SlideShare a Scribd company logo
OFFSHORE PLATFORM
DECOMMISSIONING
Your Expert Course Director
Thor Sterker
Thor Sterker has over 35 years of hand-on offshore engineering & project management
experience in drilling, offshore transport and installation work. Since 1990 he has been
specializing in decommissioning projects. In a client representative role, he has been involved in
the Gulf of Mexico, North Sea and South East Asia platform removal projects. Over the years he
specialized in ROV, diving and subsea cutting projects. As a consultant he has performed FEED
studies as well as PEER reviews of FPSO projects and participated in Environmental Impact
Assessments.
www.petroEDGEasia.net
Conduct this training course in-house for more effective savings!
Call us at +65 6741 9927 or email to info@asiaedge.net. For more information, visit us at www.petroedgeasia.net
OFFSHORE PLATFORM DECOMMISSIONING
Course overview
Each offshore platform reaches the end of its lifetime at some point, and this necessitates decommissioning. This activity
must be done safely, cost effectively and with as little environmental pollution as possible. While the life spans of these
installations cover decades, they have not generally been designed with efficient decommissioning in mind. Moreover,
the places where the facilities have been constructed are pivotal in defining the safest and most sustainable
decommissioning method.
This 3 day training course will address the key issues surrounding an offshore decommissioning project. You will be
exposed to key lessons learnt from Frigg, NW Hutton and Ekofisk, as well as lesson specifically derived from projects in
based in Asia. The course will also assist in understanding the planning and decision analysis in decommissioning projects
and costs involved.
By attending this training, participants will: -
* Review the standard supply chain and decommissioning plan
* Get to grips with the financial and organizational implication
* Evaluate the various methodologies for well P&A, platform removal, transport and onshore recycling
* Examine the environmental regimes for handling of hazardous waste
* Identify key risks, market situation and supply chain opportunities
* Learn how to other oil companies have executed recent projects
* Analyse key issues in planning a decommissioning project
* Understand implication of the decommissioning supply chain and Management of Change
* Compare best practice with colleagues from across global industry
Who should attend?
* Project managers and engineers
* Supply chain managers
* Finance & tax managers
* HSE managers
* Operational managers
* Well work-over specialists
About your Expert Trainer: Thor Sterker
After graduating as a mechanical engineer in 1977, Thor commenced his career in the oil & gas
industry as a mud logger data engineer for ultra-deep onshore wells in Europe. In 1979, he
joined, offshore construction company Heerema Marine Contractors as field engineer. As Field
Engineer he was involved in more than 65 offshore installation projects, and as Consultant /
Superintendant he was involved in almost every North Sea decommissioning project and
worldwide in more than 175 decommissioning projects.
Thor has over 35 years of hands-on offshore engineering & project management experience in
drilling, offshore transport and installation work. Since 1990 he has specialized in
decommissioning projects. In the early days of platform decommissioning he Researched & Developed innovative subsea
cutting tools, offshore installation and decommissioning techniques and platform decontamination methods. Since 2011,
as Technical Advisor to the Lenders (Mortgagee in Possession) he was involved in repossessing assets such as the
repossession of the Platform Etesco Millenium, FPSO OSX 2, and a Deep DP Drilling Vessel in Brazil.
In an effort to change the “mind set” about decommissioning he co-organized four International Conferences in
