsch Process presentationCatFT(r) Fischer-Tropsch Process presentation
CatFT(r) Fischer-Tropsch Process presentationThomas Holcombe
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Emeka Ngwobia
 
An overview of diagnostic tools used in RESNET testing
An overview of diagnostic tools used in RESNET testingAn overview of diagnostic tools used in RESNET testing
An overview of diagnostic tools used in RESNET testingBill Spohn
 
4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS S4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS STedyChriswanda1
 
POX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEPPOX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEPChris Galeotti
 
2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systemsmichaeljmack
 
Air Preheat System Upgrade on Coker Heaters
Air Preheat System Upgrade on Coker HeatersAir Preheat System Upgrade on Coker Heaters
Air Preheat System Upgrade on Coker HeatersAshutosh Garg
 
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS Dynamics
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS DynamicsHeat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS Dynamics
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS DynamicsProcess Ecology Inc
 
ELGI Airmate Air Accessories Total Compressed Air Solutions
ELGI Airmate Air Accessories Total Compressed Air SolutionsELGI Airmate Air Accessories Total Compressed Air Solutions
ELGI Airmate Air Accessories Total Compressed Air SolutionsVijayEngineeringandM1
 
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTManohar Tatwawadi
 
CaseStudy WellVizor Production Automation & Optimization
CaseStudy WellVizor Production Automation & OptimizationCaseStudy WellVizor Production Automation & Optimization
CaseStudy WellVizor Production Automation & OptimizationAEGEOS OILFIELD TECHNOLOGY
 
Ventilation
VentilationVentilation
VentilationDantherm
 
2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systemsmichaeljmack
 
Condensate Return Solutions.ppt
Condensate Return Solutions.pptCondensate Return Solutions.ppt
Condensate Return Solutions.pptssuser8006c7
 

Similar to Plumbing Design (20)

HVAC - Wetside Design
HVAC - Wetside DesignHVAC - Wetside Design
HVAC - Wetside Design
 
HVAC - Airside Design
HVAC - Airside DesignHVAC - Airside Design
HVAC - Airside Design
 
AIChE Smart Stack Damper Design Provides Better Control of Fired Heaters
AIChE Smart Stack Damper Design Provides Better Control of Fired HeatersAIChE Smart Stack Damper Design Provides Better Control of Fired Heaters
AIChE Smart Stack Damper Design Provides Better Control of Fired Heaters
 
Line sizing
Line sizingLine sizing
Line sizing
 
CatFT(r) Fischer-Tropsch Process presentation
CatFT(r) Fischer-Tropsch Process presentationCatFT(r) Fischer-Tropsch Process presentation
CatFT(r) Fischer-Tropsch Process presentation
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.
 
ML PCW Presentation
ML PCW PresentationML PCW Presentation
ML PCW Presentation
 
An overview of diagnostic tools used in RESNET testing
An overview of diagnostic tools used in RESNET testingAn overview of diagnostic tools used in RESNET testing
An overview of diagnostic tools used in RESNET testing
 
4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS S4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS S
 
POX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEPPOX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEP
 
Belimo Energy valve 3.0
Belimo Energy valve 3.0Belimo Energy valve 3.0
Belimo Energy valve 3.0
 
2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems
 
Air Preheat System Upgrade on Coker Heaters
Air Preheat System Upgrade on Coker HeatersAir Preheat System Upgrade on Coker Heaters
Air Preheat System Upgrade on Coker Heaters
 
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS Dynamics
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS DynamicsHeat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS Dynamics
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS Dynamics
 
ELGI Airmate Air Accessories Total Compressed Air Solutions
ELGI Airmate Air Accessories Total Compressed Air SolutionsELGI Airmate Air Accessories Total Compressed Air Solutions
ELGI Airmate Air Accessories Total Compressed Air Solutions
 
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
 
CaseStudy WellVizor Production Automation & Optimization
CaseStudy WellVizor Production Automation & OptimizationCaseStudy WellVizor Production Automation & Optimization
CaseStudy WellVizor Production Automation & Optimization
 
Ventilation
VentilationVentilation
Ventilation
 
2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems
 
Condensate Return Solutions.ppt
Condensate Return Solutions.pptCondensate Return Solutions.ppt
Condensate Return Solutions.ppt
 

Recently uploaded

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 

Recently uploaded (20)

