11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Air Preheat System
• Not popular
• Misconception about NOx emissions
• Number of APH installations not in use
• Heaters operating in Natural draft mode losing energy
• Energy prices are very low ??
• Our fired heaters are not very efficient
• But???
10/7/2019
2
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Two identical Balanced Draft
Coker Heaters -
Heat duty of each heater -
126.8 MMBtu/hr
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Existing Air Preheat System
RADIANT
HOT AIR DUCT
HOT FLUE GAS
HOT FLUE GAS
CONVECTION
SECTION
HOT FLUE GAS DAMPER
AIR PREHEAT-TIGHT SHUT OFF
NATURAL DRAFT MODULATING
COLD FLUE GAS
FD FAN
ID FAN
COLD AIR
DUCT
CELL
AIR DOORS
Hot Air Temperature = 579°F
Hot Flue Gas
Temperature
= 60°F
Temperature = 275°F
Cold Flue Gas
Temperature = 700°F
Cold Air
BURNERS
RADIANT
CELL
RADIANT
CELL
RADIANT
CELL
AIR
PREHEATER
STACK
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Operating Issues with Air Preheating
Systems
• Air Preheater
• Corrosion
• Air leakage
• High flue gas side pressure drop
• Bypass duct limitation
• Burners
• Non uniform air flow to burners
• Flue gas bypass to stack, ID fan limiting
• Client was throughput limited
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Air Preheater Problems
• Low tube metal temperature and excessive corrosion problems:
• Non- uniform air flow distribution
• Cold zones in static air preheater
• APH Design was deficient with respect to acid dew point corrosion
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Existing Air Preheater
• Type-Recuperative Cast Iron
• Heat Duty- 15.05 MMBtu/hr
• Flue Gas Side Details
• Flowrate- 130,150 lb/hr
• Inlet/Outlet Temperature - 700°F/ 275°F
• Pressure Drop- 2.0 inches WC
• Air Side Details
• Flowrate- 117,700 lb/hr
• Inlet /Outlet Temperature- 60°F/ 579°F
• Pressure Drop- 4.3 inches WC
 Minimum Tube Metal Temperature- 230°F
APH System
Existing Air Preheater was corroded
and leaking air into flue gas
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Existing FD Fan
 Fan rated for 34,652 acfm at 120°F with
10.5inch W.C pressure rise (TB)
 Drive Arrangement- #7 SWSI
 Fan Speed- 1,200 rpm
 Motor - 100 H.P
 Steam APH is provided at the inlet
 Inlet guide vanes to control the flow
 Provided with 20 ft tall suction stack
consisting of rain hood with screen,
silencer and steam APH coils Forced Draft Fan
Suction Stack
Existing FD fan was limiting due to APH leakage
Suction filter was getting clogged with coke particles
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Existing Steam Air Preheater
 Provided at FD Fan inlet duct
to preheat air in winter to
avoid Acid Dew Point
Corrosion in main APH
 Heat Duty- 1.61 MMBtu/hr
 Air inlet / outlet temperature
: 10 °F / 60 °F
Steam APH Coils
Existing steam air preheater was undersized
and getting clogged with coke particles
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Existing ID Fan
Rated for 58,530 acfm at 350°F
with 5.1 inch WC static rise (TB)
Arrangement- #7 SWSI Grade
Mounted
Inlet pneumatically operated
damper to control the flow
Fan Speed- 900 rpm
Motor- 75 HP
Induced Draft Fan
ID fan was undersized and was limiting
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Limitation of the Heaters and APH System
Heater
• High flue gas convection section exit temperature, almost 30-
40% flue gas bypassing the air preheater ( calculated thermal
efficiency -85%)
Air Preheater
• Acid Dew Point or Cold Block Corrosion
ID & FD Fans
• ID and FD fans were limited in capacity thereby limiting the
heater production
Combustion / Cold Air By-pass Duct was undersized
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Flue Gas Temperature Leaving Convection
Flue gas temperature to Air Preheater is higher by almost 100-180F
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Air Preheating System Modifications
• Systems approach:
• Installation of new APH, FD
fans, ID fans, Steam APH
• Modification of combustion air
and flue gas ducts
• Installation of additional
convection tubes
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Addition of Process Coils in Convection
• Two future rows provision to be used.
• Fin configuration of process coils in
future rows: 1” ht. x 0.06” thk. X 5 FPI
• 8,858 ft2 additional heat transfer area
in process convection
• Flue gas temperature leaving the
convection section is reduced from
834°F to 701°F
12'-21/2"
PROCESS
3 BARE ROWS EXISTING
PROCESS
8 FINNED ROWS EXISTING
STEAM SUPER HEATERT
1 FINNED ROW EXISTING
3'- 0 1/8"
I/S INS.
PROCESS
2 FINNED ROWS (NEW)
Flue Gas Temperature
= 701°F
Proposed Convection Section
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Air Preheater Recommendations
• New Plate Type APH
• Preheater design revised to 300°F flue gas
temperature
• 20% higher flue gas flow rate
• Steam air preheater upstream to ensure
constant air temperature of 120°F
• Glass /Ceramic Coating on metal plates to
avoid dew point corrosion in cold end.
 Design Heat Duty of 17.7 MMBtu/hr..
 Minimum tube metal temperature
(TMT) of 279°F
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Existing and Proposed APH Comparison
Parameter Unit Existing Proposed
Absorbed Duty MMBtu/hr 15.05 17.7
Air Flow Rate lb/hr 117,700 155,038
Air Inlet / Outlet Temperature °F 60 / 579 120 / 585
Flue Gas Flow Rate lb/hr 130,150 162,714
Flue Gas Inlet / Outlet
Temperature
°F 700 / 275 701 / 300
ΔP on Air Side
(allowable/calculated)
in WC - / 4.3 4.3 / 2.6
ΔP on Flue Gas Side (calculated) in WC 2.0 2.9
Minimum Metal Temperature °F 230 278.6
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Existing vs. Proposed FD fan