Aberdeen, Petten and Den Helder on the subject of “Decommissioning & Re-using of Platform Facilities” and presented
several papers on the subject of decommissioning, subsea cutting and re-use of platforms. In 1994 he took the initiative
to develop the platform re-use software (now called an App) and has participated in the development of the project
since that time. His HSE performance to date is: NO Lost Time Incidents on any project.
Conduct this training course in-house for more effective savings!
Call us at +65 6741 9927 or email to info@asiaedge.net. For more information, visit us at www.petroedgeasia.net
OFFSHORE PLATFORM DECOMMISSIONING
3 DAY COURSE OUTLINE
DAY ONE
 Introduction and learning objectives
- Each attendant introduces
her/himself and indicates what
questions / issues she /he has and
would like to highlight during the
workshop
 Decommissioning Roadmap,
Regulatory issues
- Geneva Convention on the
Continental shelf 1958
- IMO guidelines and Standards for the
removal of Offshore Platforms
- London Dumping Convention 1972
- OSPAR
- UN Convention on the Law of the Sea
1982 (UNCLOS)
- Decommissioning of Offshore
Installations and Pipelines under the
Petroleum Act
- ASCOPE decommissioning guidelines
/ DMF guidelines
- Who are the Competent Authorities
 Reputational compliance and
management, Issues in worldwide
decommissioning
- Public Relations
- Health Safety and Environmental
Issues
- Consultation Public Interest Groups,
Government, Provincial and Local
Authorities,
- Navigational Safety
- Fisheries and other sub sea interests
- Pipeline abandonment
- Residual Liability
 Funding
- Funds for decommissioning
- Accountants view towards
decommissioning
- IFRS 16 and FAS 143
 Record management
- Waste and hazardous materials
survey
- Normally Unmanned Installation (NUI)
- Inventory equipment
- Original data, as-builds, weight
records, C.O.G.
 Operators knowledge transfer.
 Case studies from North Sea
- Petronas SM-4 and SM-V
- BPNE P15-b platform,
- Esmond Complex removal (video
film)
- BAES (UK) NSR platforms,
- Total (NO) Froy platform (Video
film)
- Conoco UK Inde platforms
- Gulf of Mexico (various)
 Decommissioning risks and costs
(due to confidentiality limited to
public domain)
- Current marine equipment prices
- predicting "unknown"
decommissioning costs
- pipelines,
- drill cuttings,
- well abandonment
- Different categories of risks for
operators, contractors, suppliers
- Reduce risk and cost by smart
contracting
 Day 1 wrap up
DAY TWO
 Environmental considerations
- Definition of Waste
- Competent Authority
- Environmental act.
- Environmental Contract (based on
TFS guidelines)
- Platform disposal, sea or land
- Requirements for the Receiving
yard
 Safety issues
- new techniques,
- FDDV concept
- Using ROV or Divers to prepare
jackets for lifting
- underwater cutting techniques
- Lessons learned
 Decommissioning techniques –
pro´s and con´s
- Semi Submergible Crane vessels
- Mono hull Crane vessels,
- Shear legs,
- Lift Barges
- DSV´s
- Piece small
 Opportunities in decommissioning
- Alternative use of facilities in situ
- Re-use at other location
- Recycling opportunities.
- Carbon capture & storage
- Re-use of infrastructure
- Contracting
- Economy of Scale
- Flexible planning
- Contractor terms and conditions
versus Operator terms and
conditions
 Day 2 wrap up
DAY THREE
Summarize Day 1 and Day 2, Each attendant
writes up which issues she he would like
further clarified.
Perform a Decommissioning Cost and
Planning exercise for a 4 leg, Riser / wellhead
platform in 30 to 50 meter water depth,
commonly found in Asia (by attendants in
small groups)
Each group presents their findings
 Group discussion on above
- Write up discussion notes which will
be distributed within the group
- Decommissioning cost estimate
- What has been learned,
- How to kick start decommissioning,