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 

Plumbing Design

  • 1. PLUMBING DESIGN © Copyright 2008 HVAC Design Solutions 1 Essential Design Programs with Accurate Sizing Calculations help to “Streamline Your Design” HVAC DESIGN SOLUTIONS ENGINEERING SOFTWARE
  • 2.  “Plumbing Design” from HVAC Design Solutions is a package of software programs for most of the Plumbing Designer’s sizing tasks:  Fixture Unit/GPM Calcs  Water System Sizing  Waste & Vent System Sizing  Roof Drain System Sizing  Natural Gas System Sizing  Water Heater Sizing  Extensive Help Files, and “Extras” © Copyright 2008 HVAC Design Solutions 2
  • 3.  Reduce your dependence on Reference Books, Charts, Graphs, and “Rules of Thumb”.  Eliminate many of the usual Plumbing Design Tasks  Reduce common errors and mistakes  Create an easy-to-follow, step-by-step “Procedure for Plumbing Design” for all projects. © Copyright 2008 HVAC Design Solutions 3 Software Package contains most of the sizing calculations and procedures for typical projects
  • 4. © Copyright 2008 HVAC Design Solutions 4 indexp2.XLS#'WASTE-SCHED'!B10 indexp2.XLS#'VENT-SCHED'!B10 indexp2.XLS#'ROOFDR-SCHED'!E3 indexp2.XLS#'STORMPIPE-SCHED'!D4 indexp2.XLS#'WATERHTR-CALCS'!C6 indexp2.XLS#'GAS-SCHED1'!F3 indexp2.XLS#'GAS-SCHED2'!F3 JUMP TO FILE indexp2.XLS#INDEX!C10 BASIC PROJECT INPUT SHEET WASTE AND VENT PIPE SIZING ROOF DRAINS, VERTICAL AND HORIZONTAL PIPE SIZING PROJECT INFORMATION PLUMBING CALCS DESIGN indexp2.XLS#'WATER-SCHED1'!B10 indexp2.XLS#'WATER-SCHED2'!A10 indexp2.XLS#'GASPIPE-DIAG.'!E1 indexp1.XLS#INDEX!C10 indexp1.XLS#'FU-CALCS'!B4 MEDICAL GAS PIPING CALCULATIONS - PRELIMINARY indexp1.XLS#PIPESIZE!B10 indexp1.XLS#'W&V SIZES'!B3 indexp1.XLS#ROOFDR!G4 indexp1.XLS#MEDGAS!D10 FIXTURE UNIT CALCULATIONS WATER PIPE SIZING CALCULATIONS NATURAL GAS PIPE SIZING SCHEDULE - LOW PRESSURE NATURAL GAS PIPE SIZING SCHEDULE - MEDIUM PRESSURE PRELIMINARY WATER PIPE SIZING SCHEDULE HORIZONTAL ROOF DRAINAGE PIPING SCHEDULE GAS PIPE SIZING DIAGRAM WATER PIPE SIZING SCHEDULE WASTE PIPE SIZING SCHEDULE VENT PIPE SIZING SCHEDULE ROOF DRAIN, LEADER, OR VERTICAL PIPE SCHEDULE WATER HEATER SIZING CALCULATIONS CONTENTS indexp1.XLS#'FU-GPM'!A5 PLUMBING SCHEDULE DESIGN INDEXP.xls#INDEX!C10 INDEXP.xls#PROJ.INFO!D2 WATER FIXTURE UNIT TO GPM CONVERSIONS AIR COMPRESSOR CALCULATIONS indexp1.XLS#AIRCOMP!B11 Quick Links to all calculation programs “Any One of these programs is worth the cost of the Entire Package!”
  • 5. © Copyright 2008 HVAC Design Solutions 5 HELP BASIC PROJECT INFORMATION PROJECT NAME : PROJECT NUMBER : PROJECT LOCATION : DATE : TYPE OF BUILDING : SUMMER OUTDOOR DESIGN DRY BULB TEMP. (DEG. F): WINTER OUTDOOR DESIGN DRY BULB TEMP. (DEG. F): INDOOR DESIGN TEMP. - SUMMER (DEG. F) : INDOOR DESIGN TEMP. - WINTER (DEG. F) : PROJECT ELEVATION (FEET) : PROJECT MANAGER : PROJECT ENGINEER : CLIENT : CLIENT CONTACT NAME: 75.0 -6.0 OAKPARK OFFICE BLDG. 3 134-08 CHICAGO, IL 05/06/08 JOHN GOREMANN "YOUR COMPANY NAME" OFFICE 91.0 ADS ARCHITECTS 70.0 670 BILL REECE JIM EDMOND Begin with Basic Project Information input Information automatically transfers to all programs Design Conditions are used in some calculations
  • 6. © Copyright 2008 HVAC Design Solutions 6 FLUSH VALVES = 1, FLUSH TANKS = 2 1 FU EACH TOTAL FU FU EACH TOTAL FU BATHTUB OR COMBINATION BATH/SHOWER 2 3.0 6.0 3.0 6.0 BATHTUB WITH 3/4" FILL VALVE 8.0 0.0 8.0 0.0 BIDET 1.0 0.0 1.0 0.0 CLOTHES WASHER, DOMESTIC 3.0 0.0 3.0 0.0 DENTAL UNIT, CUSPIDOR 1.0 0.0 1.0 0.0 DISHWASHER, DOMESTIC 1.5 0.0 1.5 0.0 DRINKING FOUNTAIN OR WATERCOOLER 3 0.5 1.5 0.0 0.0 FIXTURE UNIT CALCULATIONS FIXTURE TYPE QUANTITY PROJECT NAME: DATE: PROJECT NUMBER: COLD WATER FIXTURE UNITS * HOT WATER FIXTURE UNITS * PRINT RESET/CLEAR Count the Fixtures for the project and input the quantities of each type Fixture Unit Values may be edited to meet local Codes