Parameter Unit Existing Proposed
Combustion Air Flow Rate lb/hr 141,240 168,832
Air Temperature °F 120 125
Static Pressure Rise inch WC 10.5 14.07
Maximum Fan Speed rpm 1,200 1,200
Motor Rating HP 100 150
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Existing vs. Proposed ID fan
Parameter Unit Existing Proposed
Flue Gas Flow Rate lb/hr 156,180 207,249
Flue Gas Temperature °F 350 400
Static Pressure Rise inch WC 5.0 10.62
Maximum Fan Speed rpm 900 1,200
Motor Rating HP 75 200
New ID fan motor is three times larger than the
existing ID fan motor
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Ducting Modifications
1.Combustion Air Duct Modification
• FD fan suction stack:
• Additional 20 ft FD fan suction stack
• Cold Air bypass duct:
• Size increased from 1’-8” (current size) to 3’-4”
• Sized for Full Air Flow during forced draft operation
• FD fan discharge duct:
• Smoother transition to APH
• Angled baffle plates and turning vanes
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Ducting Modifications
• Hot Air Duct Modification:
• Smooth outlet transition from APH with turning vanes
• Guide vanes and baffles
• Pressure drop plate to increase the air side pressure drop to 0.68 inch
WC in burners
2. Flue Gas Duct Modification
• Hot Flue Gas Duct Modifications
• Inlet transition to APH has gradual expansion with angled baffles
• Cold Flue Gas Duct Modifications
• New duct with turning vanes
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
New FD fan Suction Stack
• 40 ft height from FD fan flange
inlet (20 ft more than existing
suction stack)
• 90 degree elbow
• Provided with fine wire mesh
screen to block bird feathers
entering APH
Proposed
(40 ft)
Existing
(20 ft)
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
New Cold Air Bypass Duct
• Increased size to 3’-4” from 1’-8”
(outside plate)
• Controlled by pneumatically operated,
tight shut off damper
3.25 ft
o/s Plate
diameter
Proposed Bypass
Duct
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Steam Preheat Coil
Parameter Unit
Existing
Steam
Preheater
New Steam
Preheater
Coils
Heat Duty
MMBtu/
hr
1.61 6.11
Air Inlet
Temperature
°F 10 10
Air Outlet
Temperature
°F 60 180
23
Picture of Steam Preheat Coil
in Manufacturing Facility
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Existing v/s New Steam Preheater
24
Existing
Steam APH
In Fan
Suction
Existing Steam APH Layout Proposed Steam APH Layout
New Steam
APH in
Discharge
Duct
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Existing and Proposed FD fan Discharge Duct
Existing Proposed
APH
inlet
FD fan
outlet
APH
inlet
FD fan
outlet
Steam APH
with tubes
Smoother Transition, Angled baffles and turning vanes provide uniform air flow
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Velocity RMS Deviation at APH Inlet
[ft/s]
RMS deviation at APH
inlet is: ± 91.0%
RMS deviation at APH
inlet is: ± 13.9%
Existing
Proposed
Normal velocity profile at
APH inlet (after Steam APH)
Note: Recommended RMS Deviation of velocity
is in the range of ± 5%
Due to physical constraints
on duct shape it was not
feasible to further improve
the flow distribution
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Hot Air Duct Modification for Uniform Air
Flow
• Air preheat outlet
• Smooth and turning vanes are
added
• Reduced dead zones and
recirculation
HA-2N duct modification
R 1’6”
Typ.
R 1’6”
Typ.
Guide vanes
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Air Flow Path Lines colored by Velocity
[ft/s]
APH outlet
Recirculation • Recirculation is reduced as compared
to existing case with change in duct
design and adding turning vanes
• Pressure drop is reduced by 0.05
inches WC as compared to existing
design
Proposed
Existing
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Hot Air Duct Modification for Uniform Air
Flow to Burners
Pneumatic
Operated
Dampers
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
APH outlet
Burner Inlet
HA-6
HA-9
HA-10
Damper
Hot Air Duct – Proposed Geometry
Isometric view
Pressure drop
across the burner is
considered: 0.68
inches WC
Proposed
Modified inlet
duct along with
turning vanes
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Air Flow Variation to Burners
• Deviation from average flow rate per burner based
• on simulation results
Comparison
• Mass flow distribution
across all the burners is
significantly improved
for the proposed case
• Improved air flow
distribution across
burners for other ducts is
similar
1
14
2
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Hot Flue Gas Inlet Duct to Air Preheater
[ft/s]
Existing Proposed
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Flue Gas Velocity Profile at ID Suction
[ft/s]
Velocity distribution throughout
the duct has improved in the
proposed case
Existing
Proposed
Uniform velocity distribution is
achieved at the inlet of ID fan for
proposed case
Significant reduction in the
recirculation zone for the
proposed case
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Flue Gas Velocity Path Lines at ID Suction
[ft/s]
Significant reduction in swirling velocity
near the inlet of ID fan
Existing Proposed
Flue gas flow separation at the bends is
reduced
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Key Benefits
• Thermal Efficiency of the coker heater increased by 7-8% after the
revamp.
• Heater production rate was improved after APH replacement.
• Production rate increased by 4,500 Barrels per day for each heater
• Overall project cost – Total $7.5 Million for two heaters
• At about $8 per Barrel it provided $26 Million additional revenue
per year
• Payout -4 months
11th AIChE Southwest Process Technology Conference | October 1-2, 2019
Thank You!

