WETSIDE DESIGN
© Copyright 2008 HVAC Design Solutions 1
Essential Design Programs
with Accurate Sizing Calculations
help to “Streamline Your Design”
HVAC DESIGN SOLUTIONS
ENGINEERING SOFTWARE
 “Wetside Design” from HVAC Design
Solutions is a package of software programs for
many of the HVAC Designer’s sizing tasks:
 Hydronic System Sizing -“Optimum Sizes”
 Pump Head Calcs (Primary, Secondary, &
Condenser Water Pumps)
 Heating Water Expansion Tank Sizing
 Chilled Water Expansion Tank Sizing
 Coil Psychrometrics & Coil GPM Calcs
 Extensive Help Files, and “Extras”
© Copyright 2008 HVAC Design Solutions 2
 Reduce your dependence on Reference Books,
Charts, Graphs, and “Rules of Thumb”.
 Eliminate many of the usual HVAC Design
Tasks
 Reduce common errors and mistakes
 Create an easy-to-follow, step-by-step
“Procedure for Wetside Design” for all
projects.
© Copyright 2008 HVAC Design Solutions 3
Software Package contains most of
the sizing calculations and
procedures for typical projects
© Copyright 2008 HVAC Design Solutions 4
INDEX2C.xls#'PUMP-CHW-SEC.'!F15
INDEX2H.xls#'PUMP-HHW-PRIM.'!F15
INDEX2H.xls#'PUMP-HHW-SEC.'!F15
PRIMARY PUMP HEAD CALCULATIONS - HEATING WATER
INDEX2C.xls#'EXPTANK-CHW'!B9CHILLED WATER EXPANSION TANK CALCULATIONS
SECONDARY PUMP HEAD CALCULATIONS - HEATING WATER
AIR HANDLING UNIT - PRELIM. COOLING COIL CALCS
PUMP PRESSURE DROP CALCS - COOLING WATER
CONTENTS
INDEX2W.xls#'AHU-HTG.COIL'!H6
CEILING SPACE INFORMATION REQUEST FORM
HEAT/COOL LOAD DESIGN CRITERIA
AIR HANDLING UNIT - PRELIM. HEATING COIL CALCS
BASIC PROJECT INPUT SHEET
BUILDING INFORMATION REQUEST LETTER #1
BUILDING INFORMATION REQUEST LETTER #2
PIPE SIZING - OPTIMUM ECONOMIC SIZES - SINGLE PIPES
PIPE SIZING SCHEDULE - HYDRONIC PIPE SYSTEMS
PRELIMINARY PUMP HEAD CALCULATIONS
VAV - REHEAT COIL LOAD CALCULATIONS
PUMP HEAD CALCULATIONS DIAGRAM
HEATING WATER EXPANSION TANK CALCULATIONS
PRIMARY PUMP HEAD CALCULATIONS - CHILLED WATER
PUMP PRESSURE DROP CALCS - HEATING WATER
SECONDARY PUMP HEAD CALCULATIONS - CHILLED WATER
PUMP HEAD CALCULATIONS DIAGRAM - CHILLED WATER
CONDENSER WATER PUMP HEAD CALCS - COOLING TOWER
INDEX2W.xls#PIPECALC!H10
INDEX2W.xls#PIPESIZE!A13
INDEX2W.xls#'PUMP-HD.-PRELIM.'!C3
INDEX2W.xls#'VAV REHEAT'!C6
INDEX2W.xls#'AHU-COOL. COIL'!H6
INDEX2H.xls#'PUMP-DIAG.'!B2
INDEX2H.xls#INDEX!C9
JUMP TO FILE
INDEX2W.xls#INDEX!C10
Bldginfo.xls#'Bldg. Info.'!E11
Bldginfo.xls#'Bldg. Info. 2'!D11
Bldginfo.xls#'Ceiling Space'!D11
LOADCAL.XLS#'Design Criteria'!C5
INDEXP.xls
INDEXP.xls#PROJ.INFO!D2
PROJECT INFORMATION
WET SIDE DESIGN
INDEX2C.xls#INDEX!C9
INDEX2C.xls#'PUMP-CHW-PRIM.'!F15
INDEX2H.xls#'EXPTANK-HHW'!B9
INDEX2C.xls#'PUMP-DIAG.'!C2
INDEX2C.xls#'PUMP-COOL.TOWER'!F15
“Any One of these
programs is worth the cost
of the Entire Package!”
Quick Links to
all calculation
programs
© Copyright 2008 HVAC Design Solutions 5
HELP
BASIC PROJECT INFORMATION
PROJECT NAME :
PROJECT NUMBER :
PROJECT LOCATION :
DATE :
TYPE OF BUILDING :
SUMMER OUTDOOR DESIGN DRY BULB TEMP. (DEG. F):
WINTER OUTDOOR DESIGN DRY BULB TEMP. (DEG. F):
INDOOR DESIGN TEMP. - SUMMER (DEG. F) :
INDOOR DESIGN TEMP. - WINTER (DEG. F) :
PROJECT ELEVATION (FEET) :
PROJECT MANAGER :
PROJECT ENGINEER :
CLIENT :
CLIENT CONTACT NAME:
75.0
-6.0
OAKPARK OFFICE BLDG. 3
134-08
CHICAGO, IL
05/06/08
JOHN GOREMANN
"YOUR COMPANY NAME"
OFFICE
91.0
ADS ARCHITECTS
70.0
670
BILL REECE
JIM EDMOND
Begin with Basic Project
Information input
Information automatically
transfers to all programs
Design Conditions are
used in many calculations
PROJECT NAME:
* NORMAL PIPE SIZING BASED ON: PROJECT NUMBER:
VELOCITY NOT EXCEEDING 4 FT/SEC. UP TO 2" PIPE DATE:
VELOCITY NOT EXCEEDING 10 FT/SEC. FOR LARGER THAN 2" PIPE CAUTION: VELOCITY EXCEEDS 10 FT./SEC. - MAY CAUSE NOISE AND EROS
PRESSURE DROP BETWEEN 1 AND 5 FT/100 FT. CAUTION: VELOCITY IS LESS THAN 2 FT./SEC. - MAY CAUSE AIR TRAPPING
1/2" TO 3" SIZES ARE COPPER, 4" AND LARGER SIZES ARE STEEL CAUTION: EXCESSIVE PRESSURE DROP - MAY INCREASE PUMP HORSEP
FROM TO
1 2 164.0 4 4.4 1.8 2 1/2 11.7 20.0 4 4.4
2 3 152.0 4 4.4 1.8 2 1/2 11.7 20.0 4 4.4
3 4 141.5 3 7.1 5.5 2 1/2 10.1 13.0 4 4.0
4 5 138.0 3 7.1 5.5 2 1/2 10.1 13.0 4 4.0
5 6 136.8 3 7.1 5.5 2 1/2 10.1 13.0 4 4.0
6 7 121.0 3 5.9 4.0 2 1/2 8.4 8.5 4 3.3
7 8 96.0 3 4.7 2.6 2 10.4 17.0 3 4.7
8 9 48.5 2 5.2 5.1 2 5.2 5.1 3 2.4
9 10 22.3 1 1/2 4.5 5.7 1 1/4 6.4 13.0 2 2.6
10 11 12.8 1 1/4 3.1 3.4 1 4.7 9.0 1 1/2 2.2
11 12 6.3 3/4 4.0 10.0 3/4 4.0 10.0 1 1/4 1.5
0 0.0 0.0 0 0.0 0.0 0 0.0
PIPE SECTION
NORMAL
PRESS.
DROP
(FT/100 FT)
LOW FIRST
COST PD
(FT/100 FT)
LOW
OPERATING
COST VEL.
(FT/SEC)
FLOW RATE
(GPM)
NORMAL
SIZE *
(INCH)
NORMAL
VELOCITY
(FT/SEC)
LOW
OPERATING
COST SIZE
(INCH)
LOW FIRST
COST SIZE
(INCH)
LOW FIRST
COST VEL.
(FT/SEC)
PIPE SIZING SCHEDULE - OPTIMUM ECONOMICAL SIZES
TEST PROJECT #1
12/19/07
1444-07PRINT
© Copyright 2008 HVAC Design Solutions 6
Warning Flags for
Alternate Sizes
Alternate
Pipe Sizes
Quick and Easy Input
Most “Economical” Pipe
Sizes to meet Sizing Criteria
(Velocity and Pressure Drop)
HELP
164 PROJECT NAME:
4.0 PROJECT NUMBER:
3 APPROX. HP: 5.4 DATE:
PIPE SIZE
TOTAL PIPE
LENGTH (ft.)
PRESS. DROP
(ft./100 ft.)
PIPE PRESS.
DROP (ft.)
FITTING OR
VALVE TYPE
NO. OF FITTINGS
UP TO 2"
NO. OF FITTINGS
2" TO 4"
NO. OF FITTINGS
4" to 10"
FITTING PRESS.
DROP (ft)
1/2 0 4.0 0.0 ELL - 90 DEG. 12 18 0 10.3
3/4 30 4.0 1.2 ELL - 45 DEG. 0 0 0 0.0
1 0 4.0 0.0 THRU TEE 3 7 0 3.9
1 1/4 15 4.0 0.6 BRANCH TEE 1 1 0 1.1
1 1/2 25 4.0 1.0 GLOBE VALVE 0 2 0 6.6
2 25 4.0 1.0 GATE VALVE 2 0 0 0.2
2 1/2 0 3.0 0.0 ANGLE VALVE 0 0 0 0.0
3 130 3.0 3.9
SWING CHECK
VALVE
0 2 0 2.3
4 62 3.0 1.9
LIFT CHECK
VALVE
0 0 0 0.0
5 0 2.5 0.0
CONTROL
VALVE
1 1 0 5.3
MAX. PRESSURE DROP (ft./100 ft.):
TEST PROJECT #1
1444-07
12/19/2007
PRELIMINARY PUMP HEAD CALCULATIONS
PUMP CAPACITY (GPM):
MAIN PIPE SIZE (in.):
PRINT
© Copyright 2008 HVAC Design Solutions 7
Preliminary Pump Head Calcs, for
preliminary Pump HP requirements
Quick and Easy Input
“Approximate” Fitting
and Valve counts
PRIMARY PUMPS
© Copyright 2008 HVAC Design Solutions 8
Typical Project Example for
Primary Pump Head Calcs
HELP
* PRESSURE DROP BASED ON: PROJECT NAME:
VELOCITY NOT EXCEEDING 5 FT/SEC. UP TO 2" PIPE PROJECT NUMBER:
VELOCITY NOT EXCEEDING 10 FT/SEC. FOR LARGER THAN 2" PIPE DATE:
PRESSURE DROP BETWEEN 1 AND 5 FT/100 FT.
9 CAUTION : ABOVE OR BELOW NORMAL VELOCITY
APPROXIMATE PUMP BHP: 2.5
(CALCULATED DURING INPUT) AVERAGE EQUIVALENT PRESS. LOSS FOR TOTAL
SIZE NUMBER OF GPM VELOCITY LENGTH DROP -EACH SIZE LOSS
ITEM LENGTH (FT.) (IN.) FITTINGS (EACH SIZE) (FT./SEC.) (FT.) (FT/100 FT.) * (FT. HD.) (FT. HD.)
PUMP ACCESSORIES:
PUMP FLEX. CONNECTIONS 2 5 22 2.6 1.14
CHECK VALVE - LIFT CHECK 1 5 84 2.6 2.18
CHECK VALVE - SWING CHECK 0 0 0 0 0.00
CHECK VALVE - SILENT CHECK 0 0 N/A N/A 0.00
BALANCING VALVE (80% OPEN) 1 7 N/A N/A 4.00
SHUT-OFF VALVE - BUTTERFLY 2 7 N/A N/A 2.00
SHUT-OFF VALVE - GATE 0 0 0 0 0.00
PUMP HEAD CALCULATION - CHILLED WATER - PRIMARY
TEST PROJECT #1
1444-06
2/19/2006
0 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
RESET/CLEAR
© Copyright 2008 HVAC Design Solutions 9
Easy Input of System
Components and
GPM Quantities
Running Total of
Approx. Pump BHP
BRANCH TEE - DIVERTING FLOW OR CONVERGING FLOW
(FLOW TURNS 90 DEGREES) SIZE GPM VEL. EQ. LEN. FT/100 FT.
TEE #1 3 GPM "IN" 160 8 21.39 7 1.50
TEE #1 GPM "OUT" 120
TEE #2 3 GPM "IN" 120 6 16.91 4 0.68
TEE #2 GPM "OUT" 160
TEE #3 3 GPM "IN" 120 6 16.91 4 0.68
TEE #3 GPM "OUT" 160
TEE #4 3 GPM "IN" 120 6 16.91 4 0.68
TEE #4 GPM "OUT" 120
TEE #5 3 GPM "IN" 120 6 16.91 4 0.68
TEE #5 GPM "OUT" 120
TEE #6 0 GPM "IN" 0 0 0 0 0.00
TEE #6 GPM "OUT" 0
TEE #7 0 GPM "IN" 0 0 0 0 0.00
TEE #7 GPM "OUT" 0
TEE #8 0 GPM "IN" 0 0 0 0 0.00
TEE #8 GPM "OUT" 0
TEE #9 0 GPM "IN" 0 0 0 0 0.00
TEE #9 GPM "OUT" 0
TEE #10 0 GPM "IN" 0 0 0 0 0.00
TEE #10 GPM "OUT" 0 4.20
THRU TEE - CONVERGING FLOW
(FLOW STRAIGHT THRU) SIZE GPM VEL. EQ. LEN. FT/100 FT.
TEE #1 3 GPM "IN" 120 6 8.9 4 0.36
TEE #1 GPM "OUT" 160
TEE #2 3 GPM "IN" 120 6 8.9 4 0.36
TEE #2 GPM "OUT" 160
TEE #3 0 GPM "IN" 0 0 0 0 0.00
TEE #3 GPM "OUT" 0
TEE #4 0 GPM "IN" 0 0 0 0 0.00
TEE #4 GPM "OUT" 0
TEE #5 0 GPM "IN" 0 0 0 0 0.00
TEE #5 GPM "OUT" 0
OutIn
Out
In
Out
In
© Copyright 2008 HVAC Design Solutions 10
Easy Input of System
Components and
GPM Quantities
Built-in Fitting
Coefficients
CHILLER EQUIPMENT: VEL. EQ. LEN. FT/100 FT.
ISOLATION VALVE - BUTTERFLY 2 5 N/A N/A 0.60
ISOLATION VALVE - GATE 0 0 0 0 0.00
ISOLATION VALVE - GLOBE 0 0 0 0 0.00
ISOLATION VALVE - ANGLE 0 0 0 0 0.00
ISOLATION VALVE - BALL 0 0 0 0 0.00
Y-TYPE STRAINER 1 5 N/A N/A 0.80
CHILLER AUTOMATIC ISOLATION VALVE
(AUTOMATIC GLOBE VALVE) 1 5 130.5 2.6 3.39
CHILLER FLEX. CONNECTION 2 5 22 2.6 1.14
5.94
CHILLER PRESSURE DROP (FROM MANUFACTURER, IF KNOWN) : 0
GENERIC CHILLER PRESSURE DROP (IF NOT AVAIL. FROM MFG'R.) :
CHILLER TONS : 100 CHILLER GPM : 120 4.20
4.20
AIR CONTROL AND FLOW METERS:
AIR SEPARATOR PRESSURE DROP (FROM MANUFACTURER, IF KNOWN) : 0
GENERIC AIR SEPARATOR PRESSURE DROP - WITH STRAINER (IF NOT AVAIL. FROM MFG'R.) :
SIZE : 0 GPM : 160 11.05
0 0
0
0
0
0
0
0
0
0
0
0
0 0
0 0
0
0
2
© Copyright 2008 HVAC Design Solutions 11
Allowance for Items at
Chiller or Boiler
Generic Values Built-in
(Conservative) if Mfgr’s.
Data Unknown
PIPE LOSSES (MEASURE "OUT & BACK" TO PUMP) : PRESS. LOSS FOR TOTAL
SIZE NUMBER GPM VELOCITY EQ. LEN. DROP SIZE LOSS
LENGTH (FT.) (IN.) (FT./SEC.) (FT/100 FT.) * (FT. HD.) (FT. HD.)
COPPER PIPE : 0 1/2 N/A 0 0.0 0 0.0 0.00
COPPER PIPE : 0 3/4 N/A 0 0.0 0 0.0 0.00
COPPER PIPE : 0 1 N/A 0 0.0 0 0.0 0.00
COPPER PIPE : 0 1 1/4 N/A 0 0.0 0 0.0 0.00
COPPER PIPE : 0 1 1/2 N/A 0 0.0 0 0.0 0.00
COPPER PIPE : 0 2 N/A 0 0.0 0 0.0 0.00
COPPER PIPE : 0 2 1/2 N/A 0 0.0 0 0.0 0.00
COPPER PIPE : 150 3 N/A 160 8.0 150 7.0 10.50
