L J POLYTECHNIC
SUBJECT : WATER SUPPLY &
SANITARY ENGINEERING
TOPIC: PIPES , PIPE FITTINGS,PIPE JOINTS &
LAYING OF PIPELINES
MADE BY:
DHWANIK DESAI
MEHUL GOHIL
JAGDISH BHARWAD
DHAVAL DESAI
AMIT MUNJANI
PIPES:
 IN A HOUSE DRAINAGE SYSTEM, A PIPE MAY HAVE THE
FOLLOWING DESIGNATIONS,DEPENDING UPON THE
FUNCTIONS IT CARRIES :
 SOIL PIPES:
 IT IS THE PIPE CARRYING SEWAGE FROM URINALS ,
WATERCLOSETS ETC. ,I.E. IT CARRIES HUMAN EXCRETA.
 ITS DIAMETER IS OF 100MM .
WASTE PIPE :
•It is the pipe carrying discharges from bath rooms , kitchens , sinks , etc. It
doesn’t carry human excreta.
 VENT PIPE :
 The pipe installed for the purpose of ventilation of the system is known as vent pipe . It is
open at the top and bottom .It is carried at least 1m above the roof level.
 RAIN WATER PIPE :
•It is a pipe which carries only rain water .
 VENTILATING PIPE :
The ventilating pipe enables the foul gases of sewers to be safely discharged into
the atmosphere .
PIPE FITTINGS
 FOR JOINING , LAYING AND FIXING OF SOIL PIPE ,WASTE PIPE ,VENT PIPE ,RAIN WATER PIPE
,ETC. VARIOUS TYPES OF FITTINGS ARE REQUIRED :
I. SINGLE SOCKETED PIPE
II. PLANE BEND PIPE
III. SANITARY BEND PIPE
IV. LONG ARM BEND PIPE
V. SINGLE EQUAL JUNCTION
VI. DOUBLE EQUAL JUNCTION
VII. SWAN NECK PIPE
VIII. W.C. CONNECTOR PIPE
IX. SINGLE UNEQUAL PIPE
X. DOUBLE UNEQUAL PIPE
XI. SLOTTED VENT COWL. PIPE
 FIGURE SHOWS COMMON SOIL AND RAIN WATER PIPE FITTINGS
PICS OF SOME PIPE FITTINGS
PIPE JOINTS
 THE PIPES ARE MANUFACTURED IN SMALL LENGTH VARYING FROM 2 TO 5M.
BUT AT THE TIME OF LAYING , THE PIPES ARE JOINED TOGETHER TO MAKE
THEM CONTINUOUS . THE SELECTION OF THE TYPE OF THE PIPE DEPENDS ON
THE PIPE MATERIALS , INTERNAL PRESSURE , SITE CONDITIONS , ETC.
 VARIOUS PIPE JOINTS :
 BELLAND SPIGOT JOINT
 FLANGED JOINT
 FLEXIBLE JOINT
 EXPANSION JOINT
 COLLAR JOINT
 BELL & SPIGOT
JOINT
1. THIS IS THE MOST COMMONLY USED JOINT .THE C.I. PIPES
WHICH ARE TO BE JOINED BY THE SPIGOT AND SOCKET JOINT,
ARE MADE IN SUCH A WAY THAT ONE OF THEIR END IS
ENLARGED WHEREAS THE OTHER END IS NORMAL. THE
ENLARGED END IS CALLED “SOCKET ”, WHICH THE NORMAL
END IS CALLED “SPIGOT”. THE SPIGOT IS FITTED INTO THE
SOCKET . THE REMAINING SPACE BETWEEN THE SOCKET AND
SPIGOT IS FINALLY FILLED WITH MOLTEN LEAD .
2. THE QUANTITY OF LEAD REQUIRED PER JOINT VARIES FROM
3.5 TO 4KG FOR 15CM DIA.PIPE , TO ABOUT 45 TO 50 KG FOR 1.2
M DIA.PIPE. THIS IS SOMEWHAT SLIGHTLY FLEXIBLE JOINT AND
ALLOWS THE PIPES TO BE LAID ON FLAT CURVES WITHOUT THE
USE OF PIPE SPECIALS .
BELL & SLOGETJOINT
FLANGED JOINT
1. THIS JOINT IS MOSTLY USED FOR TEMPORARY PIPELINES ,
BECAUSE THE PIPE LINE CAN BE DISMENTED AND AGAIN
REUSED AT SOME OTHER PLACE.