More Related Content

What's hot

An introduction to Fired Heaters.pdf
An introduction to Fired Heaters.pdfAn introduction to Fired Heaters.pdf
An introduction to Fired Heaters.pdfKarnav Rana
 
Heat exchanger types and application
Heat exchanger types and applicationHeat exchanger types and application
Heat exchanger types and applicationKanchan Ramteke
 
Fired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
Fired Heaters-Key to Efficient Operation of Refineries and PetrochemicalsFired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
Fired Heaters-Key to Efficient Operation of Refineries and PetrochemicalsAshutosh Garg
 
sru-presentation.pptx
sru-presentation.pptxsru-presentation.pptx
sru-presentation.pptxRaul79654
 
Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsHrishikesh Devan
 
Heat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and WorkingHeat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and WorkingAbhishek Srivastav
 
Shell and tube heat exchanger design comparison
Shell and tube heat exchanger design comparisonShell and tube heat exchanger design comparison
Shell and tube heat exchanger design comparisonJuan Pablo Hernandez
 
Heat Exchangers
Heat ExchangersHeat Exchangers
Heat ExchangersSABIC
 
Power plant high pressure boilers
Power plant high pressure boilers Power plant high pressure boilers
Power plant high pressure boilers PRANAV PATEL
 
Steam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer DesignSteam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer DesignGerard B. Hawkins
 
Heat Exchanger
Heat ExchangerHeat Exchanger
Heat ExchangerNathan
 
Primary Reforming Flowsheets
Primary Reforming FlowsheetsPrimary Reforming Flowsheets
Primary Reforming FlowsheetsGerard B. Hawkins
 
Plate type heat exchanger
Plate type heat exchangerPlate type heat exchanger
Plate type heat exchangerPankaj Nishant
 
Process plant equipment and their operations in petrochemical industry
Process plant equipment and their operations in petrochemical industryProcess plant equipment and their operations in petrochemical industry
Process plant equipment and their operations in petrochemical industrySavanSardhara
 
Training material for air preheater
Training material for air preheaterTraining material for air preheater
Training material for air preheaterHOANG VAN DUC
 