- How to optimize re-use.
- How to optimize re-use of
components, jacket tubular vs
scrapping
- What is the way forward w.r.t.
funding
- What technical topics requires
further study
- What Environmental issues require
further study
- What would be needed from the
Authorities, Oil Co’s, Service Industry
- What type of contract should be used
- Identify which issues may be put
forward as Joint Industry Project.
Conduct this training course in-house for more effective savings!
Call us at +65 6741 9927 or email to info@asiaedge.net. For more information, visit us at www.petroedgeasia.net
OFFSHORE PLATFORM DECOMMISSIONING
DELEGATE DETAILS
Delegate 1 Please note
- Indicate if you have already registered by Phone
+Fax +Email +Web
- If you have not received an acknowledgement
before the training course, please call us to confirm
your booking.
- Photocopy this form to register multiple delegates.
PAYMENT METHODS
By Cheque/ Bank Draft
Make Payable to Asia Edge Pte. Ltd.
By Direct Transfer
Please quote your invoice number with the remittance
advise
Account Name: Asia Edge Pte. Ltd.
Bank Number: 508 Account Number: 762903-001 Swift
Code: OCBCSGSG
All bank charges to be borne by payer. Please ensure
that Asia Edge Pte Ltd receives the full invoiced
amount.
PAYMENT POLICY
Payment is due in full at the time of registration. Full
payment is mandatory for event attendance. By
submitting this registration form, you have agreed to
Asia Edge Pte Ltd’s payment terms
CANCELLATIONS & SUBSTITUTIONS
You may substitute delegates at any time. For
cancellations received in writing more than seven (7)
days prior to the training course, delegates will receive
a 100% credit on the amount paid which can be used in
another Asia Edge Pte. Ltd. training course for up to
one year from the date of issuance. The credit is
transferable to other persons in the same company and
applicable against any future Asia Edge Pte. Ltd. public
course. For cancellations received seven (7) days or less
prior to an event (including day 7), no credit will be
issued. In addition, a cancellation fee equivalent to 15%
of the course fee will be charged. In the event that Asia
Edge Pte. Ltd. postpones or cancels a course, delegate
payments at the date of cancellation or postponement
will be credited to a future Asia Edge Pte. Ltd. course.
This credit will be available for up to one year from the
date of issuance, and it is transferable to other persons
in the same company and applicable against any future
Asia Edge Pte. Ltd. public course. Asia Edge Pte. Ltd.
does not provide refunds for cancellations and
postponements or waive fees for unpaid invoices upon
receipt of registration.
PROGRAM CHANGE POLICY
Please note that speakers and topics were confirmed at
the time of publishing; however, circumstances beyond
the control of the organizers may necessitate
substitutions, alterations or cancellations of the
speakers and/or topics. As such, ASIA EDGE PTE LTD
reserves the right to alter or modify the advertised
speakers and/or topics if necessary. Any substitutions
or alterations will be updated on our web page as soon
as possible.
This brochure may not be copied, photocopied,
reproduced, translated, or converted to any electronic
or machine-readable form in whole or in part without
prior written approval of ASIA EDGE PTE LTD
ASIA EDGE PTE. LTD.
Company Registration No: No. 200710561C
Copyright@ 2005 ASIA EDGE PTE LTD. All rights
reserved.
Mr Ms Mrs Dr Others:
Name :
Job Title :
Department :
Telephone
No.
:
Email :
Delegate 2
Mr Ms Mrs Dr Others:
Name :
Job Title :
Department :
Telephone
No.
:
Email :
Company :
Address :
Country : Postcode:
Attention
Invoice to
:
Telephone
No.
:
Fax No. :
4 EASY WAYS TO REGISTER
 Online: www.petroedgeasia.net
 Email: info@asiaedge.net
 Phone: +65 6741 9927
 Fax: +65 6747 8737
OFFSHORE PLATFORM DECOMMISSIONING
R E G I S T R A T I O N F O R M