COPPER PIPE : 0 4 N/A 0 0.0 0 0.0 0.00
0 10.50
STEEL PIPE : 0 1/2 N/A 0 0.0 0 0.0 0.00
STEEL PIPE : 0 3/4 N/A 0 0.0 0 0.0 0.00
STEEL PIPE : 0 1 N/A 0 0.0 0 0.0 0.00
STEEL PIPE : 0 1 1/4 N/A 0 0.0 0 0.0 0.00
STEEL PIPE : 0 1 1/2 N/A 0 0.0 0 0.0 0.00
STEEL PIPE : 0 2 N/A 0 0.0 0 0.0 0.00
STEEL PIPE : 0 2 1/2 N/A 0 0.0 0 0.0 0.00
STEEL PIPE : 0 3 N/A 0 0.0 0 0.0 0.00
STEEL PIPE : 0 4 N/A 0 0.0 0 0.0 0.00
STEEL PIPE : 0 5 N/A 0 0.0 0 0.0 0.00
STEEL PIPE : 0 6 N/A 0 0.0 0 0.0 0.00
SUB-TOTAL PRESSURE DROP (FT. HEAD) : 55.25
GLYCOL PRESSURE DROP CORRECTION (IF ANY) - BASED ON 50 DEGREE F WATER TEMPERATURE :
PERCENT GLYCOL, BY WEIGHT : GLYCOL CORRECTION FACTOR : 1
CORRECTED SUB-TOTAL PRESSURE DROP (FT. HEAD) : 55.25
PRESSURE DROP SAFETY FACTOR (IF ANY) - RECOMMEND 5% = 1.05
TOTAL PUMP PRESSURE DROP (FT. HEAD): 58.01
0
1.05
© Copyright 2008 HVAC Design Solutions 12
Adjustments for
Glycol (if applicable)
and/or Safety Factor
Imput Length of
“Longest Run” Piping
(Measured “Out &
Back” to Pump)
Final, Totalized Primary
Pump Head (Ft.) for the
System
PUMP HEAD CALCULATION - CHILLED WATER - PRIMARY
* PRESSURE DROP BASED ON: PROJECT NAME:
VELOCITY NOT EXCEEDING 5 FT/SEC. UP TO 2" PIPE PROJECT NUMBER:
VELOCITY NOT EXCEEDING 10 FT/SEC. FOR LARGER THAN 2" PIPE DATE:
PRESSURE DROP BETWEEN 1 AND 5 FT/100 FT.
9 CAUTION: ABOVE OR BELOW NORMAL VELOCITY
APPROXIMATE PUMP BHP: 2.5
(CALCULATED DURING INPUT) AVERAGE EQUIVALENT PRESS. LOSS FOR LOSS
ITEM NAME LENGTH (FT.) (IN.) FITTINGS (EACH SIZE) (FT./SEC.) (FT.) (FT/100 FT.) (FT. HD.) TOTAL
PUMP FLEX. CONNECTIONS 3 2 120 5 22 2.6 1.14
CHECK VALVE - LIFT CHECK 3 1 120 5 84 2.6 2.18
BALANCING VALVE (80% OPEN) 3 1 160 7 N/A N/A 4.00
SHUT-OFF VALVE - BUTTERFLY 3 2 160 7 N/A N/A 2.00
TRIPLE DUTY VALVE -STRAIGHT 3 1 120 5 N/A N/A 1.20
TRIPLE DUTY VALVE -ANGLE 0 0 0 0 N/A N/A 0.00 10.53
STANDARD 90 DEG. ELBOW 3 5 160.0 8 9.3 7 3.26
STANDARD 90 DEG. ELBOW 12 0 0.0 0 0 0 0.00 3.26
THRU TEE - DIVERTING FLOW 3 GPM "IN" 160.0 8 1.86 7 0.13
TEE #2 3 GPM "IN" 160.0 8 1.86 7 0.13
TEE #3 3 GPM "IN" 160.0 8 1.86 7 0.13
TEE #4 3 GPM "IN" 120.0 6 0.89 4 0.04
TEE #5 3 GPM "IN" 120.0 6 0.89 4 0.04
TEE #10 0 GPM "OUT" 0.0 0 0 0 0.00 0.46
BRANCH TEE - DIVERTING FLOW OR CONVERGING FLOW3 GPM "IN" 160.0 8 21.39 7 1.50
TEE #2 3 GPM "IN" 120.0 6 16.91 4 0.68
TEE #3 3 GPM "IN" 120.0 6 16.91 4 0.68
TEE #4 3 GPM "IN" 120.0 6 16.91 4 0.68
TEE #5 3 GPM "IN" 120.0 6 16.91 4 0.68
TEE #10 0 GPM "OUT" 0.0 0 0 0 0.00 4.20
THRU TEE - CONVERGING FLOW 3 GPM "IN" 120 6.0 8.90 4 0.36
TEE #2 3 GPM "IN" 120 6.0 8.90 4 0.36
TEE #10 0 GPM "OUT" 0 0.0 0.00 0 0.00 0.71
ISOLATION VALVE - BUTTERFLY 3 2 120 5.0 N/A N/A 0.60
Y-TYPE STRAINER 3 1 120 5.0 N/A N/A 0.80
(AUTOMATIC GLOBE VALVE) 3 1 120 5.0 130.50 3 3.39
CHILLER FLEX. CONNECTION 3 2 120 5.0 22.00 3 1.14 5.94
GENERIC CHILLER PRESSURE DROP (IF NOT AVAIL. FROM MFG'R.) :CHILLER TONS :100.0 CHILLER GPM : 120 4.20 4.20
GENERIC AIR SEPARATOR PRESSURE DROP - WITH STRAINER (IF NOT AVAIL. FROM MFG'R.) :SIZE : 0.0 GPM : 160 11.05
GENERIC AIR SEPARATOR PRESSURE DROP - WITHOUT STRAINER (IF NOT AVAIL. FROM MFG'R.) :SIZE : 0.0 GPM : 0 0.00 11.05
GENERIC FLOW METER PRESSURE DROP (IF NOT AVAIL. FROM MFG'R.) :SIZE : 0.0 GPM : 160 3.50 3.50
GENERIC SUCTION DIFFUSER PRESSURE DROP (IF NOT AVAIL. FROM MFG'R.) :SIZE : 0.0 GPM : 120 0.90 0.90
COPPER PIPE : 150 3 N/A 160.0 8.0 150 7.0 10.50
COPPER PIPE : 0 4 N/A 0.0 0.0 0 0.0 0.00 10.50
SUB-TOTAL PRESSURE DROP (FT. HEAD) : 55.25
PERCENT GLYCOL, BY WEIGHT : 0 GLYCOL CORRECTION FACTOR : 1
CORRECTED SUB-TOTAL PRESSURE DROP (FT. HEAD) : 55.25
PRESSURE DROP SAFETY FACTOR (IF ANY) - RECOMMEND 5% = 1.05 1.05 1.05
TOTAL PUMP PRESSURE DROP (FT. HEAD): 58.01
© 2007 hvacdesignsolutions.com
1444-06
2/19/2006
TEST PROJECT #1
© Copyright 2008 HVAC Design Solutions 13
After Input is complete, press “Compile
& Print” Button for full System Report
© Copyright 2008 HVAC Design Solutions 14
HELP
91 670
74 10
75
AHU COOLING SUPPLY MINIMUM SUPPLY AIR RETURN AIR OUTSIDEAIR RETURN AIR ENTERING AIR LEAVING AIR COOLING CHILLED FLOOR CFM PER
NUMBER LOAD * AIR TEMP. OUTSIDEAIR QUANTITY TEMP. ENTHALPY ENTHALPY ENTHALPY ENTHALPY COIL LOAD WATER AREA SQ. FT.
(MBH) (°F) (CFM) (CFM) (°F) (BTU/LB.) (BTU/LB.) (BTU/LB.) (BTU/LB.) (MBH) (GPM) (SQ. FT)
1 12.5 54.0 150 590 78.0 37.7 30.2 32.1 21.7 26.1 5.2 400 1.5
2 18.2 54.0 320 859 78.0 37.7 30.2 33.0 21.7 41.1 8.2 650 1.3
3 46.3 54.0 1550 2186 78.0 37.7 30.2 35.5 21.7 126.6 25.3 2000 1.1
4 244.8 54.0 5500 11556 78.0 37.7 30.2 33.8 21.7 586.9 117.4 12950 0.9
5 42.0 54.0 1480 1983 78.0 37.7 30.2 35.8 21.7 117.2 23.4 1820 1.1
6 121.7 54.0 2640 5745 78.0 37.7 30.2 33.6 21.7 289.6 57.9 4800 1.2
7 24.5 54.0 450 1157 78.0 37.7 30.2 33.1 21.7 55.7 11.1 820 1.4
8 205.9 54.0 5120 9720 78.0 37.7 30.2 34.2 21.7 509.2 101.8 11200 0.9
9 105.5 54.0 2200 4980 78.0 37.7 30.2 33.5 21.7 248.2 49.6 4280 1.2
10 33.6 54.0 1250 1586 78.0 37.7 30.2 36.1 21.7 95.8 19.2 1500 1.1
11 19.5 54.0 250 921 78.0 37.7 30.2 32.2 21.7 41.2 8.2 700 1.3
12 150.3 54.0 2850 7095 78.0 37.7 30.2 33.2 21.7 344.7 68.9 6200 1.1
0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
PROJECT ELEVATION =
CHILLED WATER DELTA-T =
AIR HANDLING UNIT - PRELIMINARY COOLING COIL LOAD CALCULATIONS
TEST PROJECT #1
1456-07
06/21/07
PROJECT NAME:
PROJECT NUMBER:
DATE:
OA DESIGN DB =
OA DESIGN WB =
DESIGN ROOM TEMP. =
PRINTRESET/CLEAR
Psychrometric Calculations Assist with
Preliminary Equipment Selection,
Preliminary Pump Sizing, Etc.
HELP
MINIMUM WATER TEMP. (DEG. F): 40
HEATING WATER TEMP. (DEG. F): 200
PROJECT ELEVATION (ft.) 670
PIPE SIZE
TOTAL PIPE
LENGTH (ft.)
GALLONS PER
FOOT
PIPE GALLONS
1/2 0.0121 0.0
3/4 120 0.0251 3.0
1 60 0.0429 2.6
1 1/4 0.0653 0.0
1 1/2 75 0.0924 6.9
2 224 0.1610 36.1
DATE:
TEST PROJECT #1
1444-07
12/19/2007
PROJECT NAME:
PROJECT NUMBER:
EXPANSION TANK SIZING - HEATING WATER
PRINT
BOILER MBH 450 337.5
COIL
GALLONS
# HEATING COILS 18 36.0 EXCHANGER
GALLONS
# HEAT EXCHANGERS 1 15.0
TOTAL CONTENT (gal.) 490.2
GLYCOL % (IF APPLICABLE) 10
EXPANSION FACTOR 0.03510
EXPANDED WATER VOLUME (gal.) 20.8
HEIGHT OF SYSTEM (ft.) 45 24.6 30
RELIEF VALVE SETTING (psi) 30 27
ACCEPTANCE FACTOR 0.06 0.94
TANK VOLUME (gal.) 353.8
CAUTION: RELIEF VALVE SETTING MUST BE LARGER THAN
REQUIRED SYSTEM PRESSURE
ACCEPTANCE VOLUME MUST EXCEED EXPANDED WATER VOLUME (gal.)
(PERCENT BY VOLUME) ENTER 0 IF NO GLYCOL IN SYSTEM
(SYSTEM PRESSURE)
(BASED ON HEATING WATER TEMP. MINUS MINIMUM WATER TEMP.)
© Copyright 2008 HVAC Design Solutions 15
Heating Water and Chilled
Water Expansion Tank
Sizing Programs
Built-in Water Volumes,
Expansion Factors,
Acceptance Factors, and
Expansion Formulas
© Copyright 2008 HVAC Design Solutions 16
HELP
PROJECT NAME: DATE: 06/21/07
PROJECT NUMBER:
REQUESTED BY:
1. All Offices
2. Conference Rooms
3. Photocopy machine rooms
4. Lounge and/or lunch rooms
5. Electrical equipment rooms
6. Computer Rooms
7. Procedure Rooms
8. Other specialty rooms
B. Please indicate any special HVAC requirements such as areas requiring:
1. 24 Hour Air Conditioning
2. Relative Humidity Controls
The above information should include: PC Stations, Laser Printers, Fax Machines, Photocopy
Machines, Microwaves, Vending Machines, Refrigerators, Coffee Makers, Special Lighting, etc. If
available, this information should contain: quantity, location, BTU/hr, wattage, amperage, voltage,
heat output to the space, operating cycle time, etc.
Please provide the following information, to expedite our design of your project. It is very important that
you respond as soon as possible, with as accurate information as you have available, so we can
calculate the correct air conditioning requirements and make accurate equipment selections.
A. Please provide the number of people, heat output or amperage and voltage of equipment, and any
other element that might effect the HVAC load in the following areas:
1456-07
TEST PROJECT #1
BUILDING MECHANICAL INFORMATION REQUEST
HELP
PROJECT NAME: DATE: 06/21/07
PROJECT NUMBER:
REQUESTED BY:
ROOM NAME/NUMBER:
NUMBER OF PEOPLE
HEAT PRODUCING EQUIPMENT (Please Indicate Quantity Below)
PC Stations Laser Printers
Photocopy Machines Fax Machines
Microwaves TV Sets or Monitors
Refrigerators (Small – S, Large – L) Vending Machines
Coffee Makers
Special Lighting (Total Watts to Room)
Special Equipment (Total Watts to Room)
Exposed Motors in Room (Horsepower)
NO HEAT PRODUCING EQUIPMENT IN THIS ROOM
SPECIAL OPERATING CONDITIONS
24 Hour Air Conditioning Required
BUILDING MECHANICAL ROOM INFORMATION REQUEST FORM
PEOPLE ACTIVITY LEVEL: (S) - Seated Office; (M) - Moderate Office; (W) - Walking or
Standing; (B) - Bench Work; (H) Heavy Work
TEST PROJECT #1
1456-07
“Programming”
Information Request
Forms for Owner or
Architect Input
© Copyright 2008 HVAC Design Solutions 17
Extensive “Quality
Control” Mechanical
Checklists are available
in a separate “Mechanical
Peer Review” Software
Package
Coordination Between Disciplines
Contents: (Click on hyperlink to jump to the sheet checklist)
A Preliminary Review of Plans and Specifications
B Demolition Plans
C Architect and/or Owner Coordination
D Structural Coordination
E Mechanical Coordination
F Plumbing Coordination
G Civil Engineering Coordination
H Electrical Coordination
A Preliminary Review of Plans and Specifications
1 Quickly review all Drawings in the Construction Document set, including Architectural,
Structural, Civil, Landscaping, Mechanical, Plumbing, Fire Protection, Electrical, Food
Service, and any other discipline. Spend not more than one minute per sheet, average.
2 Make a list of any apparent discrepancies or questions while reviewing the set, and add
‘flags’ to sheets where there are significant questions.
3 Quickly review the Specifications by reading through the Table of Contents for