2. THE PIPE IN THIS CASE HAS FLANGES ON ITS BOTH ENDS ,
CAST, WELDED OR SCREWED WITH THE PIPE . THE TWO ENDS
OF THE PIPES WHICH ARE TO BE JOINED TOGETHER ARE
BROUGHT IN PERFECT LEVEL NEAR ONE ANOTHER , A HARD
RUBBER GASKET OR WASHER IS PLACED BETWEEN THE
FLANGES ARE THEN BOLTED . THIS JOINT IS STRONG BUT RIGID
, AND HENCE CANNOT BE USED AT SUCH PLACES WHERE IT
HAS TO BEAR VIBRATIONS OR DEFLECTIONS OF PIPES .
FLANGED JOINT
FLEXIBLE JOINT
 FLEXIBLE JOINTS ARE USED WHERE LARGE SCALES FLEXIBILITIES
ARE REQUIRED . THIS JOINT IS ALSO CALLED BELLAND SOCKET JOINT
OR UNIVERSAL JOINT .
 THIS JOINT IS USED AT PLACES WHERE SETTLEMENT IS LIKELY TO
OCCUR AFTER THE LAYING OF THE PIPES . THIS JOINT CAN BE ALSO
USED FOR LAYING PIPES ON CURVES , BECAUSE AT THE JOINT THE PIPE
CAN BE LAID AT ANGLE .
 THE SOCKET IS SPHERICALAND THE SPIGOT , THOUGH PLAIN, IS
HAVING A “BEAD”AT THE END . A RETAINER RING IS PLACED OVER THE
BEAD WHICH KEEPS THE RUBBER GASKET IN POSITION . A SPLIT CAST
IRON “GLAND” RING IS THEN PLACED OVER IT . THEYARE THEN
TIGHTENED BY MEANS OF NUTS AND BOLTS .
FLEXIBLE JOINTS
EXPANSION JOINTS
• EXPANSION JOINTS ARE PROVIDED AT SUITABLE INTERVALS
IN THE PIPELINES , SO AS TO COUNTERACT THE STRESSES
PRODUCED DUE TO TEMOERATURE VARIATIONS . FOR
PROVIDING EXPANSION JOINTS IN CAST IRON PIPES . THRE
SOCKET END IS CAST FLANGED AND THE SPIGOT END IS PLAIN
. THE SOCKET END IS CONNECTED RIGIDLY TO AN ANNULAR
RING WHICH CAN BE SLIDE FREELY OVER THE SPIGOT END . A
RUBBER GASKET IS PROVIDED BELOW THE SOCKET AND
OVER THE SPIGOT END . THE FLANGES ARE THEN TIGHTENED
BY MEANS OF NUTS AND BOLTS .
EXPANSION JOINTS
COLLAR JOINT
 COLLAR JOINTS IS RECOMMENDED FOR JOINING THE R.C.C.
PIPES AND CEMENT PIPES . GROOVES ARE PROVIDED AT THE
BOTH ENDS OF THESE PIPES . BEFORE JOINING, THE PIPES ARE
BROUGHT FACE TO FACE AND AT THE SAME LEVEL . THE SPACE
BETWEEN THE PIPES AND THE COLLAR IS FILLED UP WITH
CEMENT MORTAR(1:1) AND THE SURFACE IS FINISHED AT AN
ANGLE OF 45*.
COLLAR JOINTS
LAYING OF PIPELINES
 PIPES ARE LAID EITHER ON THE GROUND OR BELOW THE GROUND . GENERALLY , THE PIPES
BRINGING WATER FROM THE SOURCE TO THE CITY , ARE LAID ON THE GROUND , WHEREAS THE
DISTRIBUTING MAINS TAKING THE WATER WITHIN THE LOCALITIES , ARE LAID BELOW GROUND .
THE PIPELINE IS LAID IN THE FOLLOWING STAGES :
 STAGE 1 : MARKING OF CENTRE LINE :
 THE CENTRELINE OF THE PROPOSED PIPELINE SHOULD BE MARKET ON THE GROUND BY THE
PEGS AT AN INTERVAL OF 20 CM WITH THE HELP OF THEDOLITE . THE WIDTH OF GENERAL
EXCAVATION SHOULD BE 30CM MORE THAN THE EXTERNAL DIAMETER OF THE PIPE. THE
EXCAVATION WIDTH IS MARKED O THE GROUND BY A SPADE . AT THE LOCATIO OF JOINTS , THE