Ammonia synthesis converter
Ammonia synthesis converterAmmonia synthesis converter
Ammonia synthesis converterPrem Baboo
 

What's hot (20)

An introduction to Fired Heaters.pdf
An introduction to Fired Heaters.pdfAn introduction to Fired Heaters.pdf
An introduction to Fired Heaters.pdf
 
Waste heat recovery
Waste heat recoveryWaste heat recovery
Waste heat recovery
 
Heat exchanger types and application
Heat exchanger types and applicationHeat exchanger types and application
Heat exchanger types and application
 
Pressure drop calculations
Pressure drop calculationsPressure drop calculations
Pressure drop calculations
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Steam boiler
Steam boilerSteam boiler
Steam boiler
 
Fired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
Fired Heaters-Key to Efficient Operation of Refineries and PetrochemicalsFired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
Fired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
 
sru-presentation.pptx
sru-presentation.pptxsru-presentation.pptx
sru-presentation.pptx
 
Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam Generators
 
Heat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and WorkingHeat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and Working
 
Shell and tube heat exchanger design comparison
Shell and tube heat exchanger design comparisonShell and tube heat exchanger design comparison
Shell and tube heat exchanger design comparison
 
Heat Exchangers
Heat ExchangersHeat Exchangers
Heat Exchangers
 
Power plant high pressure boilers
Power plant high pressure boilers Power plant high pressure boilers
Power plant high pressure boilers
 
Steam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer DesignSteam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer Design
 
Heat Exchanger
Heat ExchangerHeat Exchanger
Heat Exchanger
 
Primary Reforming Flowsheets
Primary Reforming FlowsheetsPrimary Reforming Flowsheets
Primary Reforming Flowsheets
 
Plate type heat exchanger
Plate type heat exchangerPlate type heat exchanger
Plate type heat exchanger
 
Process plant equipment and their operations in petrochemical industry
Process plant equipment and their operations in petrochemical industryProcess plant equipment and their operations in petrochemical industry
Process plant equipment and their operations in petrochemical industry
 
Training material for air preheater
Training material for air preheaterTraining material for air preheater
Training material for air preheater
 
Ammonia synthesis converter
Ammonia synthesis converterAmmonia synthesis converter
Ammonia synthesis converter
 

Similar to Air Preheat System Upgrade on Coker Heaters

AIChE Smart Stack Damper Design Provides Better Control of Fired Heaters
AIChE Smart Stack Damper Design Provides Better Control of Fired HeatersAIChE Smart Stack Damper Design Provides Better Control of Fired Heaters
AIChE Smart Stack Damper Design Provides Better Control of Fired HeatersAshutosh Garg
 
Low charge ammonia vapour compression refrigeration system for residential ai...
Low charge ammonia vapour compression refrigeration system for residential ai...Low charge ammonia vapour compression refrigeration system for residential ai...
Low charge ammonia vapour compression refrigeration system for residential ai...RAJESHKUMAR4616
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plantSHIVAJI CHOUDHURY
 
Aph operation and emergency handling
Aph operation and emergency handlingAph operation and emergency handling
Aph operation and emergency handlingParag Agrawal
 
Fundamentals-of-CKV.pdf
Fundamentals-of-CKV.pdfFundamentals-of-CKV.pdf
Fundamentals-of-CKV.pdfSebaGmez4
 
11 eurammon symposium_2017-huber_r290_f3
11 eurammon symposium_2017-huber_r290_f311 eurammon symposium_2017-huber_r290_f3
11 eurammon symposium_2017-huber_r290_f3Katarina Lisci
 
Icci 2014 Dynamic Heat Exchange Solutions - Energy ROI Treasure?
Icci 2014   Dynamic Heat Exchange Solutions - Energy ROI Treasure?Icci 2014   Dynamic Heat Exchange Solutions - Energy ROI Treasure?
Icci 2014 Dynamic Heat Exchange Solutions - Energy ROI Treasure?BRONSWERK
 
Hvac basics lunch & learn
Hvac basics lunch & learnHvac basics lunch & learn
Hvac basics lunch & learnQaimuddin SODHO
 
Summary of changes in burner specifications
Summary of changes in burner specificationsSummary of changes in burner specifications
Summary of changes in burner specificationsKapil Batra
 
Furnace Improvements patented - Split Flow technology
Furnace Improvements patented - Split Flow technologyFurnace Improvements patented - Split Flow technology
Furnace Improvements patented - Split Flow technologyDisha Mangal
 