More Related Content

What's hot

Briggs Group Presentation
Briggs Group PresentationBriggs Group Presentation
Briggs Group Presentationfiona1234
 
brochure-oil-gas_en
brochure-oil-gas_enbrochure-oil-gas_en
brochure-oil-gas_enDenis Cremin
 
Atlantis II Deep - Sander Steenbrink 20141121
Atlantis II Deep - Sander Steenbrink 20141121Atlantis II Deep - Sander Steenbrink 20141121
Atlantis II Deep - Sander Steenbrink 20141121Ousama Aloub
 
Lng markets a canadian contactors perspective john j. jeffers
Lng markets a canadian contactors perspective   john j. jeffersLng markets a canadian contactors perspective   john j. jeffers
Lng markets a canadian contactors perspective john j. jeffers
John Jeffers
 
What is CCS Ready? - Jessica Morton
What is CCS Ready? - Jessica MortonWhat is CCS Ready? - Jessica Morton
What is CCS Ready? - Jessica Morton
Global CCS Institute
 
SMi Group's 3rd annual FLNG conference
SMi Group's 3rd annual FLNG conferenceSMi Group's 3rd annual FLNG conference
SMi Group's 3rd annual FLNG conference
Dale Butler
 
GLOBAL Engineers & Constructors -KENTZ
GLOBAL Engineers & Constructors -KENTZGLOBAL Engineers & Constructors -KENTZ
GLOBAL Engineers & Constructors -KENTZ
John Jeffers
 
Canadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 PresentationCanadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 Presentation
Rebecca Barton
 
A training proposal - Aquinas Oilfield Services and Sigve Hamilton Aspelund
A training proposal - Aquinas Oilfield Services and Sigve Hamilton AspelundA training proposal - Aquinas Oilfield Services and Sigve Hamilton Aspelund
A training proposal - Aquinas Oilfield Services and Sigve Hamilton Aspelund
Sigve Hamilton Aspelund
 
Nevada analyst tour presentation and process final
Nevada analyst tour presentation and process finalNevada analyst tour presentation and process final
Nevada analyst tour presentation and process final
Newmont Mining Corporation
 
ADIPEC 2015 Offshore and Marine Conference Brochure 13 September 2015
ADIPEC 2015 Offshore and Marine Conference Brochure 13 September 2015ADIPEC 2015 Offshore and Marine Conference Brochure 13 September 2015
ADIPEC 2015 Offshore and Marine Conference Brochure 13 September 2015Sandra Jeque
 
Generic slides: AMEC in the Middle East, Africa and CIS
Generic slides: AMEC in the Middle East, Africa and CISGeneric slides: AMEC in the Middle East, Africa and CIS
Generic slides: AMEC in the Middle East, Africa and CIS
Zhenya85
 
DTE Group Capability Statement - June 2013
DTE Group Capability Statement - June 2013DTE Group Capability Statement - June 2013
DTE Group Capability Statement - June 2013dtegroup
 
Air Energi - Gas Development Projects
Air Energi - Gas Development ProjectsAir Energi - Gas Development Projects
Air Energi - Gas Development Projects
Freedom Vision - Laser Eye Surgery
 

What's hot (17)

Briggs Group Presentation
Briggs Group PresentationBriggs Group Presentation
Briggs Group Presentation
 
brochure-oil-gas_en
brochure-oil-gas_enbrochure-oil-gas_en
brochure-oil-gas_en
 
Atlantis II Deep - Sander Steenbrink 20141121
Atlantis II Deep - Sander Steenbrink 20141121Atlantis II Deep - Sander Steenbrink 20141121
Atlantis II Deep - Sander Steenbrink 20141121
 
Lng markets a canadian contactors perspective john j. jeffers
Lng markets a canadian contactors perspective   john j. jeffersLng markets a canadian contactors perspective   john j. jeffers
Lng markets a canadian contactors perspective john j. jeffers
 
Clough Enercore Brochure
Clough Enercore BrochureClough Enercore Brochure
Clough Enercore Brochure
 
What is CCS Ready? - Jessica Morton
What is CCS Ready? - Jessica MortonWhat is CCS Ready? - Jessica Morton
What is CCS Ready? - Jessica Morton
 
SMi Group's 3rd annual FLNG conference
SMi Group's 3rd annual FLNG conferenceSMi Group's 3rd annual FLNG conference
SMi Group's 3rd annual FLNG conference
 
GLOBAL Engineers & Constructors -KENTZ
GLOBAL Engineers & Constructors -KENTZGLOBAL Engineers & Constructors -KENTZ
GLOBAL Engineers & Constructors -KENTZ
 
Canadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 PresentationCanadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 Presentation
 