  • 7. © Copyright 2008 HVAC Design Solutions 7 SINKS - SERVICE OR MOP BASIN, 3" DRAIN 2 2.5 5.0 2.5 5.0 SINKS - SERVICE, FLUSHING RIM 20.0 0.0 0.0 0.0 SINKS - SPECIAL PURPOSE, 2" DRAIN 2.5 0.0 2.5 0.0 SINKS - SPECIAL PURPOSE, 3" DRAIN 2.5 0.0 2.5 0.0 SINKS - WASHUP, EACH SET OF FAUCETS 1.5 0.0 1.5 0.0 URINAL, 1.0 GPF FLUSH VALVE 4 13.3 53.0 0.0 0.0 URINAL, GREATER THAN 1.0 GPF FLUSH VALVE 0.0 0.0 0.0 0.0 URINAL, FLUSH TANK 2.0 0.0 0.0 0.0 WASHFOUNTAIN, 1-1/2" DRAIN 3.0 0.0 3.0 0.0 WASHFOUNTAIN, 2" DRAIN 3.0 0.0 3.0 0.0 WATER CLOSET - 1.6 GPF GRAVITYTANK 2.5 0.0 0.0 0.0 WATER CLOSET - 1.6 GPF FLUSHOMETER TANK 2.5 0.0 0.0 0.0 WATER CLOSET - 1.6 GPF FLUSH VALVE 6 20.8 125.0 0.0 0.0 WATER CLOSET - GREATER THAN 1.6 GPF TANK 5.5 0.0 0.0 0.0 WATER CLOSET - GREATER THAN 1.6 GPF VALVE 0.0 0.0 0.0 0.0 KITCHEN EQUIPMENT - WATER GPM TOTALS 201.5 17.0 COLD WATER FU HOT WATER FU Input Fixture Quantities, and the Total FU and Total GPM are calculated, per Local Code requirements
  • 8. © Copyright 2008 HVAC Design Solutions 8 FLUSH VALVES = 1, FLUSH TANKS = 2 1 SIZE MAX. GPM VEL. DEMAND FLOW RATE (GPM) 94 1/2 2 1.4 WATER MAIN PRESSURE (PSIG) 100 3/4 6 3.2 PRESSURE DROP THRU METER (PSIG) 7 1 11 3.9 PRESSURE REDUCING VALVE - PRESSURE (IF REQUIRED) 80 1 1/4 24 5.2 PRESSURE DROP THRU BACKFLOW PREVENTER (PSIG) 5 1 1/2 32 5.6 STATIC HEIGHT OF HIGHEST FIXTURE ABOVE MAIN (FT) 30 13 2 67 6.2 PRESSURE DROP THROUGH WATER TREATMENT (PSIG) 10 2 1/2 110 7 RESIDUAL PRESSURE REQUIRED AT LAST OUTLET (PSIG) 25 3 180 6.5 PRESSURE AVAILABLE FOR PIPING LOSS (PSIG) 27 4 300 8 PRESSURE BOOSTER PUMP (IF REQUIRED) (PSIG) 0 5 460 6.8 TOTAL DEVELOPED LENGTH OF LONGEST PIPE RUN (FT) 600 6 700 8 MAXIMUM ALLOWABLE PIPE PRESS. DROP (PSIG/100 FT) 4.5 8 1200 8.2 PROJECT NUMBER: DATE: AVAILABLE WATER PRESSURE CALCULATIONS PIPE SIZE SCHEDULE (@ MAX. ALLOWABLE P PROJECT NAME: PRINTTotal Demand transferred from Fixture Unit Totals Adding Project specific information…... Results in Allowable Pipe Pressure Drop/100’ for “Longest Run” sizing
  • 9. © Copyright 2008 HVAC Design Solutions 9 ERROR FROM TO 1 2 4 0 4 3/4 4 1 2 3 42 0 25 1 1/2 2 3 4 250 100 2 1/2 3 4 5 475 135 2 1/2 2 0 0 0 0 PROJECT NUMBER: PROJECT NAME: FLUSH TANK FIXTURE UNITS (FU) FLUSH VALVE FIXTURE UNITS (FU) FLOW RATE (GPM) 90 DEG. STANDARD ELBOW DATE: PIPE SECTION MAXIMUM ALLOWABLE PRESSURE DROP - LONGEST RUN (PSIG/100 FT.) 45 DEG. STANDARD ELBOW NOTE: INPUT EITHER FLUSH TANK OR FLUSH VALVE, NOT BOTH. PIPE SIZES FOR MAIN (LONGEST RUN) NUMBER OF EACH TYPE FITTING IN THE 90 DEG. STANDARD TEE (FLOW TURNS) PRELIMINARY WATER PIPE SIZING SCHEDULE 4.5 PRINT RESET/CLEAR Max. Allowable PD/100’ Automatically transferred to Pipe Section Sizing Calcs Input FU values for each pipe section Input fittings and valves for each pipe section
  • 10. © Copyright 2008 HVAC Design Solutions 10 ERROR FROM TO 1 2 4 0 4 3/4 2.2 2.7 2 3 42 0 25 1 1/2 2.5 4.5 3 4 0 120 72 2 1/2 1.7 5.0 4 5 0 250 100 2 1/2 2.9 7.0 0 0 0.0 0.0 0 0 0.0 0.0 WATER PIPE SIZING SCHEDULE 4.5 PIPE SECTION MAXIMUM ALLOWABLE PRESSURE DROP - LONGEST RUN (PSIG/100 FT.) MAIN SIZE VELOCITY (FT./SEC.) NOTE: INPUT EITHER FLUSH TANK OR FLUSH VALVE, NOT BOTH. PROJECT NAME: FLUSH TANK FIXTURE UNITS (FU) FLUSH VALVE FIXTURE UNITS (FU) FLOW RATE (GPM) MAIN SIZE (INCHES) MAIN SIZE PD (PSI/100 FT.) DATE: PIPE SIZES FOR MAIN (LONGEST RUN) PROJECT NUMBER: PRINT RESET/CLEAR Final, Accurate Pipe Section sizing, after corrections for actual fittings and valves Accurate Pipe sizing, NOT based on Rule-of-Thumb, like “add 50% for Fittings”!!
