Photogrammetry is the science and technology of obtaining measurements and information about physical objects and environments through photographic images, using methods like aerial, terrestrial, and satellite photography. This practice has diverse applications in fields such as urban planning, geological mapping, and disaster management, providing accurate data for topographic and engineering surveys. Key concepts include orthophotos, stereoscopic viewing, and the use of various types of cameras to capture and process images.