WIDTH OF EXCAVATION(W2)SHOULD BE 30CM MORE THAN THE NORMAL WIDTH AND DEPTH OF
EXCAVATION SHOULD BE 15CM MORE THAN THE NORMAL DEPTH. THE CLEAR LENGTH (L) AT
JOINT SHOULD BE DOUBLE THE LENGTH OF JOINT .
 D=EXTERNAL DIAMETER OF PIPE
 W1= NORMAL WIDTH OF TRENCH
 = D+30CM
MARKING OF TRENCH
Stage 2 : Side Protection of Trench :
 When excavation is done in hard soil , the side
protection is not necessary . But ,when excavation
run along the loose soil,the side protection of
trench is required . The timbering to the trench
may be done by vertical sheet piles supported by
struts , wooden blocks and wedges .
SIDE PROTECTION OF
TRENCH
STAGE 3: EXCAVATION OF
TRENCH
 THE EXCAVATION OF TRENCH IS CARRIED OUT
ACCORDING TO THE MARKING ON THE GROUND . THE
EXCAVATION MAY BE DONE MANUALLY OR BY USING
TRENCHING MACHINE . THE DEPTH OF TRENCH
SHOULD NOT BE LESS THAN 90CM TO PROTECT THE
PIPELINE FROM BEING DAMAGED BY EXTERNAL
LOADS . WHILE DOING EXCAVATION,CARE SHOULD BE
TAKEN SO THAT UNDERGROUND CABLES AND OTHER
SYSTEMS ARE NOT DAMAGED.
 STAGE 4:PREPARATION OF
SUBGRADE
 FOR SMALL DIAMETER PIPES THE SUBGRADE IS PREPARED BY
RAMMING A LAYER OF SAND OR MOORUM TO A THICKNESS OF
ABOUT 15 TO 30CM . SOMETIMES A SINGLE LAYER OF FLAT BRICK
SOILING IS PROVIDED OVER THE COMPACTED SAND LAYER .
 IN CASE OF LARGE DIAMETERS PIPES THE SUBGRADE IS PREPARED
BY CEMENT CONCRETE FOUNDATION (1:3:6) OVER A LAYER OF
FLAT BRICK SOILING . CONCRETE BENCHING SHOULD BE
PROVIDED ON EITHER SIDE OF THE PIPE TO HOLD THE POSITION .
GROOVES SHOULD BE PROVIDED IN CONCRETE FOUNDATION AT
THE PLACES OF JOINTS .
PREPARATION OF
SUBGRADE
STAGE 5: LOWERING &
JOINING OF PIPES
 SIDE . PIPES SHOULD BE LOWERED IN THE TRENCH
CAREFULLY. SMALL DIAMETERS PIPES MAY BE
LOWERED IN THE TRENCH BY MANUAL LABOURS . BUT
THE LARGE DIAMETERS PIPES SHOULD BE LOWERED BY
CRANE OR OTHER MECHANICAL DEVICE .
 THE JOINING OF PIPES SHOULD BE STARTED FROM THE
LOWER LEVEL . THE SOCKET END OF PIPES ARE KEPT
TOWARD THE HIHER
STAGE 6: TESTING OF
PIPELINE :
 AFTER THE COMPETION OF THE PIPE JOINING ,THE PIPE INE SHOULD
BE TESTED FOR WATER TIGHTNESS . THE FOLLOWING TESTS ARE
GENERALLY PERFORMED :
 PRESSURE TEST :
 A SECTION OF PIPE LINE SHOULD BE FILLED WITH WATER AND
PRESSURE SHOULD BE APPLIED BY PUMP . THE PRESSURE IS NOTED
ON THE PRESSURE GAUGE . IF THE PRESSURE ON THE GAUGE FALLS
GRADUALLY,THEN IT INDICATES THE LEAKAGE IN THAT SECTION OF
PIPE LINE. THE LEAKAGE SHOULD BE DETECTED AND RECTIFIED
ACCORDINGLY.
 LEAKAGE TEST BY EMPERICAL FORMULA:
 THE ALLOWABLE LEAKAGE IS GIVEN BY RELATION , L=NDP/3.3
 WHERE:
 L= ALLOWABLE LEAKAGE IN CM^3/HR
 N = NUMBER OF JOINTS
 D = DIAMETER OF PIPE IN MM
 P = APPLIED PRESSURE IN KG/CM^2