ELGI Airmate Air Accessories Total Compressed Air Solutions
ELGI Airmate Air Accessories Total Compressed Air SolutionsELGI Airmate Air Accessories Total Compressed Air Solutions
ELGI Airmate Air Accessories Total Compressed Air SolutionsVijayEngineeringandM1
 
Soot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field ExperienceSoot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field ExperiencePooja Agarwal
 
BOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdfBOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdfPrasadKandukuri4
 
Refrigeration and air conditioning
Refrigeration and air conditioningRefrigeration and air conditioning
Refrigeration and air conditioningVignesh Waran
 
Refrigeration And Air Conditioning
Refrigeration And Air ConditioningRefrigeration And Air Conditioning
Refrigeration And Air ConditioningSaurabh Jain
 

Similar to Air Preheat System Upgrade on Coker Heaters (20)

AIChE Smart Stack Damper Design Provides Better Control of Fired Heaters
AIChE Smart Stack Damper Design Provides Better Control of Fired HeatersAIChE Smart Stack Damper Design Provides Better Control of Fired Heaters
AIChE Smart Stack Damper Design Provides Better Control of Fired Heaters
 
Low charge ammonia vapour compression refrigeration system for residential ai...
Low charge ammonia vapour compression refrigeration system for residential ai...Low charge ammonia vapour compression refrigeration system for residential ai...
Low charge ammonia vapour compression refrigeration system for residential ai...
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plant
 
Aph operation and emergency handling
Aph operation and emergency handlingAph operation and emergency handling
Aph operation and emergency handling
 
Fundamentals-of-CKV.pdf
Fundamentals-of-CKV.pdfFundamentals-of-CKV.pdf
Fundamentals-of-CKV.pdf
 
11 eurammon symposium_2017-huber_r290_f3
11 eurammon symposium_2017-huber_r290_f311 eurammon symposium_2017-huber_r290_f3
11 eurammon symposium_2017-huber_r290_f3
 
Icci 2014 Dynamic Heat Exchange Solutions - Energy ROI Treasure?
Icci 2014   Dynamic Heat Exchange Solutions - Energy ROI Treasure?Icci 2014   Dynamic Heat Exchange Solutions - Energy ROI Treasure?
Icci 2014 Dynamic Heat Exchange Solutions - Energy ROI Treasure?
 
Hvac basics lunch & learn
Hvac basics lunch & learnHvac basics lunch & learn
Hvac basics lunch & learn
 
Summary of changes in burner specifications
Summary of changes in burner specificationsSummary of changes in burner specifications
Summary of changes in burner specifications
 
Furnace Improvements patented - Split Flow technology
Furnace Improvements patented - Split Flow technologyFurnace Improvements patented - Split Flow technology
Furnace Improvements patented - Split Flow technology
 
training report
training reporttraining report
training report
 
ELGI Airmate Air Accessories Total Compressed Air Solutions
ELGI Airmate Air Accessories Total Compressed Air SolutionsELGI Airmate Air Accessories Total Compressed Air Solutions
ELGI Airmate Air Accessories Total Compressed Air Solutions
 
Ank y na60_00
Ank y na60_00Ank y na60_00
Ank y na60_00
 
Plumbing Design
Plumbing DesignPlumbing Design
Plumbing Design
 
Compact Clean Steam Generator
Compact Clean Steam GeneratorCompact Clean Steam Generator
Compact Clean Steam Generator
 
Soot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field ExperienceSoot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field Experience
 
Types of Steam Desuperheaters
Types of Steam DesuperheatersTypes of Steam Desuperheaters
Types of Steam Desuperheaters
 
BOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdfBOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdf
 
Refrigeration and air conditioning
Refrigeration and air conditioningRefrigeration and air conditioning
Refrigeration and air conditioning
 
Refrigeration And Air Conditioning
Refrigeration And Air ConditioningRefrigeration And Air Conditioning
Refrigeration And Air Conditioning
 

More from Ashutosh Garg

Improving Performance of Coker Heaters
Improving Performance of Coker HeatersImproving Performance of Coker Heaters
Improving Performance of Coker HeatersAshutosh Garg
 
AIChE 2018 improving catalytic reformer heaters using split flow technology rev2
AIChE 2018 improving catalytic reformer heaters using split flow technology rev2AIChE 2018 improving catalytic reformer heaters using split flow technology rev2
AIChE 2018 improving catalytic reformer heaters using split flow technology rev2Ashutosh Garg
 