Mechanical and Plumbing work. Check the Table of Contents against the actual
Specification sections to verify all sections have been included. Make a list of questions
that may come up during the cursory review.
4 Review Architectural Title Sheet, or first sheet in the set, and make a list of the Project
Square Footage, Building Occupancy Type, Building Construction Type, Governing
Codes, Index of Drawings, and any other information that relates to Mechanical or
Plumbing work.
5 Check for consistent appearance of Title Blocks, Drawing Scales, North Arrows,
Professional Stamps, Company Logos, Sheet Numbers, Sheet Titles, Issue Dates, and
Issue Revisions on all sheets.
B Demolition Plans
1 Verify that Demolition Symbols (cross-hatching, etc.) are clear and complete, and are
coordinated with other disciplines.
2 Verify there are notes regarding potential hazardous materials (asbestos, lead paint,
etc.), and coordinate with Architect or other Prime Consultant and Owner.
Over (110) Pages of
Checklists and
Spreadsheets for a
thorough review of
Mechanical Construction
Documents
© Copyright 2008 HVAC Design Solutions 18
Mechanical Plan Review Items
Contents: (Click on hyperlink to jump to the sheet checklist)
A Preliminary Review of Plans and Specifications
B Legend and Symbols Sheet
C Schedule Sheets
D Mechanical Demolition Plans
E Mechanical Ductwork Floor Plans
F Mechanical Piping Plans
G Mechanical Roof Plans
H Mechanical Central Plant Plans
I Clean Room and Fabrication Facilities
J Mechanical Piping Diagrams
K Mechanical Control Drawings
L Mechanical Detail Drawings
A Mechanical Piping Plans Return to Table of Contents
1 Sum all Chilled Water Supply and Return quantities (GPM’s) from coils back to service
connection or pumps. Pencil in quantities adjacent to pipes. Verify flow rates are listed
for all coils or equipment, and that Schedules for each device are complete. Check flow
direction Arrows for completeness and correct direction.
2 Sum all Heating Water Supply and Return quantities (GPM’s) same as Chilled Water.
Pencil in quantities. Verify Schedule information is complete. Check flow direction
Arrows.
3 Check for provisions for Water Balancing on plans or on details of coil connections.
4 Check for Isolation Valves to allow servicing without shutting down and draining entire
systems.
5 Verify whether Direct-return or Reverse-return piping. Suggest Reverse-return for better
water balancing, if appropriate.
6 Check provisions for Condensate Drains. Coordinate with Plumbing drawings for piping
and Approved Disposal methods.
7 Check on provisions for Air Venting and Drainage – on Coil Piping Details and plans.
8 Check Thermostat locations (if thermostats are shown on Piping Plans) and verify all
heating and cooling elements have a corresponding Thermostat or Sensor Control.
9 Spot-check pipe sizes against totalized water quantities. Use maximum of 4 ft. per 100 ft.
pipe friction, up to 5” pipe size, and maximum of 8 ft. per second Velocity for pipe 6” and
larger.
10 Check for provisions for Pipe Expansion – Pipe Loops, adequate turns (less than 50 feet
of straight pipe), or expansion devices.
11 Check for restrictions to pipe movement – against columns, against solid walls, drops or
rises to adjacent floors.
12 Verify that pipes are not run through Stairwells, Elevator Shafts, Columns, or Electrical
Rooms.
13 Compare Totalized water quantities with associated Pumps, and analyze diversity if totals
are not equal.
14 Verify that all pipes are sized.
15 Coordinate Pipe plans with Ductwork plans and identify any potential conflicts.
Example of Quality
Control Check List
Items
PUMP HEAD CALCULATION - CHILLED WATER - PRIMARY
* PRESSURE DROP BASED ON: PROJECT NAME:
VELOCITY NOT EXCEEDING 5 FT/SEC. UP TO 2" PIPE PROJECT NUMBER:
VELOCITY NOT EXCEEDING 10 FT/SEC. FOR LARGER THAN 2" PIPE DATE:
PRESSURE DROP BETWEEN 1 AND 5 FT/100 FT.
9 CAUTION: ABOVE OR BELOW NORMAL VELOCITY
APPROXIMATE PUMP BHP: 2.5
(CALCULATED DURING INPUT) AVERAGE EQUIVALENT PRESS. LOSS FOR LOSS
ITEM NAME LENGTH (FT.) (IN.) FITTINGS (EACH SIZE) (FT./SEC.) (FT.) (FT/100 FT.) (FT. HD.) TOTAL
PUMP FLEX. CONNECTIONS 3 2 120 5 22 2.6 1.14
CHECK VALVE - LIFT CHECK 3 1 120 5 84 2.6 2.18
BALANCING VALVE (80% OPEN) 3 1 160 7 N/A N/A 4.00
SHUT-OFF VALVE - BUTTERFLY 3 2 160 7 N/A N/A 2.00
TRIPLE DUTY VALVE -STRAIGHT 3 1 120 5 N/A N/A 1.20
TRIPLE DUTY VALVE -ANGLE 0 0 0 0 N/A N/A 0.00 10.53
STANDARD 90 DEG. ELBOW 3 5 160.0 8 9.3 7 3.26
STANDARD 90 DEG. ELBOW 12 0 0.0 0 0 0 0.00 3.26
THRU TEE - DIVERTING FLOW 3 GPM "IN" 160.0 8 1.86 7 0.13
TEE #2 3 GPM "IN" 160.0 8 1.86 7 0.13
TEE #3 3 GPM "IN" 160.0 8 1.86 7 0.13
TEE #4 3 GPM "IN" 120.0 6 0.89 4 0.04
TEE #5 3 GPM "IN" 120.0 6 0.89 4 0.04
TEE #10 0 GPM "OUT" 0.0 0 0 0 0.00 0.46
BRANCH TEE - DIVERTING FLOW OR CONVERGING FLOW3 GPM "IN" 160.0 8 21.39 7 1.50
TEE #2 3 GPM "IN" 120.0 6 16.91 4 0.68
TEE #3 3 GPM "IN" 120.0 6 16.91 4 0.68
TEE #4 3 GPM "IN" 120.0 6 16.91 4 0.68
TEE #5 3 GPM "IN" 120.0 6 16.91 4 0.68
TEE #10 0 GPM "OUT" 0.0 0 0 0 0.00 4.20
THRU TEE - CONVERGING FLOW 3 GPM "IN" 120 6.0 8.90 4 0.36
TEE #2 3 GPM "IN" 120 6.0 8.90 4 0.36
TEE #10 0 GPM "OUT" 0 0.0 0.00 0 0.00 0.71
ISOLATION VALVE - BUTTERFLY 3 2 120 5.0 N/A N/A 0.60
Y-TYPE STRAINER 3 1 120 5.0 N/A N/A 0.80
(AUTOMATIC GLOBE VALVE) 3 1 120 5.0 130.50 3 3.39
CHILLER FLEX. CONNECTION 3 2 120 5.0 22.00 3 1.14 5.94
GENERIC CHILLER PRESSURE DROP (IF NOT AVAIL. FROM MFG'R.) :CHILLER TONS :100.0 CHILLER GPM : 120 4.20 4.20
GENERIC AIR SEPARATOR PRESSURE DROP - WITH STRAINER (IF NOT AVAIL. FROM MFG'R.) :SIZE : 0.0 GPM : 160 11.05
GENERIC AIR SEPARATOR PRESSURE DROP - WITHOUT STRAINER (IF NOT AVAIL. FROM MFG'R.) :SIZE : 0.0 GPM : 0 0.00 11.05
GENERIC FLOW METER PRESSURE DROP (IF NOT AVAIL. FROM MFG'R.) :SIZE : 0.0 GPM : 160 3.50 3.50
GENERIC SUCTION DIFFUSER PRESSURE DROP (IF NOT AVAIL. FROM MFG'R.) :SIZE : 0.0 GPM : 120 0.90 0.90
COPPER PIPE : 150 3 N/A 160.0 8.0 150 7.0 10.50
COPPER PIPE : 0 4 N/A 0.0 0.0 0 0.0 0.00 10.50
SUB-TOTAL PRESSURE DROP (FT. HEAD) : 55.25
PERCENT GLYCOL, BY WEIGHT : 0 GLYCOL CORRECTION FACTOR : 1
CORRECTED SUB-TOTAL PRESSURE DROP (FT. HEAD) : 55.25
PRESSURE DROP SAFETY FACTOR (IF ANY) - RECOMMEND 5% = 1.05 1.05 1.05
TOTAL PUMP PRESSURE DROP (FT. HEAD): 58.01
© 2007 hvacdesignsolutions.com
1444-06
2/19/2006
TEST PROJECT #1
© Copyright 2008 HVAC Design Solutions 19
After completing input and
calculations, Output and
Sizing Documents can be
printed for submittal to
building department
officials and for addition to
drawings and schedules
PUMP-DIAG.
EXPTANK-HHW
SECONDARY HEATING WATER PUMP HEAD
CALCULATIONS
PUMP HEAD CALCULATIONS DIAGRAM
PUMP-HHW-PRIM.
PUMP-HHW-SEC.
PRIMARY HEATING WATER PUMP HEAD
CALCULATIONS
HEATING WATER EXPANSION TANK
CALCULATIONS
PUMP-DIAG.
PUMP-COOL.TOWER
EXPTANK-CHW
SECONDARY CHILLED WATER PUMP HEAD
CALCULATIONS
CHILLED WATER EXPANSION TANK
CALCULATIONS
PUMP HEAD CALCULATIONS DIAGRAM
PUMP-CHW-PRIM.
PUMP-CHW-SEC.
CONDENSER WATER (COOLING TOWER) PUMP
HEAD CALCULATIONS
PRIMARY CHILLED WATER PUMP HEAD
CALCULATIONS
Bldg. Info. 2
Ceiling Space
Bldg. Info.
BUILDING MECHANICAL INFORMATION REQUEST
FORM
BUILDING MECHANICAL ROOM INFORMATION
REQUEST FORM
CEILING SPACE INFORMATION REQUEST FORM
© Copyright 2008 HVAC Design Solutions 20
Extensive Wetside
Programs to help
“Streamline” your
Design Procedures
PIPESIZE
PUMP-HD.-PRELIM.
PIPECALC
PIPE SIZING CALCULATOR- OPTIMAL ECONOMIC
SIZING
PIPE SIZING SCHEDULE - OPTIMAL ECONOMIC
SIZING
PRELIMINARY PUMP HEAD CALCULATIONS
VAV - REHEAT COIL LOAD CALCULATIONS
VAV REHEAT
AHU-COOL. COIL
AHU-HTG.COIL
AHU - PRELIMINARY COOLING COIL LOAD
CALCULATIONS
AHU - PRELIMINARY HEATING COIL LOAD
CALCULATIONS
 Straightforward takeoff and input allows easy
calculation and sizing of Wetside Systems.
 Extensive procedures, formulas, charts, and
tables as prescribed by Mechanical Codes and
as recommended by ASHRAE and Equipment
Manufacturers have been included and have
been used to establish the “Accurate” Wetside
System Sizes.
 Multiple Programs are included, covering
most of the typical Wetside Design Tasks for
most projects.
© Copyright 2008 HVAC Design Solutions 21
 Significantly reduces “Reference Material
Dependence” which can save a great deal of
time and effort.
 Output in the form of Compliance
Documents or System Sizing Summaries for
submittal to appropriate code enforcement
officials or building departments.
 Extensive “Help Files” that are hyperlinked to
each program, form, or table.
© Copyright 2008 HVAC Design Solutions 22
 Limited time “Special Pricing” available at our
website www.hvacdesignsolutions.com
 Wetside Design Package
Original Price: $225 US, Special Price: $169 US
 Mechanical Peer Review Package
Original Price: $275 US, Special Price: $198 US
© Copyright 2008 HVAC Design Solutions 23
 Current Version: 2.12, with latest update
(08/24/2008) Free updates, as available.
 To purchase Wetside Design or Mechanical
Peer Review, visit our website at
www.hvacdesignsolutions.com and go to the
Prices/Orders page
 Software can be downloaded for immediate
installation (with password) after purchase is
confirmed
© Copyright 2008 HVAC Design Solutions 24
 OS: Windows® 98, 2000, XP, 2003, Vista
 Processor: Pentium® or equivalent
 Ram: 512MB (minimum recommended)
 Disk Space: 100 MB (recommended)
 Software: MS Word®, MS Excel®
© Copyright 2008 HVAC Design Solutions 25
 Thank you for taking your time to review
our Wetside Design software packages
 If you have any questions or comments, you
can e-mail to:
steve”at”hvacdesignsolutions.com , or
support”at”hvacdesignsolutions.com
 We also have an interactive demo of our
Wetside Design software that can be
delivered, on request, via e-mail.
© Copyright 2008 HVAC Design Solutions 26