A training proposal - Aquinas Oilfield Services and Sigve Hamilton Aspelund
A training proposal - Aquinas Oilfield Services and Sigve Hamilton AspelundA training proposal - Aquinas Oilfield Services and Sigve Hamilton Aspelund
A training proposal - Aquinas Oilfield Services and Sigve Hamilton Aspelund
 
Clough Corporate Brochure
Clough Corporate BrochureClough Corporate Brochure
Clough Corporate Brochure
 
Nevada analyst tour presentation and process final
Nevada analyst tour presentation and process finalNevada analyst tour presentation and process final
Nevada analyst tour presentation and process final
 
ADIPEC 2015 Offshore and Marine Conference Brochure 13 September 2015
ADIPEC 2015 Offshore and Marine Conference Brochure 13 September 2015ADIPEC 2015 Offshore and Marine Conference Brochure 13 September 2015
ADIPEC 2015 Offshore and Marine Conference Brochure 13 September 2015
 
Generic slides: AMEC in the Middle East, Africa and CIS
Generic slides: AMEC in the Middle East, Africa and CISGeneric slides: AMEC in the Middle East, Africa and CIS
Generic slides: AMEC in the Middle East, Africa and CIS
 
Clough Booth Welsh Brochure
Clough Booth Welsh BrochureClough Booth Welsh Brochure
Clough Booth Welsh Brochure
 
DTE Group Capability Statement - June 2013
DTE Group Capability Statement - June 2013DTE Group Capability Statement - June 2013
DTE Group Capability Statement - June 2013
 
Air Energi - Gas Development Projects
Air Energi - Gas Development ProjectsAir Energi - Gas Development Projects
Air Energi - Gas Development Projects
 

Viewers also liked

Decommissioning presentations complete
Decommissioning presentations   completeDecommissioning presentations   complete
Decommissioning presentations completeNuclear Energy Insider
 
Cost Estimating for Offshore Oil & Gas Facility Decommissioning
Cost Estimating for Offshore Oil & Gas Facility DecommissioningCost Estimating for Offshore Oil & Gas Facility Decommissioning
Cost Estimating for Offshore Oil & Gas Facility DecommissioningDonnie Miller
 
The offshore decommissioning market review, 2011
The offshore decommissioning market review, 2011The offshore decommissioning market review, 2011
The offshore decommissioning market review, 2011piersfrench
 
10 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 2910 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 29Will Butler, P.Eng
 
Nuclear decommissioning - costs and risks
Nuclear decommissioning - costs and risksNuclear decommissioning - costs and risks
Nuclear decommissioning - costs and risks
Oeko-Institut
 
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & AbandonmentStatoil
 
Oil & Gas Decommissioning
Oil & Gas DecommissioningOil & Gas Decommissioning
Oil & Gas Decommissioning
Ian Kennedy
 
Using smart plant technology to support engineering and radiation survey for ...
Using smart plant technology to support engineering and radiation survey for ...Using smart plant technology to support engineering and radiation survey for ...
Using smart plant technology to support engineering and radiation survey for ...Neolant
 
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case StudyPremier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
Thorne & Derrick International
 
Joining the prison service brief reflections
Joining the prison service brief reflectionsJoining the prison service brief reflections
Joining the prison service brief reflections
Sir Martin Narey
 
Oil & Gas Production and Surface Facilities
Oil & Gas Production and Surface FacilitiesOil & Gas Production and Surface Facilities
Oil & Gas Production and Surface FacilitiesMohamed Elnagar
 
GOM decom market reveiw and update mark kaiser, lsu
GOM decom market reveiw and update mark kaiser, lsuGOM decom market reveiw and update mark kaiser, lsu
GOM decom market reveiw and update mark kaiser, lsu
gomdecom
 
Decommissioning & Abandonment For Oil & Gas
Decommissioning & Abandonment For Oil & GasDecommissioning & Abandonment For Oil & Gas
Decommissioning & Abandonment For Oil & Gas
prada2000
 