  • 11. © Copyright 2008 HVAC Design Solutions 11 WASTE FIXTURE UNITS (FU): 30 WASTE SLOPE (1/4=1, OR 1/8=2): 1 2 1/2 WASTE VERTICAL LENGTH (FT.): 65 3 VENT FIXTURE UNITS (FU): 30 VENT TOTAL LENGTH (FT.): 46 2 1/2 VENT HORIZONTAL LENGTH (FT.): 12 SIZES 1 1/4 1 1/2 2 2 1/2 3 4 MAXIMUM UNITS DRAINAGE PIPING (#1) VERTICAL 1 2 (#2) 16 (#3) 32 (#3) 48 (#4) 256 HORIZONTAL @ 1/4"/FT. SLOPE 1 1 8 (#3) 14 (#3) 35 (#4) 216 (#5) HORIZONTAL @ 1/8"/FT. SLOPE N/A N/A N/A N/A N/A 172 (#5) MAXIMUM UNIT LOADING AND MAXIMUM LENGTH OF DRAINAGE AND VE WASTE & VENT SIZING AND MAX. LENGTHS WASTE SIZE - VERT.: VENT SIZE: WASTE SIZE - HORIZ.: Quick input of pipe section loading and lengths (W and/or V) Resulting sizes for the section Cross reference in chart form
  • 12. © Copyright 2008 HVAC Design Solutions 12 HELP FROM TO 1 2 6 4 2 2 4 0 2 3 12 4 2 2 1/2 4 0 3 4 22 4 3 3 4 1 4 5 34 4 4 4 4 4 WASTE PIPE SIZING SCHEDULE WASTE PIPE SECTION WASTE FIXTURE UNITS (FU) WASTE PIPE VERTICAL LENGTH (FT.) WASTE PIPE SIZE - VERTICAL WASTE PIPE SIZE AT 1/4"/FT. SLOPE WASTE PIPE SIZE AT 1/8"/FT. SLOPE NUMBER OF WATER CLOSETS ON PIPE SECTION PROJECT NAME: PROJECT NUMBER: DATE: OAKPARK OFFICE BLDG. 3 134-08 05/06/08 RESET/CLEAR PRINT Input W-FU and vertical length for each pipe section Required sizes at different slopes are calculated automatically
  • 13. © Copyright 2008 HVAC Design Solutions 13 HELP CAUTION FROM TO 1 2 20 110 35 2 0 0 2 3 30 190 55 0 3 0 3 4 45 100 70 0 0 3 4 5 65 30 8 4 0 0 5 6 150 60 20 5 0 0 PROJECT NAME: PROJECT NUMBER: DATE: OAKPARK OFFICE BLDG. 3 134-08 VENT PIPE SECTION VENT FIXTURE UNITS (FU) VENT PIPE TOTAL LENGTH (FT.) VENT PIPE HORIZONTAL LENGTH (FT.) VENT PIPE SIZE (IF TOTAL AND HORIZ. LEN. LESS THAN ALLOWABLE LENGTH) VENT PIPE SIZE (IF TOTAL LEN. MORE THAN ALLOWABLE LENGTH) VENT PIPE SIZE (IF HORIZ. LEN. MORE THAN 1/3 OF ALLOWABLE TOTAL LENGTH) VENT PIPE SIZING SCHEDULE EITHER TOTAL LENGTH OR HORIZONTAL LENGTH EXCEEDS CODE MAXIMUM ALLOWABLE. SIZE HAS BEEN INCREASED BYONE PIPE SIZE. 05/06/08 RESET/CLEAR PRINT Input V-FU, total length, and horizontal length for each pipe section Required sizes are calculated automatically
  • 14. © Copyright 2008 HVAC Design Solutions 14 HELP 3.00 1 1500 1000 2000 3 67 2147 2 2500 1200 2920 4 144 4613 3 3000 2500 3875 4 144 4613 4 1000 1000 3 67 2147 FLOW RATE (GPM) DRAIN NUMBER ROOF AREA (SQ. FT.) (1) ADJACENT WALL - AREA (SQ. FT.) PROJECT NUMBER: 134-08 DATE: 05/06/08 (2) ADJACENT WALLS - AREA (SQ. FT.) TOTAL AREA - ROOF + WALLS (SQ. FT.) MAXIMUM AREA DRAIN OR PIPE SIZE CAN CARRY (SQ. FT.) SIZE OF ROOF DRAIN, LEADER, OR VERTICAL PIPE (IN.) PROJECT NAME: OAKPARK OFFICE BLDG. 3RAINFALL RATE FOR 100 YEAR, 60 MINUTE DURATION STORM IN LOCAL AREA (INCHES/HR.): ROOF DRAIN, LEADER, OR VERTICAL PIPE SCHEDULE PRINT RESET/CLEAR Input Roof Area served by Roof Drain Input Local Rainfall Rate Roof Drain size or Vertical Pipe sizes are calculated Input Adjacent Wall Area where applicable
  • 15. © Copyright 2008 HVAC Design Solutions 15 FROM TO 1 2 3500 1200 4100 5 139 2 3 2000 3000 3050 5 139 3 4 5500 4500 7075 6 222 4 5 3000 3000 5 139 RAINFALL RATE FOR 100 YEAR, 60 MINUTE DURATION STORM IN LOCAL AREA (INCHES/HR.): 3.00 (1) ADJACENT WALL - AREA (SQ. FT.) HORIZ. PIPE SIZE AT 1/8"/FT. SLOPE (INCHES) TOTAL AREA - ROOF + WALLS (SQ. FT.) PIPE SECTION ROOF AREA (SQ. FT.) FLOW RATE AT 1/8"/FT. SLOPE (GPM) PROJECT NAME: PROJECT NUMBER: (2) ADJACENT WALLS - AREA (SQ. FT.) DATE: HORIZONTAL ROOF DRAINAGE PIPING SCHEDULE PRINT RESET/CLEAR Input Local Rainfall Rate Input Roof Area served by Pipe Section Input Adjacent Wall Area where applicable Horizontal Roof Drainage Pipe Section sizes are calculated for 1/8”, 1/4”, and 1/2” pipe slopes