More Related Content

What's hot

INCE Paper_NoiseStudy_Final Copy_May 29
INCE Paper_NoiseStudy_Final Copy_May 29INCE Paper_NoiseStudy_Final Copy_May 29
INCE Paper_NoiseStudy_Final Copy_May 29ankit chadha
 
06 procedure of start up boiler ok
06 procedure of start up boiler ok06 procedure of start up boiler ok
06 procedure of start up boiler okBunk Bonk
 
Awareness of RIG high pressure piping activities
Awareness of RIG high pressure piping activitiesAwareness of RIG high pressure piping activities
Awareness of RIG high pressure piping activitiesAbdul Sayeed Mohammed
 
Precommisioning and commissioning updated
Precommisioning and commissioning updatedPrecommisioning and commissioning updated
Precommisioning and commissioning updatedPersonal Secret
 
Máy lạnh Daikin âm trần
Máy lạnh Daikin âm trầnMáy lạnh Daikin âm trần
Máy lạnh Daikin âm trầnMyLnhGiGc
 
Primavera Activity ID Coding
Primavera Activity ID CodingPrimavera Activity ID Coding
Primavera Activity ID Codingignitetribes
 
Energy Savings in Dairy Applications
Energy Savings in Dairy ApplicationsEnergy Savings in Dairy Applications
Energy Savings in Dairy Applicationseecfncci
 
Process diagrams lecture
Process diagrams lectureProcess diagrams lecture
Process diagrams lectureAli Ahmad
 
Medidores de turbina blancett
Medidores de turbina blancettMedidores de turbina blancett
Medidores de turbina blancettClaudia Gonzalez
 
2 twb0 10 seer monofasica heat pump 1 a 5 tr
2 twb0  10 seer monofasica heat pump   1 a 5 tr2 twb0  10 seer monofasica heat pump   1 a 5 tr
2 twb0 10 seer monofasica heat pump 1 a 5 trssuser776e17
 
Digital Vortex Flowmeters From Yokogawa
Digital Vortex Flowmeters From YokogawaDigital Vortex Flowmeters From Yokogawa
Digital Vortex Flowmeters From YokogawaClassic Controls, Inc.
 
Fire pump-application-packet
Fire pump-application-packetFire pump-application-packet
Fire pump-application-packetbartul zizic
 
Piping and Insruementaion Diagrams
Piping and Insruementaion DiagramsPiping and Insruementaion Diagrams
Piping and Insruementaion DiagramsTejas Deshpande
 
Performance Monitoring for Efficiency
Performance Monitoring for EfficiencyPerformance Monitoring for Efficiency
Performance Monitoring for EfficiencyCx Associates
 
Sb ic lambda_cw_ver.1.3_en
Sb ic lambda_cw_ver.1.3_enSb ic lambda_cw_ver.1.3_en
Sb ic lambda_cw_ver.1.3_enYury Naumov
 

What's hot (19)

Process Plant design fundementals
Process Plant design fundementalsProcess Plant design fundementals
Process Plant design fundementals
 
INCE Paper_NoiseStudy_Final Copy_May 29
INCE Paper_NoiseStudy_Final Copy_May 29INCE Paper_NoiseStudy_Final Copy_May 29
INCE Paper_NoiseStudy_Final Copy_May 29
 
Dmmehosp
DmmehospDmmehosp
Dmmehosp
 
06 procedure of start up boiler ok
06 procedure of start up boiler ok06 procedure of start up boiler ok
06 procedure of start up boiler ok
 
Awareness of RIG high pressure piping activities
Awareness of RIG high pressure piping activitiesAwareness of RIG high pressure piping activities
Awareness of RIG high pressure piping activities
 
Integrated control valve, sensors, actuator, and controller
Integrated control valve, sensors, actuator, and controllerIntegrated control valve, sensors, actuator, and controller
Integrated control valve, sensors, actuator, and controller
 
Precommisioning and commissioning updated
Precommisioning and commissioning updatedPrecommisioning and commissioning updated
Precommisioning and commissioning updated
 
Máy lạnh Daikin âm trần
Máy lạnh Daikin âm trầnMáy lạnh Daikin âm trần
Máy lạnh Daikin âm trần
 
Primavera Activity ID Coding
Primavera Activity ID CodingPrimavera Activity ID Coding
Primavera Activity ID Coding
 
Energy Savings in Dairy Applications
Energy Savings in Dairy ApplicationsEnergy Savings in Dairy Applications
Energy Savings in Dairy Applications
 
Process diagrams lecture
Process diagrams lectureProcess diagrams lecture
Process diagrams lecture
 
Medidores de turbina blancett
Medidores de turbina blancettMedidores de turbina blancett
Medidores de turbina blancett
 
2 twb0 10 seer monofasica heat pump 1 a 5 tr
2 twb0  10 seer monofasica heat pump   1 a 5 tr2 twb0  10 seer monofasica heat pump   1 a 5 tr
2 twb0 10 seer monofasica heat pump 1 a 5 tr
 
Digital Vortex Flowmeters From Yokogawa
Digital Vortex Flowmeters From YokogawaDigital Vortex Flowmeters From Yokogawa
Digital Vortex Flowmeters From Yokogawa
 
Fire pump-application-packet
Fire pump-application-packetFire pump-application-packet
Fire pump-application-packet
 
Nitrogen purging
Nitrogen  purgingNitrogen  purging
Nitrogen purging
 
Piping and Insruementaion Diagrams
Piping and Insruementaion DiagramsPiping and Insruementaion Diagrams
Piping and Insruementaion Diagrams
 
Performance Monitoring for Efficiency
Performance Monitoring for EfficiencyPerformance Monitoring for Efficiency
Performance Monitoring for Efficiency
 
Sb ic lambda_cw_ver.1.3_en
Sb ic lambda_cw_ver.1.3_enSb ic lambda_cw_ver.1.3_en
Sb ic lambda_cw_ver.1.3_en
 