Improve shale oil crude heater performance summary slideshare
Improve shale oil crude heater performance summary slideshareImprove shale oil crude heater performance summary slideshare
Improve shale oil crude heater performance summary slideshareAshutosh Garg
 
Uniform heat transfer in fired heaters
Uniform heat transfer in fired heatersUniform heat transfer in fired heaters
Uniform heat transfer in fired heatersAshutosh Garg
 
Good heater specifications pay off
Good heater specifications pay off Good heater specifications pay off
Good heater specifications pay off Ashutosh Garg
 
Improve fired heaters performance and reliabilty
Improve fired heaters performance and reliabiltyImprove fired heaters performance and reliabilty
Improve fired heaters performance and reliabiltyAshutosh Garg
 
A new approach to improving heater efficiency
A new approach to improving heater efficiencyA new approach to improving heater efficiency
A new approach to improving heater efficiencyAshutosh Garg
 

More from Ashutosh Garg (7)

Improving Performance of Coker Heaters
Improving Performance of Coker HeatersImproving Performance of Coker Heaters
Improving Performance of Coker Heaters
 
AIChE 2018 improving catalytic reformer heaters using split flow technology rev2
AIChE 2018 improving catalytic reformer heaters using split flow technology rev2AIChE 2018 improving catalytic reformer heaters using split flow technology rev2
AIChE 2018 improving catalytic reformer heaters using split flow technology rev2
 
Improve shale oil crude heater performance summary slideshare
Improve shale oil crude heater performance summary slideshareImprove shale oil crude heater performance summary slideshare
Improve shale oil crude heater performance summary slideshare
 
Uniform heat transfer in fired heaters
Uniform heat transfer in fired heatersUniform heat transfer in fired heaters
Uniform heat transfer in fired heaters
 
Good heater specifications pay off
Good heater specifications pay off Good heater specifications pay off
Good heater specifications pay off
 
Improve fired heaters performance and reliabilty
Improve fired heaters performance and reliabiltyImprove fired heaters performance and reliabilty
Improve fired heaters performance and reliabilty
 
A new approach to improving heater efficiency
A new approach to improving heater efficiencyA new approach to improving heater efficiency
A new approach to improving heater efficiency
 

Recently uploaded

Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 

Recently uploaded (20)

Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 

Air Preheat System Upgrade on Coker Heaters

  • 1. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Air Preheat System Upgrade on Coker Heaters Ashutosh Garg Furnace Improvements
  • 2. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Air Preheat System • Not popular • Misconception about NOx emissions • Number of APH installations not in use • Heaters operating in Natural draft mode losing energy • Energy prices are very low ?? • Our fired heaters are not very efficient • But??? 10/7/2019 2
  • 3. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Two identical Balanced Draft Coker Heaters - Heat duty of each heater - 126.8 MMBtu/hr
  • 4. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Existing Air Preheat System RADIANT HOT AIR DUCT HOT FLUE GAS HOT FLUE GAS CONVECTION SECTION HOT FLUE GAS DAMPER AIR PREHEAT-TIGHT SHUT OFF NATURAL DRAFT MODULATING COLD FLUE GAS FD FAN ID FAN COLD AIR DUCT CELL AIR DOORS Hot Air Temperature = 579°F Hot Flue Gas Temperature = 60°F Temperature = 275°F Cold Flue Gas Temperature = 700°F Cold Air BURNERS RADIANT CELL RADIANT CELL RADIANT CELL AIR PREHEATER STACK
  • 5. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Operating Issues with Air Preheating Systems • Air Preheater • Corrosion • Air leakage • High flue gas side pressure drop • Bypass duct limitation • Burners • Non uniform air flow to burners • Flue gas bypass to stack, ID fan limiting • Client was throughput limited
  • 6. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Air Preheater Problems • Low tube metal temperature and excessive corrosion problems: • Non- uniform air flow distribution • Cold zones in static air preheater • APH Design was deficient with respect to acid dew point corrosion
  • 7. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Existing Air Preheater • Type-Recuperative Cast Iron • Heat Duty- 15.05 MMBtu/hr • Flue Gas Side Details • Flowrate- 130,150 lb/hr • Inlet/Outlet Temperature - 700°F/ 275°F • Pressure Drop- 2.0 inches WC • Air Side Details • Flowrate- 117,700 lb/hr • Inlet /Outlet Temperature- 60°F/ 579°F • Pressure Drop- 4.3 inches WC  Minimum Tube Metal Temperature- 230°F APH System Existing Air Preheater was corroded and leaking air into flue gas
  • 8. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Existing FD Fan  Fan rated for 34,652 acfm at 120°F with 10.5inch W.C pressure rise (TB)  Drive Arrangement- #7 SWSI  Fan Speed- 1,200 rpm  Motor - 100 H.P  Steam APH is provided at the inlet  Inlet guide vanes to control the flow  Provided with 20 ft tall suction stack consisting of rain hood with screen, silencer and steam APH coils Forced Draft Fan Suction Stack Existing FD fan was limiting due to APH leakage Suction filter was getting clogged with coke particles
  • 9. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Existing Steam Air Preheater  Provided at FD Fan inlet duct to preheat air in winter to avoid Acid Dew Point Corrosion in main APH  Heat Duty- 1.61 MMBtu/hr  Air inlet / outlet temperature : 10 °F / 60 °F Steam APH Coils Existing steam air preheater was undersized and getting clogged with coke particles
  • 10. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Existing ID Fan Rated for 58,530 acfm at 350°F with 5.1 inch WC static rise (TB) Arrangement- #7 SWSI Grade Mounted Inlet pneumatically operated damper to control the flow Fan Speed- 900 rpm Motor- 75 HP Induced Draft Fan ID fan was undersized and was limiting
  • 11. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Limitation of the Heaters and APH System Heater • High flue gas convection section exit temperature, almost 30- 40% flue gas bypassing the air preheater ( calculated thermal efficiency -85%) Air Preheater • Acid Dew Point or Cold Block Corrosion ID & FD Fans • ID and FD fans were limited in capacity thereby limiting the heater production Combustion / Cold Air By-pass Duct was undersized
  • 12. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Flue Gas Temperature Leaving Convection Flue gas temperature to Air Preheater is higher by almost 100-180F
  • 13. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Air Preheating System Modifications • Systems approach: • Installation of new APH, FD fans, ID fans, Steam APH • Modification of combustion air and flue gas ducts • Installation of additional convection tubes
  • 14. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Addition of Process Coils in Convection • Two future rows provision to be used. • Fin configuration of process coils in future rows: 1” ht. x 0.06” thk. X 5 FPI • 8,858 ft2 additional heat transfer area in process convection • Flue gas temperature leaving the convection section is reduced from 834°F to 701°F 12'-21/2" PROCESS 3 BARE ROWS EXISTING PROCESS 8 FINNED ROWS EXISTING STEAM SUPER HEATERT 1 FINNED ROW EXISTING 3'- 0 1/8" I/S INS. PROCESS 2 FINNED ROWS (NEW) Flue Gas Temperature = 701°F Proposed Convection Section
  • 15. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Air Preheater Recommendations • New Plate Type APH • Preheater design revised to 300°F flue gas temperature • 20% higher flue gas flow rate • Steam air preheater upstream to ensure constant air temperature of 120°F • Glass /Ceramic Coating on metal plates to avoid dew point corrosion in cold end.  Design Heat Duty of 17.7 MMBtu/hr..  Minimum tube metal temperature (TMT) of 279°F
  • 16. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Existing and Proposed APH Comparison Parameter Unit Existing Proposed Absorbed Duty MMBtu/hr 15.05 17.7 Air Flow Rate lb/hr 117,700 155,038 Air Inlet / Outlet Temperature °F 60 / 579 120 / 585 Flue Gas Flow Rate lb/hr 130,150 162,714 Flue Gas Inlet / Outlet Temperature °F 700 / 275 701 / 300 ΔP on Air Side (allowable/calculated) in WC - / 4.3 4.3 / 2.6 ΔP on Flue Gas Side (calculated) in WC 2.0 2.9 Minimum Metal Temperature °F 230 278.6