  • 16. © Copyright 2008 HVAC Design Solutions 16 TYPE OF BUILDING OR FACILITY: FACILITYINCLUDE FULL KITCHEN? 1 = YES, 2 = NO 1 GPH EACH TOTAL GPH BATHTUB FILL (EXCLUDING WHIRLPOOL TUBS) 20 0 BATHTUB AND SHOWER 5 75 375 BIDET 1 5 5 DISHWASHER - DOMESTIC UNDERCOUNTER 15 0 FOOT BASIN 3 0 LAUNDRY- DOMESTIC, STATIONARYTUB 28 0 LAVATORY- PRIVATE 2 0 LAVATORY- PUBLIC 6 0 SHOWER - SINGLE HEAD 3 75 225 20 x 20 IN. RACKS 18 x 18 IN. RACKS UNDERCOUNTER TYPE SINGLE TANK DISHWASHER - CONVEYOR TYPE - WITHOUT INTE MULTIPLE TANK (DISHES FLAT) PLUMBING FIXTURE TYPE QUANTITY KITCHEN FIXTURE TYPE (ASSUMING SEPARATE BOOSTER HEATER FOR 140 DEG. F TO 180 DEG. F HOT WATER WHERE REQUIRED) PROJECT NAME: PROJECT NUMBER: DISHWASHER - DOOR TYPE - WITHOUT INTERN DATE: PROJECT ELEVATION: KITCHENS:GENERAL PLUMBING FIXTURES: DISHWASHER - FROM MANUFACTURER, IF AVAIL. HOT WATER - GALLONS PER HOUR AT 140 DEG. F 16 x 16 IN. RACKS WATER HEATER SIZING CALCULATIONS PRINT RESET/CLEAR HOSPITAL Select Type of Facility from drop-down list Input quantity of each Fixture Type
  • 17. © Copyright 2008 HVAC Design Solutions 17 LAVATORY- PUBLIC 1 8 8 SHOWER - GENERAL 50 0 SHOWER - THERAPEUTIC 400 0 SINK - BARIUM 1 15 15 SINK - CLEANUP ROOM 1 15 15 SINK - CENTRAL SUPPLY 1 15 15 SINK - CLINICAL 1 10 10 SINK - CLINICAL, BEDPAN HOSE 15 0 SINK - LABORATORY 2 5 10 SINK - PHARMACY 1 5 5 SINK - PLASTER 1 15 15 SINK - SCRUB-UP 2 10 20 1424 1919 0.25 480 0.60 288STORAGE TANK CAPACITY(GALLONS): POSSIBLE TOTAL MAXIMUM DEMAND (GPH): DEMAND FACTOR: PROBABLE MAXIMUM DEMAND (GPH): STORAGE CAPACITYFACTOR: POSSIBLE MAXIMUM DEMAND - FIXTURES (GPH): 75 0 139 0 1 8 8 60 0 240 0 1 45 45 180 0 40 0 1 30 30 1 90 90 1 45 45 495 1.00 359669 0.70 411 SINGLE POT SINK TRIPLE POT SINK VEGETABLE SINK PREFLUSH (CLOSED TYPE) PREFLUSH (HAND-OPERATED) PRESCRAPPER (OPEN TYPE) RECIRCULATING PREFLUSH UTINSIL WASHERS DISHWASHER MAKEUP WATER REQ. HAND SINK DOUBLE POT SINK KITCHEN FIXTURES: POSSIBLE MAXIMUM DEMAND - KITCHEN (GPH): ALTITUDE CORRECTION FACTOR (IF ANY): REQUIRED WATER HEATER OUTPUT (AT 140 DEG. F) (BTUH): USABLE STORAGE CAPACITYFACTOR: REQUIRED STORAGE TANK CAPACITY(GALLONS): Input Kitchen Fixtures, as applicable Demand Factor and Storage Factor are applied to Max. Demand, based on Type of Facility Resulting in required Water Heater Output and required Storage Tank Capacity
  • 18. © Copyright 2008 HVAC Design Solutions 18 Start with a sketch of the Gas Piping system
  • 19. © Copyright 2008 HVAC Design Solutions 19 28.00 1.00 (PSI) 2.00 0.07 (PSI) 0.60 1.000 (SG MULT) FROM TO 1 2 150 570 1 0 2 2 3 450 570 1 1/2 0 3 4 750 570 2 0 2 4 5 2500 570 3 0 5 6 2565 570 3 0 2 2 7 300 0 500 1 1/4 1 3 8 300 0 460 1 1/4 4 9 1750 0 420 3 5 10 65 0 320 3/4 PIPE SIZES FOR BRANCH NUMBER OF EACH FITMEASURED LENGTH BRANCH - FROM METER (WITHOUT FITTINGS) (FEET) GAS FLOW RATE (CFH) MEASURED LENGTH MAIN - LONGEST RUN (WITHOUT FITTINGS) (FEET) PIPE SIZES FOR MAIN (LONGEST RUN) PIPE SECTION NATURAL GAS PIPE SIZING SCHEDULE (LOW PRESSURE - BELO 90 DEG. STANDARD ELBOW INITIAL GAS PRESSURE (IN. WC) (28" WC PER PSI) ALLOWABLE PRESSURE DROP (IN. WC) GAS SPECIFIC GRAVITY PRINT RESET/CLEAR 1. Input Local Gas conditions 2. Input Flow Rate and Lengths for “Longest Run” and Branches 3. Input Fittings and Valves for each section 4. Sizes are calculated for each Section