Similar to Streamline Wetside Design with HVAC Software Package

Pressure relief valve_data_sheet_rev01
Pressure relief valve_data_sheet_rev01Pressure relief valve_data_sheet_rev01
Pressure relief valve_data_sheet_rev01soetrisno
 
Improving Gas Turbine – HRSG output using Inlet Air Chilling and Converted Ev...
Improving Gas Turbine – HRSG output using Inlet Air Chilling and Converted Ev...Improving Gas Turbine – HRSG output using Inlet Air Chilling and Converted Ev...
Improving Gas Turbine – HRSG output using Inlet Air Chilling and Converted Ev...IRJET Journal
 
Screw air compressor usa
Screw air compressor usaScrew air compressor usa
Screw air compressor usaelgiusa
 
Air compressor in saudi arabia
Air compressor in saudi arabiaAir compressor in saudi arabia
Air compressor in saudi arabia3tsaudi
 
AIChE Smart Stack Damper Design Provides Better Control of Fired Heaters
AIChE Smart Stack Damper Design Provides Better Control of Fired HeatersAIChE Smart Stack Damper Design Provides Better Control of Fired Heaters
AIChE Smart Stack Damper Design Provides Better Control of Fired HeatersAshutosh Garg
 
ELGI Airmate Air Accessories Total Compressed Air Solutions
ELGI Airmate Air Accessories Total Compressed Air SolutionsELGI Airmate Air Accessories Total Compressed Air Solutions
ELGI Airmate Air Accessories Total Compressed Air SolutionsVijayEngineeringandM1
 
4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS S4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS STedyChriswanda1
 
2018 pumster english catalog
2018 pumster english catalog2018 pumster english catalog
2018 pumster english catalogpumster
 
Tdb vrf dvm s standard for turkey (odu 50 hz hp) ver.1.0
Tdb vrf dvm s standard for turkey (odu 50 hz hp) ver.1.0Tdb vrf dvm s standard for turkey (odu 50 hz hp) ver.1.0
Tdb vrf dvm s standard for turkey (odu 50 hz hp) ver.1.0Haluk TOSUN
 
Cashco - Reguladores Industriais
Cashco - Reguladores IndustriaisCashco - Reguladores Industriais
Cashco - Reguladores IndustriaisRenan Sehn Santos
 
Waterfall Turbine Development Primer - Updated
Waterfall Turbine Development Primer - UpdatedWaterfall Turbine Development Primer - Updated
Waterfall Turbine Development Primer - UpdatedJason Rota
 
Điều hòa âm trần LG 36000BTU
Điều hòa âm trần LG 36000BTUĐiều hòa âm trần LG 36000BTU
Điều hòa âm trần LG 36000BTUMyravn1
 
Ga7- 75 vsd plus_antwerp_leaflet
Ga7- 75 vsd plus_antwerp_leafletGa7- 75 vsd plus_antwerp_leaflet
Ga7- 75 vsd plus_antwerp_leafletdaisy Airmax
 
Zahroof Valves Inc. - Product Portfolio
Zahroof Valves Inc. - Product PortfolioZahroof Valves Inc. - Product Portfolio
Zahroof Valves Inc. - Product PortfolioZahroof Mohamed
 

Similar to Streamline Wetside Design with HVAC Software Package (20)

BGC description
BGC description BGC description
BGC description
 
AUTOSPOOL.pdf
AUTOSPOOL.pdfAUTOSPOOL.pdf
AUTOSPOOL.pdf
 
Pressure relief valve_data_sheet_rev01
Pressure relief valve_data_sheet_rev01Pressure relief valve_data_sheet_rev01
Pressure relief valve_data_sheet_rev01
 
Improving Gas Turbine – HRSG output using Inlet Air Chilling and Converted Ev...
Improving Gas Turbine – HRSG output using Inlet Air Chilling and Converted Ev...Improving Gas Turbine – HRSG output using Inlet Air Chilling and Converted Ev...
Improving Gas Turbine – HRSG output using Inlet Air Chilling and Converted Ev...
 
Screw air compressor usa
Screw air compressor usaScrew air compressor usa
Screw air compressor usa
 
Air compressor in saudi arabia
Air compressor in saudi arabiaAir compressor in saudi arabia
Air compressor in saudi arabia
 
AIChE Smart Stack Damper Design Provides Better Control of Fired Heaters
AIChE Smart Stack Damper Design Provides Better Control of Fired HeatersAIChE Smart Stack Damper Design Provides Better Control of Fired Heaters
AIChE Smart Stack Damper Design Provides Better Control of Fired Heaters
 
ELGI Airmate Air Accessories Total Compressed Air Solutions
ELGI Airmate Air Accessories Total Compressed Air SolutionsELGI Airmate Air Accessories Total Compressed Air Solutions
ELGI Airmate Air Accessories Total Compressed Air Solutions
 
4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS S4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS S
 
2018 pumster english catalog
2018 pumster english catalog2018 pumster english catalog
2018 pumster english catalog
 
Tdb vrf dvm s standard for turkey (odu 50 hz hp) ver.1.0
Tdb vrf dvm s standard for turkey (odu 50 hz hp) ver.1.0Tdb vrf dvm s standard for turkey (odu 50 hz hp) ver.1.0
Tdb vrf dvm s standard for turkey (odu 50 hz hp) ver.1.0
 
Cashco - Reguladores Industriais
Cashco - Reguladores IndustriaisCashco - Reguladores Industriais
Cashco - Reguladores Industriais
 
Waterfall Turbine Development Primer - Updated
Waterfall Turbine Development Primer - UpdatedWaterfall Turbine Development Primer - Updated
Waterfall Turbine Development Primer - Updated
 
ML PCW Presentation
ML PCW PresentationML PCW Presentation
ML PCW Presentation
 
36512435-Fired-Heater-Design.ppt
36512435-Fired-Heater-Design.ppt36512435-Fired-Heater-Design.ppt
36512435-Fired-Heater-Design.ppt
 
Điều hòa âm trần LG 36000BTU
Điều hòa âm trần LG 36000BTUĐiều hòa âm trần LG 36000BTU
Điều hòa âm trần LG 36000BTU
 
Ga7- 75 vsd plus_antwerp_leaflet
Ga7- 75 vsd plus_antwerp_leafletGa7- 75 vsd plus_antwerp_leaflet
Ga7- 75 vsd plus_antwerp_leaflet
 
R gz7 v1-databook
R gz7 v1-databookR gz7 v1-databook
R gz7 v1-databook
 
R gz7 v1-databook
R gz7 v1-databookR gz7 v1-databook
R gz7 v1-databook
 
Zahroof Valves Inc. - Product Portfolio
Zahroof Valves Inc. - Product PortfolioZahroof Valves Inc. - Product Portfolio
Zahroof Valves Inc. - Product Portfolio
 

Recently uploaded

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 

Recently uploaded (20)

Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 

Streamline Wetside Design with HVAC Software Package

  • 1. WETSIDE DESIGN © Copyright 2008 HVAC Design Solutions 1 Essential Design Programs with Accurate Sizing Calculations help to “Streamline Your Design” HVAC DESIGN SOLUTIONS ENGINEERING SOFTWARE
  • 2.  “Wetside Design” from HVAC Design Solutions is a package of software programs for many of the HVAC Designer’s sizing tasks:  Hydronic System Sizing -“Optimum Sizes”  Pump Head Calcs (Primary, Secondary, & Condenser Water Pumps)  Heating Water Expansion Tank Sizing  Chilled Water Expansion Tank Sizing  Coil Psychrometrics & Coil GPM Calcs  Extensive Help Files, and “Extras” © Copyright 2008 HVAC Design Solutions 2
  • 3.  Reduce your dependence on Reference Books, Charts, Graphs, and “Rules of Thumb”.  Eliminate many of the usual HVAC Design Tasks  Reduce common errors and mistakes  Create an easy-to-follow, step-by-step “Procedure for Wetside Design” for all projects. © Copyright 2008 HVAC Design Solutions 3 Software Package contains most of the sizing calculations and procedures for typical projects
  • 4. © Copyright 2008 HVAC Design Solutions 4 INDEX2C.xls#'PUMP-CHW-SEC.'!F15 INDEX2H.xls#'PUMP-HHW-PRIM.'!F15 INDEX2H.xls#'PUMP-HHW-SEC.'!F15 PRIMARY PUMP HEAD CALCULATIONS - HEATING WATER INDEX2C.xls#'EXPTANK-CHW'!B9CHILLED WATER EXPANSION TANK CALCULATIONS SECONDARY PUMP HEAD CALCULATIONS - HEATING WATER AIR HANDLING UNIT - PRELIM. COOLING COIL CALCS PUMP PRESSURE DROP CALCS - COOLING WATER CONTENTS INDEX2W.xls#'AHU-HTG.COIL'!H6 CEILING SPACE INFORMATION REQUEST FORM HEAT/COOL LOAD DESIGN CRITERIA AIR HANDLING UNIT - PRELIM. HEATING COIL CALCS BASIC PROJECT INPUT SHEET BUILDING INFORMATION REQUEST LETTER #1 BUILDING INFORMATION REQUEST LETTER #2 PIPE SIZING - OPTIMUM ECONOMIC SIZES - SINGLE PIPES PIPE SIZING SCHEDULE - HYDRONIC PIPE SYSTEMS PRELIMINARY PUMP HEAD CALCULATIONS VAV - REHEAT COIL LOAD CALCULATIONS PUMP HEAD CALCULATIONS DIAGRAM HEATING WATER EXPANSION TANK CALCULATIONS PRIMARY PUMP HEAD CALCULATIONS - CHILLED WATER PUMP PRESSURE DROP CALCS - HEATING WATER SECONDARY PUMP HEAD CALCULATIONS - CHILLED WATER PUMP HEAD CALCULATIONS DIAGRAM - CHILLED WATER CONDENSER WATER PUMP HEAD CALCS - COOLING TOWER INDEX2W.xls#PIPECALC!H10 INDEX2W.xls#PIPESIZE!A13 INDEX2W.xls#'PUMP-HD.-PRELIM.'!C3 INDEX2W.xls#'VAV REHEAT'!C6 INDEX2W.xls#'AHU-COOL. COIL'!H6 INDEX2H.xls#'PUMP-DIAG.'!B2 INDEX2H.xls#INDEX!C9 JUMP TO FILE INDEX2W.xls#INDEX!C10 Bldginfo.xls#'Bldg. Info.'!E11 Bldginfo.xls#'Bldg. Info. 2'!D11 Bldginfo.xls#'Ceiling Space'!D11 LOADCAL.XLS#'Design Criteria'!C5 INDEXP.xls INDEXP.xls#PROJ.INFO!D2 PROJECT INFORMATION WET SIDE DESIGN INDEX2C.xls#INDEX!C9 INDEX2C.xls#'PUMP-CHW-PRIM.'!F15 INDEX2H.xls#'EXPTANK-HHW'!B9 INDEX2C.xls#'PUMP-DIAG.'!C2 INDEX2C.xls#'PUMP-COOL.TOWER'!F15 “Any One of these programs is worth the cost of the Entire Package!” Quick Links to all calculation programs
  • 5. © Copyright 2008 HVAC Design Solutions 5 HELP BASIC PROJECT INFORMATION PROJECT NAME : PROJECT NUMBER : PROJECT LOCATION : DATE : TYPE OF BUILDING : SUMMER OUTDOOR DESIGN DRY BULB TEMP. (DEG. F): WINTER OUTDOOR DESIGN DRY BULB TEMP. (DEG. F): INDOOR DESIGN TEMP. - SUMMER (DEG. F) : INDOOR DESIGN TEMP. - WINTER (DEG. F) : PROJECT ELEVATION (FEET) : PROJECT MANAGER : PROJECT ENGINEER : CLIENT : CLIENT CONTACT NAME: 75.0 -6.0 OAKPARK OFFICE BLDG. 3 134-08 CHICAGO, IL 05/06/08 JOHN GOREMANN "YOUR COMPANY NAME" OFFICE 91.0 ADS ARCHITECTS 70.0 670 BILL REECE JIM EDMOND Begin with Basic Project Information input Information automatically transfers to all programs Design Conditions are used in many calculations
  • 6. PROJECT NAME: * NORMAL PIPE SIZING BASED ON: PROJECT NUMBER: VELOCITY NOT EXCEEDING 4 FT/SEC. UP TO 2" PIPE DATE: VELOCITY NOT EXCEEDING 10 FT/SEC. FOR LARGER THAN 2" PIPE CAUTION: VELOCITY EXCEEDS 10 FT./SEC. - MAY CAUSE NOISE AND EROS PRESSURE DROP BETWEEN 1 AND 5 FT/100 FT. CAUTION: VELOCITY IS LESS THAN 2 FT./SEC. - MAY CAUSE AIR TRAPPING 1/2" TO 3" SIZES ARE COPPER, 4" AND LARGER SIZES ARE STEEL CAUTION: EXCESSIVE PRESSURE DROP - MAY INCREASE PUMP HORSEP FROM TO 1 2 164.0 4 4.4 1.8 2 1/2 11.7 20.0 4 4.4 2 3 152.0 4 4.4 1.8 2 1/2 11.7 20.0 4 4.4 3 4 141.5 3 7.1 5.5 2 1/2 10.1 13.0 4 4.0 4 5 138.0 3 7.1 5.5 2 1/2 10.1 13.0 4 4.0 5 6 136.8 3 7.1 5.5 2 1/2 10.1 13.0 4 4.0 6 7 121.0 3 5.9 4.0 2 1/2 8.4 8.5 4 3.3 7 8 96.0 3 4.7 2.6 2 10.4 17.0 3 4.7 8 9 48.5 2 5.2 5.1 2 5.2 5.1 3 2.4 9 10 22.3 1 1/2 4.5 5.7 1 1/4 6.4 13.0 2 2.6 10 11 12.8 1 1/4 3.1 3.4 1 4.7 9.0 1 1/2 2.2 11 12 6.3 3/4 4.0 10.0 3/4 4.0 10.0 1 1/4 1.5 0 0.0 0.0 0 0.0 0.0 0 0.0 PIPE SECTION NORMAL PRESS. DROP (FT/100 FT) LOW FIRST COST PD (FT/100 FT) LOW OPERATING COST VEL. (FT/SEC) FLOW RATE (GPM) NORMAL SIZE * (INCH) NORMAL VELOCITY (FT/SEC) LOW OPERATING COST SIZE (INCH) LOW FIRST COST SIZE (INCH) LOW FIRST COST VEL. (FT/SEC) PIPE SIZING SCHEDULE - OPTIMUM ECONOMICAL SIZES TEST PROJECT #1 12/19/07 1444-07PRINT © Copyright 2008 HVAC Design Solutions 6 Warning Flags for Alternate Sizes Alternate Pipe Sizes Quick and Easy Input Most “Economical” Pipe Sizes to meet Sizing Criteria (Velocity and Pressure Drop)
  • 7. HELP 164 PROJECT NAME: 4.0 PROJECT NUMBER: 3 APPROX. HP: 5.4 DATE: PIPE SIZE TOTAL PIPE LENGTH (ft.) PRESS. DROP (ft./100 ft.) PIPE PRESS. DROP (ft.) FITTING OR VALVE TYPE NO. OF FITTINGS UP TO 2" NO. OF FITTINGS 2" TO 4" NO. OF FITTINGS 4" to 10" FITTING PRESS. DROP (ft) 1/2 0 4.0 0.0 ELL - 90 DEG. 12 18 0 10.3 3/4 30 4.0 1.2 ELL - 45 DEG. 0 0 0 0.0 1 0 4.0 0.0 THRU TEE 3 7 0 3.9 1 1/4 15 4.0 0.6 BRANCH TEE 1 1 0 1.1 1 1/2 25 4.0 1.0 GLOBE VALVE 0 2 0 6.6 2 25 4.0 1.0 GATE VALVE 2 0 0 0.2 2 1/2 0 3.0 0.0 ANGLE VALVE 0 0 0 0.0 3 130 3.0 3.9 SWING CHECK VALVE 0 2 0 2.3 4 62 3.0 1.9 LIFT CHECK VALVE 0 0 0 0.0 5 0 2.5 0.0 CONTROL VALVE 1 1 0 5.3 MAX. PRESSURE DROP (ft./100 ft.): TEST PROJECT #1 1444-07 12/19/2007 PRELIMINARY PUMP HEAD CALCULATIONS PUMP CAPACITY (GPM): MAIN PIPE SIZE (in.): PRINT © Copyright 2008 HVAC Design Solutions 7 Preliminary Pump Head Calcs, for preliminary Pump HP requirements Quick and Easy Input “Approximate” Fitting and Valve counts
  • 8. PRIMARY PUMPS © Copyright 2008 HVAC Design Solutions 8 Typical Project Example for Primary Pump Head Calcs
  • 9. HELP * PRESSURE DROP BASED ON: PROJECT NAME: VELOCITY NOT EXCEEDING 5 FT/SEC. UP TO 2" PIPE PROJECT NUMBER: VELOCITY NOT EXCEEDING 10 FT/SEC. FOR LARGER THAN 2" PIPE DATE: PRESSURE DROP BETWEEN 1 AND 5 FT/100 FT. 9 CAUTION : ABOVE OR BELOW NORMAL VELOCITY APPROXIMATE PUMP BHP: 2.5 (CALCULATED DURING INPUT) AVERAGE EQUIVALENT PRESS. LOSS FOR TOTAL SIZE NUMBER OF GPM VELOCITY LENGTH DROP -EACH SIZE LOSS ITEM LENGTH (FT.) (IN.) FITTINGS (EACH SIZE) (FT./SEC.) (FT.) (FT/100 FT.) * (FT. HD.) (FT. HD.) PUMP ACCESSORIES: PUMP FLEX. CONNECTIONS 2 5 22 2.6 1.14 CHECK VALVE - LIFT CHECK 1 5 84 2.6 2.18 CHECK VALVE - SWING CHECK 0 0 0 0 0.00 CHECK VALVE - SILENT CHECK 0 0 N/A N/A 0.00 BALANCING VALVE (80% OPEN) 1 7 N/A N/A 4.00 SHUT-OFF VALVE - BUTTERFLY 2 7 N/A N/A 2.00 SHUT-OFF VALVE - GATE 0 0 0 0 0.00 PUMP HEAD CALCULATION - CHILLED WATER - PRIMARY TEST PROJECT #1 1444-06 2/19/2006 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RESET/CLEAR © Copyright 2008 HVAC Design Solutions 9 Easy Input of System Components and GPM Quantities Running Total of Approx. Pump BHP
  • 10. BRANCH TEE - DIVERTING FLOW OR CONVERGING FLOW (FLOW TURNS 90 DEGREES) SIZE GPM VEL. EQ. LEN. FT/100 FT. TEE #1 3 GPM "IN" 160 8 21.39 7 1.50 TEE #1 GPM "OUT" 120 TEE #2 3 GPM "IN" 120 6 16.91 4 0.68 TEE #2 GPM "OUT" 160 TEE #3 3 GPM "IN" 120 6 16.91 4 0.68 TEE #3 GPM "OUT" 160 TEE #4 3 GPM "IN" 120 6 16.91 4 0.68 TEE #4 GPM "OUT" 120 TEE #5 3 GPM "IN" 120 6 16.91 4 0.68 TEE #5 GPM "OUT" 120 TEE #6 0 GPM "IN" 0 0 0 0 0.00 TEE #6 GPM "OUT" 0 TEE #7 0 GPM "IN" 0 0 0 0 0.00 TEE #7 GPM "OUT" 0 TEE #8 0 GPM "IN" 0 0 0 0 0.00 TEE #8 GPM "OUT" 0 TEE #9 0 GPM "IN" 0 0 0 0 0.00 TEE #9 GPM "OUT" 0 TEE #10 0 GPM "IN" 0 0 0 0 0.00 TEE #10 GPM "OUT" 0 4.20 THRU TEE - CONVERGING FLOW (FLOW STRAIGHT THRU) SIZE GPM VEL. EQ. LEN. FT/100 FT. TEE #1 3 GPM "IN" 120 6 8.9 4 0.36 TEE #1 GPM "OUT" 160 TEE #2 3 GPM "IN" 120 6 8.9 4 0.36 TEE #2 GPM "OUT" 160 TEE #3 0 GPM "IN" 0 0 0 0 0.00 TEE #3 GPM "OUT" 0 TEE #4 0 GPM "IN" 0 0 0 0 0.00 TEE #4 GPM "OUT" 0 TEE #5 0 GPM "IN" 0 0 0 0 0.00 TEE #5 GPM "OUT" 0 OutIn Out In Out In © Copyright 2008 HVAC Design Solutions 10 Easy Input of System Components and GPM Quantities Built-in Fitting Coefficients
  • 11. CHILLER EQUIPMENT: VEL. EQ. LEN. FT/100 FT. ISOLATION VALVE - BUTTERFLY 2 5 N/A N/A 0.60 ISOLATION VALVE - GATE 0 0 0 0 0.00 ISOLATION VALVE - GLOBE 0 0 0 0 0.00 ISOLATION VALVE - ANGLE 0 0 0 0 0.00 ISOLATION VALVE - BALL 0 0 0 0 0.00 Y-TYPE STRAINER 1 5 N/A N/A 0.80 CHILLER AUTOMATIC ISOLATION VALVE (AUTOMATIC GLOBE VALVE) 1 5 130.5 2.6 3.39 CHILLER FLEX. CONNECTION 2 5 22 2.6 1.14 5.94 CHILLER PRESSURE DROP (FROM MANUFACTURER, IF KNOWN) : 0 GENERIC CHILLER PRESSURE DROP (IF NOT AVAIL. FROM MFG'R.) : CHILLER TONS : 100 CHILLER GPM : 120 4.20 4.20 AIR CONTROL AND FLOW METERS: AIR SEPARATOR PRESSURE DROP (FROM MANUFACTURER, IF KNOWN) : 0 GENERIC AIR SEPARATOR PRESSURE DROP - WITH STRAINER (IF NOT AVAIL. FROM MFG'R.) : SIZE : 0 GPM : 160 11.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 © Copyright 2008 HVAC Design Solutions 11 Allowance for Items at Chiller or Boiler Generic Values Built-in (Conservative) if Mfgr’s. Data Unknown