Nuclear decommissioning
Nuclear decommissioningNuclear decommissioning
Nuclear decommissioning
joshuacford
 
Decommissioning Report, 2012-13, Gulf of Mexico
Decommissioning Report, 2012-13, Gulf of MexicoDecommissioning Report, 2012-13, Gulf of Mexico
Decommissioning Report, 2012-13, Gulf of Mexicopiersfrench
 
GoM decommissioning conference
GoM decommissioning conferenceGoM decommissioning conference
GoM decommissioning conferenceDean Murphy
 
Decommissioning & Abandonment For Oil & Gas
Decommissioning & Abandonment For Oil & GasDecommissioning & Abandonment For Oil & Gas
Decommissioning & Abandonment For Oil & Gas
prada2000
 
Project initiation document
Project initiation documentProject initiation document
Project initiation document
Lenka Tomsova
 
Subsea well intervention: Learning from the past - planning for the future
Subsea well intervention: Learning from the past - planning for the futureSubsea well intervention: Learning from the past - planning for the future
Subsea well intervention: Learning from the past - planning for the futureStatoil
 
EPSA Training Project
EPSA Training Project EPSA Training Project
EPSA Training Project
Inkatuuli Heikkinen
 

Viewers also liked (20)

Decommissioning presentations complete
Decommissioning presentations   completeDecommissioning presentations   complete
Decommissioning presentations complete
 
Cost Estimating for Offshore Oil & Gas Facility Decommissioning
Cost Estimating for Offshore Oil & Gas Facility DecommissioningCost Estimating for Offshore Oil & Gas Facility Decommissioning
Cost Estimating for Offshore Oil & Gas Facility Decommissioning
 
The offshore decommissioning market review, 2011
The offshore decommissioning market review, 2011The offshore decommissioning market review, 2011
The offshore decommissioning market review, 2011
 
10 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 2910 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 29
 
Nuclear decommissioning - costs and risks
Nuclear decommissioning - costs and risksNuclear decommissioning - costs and risks
Nuclear decommissioning - costs and risks
 
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & Abandonment
 
Oil & Gas Decommissioning
Oil & Gas DecommissioningOil & Gas Decommissioning
Oil & Gas Decommissioning
 
Using smart plant technology to support engineering and radiation survey for ...
Using smart plant technology to support engineering and radiation survey for ...Using smart plant technology to support engineering and radiation survey for ...
Using smart plant technology to support engineering and radiation survey for ...
 
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case StudyPremier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
 
Joining the prison service brief reflections
Joining the prison service brief reflectionsJoining the prison service brief reflections
Joining the prison service brief reflections
 
Oil & Gas Production and Surface Facilities
Oil & Gas Production and Surface FacilitiesOil & Gas Production and Surface Facilities
Oil & Gas Production and Surface Facilities
 
GOM decom market reveiw and update mark kaiser, lsu
GOM decom market reveiw and update mark kaiser, lsuGOM decom market reveiw and update mark kaiser, lsu
GOM decom market reveiw and update mark kaiser, lsu
 
Decommissioning & Abandonment For Oil & Gas
Decommissioning & Abandonment For Oil & GasDecommissioning & Abandonment For Oil & Gas
Decommissioning & Abandonment For Oil & Gas
 
Nuclear decommissioning
Nuclear decommissioningNuclear decommissioning
Nuclear decommissioning
 
Decommissioning Report, 2012-13, Gulf of Mexico
Decommissioning Report, 2012-13, Gulf of MexicoDecommissioning Report, 2012-13, Gulf of Mexico
Decommissioning Report, 2012-13, Gulf of Mexico
 
GoM decommissioning conference
GoM decommissioning conferenceGoM decommissioning conference
GoM decommissioning conference
 
Decommissioning & Abandonment For Oil & Gas
Decommissioning & Abandonment For Oil & GasDecommissioning & Abandonment For Oil & Gas
Decommissioning & Abandonment For Oil & Gas
 
Project initiation document
Project initiation documentProject initiation document
Project initiation document
 