 IF THE ACTUAL LEAKAGE IS MORE THAN THE ALLOWABLE LEAKAGE
, THE LEAKAGE POINT SHOULD BE DETECTED AND RECTIFIED
ACCORDINGLY.
STAGE 7: BACKFILLING THE
TRENCH
 AFTER TESTING AND RECTIFICATION , THE EXCAVATED
EARTH FROM BOTH SIDES IS BACKFILLED IN THE
TRENCH IN LAYERS 15 CM THICKNESS. EACH LAYER
OF BACKFILL IS TAMPED LIGHTLY BY TAMPING ROD.
FINALLY ,THE TOP SURFACE IS WELL RAMMED WITH
EXTRA EARTH IN SHAPE OF RIDGE WHICH GETS
LEVELLED IN COURSE OF TIME .
PIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINES

More Related Content

What's hot

Planning and design of building services in multi Story
Planning and design of building services in multi Story Planning and design of building services in multi Story
Planning and design of building services in multi Story Vj NiroSh
 
Valve and fittings
Valve and fittingsValve and fittings
Valve and fittingsYogesh SN
 
Plumbing services in high rise building and group housing
Plumbing services in high rise building and group housingPlumbing services in high rise building and group housing
Plumbing services in high rise building and group housingRohit Bhatt
 
Sewer appurtenances
Sewer appurtenances Sewer appurtenances
Sewer appurtenances SitalParajuli
 
Drainage System For a Building
Drainage System For a BuildingDrainage System For a Building
Drainage System For a BuildingAroh Thombre
 
Plumbing system updated ppt
Plumbing system updated pptPlumbing system updated ppt
Plumbing system updated pptwasim shaikh
 
Pipe lines in sewage system
Pipe lines in sewage systemPipe lines in sewage system
Pipe lines in sewage systemGokul Ayyappan
 
08 Building Water Supply and Sanitary Fixtures
08 Building Water Supply and Sanitary Fixtures08 Building Water Supply and Sanitary Fixtures
08 Building Water Supply and Sanitary Fixturesakashpadole
 
WATER SUPPLY AND PLUMBING SERVICES
WATER SUPPLY AND PLUMBING SERVICESWATER SUPPLY AND PLUMBING SERVICES
WATER SUPPLY AND PLUMBING SERVICESRIDDHESH VARIK
 
Manholes, by mayank agrawal
Manholes, by mayank agrawalManholes, by mayank agrawal
Manholes, by mayank agrawalMayank Agrawal
 
Building drainage system
Building drainage systemBuilding drainage system
Building drainage systemDipesh Jain
 

What's hot (20)

Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
Planning and design of building services in multi Story
Planning and design of building services in multi Story Planning and design of building services in multi Story
Planning and design of building services in multi Story
 
Valve and fittings
Valve and fittingsValve and fittings
Valve and fittings
 
Plumbing services in high rise building and group housing
Plumbing services in high rise building and group housingPlumbing services in high rise building and group housing
Plumbing services in high rise building and group housing
 
Storm water drainage
Storm water drainageStorm water drainage
Storm water drainage
 
Sewer appurtenances
Sewer appurtenances Sewer appurtenances
Sewer appurtenances
 
House Drainage System
House Drainage SystemHouse Drainage System
House Drainage System
 
Drainage System For a Building
Drainage System For a BuildingDrainage System For a Building
Drainage System For a Building
 
Types of traps
Types of trapsTypes of traps
Types of traps
 
Plumbing system updated ppt
Plumbing system updated pptPlumbing system updated ppt
Plumbing system updated ppt
 
House plumbing
House plumbingHouse plumbing
House plumbing
 
Pipe lines in sewage system
Pipe lines in sewage systemPipe lines in sewage system
Pipe lines in sewage system
 
Types of pipes
Types of pipesTypes of pipes
Types of pipes
 
08 Building Water Supply and Sanitary Fixtures
08 Building Water Supply and Sanitary Fixtures08 Building Water Supply and Sanitary Fixtures
08 Building Water Supply and Sanitary Fixtures
 
WATER SUPPLY AND PLUMBING SERVICES
WATER SUPPLY AND PLUMBING SERVICESWATER SUPPLY AND PLUMBING SERVICES
WATER SUPPLY AND PLUMBING SERVICES
 
05 water supply system
05 water supply system05 water supply system
05 water supply system
 
Caisson
CaissonCaisson
Caisson
 
Manholes, by mayank agrawal
Manholes, by mayank agrawalManholes, by mayank agrawal
Manholes, by mayank agrawal
 