  • 12. PIPE LOSSES (MEASURE "OUT & BACK" TO PUMP) : PRESS. LOSS FOR TOTAL SIZE NUMBER GPM VELOCITY EQ. LEN. DROP SIZE LOSS LENGTH (FT.) (IN.) (FT./SEC.) (FT/100 FT.) * (FT. HD.) (FT. HD.) COPPER PIPE : 0 1/2 N/A 0 0.0 0 0.0 0.00 COPPER PIPE : 0 3/4 N/A 0 0.0 0 0.0 0.00 COPPER PIPE : 0 1 N/A 0 0.0 0 0.0 0.00 COPPER PIPE : 0 1 1/4 N/A 0 0.0 0 0.0 0.00 COPPER PIPE : 0 1 1/2 N/A 0 0.0 0 0.0 0.00 COPPER PIPE : 0 2 N/A 0 0.0 0 0.0 0.00 COPPER PIPE : 0 2 1/2 N/A 0 0.0 0 0.0 0.00 COPPER PIPE : 150 3 N/A 160 8.0 150 7.0 10.50 COPPER PIPE : 0 4 N/A 0 0.0 0 0.0 0.00 0 10.50 STEEL PIPE : 0 1/2 N/A 0 0.0 0 0.0 0.00 STEEL PIPE : 0 3/4 N/A 0 0.0 0 0.0 0.00 STEEL PIPE : 0 1 N/A 0 0.0 0 0.0 0.00 STEEL PIPE : 0 1 1/4 N/A 0 0.0 0 0.0 0.00 STEEL PIPE : 0 1 1/2 N/A 0 0.0 0 0.0 0.00 STEEL PIPE : 0 2 N/A 0 0.0 0 0.0 0.00 STEEL PIPE : 0 2 1/2 N/A 0 0.0 0 0.0 0.00 STEEL PIPE : 0 3 N/A 0 0.0 0 0.0 0.00 STEEL PIPE : 0 4 N/A 0 0.0 0 0.0 0.00 STEEL PIPE : 0 5 N/A 0 0.0 0 0.0 0.00 STEEL PIPE : 0 6 N/A 0 0.0 0 0.0 0.00 SUB-TOTAL PRESSURE DROP (FT. HEAD) : 55.25 GLYCOL PRESSURE DROP CORRECTION (IF ANY) - BASED ON 50 DEGREE F WATER TEMPERATURE : PERCENT GLYCOL, BY WEIGHT : GLYCOL CORRECTION FACTOR : 1 CORRECTED SUB-TOTAL PRESSURE DROP (FT. HEAD) : 55.25 PRESSURE DROP SAFETY FACTOR (IF ANY) - RECOMMEND 5% = 1.05 TOTAL PUMP PRESSURE DROP (FT. HEAD): 58.01 0 1.05 © Copyright 2008 HVAC Design Solutions 12 Adjustments for Glycol (if applicable) and/or Safety Factor Imput Length of “Longest Run” Piping (Measured “Out & Back” to Pump) Final, Totalized Primary Pump Head (Ft.) for the System
  • 13. PUMP HEAD CALCULATION - CHILLED WATER - PRIMARY * PRESSURE DROP BASED ON: PROJECT NAME: VELOCITY NOT EXCEEDING 5 FT/SEC. UP TO 2" PIPE PROJECT NUMBER: VELOCITY NOT EXCEEDING 10 FT/SEC. FOR LARGER THAN 2" PIPE DATE: PRESSURE DROP BETWEEN 1 AND 5 FT/100 FT. 9 CAUTION: ABOVE OR BELOW NORMAL VELOCITY APPROXIMATE PUMP BHP: 2.5 (CALCULATED DURING INPUT) AVERAGE EQUIVALENT PRESS. LOSS FOR LOSS ITEM NAME LENGTH (FT.) (IN.) FITTINGS (EACH SIZE) (FT./SEC.) (FT.) (FT/100 FT.) (FT. HD.) TOTAL PUMP FLEX. CONNECTIONS 3 2 120 5 22 2.6 1.14 CHECK VALVE - LIFT CHECK 3 1 120 5 84 2.6 2.18 BALANCING VALVE (80% OPEN) 3 1 160 7 N/A N/A 4.00 SHUT-OFF VALVE - BUTTERFLY 3 2 160 7 N/A N/A 2.00 TRIPLE DUTY VALVE -STRAIGHT 3 1 120 5 N/A N/A 1.20 TRIPLE DUTY VALVE -ANGLE 0 0 0 0 N/A N/A 0.00 10.53 STANDARD 90 DEG. ELBOW 3 5 160.0 8 9.3 7 3.26 STANDARD 90 DEG. ELBOW 12 0 0.0 0 0 0 0.00 3.26 THRU TEE - DIVERTING FLOW 3 GPM "IN" 160.0 8 1.86 7 0.13 TEE #2 3 GPM "IN" 160.0 8 1.86 7 0.13 TEE #3 3 GPM "IN" 160.0 8 1.86 7 0.13 TEE #4 3 GPM "IN" 120.0 6 0.89 4 0.04 TEE #5 3 GPM "IN" 120.0 6 0.89 4 0.04 TEE #10 0 GPM "OUT" 0.0 0 0 0 0.00 0.46 BRANCH TEE - DIVERTING FLOW OR CONVERGING FLOW3 GPM "IN" 160.0 8 21.39 7 1.50 TEE #2 3 GPM "IN" 120.0 6 16.91 4 0.68 TEE #3 3 GPM "IN" 120.0 6 16.91 4 0.68 TEE #4 3 GPM "IN" 120.0 6 16.91 4 0.68 TEE #5 3 GPM "IN" 120.0 6 16.91 4 0.68 TEE #10 0 GPM "OUT" 0.0 0 0 0 0.00 4.20 THRU TEE - CONVERGING FLOW 3 GPM "IN" 120 6.0 8.90 4 0.36 TEE #2 3 GPM "IN" 120 6.0 8.90 4 0.36 TEE #10 0 GPM "OUT" 0 0.0 0.00 0 0.00 0.71 ISOLATION VALVE - BUTTERFLY 3 2 120 5.0 N/A N/A 0.60 Y-TYPE STRAINER 3 1 120 5.0 N/A N/A 0.80 (AUTOMATIC GLOBE VALVE) 3 1 120 5.0 130.50 3 3.39 CHILLER FLEX. CONNECTION 3 2 120 5.0 22.00 3 1.14 5.94 GENERIC CHILLER PRESSURE DROP (IF NOT AVAIL. FROM MFG'R.) :CHILLER TONS :100.0 CHILLER GPM : 120 4.20 4.20 GENERIC AIR SEPARATOR PRESSURE DROP - WITH STRAINER (IF NOT AVAIL. FROM MFG'R.) :SIZE : 0.0 GPM : 160 11.05 GENERIC AIR SEPARATOR PRESSURE DROP - WITHOUT STRAINER (IF NOT AVAIL. FROM MFG'R.) :SIZE : 0.0 GPM : 0 0.00 11.05 GENERIC FLOW METER PRESSURE DROP (IF NOT AVAIL. FROM MFG'R.) :SIZE : 0.0 GPM : 160 3.50 3.50 GENERIC SUCTION DIFFUSER PRESSURE DROP (IF NOT AVAIL. FROM MFG'R.) :SIZE : 0.0 GPM : 120 0.90 0.90 COPPER PIPE : 150 3 N/A 160.0 8.0 150 7.0 10.50 COPPER PIPE : 0 4 N/A 0.0 0.0 0 0.0 0.00 10.50 SUB-TOTAL PRESSURE DROP (FT. HEAD) : 55.25 PERCENT GLYCOL, BY WEIGHT : 0 GLYCOL CORRECTION FACTOR : 1 CORRECTED SUB-TOTAL PRESSURE DROP (FT. HEAD) : 55.25 PRESSURE DROP SAFETY FACTOR (IF ANY) - RECOMMEND 5% = 1.05 1.05 1.05 TOTAL PUMP PRESSURE DROP (FT. HEAD): 58.01 © 2007 hvacdesignsolutions.com 1444-06 2/19/2006 TEST PROJECT #1 © Copyright 2008 HVAC Design Solutions 13 After Input is complete, press “Compile & Print” Button for full System Report
  • 14. © Copyright 2008 HVAC Design Solutions 14 HELP 91 670 74 10 75 AHU COOLING SUPPLY MINIMUM SUPPLY AIR RETURN AIR OUTSIDEAIR RETURN AIR ENTERING AIR LEAVING AIR COOLING CHILLED FLOOR CFM PER NUMBER LOAD * AIR TEMP. OUTSIDEAIR QUANTITY TEMP. ENTHALPY ENTHALPY ENTHALPY ENTHALPY COIL LOAD WATER AREA SQ. FT. (MBH) (°F) (CFM) (CFM) (°F) (BTU/LB.) (BTU/LB.) (BTU/LB.) (BTU/LB.) (MBH) (GPM) (SQ. FT) 1 12.5 54.0 150 590 78.0 37.7 30.2 32.1 21.7 26.1 5.2 400 1.5 2 18.2 54.0 320 859 78.0 37.7 30.2 33.0 21.7 41.1 8.2 650 1.3 3 46.3 54.0 1550 2186 78.0 37.7 30.2 35.5 21.7 126.6 25.3 2000 1.1 4 244.8 54.0 5500 11556 78.0 37.7 30.2 33.8 21.7 586.9 117.4 12950 0.9 5 42.0 54.0 1480 1983 78.0 37.7 30.2 35.8 21.7 117.2 23.4 1820 1.1 6 121.7 54.0 2640 5745 78.0 37.7 30.2 33.6 21.7 289.6 57.9 4800 1.2 7 24.5 54.0 450 1157 78.0 37.7 30.2 33.1 21.7 55.7 11.1 820 1.4 8 205.9 54.0 5120 9720 78.0 37.7 30.2 34.2 21.7 509.2 101.8 11200 0.9 9 105.5 54.0 2200 4980 78.0 37.7 30.2 33.5 21.7 248.2 49.6 4280 1.2 10 33.6 54.0 1250 1586 78.0 37.7 30.2 36.1 21.7 95.8 19.2 1500 1.1 11 19.5 54.0 250 921 78.0 37.7 30.2 32.2 21.7 41.2 8.2 700 1.3 12 150.3 54.0 2850 7095 78.0 37.7 30.2 33.2 21.7 344.7 68.9 6200 1.1 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PROJECT ELEVATION = CHILLED WATER DELTA-T = AIR HANDLING UNIT - PRELIMINARY COOLING COIL LOAD CALCULATIONS TEST PROJECT #1 1456-07 06/21/07 PROJECT NAME: PROJECT NUMBER: DATE: OA DESIGN DB = OA DESIGN WB = DESIGN ROOM TEMP. = PRINTRESET/CLEAR Psychrometric Calculations Assist with Preliminary Equipment Selection, Preliminary Pump Sizing, Etc.
  • 15. HELP MINIMUM WATER TEMP. (DEG. F): 40 HEATING WATER TEMP. (DEG. F): 200 PROJECT ELEVATION (ft.) 670 PIPE SIZE TOTAL PIPE LENGTH (ft.) GALLONS PER FOOT PIPE GALLONS 1/2 0.0121 0.0 3/4 120 0.0251 3.0 1 60 0.0429 2.6 1 1/4 0.0653 0.0 1 1/2 75 0.0924 6.9 2 224 0.1610 36.1 DATE: TEST PROJECT #1 1444-07 12/19/2007 PROJECT NAME: PROJECT NUMBER: EXPANSION TANK SIZING - HEATING WATER PRINT BOILER MBH 450 337.5 COIL GALLONS # HEATING COILS 18 36.0 EXCHANGER GALLONS # HEAT EXCHANGERS 1 15.0 TOTAL CONTENT (gal.) 490.2 GLYCOL % (IF APPLICABLE) 10 EXPANSION FACTOR 0.03510 EXPANDED WATER VOLUME (gal.) 20.8 HEIGHT OF SYSTEM (ft.) 45 24.6 30 RELIEF VALVE SETTING (psi) 30 27 ACCEPTANCE FACTOR 0.06 0.94 TANK VOLUME (gal.) 353.8 CAUTION: RELIEF VALVE SETTING MUST BE LARGER THAN REQUIRED SYSTEM PRESSURE ACCEPTANCE VOLUME MUST EXCEED EXPANDED WATER VOLUME (gal.) (PERCENT BY VOLUME) ENTER 0 IF NO GLYCOL IN SYSTEM (SYSTEM PRESSURE) (BASED ON HEATING WATER TEMP. MINUS MINIMUM WATER TEMP.) © Copyright 2008 HVAC Design Solutions 15 Heating Water and Chilled Water Expansion Tank Sizing Programs Built-in Water Volumes, Expansion Factors, Acceptance Factors, and Expansion Formulas
  • 16. © Copyright 2008 HVAC Design Solutions 16 HELP PROJECT NAME: DATE: 06/21/07 PROJECT NUMBER: REQUESTED BY: 1. All Offices 2. Conference Rooms 3. Photocopy machine rooms 4. Lounge and/or lunch rooms 5. Electrical equipment rooms 6. Computer Rooms 7. Procedure Rooms 8. Other specialty rooms B. Please indicate any special HVAC requirements such as areas requiring: 1. 24 Hour Air Conditioning 2. Relative Humidity Controls The above information should include: PC Stations, Laser Printers, Fax Machines, Photocopy Machines, Microwaves, Vending Machines, Refrigerators, Coffee Makers, Special Lighting, etc. If available, this information should contain: quantity, location, BTU/hr, wattage, amperage, voltage, heat output to the space, operating cycle time, etc. Please provide the following information, to expedite our design of your project. It is very important that you respond as soon as possible, with as accurate information as you have available, so we can calculate the correct air conditioning requirements and make accurate equipment selections. A. Please provide the number of people, heat output or amperage and voltage of equipment, and any other element that might effect the HVAC load in the following areas: 1456-07 TEST PROJECT #1 BUILDING MECHANICAL INFORMATION REQUEST HELP PROJECT NAME: DATE: 06/21/07 PROJECT NUMBER: REQUESTED BY: ROOM NAME/NUMBER: NUMBER OF PEOPLE HEAT PRODUCING EQUIPMENT (Please Indicate Quantity Below) PC Stations Laser Printers Photocopy Machines Fax Machines Microwaves TV Sets or Monitors Refrigerators (Small – S, Large – L) Vending Machines Coffee Makers Special Lighting (Total Watts to Room) Special Equipment (Total Watts to Room) Exposed Motors in Room (Horsepower) NO HEAT PRODUCING EQUIPMENT IN THIS ROOM SPECIAL OPERATING CONDITIONS 24 Hour Air Conditioning Required BUILDING MECHANICAL ROOM INFORMATION REQUEST FORM PEOPLE ACTIVITY LEVEL: (S) - Seated Office; (M) - Moderate Office; (W) - Walking or Standing; (B) - Bench Work; (H) Heavy Work TEST PROJECT #1 1456-07 “Programming” Information Request Forms for Owner or Architect Input