Subsea well intervention: Learning from the past - planning for the future
Subsea well intervention: Learning from the past - planning for the futureSubsea well intervention: Learning from the past - planning for the future
Subsea well intervention: Learning from the past - planning for the future
 
EPSA Training Project
EPSA Training Project EPSA Training Project
EPSA Training Project
 

Similar to PE976 Offshore Platform Decommissioning

Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)
petroEDGE
 
Doucette, Jonathan - Resume - March 2014
Doucette, Jonathan -  Resume - March 2014Doucette, Jonathan -  Resume - March 2014
Doucette, Jonathan - Resume - March 2014Jon Doucette
 
PD184 - TopSide Processing System
PD184 - TopSide Processing SystemPD184 - TopSide Processing System
PD184 - TopSide Processing System
petroEDGE
 
FPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas ProductionFPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas Production
Walter Lee
 
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIESINTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
petroEDGE
 
FSRU Technology & Project Development
FSRU Technology & Project DevelopmentFSRU Technology & Project Development
FSRU Technology & Project Development
Walter Lee
 
Sand Control
Sand Control Sand Control
Sand Control
petroEDGE
 
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
Zaharah Kasim
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CVAli Khidr
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
CV- NARASIMHA offshore Fleet (latest)
CV- NARASIMHA offshore Fleet (latest)CV- NARASIMHA offshore Fleet (latest)
CV- NARASIMHA offshore Fleet (latest)Narasimha Swamy
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assets
Advisian
 
HPHT Planning and Well Control
HPHT Planning  and Well Control HPHT Planning  and Well Control
HPHT Planning and Well Control
petroEDGE
 
Eng.Zakarya Nasaar C.V
Eng.Zakarya Nasaar C.VEng.Zakarya Nasaar C.V
Eng.Zakarya Nasaar C.VZAKARYA NASSAR
 
William masson 2016-cv_a
William masson 2016-cv_aWilliam masson 2016-cv_a
William masson 2016-cv_a
Will Masson MAPM, MBCS
 
Beau M Wallace Curriculum Vitae
Beau M Wallace Curriculum VitaeBeau M Wallace Curriculum Vitae
Beau M Wallace Curriculum VitaeBeau Wallace
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CVAli Khidr
 
Knud larsen
Knud larsenKnud larsen
Knud larsen
Knud Larsen
 
Nivaldo Curcio CV Feb 2015
Nivaldo Curcio CV Feb 2015Nivaldo Curcio CV Feb 2015
Nivaldo Curcio CV Feb 2015NIVALDO CURCIO
 

Similar to PE976 Offshore Platform Decommissioning (20)

Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)
 
Doucette, Jonathan - Resume - March 2014
Doucette, Jonathan -  Resume - March 2014Doucette, Jonathan -  Resume - March 2014
Doucette, Jonathan - Resume - March 2014
 
PD184 - TopSide Processing System
PD184 - TopSide Processing SystemPD184 - TopSide Processing System
PD184 - TopSide Processing System
 
FPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas ProductionFPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas Production
 
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIESINTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
 
FSRU Technology & Project Development
FSRU Technology & Project DevelopmentFSRU Technology & Project Development
FSRU Technology & Project Development
 
Sand Control
Sand Control Sand Control
Sand Control
 
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CV
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
CV- NARASIMHA offshore Fleet (latest)
CV- NARASIMHA offshore Fleet (latest)CV- NARASIMHA offshore Fleet (latest)
CV- NARASIMHA offshore Fleet (latest)
 
GC - CV June
GC - CV JuneGC - CV June
GC - CV June
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assets
 
HPHT Planning and Well Control
HPHT Planning  and Well Control HPHT Planning  and Well Control
HPHT Planning and Well Control
 
Eng.Zakarya Nasaar C.V
Eng.Zakarya Nasaar C.VEng.Zakarya Nasaar C.V
Eng.Zakarya Nasaar C.V
 
William masson 2016-cv_a
William masson 2016-cv_aWilliam masson 2016-cv_a
William masson 2016-cv_a
 