  • 20. © Copyright 2008 HVAC Design Solutions 20 QUANTITY DIVERSITYFACTOR PSI PER 100 FT. IN. HG PER 100 FT. PERCENT (%) OXYGEN (O2) NUMBER OF STANDARD OUTLETS 24 1.00 --- 33 NUMBER OF RESPIRATORYVENTILATORS 8 1.00 --- 100 NITROUS OXIDE (N2O) NUMBER OF STANDARD OUTLETS 18 1.00 --- 50 NITROGEN (N2) NUMBER OF STANDARD OUTLETS 18 2.00 --- 75 MEDICAL AIR (MA) NUMBER OF STANDARD OUTLETS 24 1.00 --- 60 MEDICAL VACUUM (VAC) NUMBER OF STANDARD OUTLETS 18 --- 1.00 60 NUMBER OF MAJOR SURGERYROOMS 4 --- 1.00 100 NUMBER OF INTENSIVE CARE BEDS 6 --- 1.00 50 MEDICAL GAS SERVICE TYPE DESIGN FRICTION LOSS 1 Initial Pipe Sizing for Med. Gas Systems
  • 21. © Copyright 2008 HVAC Design Solutions 21 FREE AIR USAGE AT 90 PSIG (CFM) 1 AIR HOIST - 1,000 LB. OR LESS 7 0.8 AIR HOIST - 2,000 LB. TO 10,000 LB 2 35 0.8 AIR HOIST - 10,000 LB. AND LARGER 1 105 0.8 ANGLE NUT SETTER - TO 5/16" (WEIGH 8 LBS.) 6 20 0.8 ANGLE NUT SETTER - 1/2" TO 3/4" (WEIGH 18 LBS.) 2 30 0.8 BLOWGUNS 1 25 0.8 BUSHING TOOLS (MONUMENTAL) 25 0.8 CARVING TOOLS (MONUMENTAL) 15 0.8 CHIPPING HAMMERS (WEIGH 2 - 4 LBS.) 3 12 0.8 CHIPPING HAMMERS (WEIGH 10 - 13 LBS.) 30 0.8 CHIPPING HAMMERS (HEAVYWEIGHT) 39 0.8 CONCRETE VIBRATORS 30 0.8 FILE AND BURR MACHINES 1 18 0.8 GREASE GUN 3 4 0.8 GRINDERS - HORIZONTAL (1-1/2" WHEELS AND UNDER) 10 0.8 GRINDERS - HORIZONTAL (2" AND 2-1/2" WHEELS) 2 20 0.8 TOOL OR EQUIPMENT QUANTITY USE FACTOR2 Calculates Total Anticipated Usage & Recommended Receiver Volume
  • 22. © Copyright 2008 HVAC Design Solutions 22 Extensive “Quality Control” Plumbing Checklists are available in a separate “Plumbing Peer Review” Software Package Coordination Between Disciplines Contents: (Click on hyperlink to jump to the sheet checklist) A Preliminary Review of Plans and Specifications B Demolition Plans C Architect and/or Owner Coordination D Structural Coordination E Mechanical Coordination F Plumbing Coordination G Civil Engineering Coordination H Electrical Coordination A Preliminary Review of Plans and Specifications 1 Quickly review all Drawings in the Construction Document set, including Architectural, Structural, Civil, Landscaping, Mechanical, Plumbing, Fire Protection, Electrical, Food Service, and any other discipline. Spend not more than one minute per sheet, average. 2 Make a list of any apparent discrepancies or questions while reviewing the set, and add ‘flags’ to sheets where there are significant questions. 3 Quickly review the Specifications by reading through the Table of Contents for Mechanical and Plumbing work. Check the Table of Contents against the actual Specification sections to verify all sections have been included. Make a list of questions that may come up during the cursory review. 4 Review Architectural Title Sheet, or first sheet in the set, and make a list of the Project Square Footage, Building Occupancy Type, Building Construction Type, Governing Codes, Index of Drawings, and any other information that relates to Mechanical or Plumbing work. 5 Check for consistent appearance of Title Blocks, Drawing Scales, North Arrows, Professional Stamps, Company Logos, Sheet Numbers, Sheet Titles, Issue Dates, and Issue Revisions on all sheets. B Demolition Plans 1 Verify that Demolition Symbols (cross-hatching, etc.) are clear and complete, and are coordinated with other disciplines. 2 Verify there are notes regarding potential hazardous materials (asbestos, lead paint, etc.), and coordinate with Architect or other Prime Consultant and Owner. Over (70) Pages of Checklists and Spreadsheets for a thorough review of Plumbing Construction Documents