Building drainage system
Building drainage systemBuilding drainage system
Building drainage system
 
Sewer joint
Sewer jointSewer joint
Sewer joint
 

Similar to PIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINES

Unit 3 ground water lect-2
Unit 3 ground water lect-2Unit 3 ground water lect-2
Unit 3 ground water lect-2DIPESH RAJPUT
 
Hydrology (Ground water Hydrology)
Hydrology (Ground water Hydrology)Hydrology (Ground water Hydrology)
Hydrology (Ground water Hydrology)Latif Hyder Wadho
 
Laying and Testing of sewer
Laying and Testing of sewerLaying and Testing of sewer
Laying and Testing of sewersathyan s
 
DEWATERING METHODS IN DIFFERENT SOIL CONDITIONS
DEWATERING METHODS IN DIFFERENT SOIL CONDITIONSDEWATERING METHODS IN DIFFERENT SOIL CONDITIONS
DEWATERING METHODS IN DIFFERENT SOIL CONDITIONSTejaswiniNarayane
 
construction of drain and seers
construction of drain and seersconstruction of drain and seers
construction of drain and seersjeetusinghkumar
 
Water Resources Engineering types of wells with figures Denish Jangid Open we...
Water Resources Engineering types of wells with figures Denish Jangid Open we...Water Resources Engineering types of wells with figures Denish Jangid Open we...
Water Resources Engineering types of wells with figures Denish Jangid Open we...Denish Jangid
 
Domestic sewage
Domestic sewageDomestic sewage
Domestic sewageNIKAMVN
 
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptx
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptxSewer joints of pipes, sewer appurtenances, storm water drainage.pptx
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptxPriyaTalwar8
 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point systemAnshuman Tyagi
 
Interior services unit 2
Interior services unit 2Interior services unit 2
Interior services unit 2ctlachu
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigationSAGAR RAUT
 
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTUVATSAL PATEL
 
Well completion.
Well completion.Well completion.
Well completion.Mawa James
 

Similar to PIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINES (20)

Cross drainage work.pptx
Cross drainage work.pptxCross drainage work.pptx
Cross drainage work.pptx
 
Unit 3 ground water lect-2
Unit 3 ground water lect-2Unit 3 ground water lect-2
Unit 3 ground water lect-2
 
Hydrology (Ground water Hydrology)
Hydrology (Ground water Hydrology)Hydrology (Ground water Hydrology)
Hydrology (Ground water Hydrology)
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 
Laying and Testing of sewer
Laying and Testing of sewerLaying and Testing of sewer
Laying and Testing of sewer
 
DEWATERING METHODS IN DIFFERENT SOIL CONDITIONS
DEWATERING METHODS IN DIFFERENT SOIL CONDITIONSDEWATERING METHODS IN DIFFERENT SOIL CONDITIONS
DEWATERING METHODS IN DIFFERENT SOIL CONDITIONS
 
16
1616
16
 
construction of drain and seers
construction of drain and seersconstruction of drain and seers
construction of drain and seers
 
Water Resources Engineering types of wells with figures Denish Jangid Open we...
Water Resources Engineering types of wells with figures Denish Jangid Open we...Water Resources Engineering types of wells with figures Denish Jangid Open we...
Water Resources Engineering types of wells with figures Denish Jangid Open we...
 
Drainage
DrainageDrainage
Drainage
 
sewage layy out lec
sewage layy out lecsewage layy out lec
sewage layy out lec
 
Domestic sewage
Domestic sewageDomestic sewage
Domestic sewage
 
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptx
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptxSewer joints of pipes, sewer appurtenances, storm water drainage.pptx
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptx
 
Hydraulicdesignofsewer
HydraulicdesignofsewerHydraulicdesignofsewer
Hydraulicdesignofsewer
 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point system
 
Interior services unit 2
Interior services unit 2Interior services unit 2
Interior services unit 2
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
 
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
 
Canal design
Canal designCanal design
Canal design
 
Well completion.
Well completion.Well completion.
Well completion.
 