  • 17. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Existing vs. Proposed FD fan Parameter Unit Existing Proposed Combustion Air Flow Rate lb/hr 141,240 168,832 Air Temperature °F 120 125 Static Pressure Rise inch WC 10.5 14.07 Maximum Fan Speed rpm 1,200 1,200 Motor Rating HP 100 150
  • 18. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Existing vs. Proposed ID fan Parameter Unit Existing Proposed Flue Gas Flow Rate lb/hr 156,180 207,249 Flue Gas Temperature °F 350 400 Static Pressure Rise inch WC 5.0 10.62 Maximum Fan Speed rpm 900 1,200 Motor Rating HP 75 200 New ID fan motor is three times larger than the existing ID fan motor
  • 19. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Ducting Modifications 1.Combustion Air Duct Modification • FD fan suction stack: • Additional 20 ft FD fan suction stack • Cold Air bypass duct: • Size increased from 1’-8” (current size) to 3’-4” • Sized for Full Air Flow during forced draft operation • FD fan discharge duct: • Smoother transition to APH • Angled baffle plates and turning vanes
  • 20. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Ducting Modifications • Hot Air Duct Modification: • Smooth outlet transition from APH with turning vanes • Guide vanes and baffles • Pressure drop plate to increase the air side pressure drop to 0.68 inch WC in burners 2. Flue Gas Duct Modification • Hot Flue Gas Duct Modifications • Inlet transition to APH has gradual expansion with angled baffles • Cold Flue Gas Duct Modifications • New duct with turning vanes
  • 21. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 New FD fan Suction Stack • 40 ft height from FD fan flange inlet (20 ft more than existing suction stack) • 90 degree elbow • Provided with fine wire mesh screen to block bird feathers entering APH Proposed (40 ft) Existing (20 ft)
  • 22. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 New Cold Air Bypass Duct • Increased size to 3’-4” from 1’-8” (outside plate) • Controlled by pneumatically operated, tight shut off damper 3.25 ft o/s Plate diameter Proposed Bypass Duct
  • 23. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Steam Preheat Coil Parameter Unit Existing Steam Preheater New Steam Preheater Coils Heat Duty MMBtu/ hr 1.61 6.11 Air Inlet Temperature °F 10 10 Air Outlet Temperature °F 60 180 23 Picture of Steam Preheat Coil in Manufacturing Facility
  • 24. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Existing v/s New Steam Preheater 24 Existing Steam APH In Fan Suction Existing Steam APH Layout Proposed Steam APH Layout New Steam APH in Discharge Duct
  • 25. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Existing and Proposed FD fan Discharge Duct Existing Proposed APH inlet FD fan outlet APH inlet FD fan outlet Steam APH with tubes Smoother Transition, Angled baffles and turning vanes provide uniform air flow
  • 26. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Velocity RMS Deviation at APH Inlet [ft/s] RMS deviation at APH inlet is: ± 91.0% RMS deviation at APH inlet is: ± 13.9% Existing Proposed Normal velocity profile at APH inlet (after Steam APH) Note: Recommended RMS Deviation of velocity is in the range of ± 5% Due to physical constraints on duct shape it was not feasible to further improve the flow distribution
  • 27. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Hot Air Duct Modification for Uniform Air Flow • Air preheat outlet • Smooth and turning vanes are added • Reduced dead zones and recirculation HA-2N duct modification R 1’6” Typ. R 1’6” Typ. Guide vanes
  • 28. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Air Flow Path Lines colored by Velocity [ft/s] APH outlet Recirculation • Recirculation is reduced as compared to existing case with change in duct design and adding turning vanes • Pressure drop is reduced by 0.05 inches WC as compared to existing design Proposed Existing
  • 29. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Hot Air Duct Modification for Uniform Air Flow to Burners Pneumatic Operated Dampers
  • 30. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 APH outlet Burner Inlet HA-6 HA-9 HA-10 Damper Hot Air Duct – Proposed Geometry Isometric view Pressure drop across the burner is considered: 0.68 inches WC Proposed Modified inlet duct along with turning vanes
  • 31. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Air Flow Variation to Burners • Deviation from average flow rate per burner based • on simulation results Comparison • Mass flow distribution across all the burners is significantly improved for the proposed case • Improved air flow distribution across burners for other ducts is similar 1 14 2
  • 32. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Hot Flue Gas Inlet Duct to Air Preheater [ft/s] Existing Proposed
  • 33. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Flue Gas Velocity Profile at ID Suction [ft/s] Velocity distribution throughout the duct has improved in the proposed case Existing Proposed Uniform velocity distribution is achieved at the inlet of ID fan for proposed case Significant reduction in the recirculation zone for the proposed case
  • 34. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Flue Gas Velocity Path Lines at ID Suction [ft/s] Significant reduction in swirling velocity near the inlet of ID fan Existing Proposed Flue gas flow separation at the bends is reduced
  • 35. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Key Benefits • Thermal Efficiency of the coker heater increased by 7-8% after the revamp. • Heater production rate was improved after APH replacement. • Production rate increased by 4,500 Barrels per day for each heater • Overall project cost – Total $7.5 Million for two heaters • At about $8 per Barrel it provided $26 Million additional revenue per year • Payout -4 months
  • 36. 11th AIChE Southwest Process Technology Conference | October 1-2, 2019 Thank You!