  • 23. Plumbing Plan Review Items Contents: (Click on hyperlink to jump to the sheet checklist) A Preliminary Review of Plans and Specifications B Legend and Symbols, and Fixture Calculations Sheet C Schedule Sheets D Plumbing Site Plan E Plumbing Demolition Plans F Plumbing Underground Floor Plan G Plumbing Floor Plans H Plumbing Roof Plans I Plumbing Medical/Lab/Process Piping Plans J Central Plant Plumbing Plans K Plumbing Riser Diagram Sheets L Plumbing Detail Drawings © Copyright 2008 HVAC Design Solutions 23 C Plumbing Underground Floor Plan Return to Table of Contents 1 Read all Sheet Notes and verify they are clear and appropriate. 2 Verify all References are correct. Follow references to indicated sheets. 3 Coordinate Plumbing Underground Plan with Structural Grade Plan. Verify that below-slab Footings and Grade Beams have been shown on the Plumbing Underground Floor Plan, for underground pipe coordination. (If Footings and Grade Beams are not on Plumbing Underground Plan, they should be added to the ‘background’). 4 Verify that any pipes passing over, under, or through Footings or Grade Beams have been coordinated with Structural Plans. Check on provisions for sleeving beams, etc. Verify depth of Footings and Grade Beams below floor slab, to check for any potential conflicts. 5 Verify that Footings and Grade Beams are not directly below Plumbing Fixture outlets, Floor Drains, Floor Sinks, Plumbing Chases, or pipe drops, such as Storm Drains and Overflow Drains. Verify coordination with pipes at Columns, such as Sanitary Vents and Trap Primer water pipes, to avoid conflicts with Footings at Columns. 6 Check for locations of building expansion joints or seismic joints, and verify that pipes have been designed to accommodate expansion joints. 7 Follow all Waste Pipe risers up to floors above. Place a pencil check-mark on each riser as it is verified to continue on the floor above (or roof). Check for coordinated locations from floor to floor on each pipe riser. 8 After following each Waste pipe riser to the top, follow horizontally to the most remote fixture or drain connection point. Pencil in Fixture Units (FU) for all Fixtures and Drains served by each Waste riser. Sum the flow rates (FU) from the remote fixtures or drains, back to the risers. Pencil in the accumulated FU on the plans adjacent to the pipes. Verify that Fixture Units are listed for all fixtures or drains and that Schedules for each fixture are complete. 9 If the Floor Plan has references to larger scale plans (such as Enlarged Toilet Room Partial Plans), follow to the referenced Enlarged Plan. Verify all pipe sizes are coordinated from Floor Plan to Enlarged Partial Plan. Verify the Floor Plan and Enlarged Plan have the same background and are current with the latest Architectural plans. Pencil in the Fixture Unit value for each Fixture or Drain on the Enlarged Plan, and sum the FU to the extent of the Enlarged Scale Plan. Transfer the total flow rates back to the original Floor Plan, for continuation. Example of Quality Control Check List Items