Recently uploaded

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 

Recently uploaded (20)

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 

PIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINES

  • 1. L J POLYTECHNIC SUBJECT : WATER SUPPLY & SANITARY ENGINEERING TOPIC: PIPES , PIPE FITTINGS,PIPE JOINTS & LAYING OF PIPELINES MADE BY: DHWANIK DESAI MEHUL GOHIL JAGDISH BHARWAD DHAVAL DESAI AMIT MUNJANI
  • 2. PIPES:  IN A HOUSE DRAINAGE SYSTEM, A PIPE MAY HAVE THE FOLLOWING DESIGNATIONS,DEPENDING UPON THE FUNCTIONS IT CARRIES :  SOIL PIPES:  IT IS THE PIPE CARRYING SEWAGE FROM URINALS , WATERCLOSETS ETC. ,I.E. IT CARRIES HUMAN EXCRETA.  ITS DIAMETER IS OF 100MM .
  • 3. WASTE PIPE : •It is the pipe carrying discharges from bath rooms , kitchens , sinks , etc. It doesn’t carry human excreta.  VENT PIPE :  The pipe installed for the purpose of ventilation of the system is known as vent pipe . It is open at the top and bottom .It is carried at least 1m above the roof level.  RAIN WATER PIPE : •It is a pipe which carries only rain water .  VENTILATING PIPE : The ventilating pipe enables the foul gases of sewers to be safely discharged into the atmosphere .
  • 4. PIPE FITTINGS  FOR JOINING , LAYING AND FIXING OF SOIL PIPE ,WASTE PIPE ,VENT PIPE ,RAIN WATER PIPE ,ETC. VARIOUS TYPES OF FITTINGS ARE REQUIRED : I. SINGLE SOCKETED PIPE II. PLANE BEND PIPE III. SANITARY BEND PIPE IV. LONG ARM BEND PIPE V. SINGLE EQUAL JUNCTION VI. DOUBLE EQUAL JUNCTION VII. SWAN NECK PIPE VIII. W.C. CONNECTOR PIPE IX. SINGLE UNEQUAL PIPE X. DOUBLE UNEQUAL PIPE XI. SLOTTED VENT COWL. PIPE  FIGURE SHOWS COMMON SOIL AND RAIN WATER PIPE FITTINGS
  • 5. PICS OF SOME PIPE FITTINGS
  • 6. PIPE JOINTS  THE PIPES ARE MANUFACTURED IN SMALL LENGTH VARYING FROM 2 TO 5M. BUT AT THE TIME OF LAYING , THE PIPES ARE JOINED TOGETHER TO MAKE THEM CONTINUOUS . THE SELECTION OF THE TYPE OF THE PIPE DEPENDS ON THE PIPE MATERIALS , INTERNAL PRESSURE , SITE CONDITIONS , ETC.  VARIOUS PIPE JOINTS :  BELLAND SPIGOT JOINT  FLANGED JOINT  FLEXIBLE JOINT  EXPANSION JOINT  COLLAR JOINT
  • 7.  BELL & SPIGOT JOINT 1. THIS IS THE MOST COMMONLY USED JOINT .THE C.I. PIPES WHICH ARE TO BE JOINED BY THE SPIGOT AND SOCKET JOINT, ARE MADE IN SUCH A WAY THAT ONE OF THEIR END IS ENLARGED WHEREAS THE OTHER END IS NORMAL. THE ENLARGED END IS CALLED “SOCKET ”, WHICH THE NORMAL END IS CALLED “SPIGOT”. THE SPIGOT IS FITTED INTO THE SOCKET . THE REMAINING SPACE BETWEEN THE SOCKET AND SPIGOT IS FINALLY FILLED WITH MOLTEN LEAD . 2. THE QUANTITY OF LEAD REQUIRED PER JOINT VARIES FROM 3.5 TO 4KG FOR 15CM DIA.PIPE , TO ABOUT 45 TO 50 KG FOR 1.2 M DIA.PIPE. THIS IS SOMEWHAT SLIGHTLY FLEXIBLE JOINT AND ALLOWS THE PIPES TO BE LAID ON FLAT CURVES WITHOUT THE USE OF PIPE SPECIALS .