  • 17. © Copyright 2008 HVAC Design Solutions 17 Extensive “Quality Control” Mechanical Checklists are available in a separate “Mechanical Peer Review” Software Package Coordination Between Disciplines Contents: (Click on hyperlink to jump to the sheet checklist) A Preliminary Review of Plans and Specifications B Demolition Plans C Architect and/or Owner Coordination D Structural Coordination E Mechanical Coordination F Plumbing Coordination G Civil Engineering Coordination H Electrical Coordination A Preliminary Review of Plans and Specifications 1 Quickly review all Drawings in the Construction Document set, including Architectural, Structural, Civil, Landscaping, Mechanical, Plumbing, Fire Protection, Electrical, Food Service, and any other discipline. Spend not more than one minute per sheet, average. 2 Make a list of any apparent discrepancies or questions while reviewing the set, and add ‘flags’ to sheets where there are significant questions. 3 Quickly review the Specifications by reading through the Table of Contents for Mechanical and Plumbing work. Check the Table of Contents against the actual Specification sections to verify all sections have been included. Make a list of questions that may come up during the cursory review. 4 Review Architectural Title Sheet, or first sheet in the set, and make a list of the Project Square Footage, Building Occupancy Type, Building Construction Type, Governing Codes, Index of Drawings, and any other information that relates to Mechanical or Plumbing work. 5 Check for consistent appearance of Title Blocks, Drawing Scales, North Arrows, Professional Stamps, Company Logos, Sheet Numbers, Sheet Titles, Issue Dates, and Issue Revisions on all sheets. B Demolition Plans 1 Verify that Demolition Symbols (cross-hatching, etc.) are clear and complete, and are coordinated with other disciplines. 2 Verify there are notes regarding potential hazardous materials (asbestos, lead paint, etc.), and coordinate with Architect or other Prime Consultant and Owner. Over (110) Pages of Checklists and Spreadsheets for a thorough review of Mechanical Construction Documents
  • 18. © Copyright 2008 HVAC Design Solutions 18 Mechanical Plan Review Items Contents: (Click on hyperlink to jump to the sheet checklist) A Preliminary Review of Plans and Specifications B Legend and Symbols Sheet C Schedule Sheets D Mechanical Demolition Plans E Mechanical Ductwork Floor Plans F Mechanical Piping Plans G Mechanical Roof Plans H Mechanical Central Plant Plans I Clean Room and Fabrication Facilities J Mechanical Piping Diagrams K Mechanical Control Drawings L Mechanical Detail Drawings A Mechanical Piping Plans Return to Table of Contents 1 Sum all Chilled Water Supply and Return quantities (GPM’s) from coils back to service connection or pumps. Pencil in quantities adjacent to pipes. Verify flow rates are listed for all coils or equipment, and that Schedules for each device are complete. Check flow direction Arrows for completeness and correct direction. 2 Sum all Heating Water Supply and Return quantities (GPM’s) same as Chilled Water. Pencil in quantities. Verify Schedule information is complete. Check flow direction Arrows. 3 Check for provisions for Water Balancing on plans or on details of coil connections. 4 Check for Isolation Valves to allow servicing without shutting down and draining entire systems. 5 Verify whether Direct-return or Reverse-return piping. Suggest Reverse-return for better water balancing, if appropriate. 6 Check provisions for Condensate Drains. Coordinate with Plumbing drawings for piping and Approved Disposal methods. 7 Check on provisions for Air Venting and Drainage – on Coil Piping Details and plans. 8 Check Thermostat locations (if thermostats are shown on Piping Plans) and verify all heating and cooling elements have a corresponding Thermostat or Sensor Control. 9 Spot-check pipe sizes against totalized water quantities. Use maximum of 4 ft. per 100 ft. pipe friction, up to 5” pipe size, and maximum of 8 ft. per second Velocity for pipe 6” and larger. 10 Check for provisions for Pipe Expansion – Pipe Loops, adequate turns (less than 50 feet of straight pipe), or expansion devices. 11 Check for restrictions to pipe movement – against columns, against solid walls, drops or rises to adjacent floors. 12 Verify that pipes are not run through Stairwells, Elevator Shafts, Columns, or Electrical Rooms. 13 Compare Totalized water quantities with associated Pumps, and analyze diversity if totals are not equal. 14 Verify that all pipes are sized. 15 Coordinate Pipe plans with Ductwork plans and identify any potential conflicts. Example of Quality Control Check List Items
  • 19. PUMP HEAD CALCULATION - CHILLED WATER - PRIMARY * PRESSURE DROP BASED ON: PROJECT NAME: VELOCITY NOT EXCEEDING 5 FT/SEC. UP TO 2" PIPE PROJECT NUMBER: VELOCITY NOT EXCEEDING 10 FT/SEC. FOR LARGER THAN 2" PIPE DATE: PRESSURE DROP BETWEEN 1 AND 5 FT/100 FT. 9 CAUTION: ABOVE OR BELOW NORMAL VELOCITY APPROXIMATE PUMP BHP: 2.5 (CALCULATED DURING INPUT) AVERAGE EQUIVALENT PRESS. LOSS FOR LOSS ITEM NAME LENGTH (FT.) (IN.) FITTINGS (EACH SIZE) (FT./SEC.) (FT.) (FT/100 FT.) (FT. HD.) TOTAL PUMP FLEX. CONNECTIONS 3 2 120 5 22 2.6 1.14 CHECK VALVE - LIFT CHECK 3 1 120 5 84 2.6 2.18 BALANCING VALVE (80% OPEN) 3 1 160 7 N/A N/A 4.00 SHUT-OFF VALVE - BUTTERFLY 3 2 160 7 N/A N/A 2.00 TRIPLE DUTY VALVE -STRAIGHT 3 1 120 5 N/A N/A 1.20 TRIPLE DUTY VALVE -ANGLE 0 0 0 0 N/A N/A 0.00 10.53 STANDARD 90 DEG. ELBOW 3 5 160.0 8 9.3 7 3.26 STANDARD 90 DEG. ELBOW 12 0 0.0 0 0 0 0.00 3.26 THRU TEE - DIVERTING FLOW 3 GPM "IN" 160.0 8 1.86 7 0.13 TEE #2 3 GPM "IN" 160.0 8 1.86 7 0.13 TEE #3 3 GPM "IN" 160.0 8 1.86 7 0.13 TEE #4 3 GPM "IN" 120.0 6 0.89 4 0.04 TEE #5 3 GPM "IN" 120.0 6 0.89 4 0.04 TEE #10 0 GPM "OUT" 0.0 0 0 0 0.00 0.46 BRANCH TEE - DIVERTING FLOW OR CONVERGING FLOW3 GPM "IN" 160.0 8 21.39 7 1.50 TEE #2 3 GPM "IN" 120.0 6 16.91 4 0.68 TEE #3 3 GPM "IN" 120.0 6 16.91 4 0.68 TEE #4 3 GPM "IN" 120.0 6 16.91 4 0.68 TEE #5 3 GPM "IN" 120.0 6 16.91 4 0.68 TEE #10 0 GPM "OUT" 0.0 0 0 0 0.00 4.20 THRU TEE - CONVERGING FLOW 3 GPM "IN" 120 6.0 8.90 4 0.36 TEE #2 3 GPM "IN" 120 6.0 8.90 4 0.36 TEE #10 0 GPM "OUT" 0 0.0 0.00 0 0.00 0.71 ISOLATION VALVE - BUTTERFLY 3 2 120 5.0 N/A N/A 0.60 Y-TYPE STRAINER 3 1 120 5.0 N/A N/A 0.80 (AUTOMATIC GLOBE VALVE) 3 1 120 5.0 130.50 3 3.39 CHILLER FLEX. CONNECTION 3 2 120 5.0 22.00 3 1.14 5.94 GENERIC CHILLER PRESSURE DROP (IF NOT AVAIL. FROM MFG'R.) :CHILLER TONS :100.0 CHILLER GPM : 120 4.20 4.20 GENERIC AIR SEPARATOR PRESSURE DROP - WITH STRAINER (IF NOT AVAIL. FROM MFG'R.) :SIZE : 0.0 GPM : 160 11.05 GENERIC AIR SEPARATOR PRESSURE DROP - WITHOUT STRAINER (IF NOT AVAIL. FROM MFG'R.) :SIZE : 0.0 GPM : 0 0.00 11.05 GENERIC FLOW METER PRESSURE DROP (IF NOT AVAIL. FROM MFG'R.) :SIZE : 0.0 GPM : 160 3.50 3.50 GENERIC SUCTION DIFFUSER PRESSURE DROP (IF NOT AVAIL. FROM MFG'R.) :SIZE : 0.0 GPM : 120 0.90 0.90 COPPER PIPE : 150 3 N/A 160.0 8.0 150 7.0 10.50 COPPER PIPE : 0 4 N/A 0.0 0.0 0 0.0 0.00 10.50 SUB-TOTAL PRESSURE DROP (FT. HEAD) : 55.25 PERCENT GLYCOL, BY WEIGHT : 0 GLYCOL CORRECTION FACTOR : 1 CORRECTED SUB-TOTAL PRESSURE DROP (FT. HEAD) : 55.25 PRESSURE DROP SAFETY FACTOR (IF ANY) - RECOMMEND 5% = 1.05 1.05 1.05 TOTAL PUMP PRESSURE DROP (FT. HEAD): 58.01 © 2007 hvacdesignsolutions.com 1444-06 2/19/2006 TEST PROJECT #1 © Copyright 2008 HVAC Design Solutions 19 After completing input and calculations, Output and Sizing Documents can be printed for submittal to building department officials and for addition to drawings and schedules
  • 20. PUMP-DIAG. EXPTANK-HHW SECONDARY HEATING WATER PUMP HEAD CALCULATIONS PUMP HEAD CALCULATIONS DIAGRAM PUMP-HHW-PRIM. PUMP-HHW-SEC. PRIMARY HEATING WATER PUMP HEAD CALCULATIONS HEATING WATER EXPANSION TANK CALCULATIONS PUMP-DIAG. PUMP-COOL.TOWER EXPTANK-CHW SECONDARY CHILLED WATER PUMP HEAD CALCULATIONS CHILLED WATER EXPANSION TANK CALCULATIONS PUMP HEAD CALCULATIONS DIAGRAM PUMP-CHW-PRIM. PUMP-CHW-SEC. CONDENSER WATER (COOLING TOWER) PUMP HEAD CALCULATIONS PRIMARY CHILLED WATER PUMP HEAD CALCULATIONS Bldg. Info. 2 Ceiling Space Bldg. Info. BUILDING MECHANICAL INFORMATION REQUEST FORM BUILDING MECHANICAL ROOM INFORMATION REQUEST FORM CEILING SPACE INFORMATION REQUEST FORM © Copyright 2008 HVAC Design Solutions 20 Extensive Wetside Programs to help “Streamline” your Design Procedures PIPESIZE PUMP-HD.-PRELIM. PIPECALC PIPE SIZING CALCULATOR- OPTIMAL ECONOMIC SIZING PIPE SIZING SCHEDULE - OPTIMAL ECONOMIC SIZING PRELIMINARY PUMP HEAD CALCULATIONS VAV - REHEAT COIL LOAD CALCULATIONS VAV REHEAT AHU-COOL. COIL AHU-HTG.COIL AHU - PRELIMINARY COOLING COIL LOAD CALCULATIONS AHU - PRELIMINARY HEATING COIL LOAD CALCULATIONS
  • 21.  Straightforward takeoff and input allows easy calculation and sizing of Wetside Systems.  Extensive procedures, formulas, charts, and tables as prescribed by Mechanical Codes and as recommended by ASHRAE and Equipment Manufacturers have been included and have been used to establish the “Accurate” Wetside System Sizes.  Multiple Programs are included, covering most of the typical Wetside Design Tasks for most projects. © Copyright 2008 HVAC Design Solutions 21
  • 22.  Significantly reduces “Reference Material Dependence” which can save a great deal of time and effort.  Output in the form of Compliance Documents or System Sizing Summaries for submittal to appropriate code enforcement officials or building departments.  Extensive “Help Files” that are hyperlinked to each program, form, or table. © Copyright 2008 HVAC Design Solutions 22
  • 23.  Limited time “Special Pricing” available at our website www.hvacdesignsolutions.com  Wetside Design Package Original Price: $225 US, Special Price: $169 US  Mechanical Peer Review Package Original Price: $275 US, Special Price: $198 US © Copyright 2008 HVAC Design Solutions 23
  • 24.  Current Version: 2.12, with latest update (08/24/2008) Free updates, as available.  To purchase Wetside Design or Mechanical Peer Review, visit our website at www.hvacdesignsolutions.com and go to the Prices/Orders page  Software can be downloaded for immediate installation (with password) after purchase is confirmed © Copyright 2008 HVAC Design Solutions 24
  • 25.  OS: Windows® 98, 2000, XP, 2003, Vista  Processor: Pentium® or equivalent  Ram: 512MB (minimum recommended)  Disk Space: 100 MB (recommended)  Software: MS Word®, MS Excel® © Copyright 2008 HVAC Design Solutions 25
  • 26.  Thank you for taking your time to review our Wetside Design software packages  If you have any questions or comments, you can e-mail to: steve”at”hvacdesignsolutions.com , or support”at”hvacdesignsolutions.com  We also have an interactive demo of our Wetside Design software that can be delivered, on request, via e-mail. © Copyright 2008 HVAC Design Solutions 26