  • 24. © Copyright 2008 HVAC Design Solutions 24 FLUSH VALVES = 1, FLUSH TANKS = 2 1 SIZE MAX. GPM VEL. DEMAND FLOW RATE (GPM) 96 1/2 2 1.4 WATER MAIN PRESSURE (PSIG) 100 3/4 6 3.2 PRESSURE DROP THRU METER (PSIG) 7 1 11 3.9 PRESSURE REDUCING VALVE - PRESSURE (IF REQUIRED) 80 1 1/4 24 5.2 PRESSURE DROP THRU BACKFLOW PREVENTER (PSIG) 5 1 1/2 32 5.6 STATIC HEIGHT OF HIGHEST FIXTURE ABOVE MAIN (FT) 30 13 2 67 6.2 PRESSURE DROP THROUGH WATER TREATMENT (PSIG) 10 2 1/2 110 7.0 RESIDUAL PRESSURE REQUIRED AT LAST OUTLET (PSIG) 25 3 180 6.5 PRESSURE AVAILABLE FOR PIPING LOSS (PSIG) 27 4 300 8.0 PRESSURE BOOSTER PUMP (IF REQUIRED) (PSIG) 0 0 5 460 6.8 TOTAL DEVELOPED LENGTH OF LONGEST PIPE RUN (FT) 600 6 700 8.0 MAXIMUM ALLOWABLE PIPE PRESS. DROP (PSIG/100 FT) 4.5 8 1200 8.2 AVAILABLE WATER PRESSURE CALCULATIONS PIPE SIZE SCHEDULE (@ MAX. ALLOWABLE PD/100 FT) PROJECT NUMBER: DATE: WATER PIPE SIZING CALCULATIONS PROJECT NAME: After completing input and calculations, Output and Sizing Documents can be printed for submittal to building department officials and for addition to drawings and schedules
  • 25. © Copyright 2008 HVAC Design Solutions 25 Extensive Plumbing Programs MEDICAL GAS PIPING CALCULATIONS - PRELIMINARY WATER FIXTURE UNIT TO GPM CONVERSION ROOF DRAINS, VERTICAL AND HORIZONTAL PIPE SIZINGROOFDR MEDGAS FU-GPM AIRCOMP AIR COMPRESSOR CALCULATIONS PIPESIZE W&V SIZES FU-CALCS FIXTURE UNIT CALCULATIONS WATER PIPE SIZING CALCULATIONS WASTE AND VENT PIPE SIZING HORIZONTAL ROOF DRAINAGE PIPING SCHEDULE WATER HEATER SIZING CALCULATIONS ROOF DRAIN, LEADER, OR VERTICAL PIPE SCHEDULE GAS-SCHED1 NATURAL GAS PIPE SIZING SCHEDULE - LOW PRESSURE (BELOW 1.5 PSI) GAS-SCHED2 NATURAL GAS PIPE SIZING SCHEDULE - MEDIUM PRESSURE (ABOVE 1.5 PSI) ROOFDR-SCHED STORMPIPE-SCHED WATERHTR-CALCS WASTE-SCHED VENT-SCHED WASTE PIPE SIZING SCHEDULE VENT PIPE SIZING SCHEDULE WATER-SCHED2 WATER PIPE SIZING SCHEDULE GASPIPE-DIAG. GAS PIPE SIZING DIAGRAM
  • 26.  Straightforward takeoff and input allows easy calculation and sizing of Plumbing Systems.  Extensive procedures, formulas, charts, and tables as prescribed by Plumbing Codes and as recommended by ASPE and ASHRAE have been included and have been used to establish the “Accurate” Plumbing System Sizes.  Multiple Programs are included, covering most of the typical Plumbing Design Tasks for most projects. © Copyright 2008 HVAC Design Solutions 26
  • 27.  Significantly reduces “Reference Material Dependence” which can save a great deal of time and effort.  Output in the form of Compliance Documents or System Sizing Summaries for submittal to appropriate code enforcement officials or building departments.  Extensive “Help Files” that are hyperlinked to each program, form, or table. © Copyright 2008 HVAC Design Solutions 27
  • 28.  Limited time “Special Pricing” available at our website www.hvacdesignsolutions.com  Plumbing Design Package Original Price: $250 US, Special Price: $189 US  Plumbing Peer Review Package Original Price: $200 US, Special Price: $148 US © Copyright 2008 HVAC Design Solutions 28
  • 29.  Current Version: 2.16, with latest update (03/31/2008) Free updates, as available.  To purchase Plumbing Design or Plumbing Peer Review, visit our website at www.hvacdesignsolutions.com and go to the Prices/Orders page  Software can be downloaded for immediate installation (with password) after purchase is confirmed © Copyright 2008 HVAC Design Solutions 29
  • 30.  OS: Windows® 98, 2000, XP, 2003, Vista  Processor: Pentium® or equivalent  Ram: 512MB (minimum recommended)  Disk Space: 100 MB (recommended)  Software: MS Word®, MS Excel® © Copyright 2008 HVAC Design Solutions 30
  • 31.  Thank you for taking your time to review our Plumbing Design software packages  If you have any questions or comments, you can e-mail to: steve”at”hvacdesignsolutions.com , or support”at”hvacdesignsolutions.com  We also have an interactive demo of our Plumbing Design software that can be delivered, on request, via e-mail. © Copyright 2008 HVAC Design Solutions 31