  • 9. FLANGED JOINT 1. THIS JOINT IS MOSTLY USED FOR TEMPORARY PIPELINES , BECAUSE THE PIPE LINE CAN BE DISMENTED AND AGAIN REUSED AT SOME OTHER PLACE. 2. THE PIPE IN THIS CASE HAS FLANGES ON ITS BOTH ENDS , CAST, WELDED OR SCREWED WITH THE PIPE . THE TWO ENDS OF THE PIPES WHICH ARE TO BE JOINED TOGETHER ARE BROUGHT IN PERFECT LEVEL NEAR ONE ANOTHER , A HARD RUBBER GASKET OR WASHER IS PLACED BETWEEN THE FLANGES ARE THEN BOLTED . THIS JOINT IS STRONG BUT RIGID , AND HENCE CANNOT BE USED AT SUCH PLACES WHERE IT HAS TO BEAR VIBRATIONS OR DEFLECTIONS OF PIPES .
  • 11. FLEXIBLE JOINT  FLEXIBLE JOINTS ARE USED WHERE LARGE SCALES FLEXIBILITIES ARE REQUIRED . THIS JOINT IS ALSO CALLED BELLAND SOCKET JOINT OR UNIVERSAL JOINT .  THIS JOINT IS USED AT PLACES WHERE SETTLEMENT IS LIKELY TO OCCUR AFTER THE LAYING OF THE PIPES . THIS JOINT CAN BE ALSO USED FOR LAYING PIPES ON CURVES , BECAUSE AT THE JOINT THE PIPE CAN BE LAID AT ANGLE .  THE SOCKET IS SPHERICALAND THE SPIGOT , THOUGH PLAIN, IS HAVING A “BEAD”AT THE END . A RETAINER RING IS PLACED OVER THE BEAD WHICH KEEPS THE RUBBER GASKET IN POSITION . A SPLIT CAST IRON “GLAND” RING IS THEN PLACED OVER IT . THEYARE THEN TIGHTENED BY MEANS OF NUTS AND BOLTS .
  • 13. EXPANSION JOINTS • EXPANSION JOINTS ARE PROVIDED AT SUITABLE INTERVALS IN THE PIPELINES , SO AS TO COUNTERACT THE STRESSES PRODUCED DUE TO TEMOERATURE VARIATIONS . FOR PROVIDING EXPANSION JOINTS IN CAST IRON PIPES . THRE SOCKET END IS CAST FLANGED AND THE SPIGOT END IS PLAIN . THE SOCKET END IS CONNECTED RIGIDLY TO AN ANNULAR RING WHICH CAN BE SLIDE FREELY OVER THE SPIGOT END . A RUBBER GASKET IS PROVIDED BELOW THE SOCKET AND OVER THE SPIGOT END . THE FLANGES ARE THEN TIGHTENED BY MEANS OF NUTS AND BOLTS .
  • 15. COLLAR JOINT  COLLAR JOINTS IS RECOMMENDED FOR JOINING THE R.C.C. PIPES AND CEMENT PIPES . GROOVES ARE PROVIDED AT THE BOTH ENDS OF THESE PIPES . BEFORE JOINING, THE PIPES ARE BROUGHT FACE TO FACE AND AT THE SAME LEVEL . THE SPACE BETWEEN THE PIPES AND THE COLLAR IS FILLED UP WITH CEMENT MORTAR(1:1) AND THE SURFACE IS FINISHED AT AN ANGLE OF 45*.
  • 17. LAYING OF PIPELINES  PIPES ARE LAID EITHER ON THE GROUND OR BELOW THE GROUND . GENERALLY , THE PIPES BRINGING WATER FROM THE SOURCE TO THE CITY , ARE LAID ON THE GROUND , WHEREAS THE DISTRIBUTING MAINS TAKING THE WATER WITHIN THE LOCALITIES , ARE LAID BELOW GROUND . THE PIPELINE IS LAID IN THE FOLLOWING STAGES :  STAGE 1 : MARKING OF CENTRE LINE :  THE CENTRELINE OF THE PROPOSED PIPELINE SHOULD BE MARKET ON THE GROUND BY THE PEGS AT AN INTERVAL OF 20 CM WITH THE HELP OF THEDOLITE . THE WIDTH OF GENERAL EXCAVATION SHOULD BE 30CM MORE THAN THE EXTERNAL DIAMETER OF THE PIPE. THE EXCAVATION WIDTH IS MARKED O THE GROUND BY A SPADE . AT THE LOCATIO OF JOINTS , THE WIDTH OF EXCAVATION(W2)SHOULD BE 30CM MORE THAN THE NORMAL WIDTH AND DEPTH OF EXCAVATION SHOULD BE 15CM MORE THAN THE NORMAL DEPTH. THE CLEAR LENGTH (L) AT JOINT SHOULD BE DOUBLE THE LENGTH OF JOINT .  D=EXTERNAL DIAMETER OF PIPE  W1= NORMAL WIDTH OF TRENCH  = D+30CM
  • 19. Stage 2 : Side Protection of Trench :  When excavation is done in hard soil , the side protection is not necessary . But ,when excavation run along the loose soil,the side protection of trench is required . The timbering to the trench may be done by vertical sheet piles supported by struts , wooden blocks and wedges .
  • 21. STAGE 3: EXCAVATION OF TRENCH  THE EXCAVATION OF TRENCH IS CARRIED OUT ACCORDING TO THE MARKING ON THE GROUND . THE EXCAVATION MAY BE DONE MANUALLY OR BY USING TRENCHING MACHINE . THE DEPTH OF TRENCH SHOULD NOT BE LESS THAN 90CM TO PROTECT THE PIPELINE FROM BEING DAMAGED BY EXTERNAL LOADS . WHILE DOING EXCAVATION,CARE SHOULD BE TAKEN SO THAT UNDERGROUND CABLES AND OTHER SYSTEMS ARE NOT DAMAGED.
  • 22.  STAGE 4:PREPARATION OF SUBGRADE  FOR SMALL DIAMETER PIPES THE SUBGRADE IS PREPARED BY RAMMING A LAYER OF SAND OR MOORUM TO A THICKNESS OF ABOUT 15 TO 30CM . SOMETIMES A SINGLE LAYER OF FLAT BRICK SOILING IS PROVIDED OVER THE COMPACTED SAND LAYER .  IN CASE OF LARGE DIAMETERS PIPES THE SUBGRADE IS PREPARED BY CEMENT CONCRETE FOUNDATION (1:3:6) OVER A LAYER OF FLAT BRICK SOILING . CONCRETE BENCHING SHOULD BE PROVIDED ON EITHER SIDE OF THE PIPE TO HOLD THE POSITION . GROOVES SHOULD BE PROVIDED IN CONCRETE FOUNDATION AT THE PLACES OF JOINTS .
  • 24. STAGE 5: LOWERING & JOINING OF PIPES  SIDE . PIPES SHOULD BE LOWERED IN THE TRENCH CAREFULLY. SMALL DIAMETERS PIPES MAY BE LOWERED IN THE TRENCH BY MANUAL LABOURS . BUT THE LARGE DIAMETERS PIPES SHOULD BE LOWERED BY CRANE OR OTHER MECHANICAL DEVICE .  THE JOINING OF PIPES SHOULD BE STARTED FROM THE LOWER LEVEL . THE SOCKET END OF PIPES ARE KEPT TOWARD THE HIHER
  • 25. STAGE 6: TESTING OF PIPELINE :  AFTER THE COMPETION OF THE PIPE JOINING ,THE PIPE INE SHOULD BE TESTED FOR WATER TIGHTNESS . THE FOLLOWING TESTS ARE GENERALLY PERFORMED :  PRESSURE TEST :  A SECTION OF PIPE LINE SHOULD BE FILLED WITH WATER AND PRESSURE SHOULD BE APPLIED BY PUMP . THE PRESSURE IS NOTED ON THE PRESSURE GAUGE . IF THE PRESSURE ON THE GAUGE FALLS GRADUALLY,THEN IT INDICATES THE LEAKAGE IN THAT SECTION OF PIPE LINE. THE LEAKAGE SHOULD BE DETECTED AND RECTIFIED ACCORDINGLY.
  • 26.  LEAKAGE TEST BY EMPERICAL FORMULA:  THE ALLOWABLE LEAKAGE IS GIVEN BY RELATION , L=NDP/3.3  WHERE:  L= ALLOWABLE LEAKAGE IN CM^3/HR  N = NUMBER OF JOINTS  D = DIAMETER OF PIPE IN MM  P = APPLIED PRESSURE IN KG/CM^2   IF THE ACTUAL LEAKAGE IS MORE THAN THE ALLOWABLE LEAKAGE , THE LEAKAGE POINT SHOULD BE DETECTED AND RECTIFIED ACCORDINGLY.
  • 27. STAGE 7: BACKFILLING THE TRENCH  AFTER TESTING AND RECTIFICATION , THE EXCAVATED EARTH FROM BOTH SIDES IS BACKFILLED IN THE TRENCH IN LAYERS 15 CM THICKNESS. EACH LAYER OF BACKFILL IS TAMPED LIGHTLY BY TAMPING ROD. FINALLY ,THE TOP SURFACE IS WELL RAMMED WITH EXTRA EARTH IN SHAPE OF RIDGE WHICH GETS LEVELLED IN COURSE OF TIME .