Beau M Wallace Curriculum Vitae
Beau M Wallace Curriculum VitaeBeau M Wallace Curriculum Vitae
Beau M Wallace Curriculum Vitae
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CV
 
Knud larsen
Knud larsenKnud larsen
Knud larsen
 
Nivaldo Curcio CV Feb 2015
Nivaldo Curcio CV Feb 2015Nivaldo Curcio CV Feb 2015
Nivaldo Curcio CV Feb 2015
 

More from petroEDGE

2020 training calendar
2020 training calendar2020 training calendar
2020 training calendar
petroEDGE
 
Case Study : National Oil Company - Indonesia
Case Study : National Oil Company - IndonesiaCase Study : National Oil Company - Indonesia
Case Study : National Oil Company - Indonesia
petroEDGE
 
Case Study : National Oil Company - Malaysia
Case Study : National Oil Company - MalaysiaCase Study : National Oil Company - Malaysia
Case Study : National Oil Company - Malaysia
petroEDGE
 
Case study - EnQuest Malaysia
Case study - EnQuest MalaysiaCase study - EnQuest Malaysia
Case study - EnQuest Malaysia
petroEDGE
 
Deepwater Depositional Systems
Deepwater Depositional SystemsDeepwater Depositional Systems
Deepwater Depositional Systems
petroEDGE
 
API 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory CourseAPI 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory Course
petroEDGE
 
Strategic Innovation In Oil & Gas
Strategic Innovation In Oil & GasStrategic Innovation In Oil & Gas
Strategic Innovation In Oil & Gas
petroEDGE
 
Distributed Control System (DCS) Applications, Selection & Troubleshooting
Distributed Control System (DCS) Applications, Selection & TroubleshootingDistributed Control System (DCS) Applications, Selection & Troubleshooting
Distributed Control System (DCS) Applications, Selection & Troubleshooting
petroEDGE
 
Pipe Work Design & Fabrication
Pipe Work Design & FabricationPipe Work Design & Fabrication
Pipe Work Design & Fabrication
petroEDGE
 
Petronas activity outlook 2018 - 2020
Petronas activity outlook 2018 - 2020Petronas activity outlook 2018 - 2020
Petronas activity outlook 2018 - 2020
petroEDGE
 
Advanced Heat Exchanger Design, Inspection and Troubleshooting
Advanced Heat Exchanger Design, Inspection and TroubleshootingAdvanced Heat Exchanger Design, Inspection and Troubleshooting
Advanced Heat Exchanger Design, Inspection and Troubleshooting
petroEDGE
 
Liquid & Gas Flowmetering & Custody Measurement
Liquid & Gas Flowmetering & Custody MeasurementLiquid & Gas Flowmetering & Custody Measurement
Liquid & Gas Flowmetering & Custody Measurement
petroEDGE
 
Sand Control Operations
Sand Control OperationsSand Control Operations
Sand Control Operations
petroEDGE
 
Webinar: Scenario planning for long term decision making
Webinar: Scenario planning for long term decision makingWebinar: Scenario planning for long term decision making
Webinar: Scenario planning for long term decision making
petroEDGE
 
Risk volume assessment in exploration
Risk  volume assessment in explorationRisk  volume assessment in exploration
Risk volume assessment in exploration
petroEDGE
 
ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)
petroEDGE
 
Rig Safety Awareness
Rig Safety AwarenessRig Safety Awareness
Rig Safety Awareness
petroEDGE
 
Well reservoir and management
Well reservoir and managementWell reservoir and management
Well reservoir and management
petroEDGE
 
Safety awareness
Safety awarenessSafety awareness
Safety awareness
petroEDGE
 
Major changes in 2020 for the global refining industry
Major changes in 2020 for the global refining industryMajor changes in 2020 for the global refining industry
Major changes in 2020 for the global refining industry
petroEDGE
 

More from petroEDGE (20)

2020 training calendar
2020 training calendar2020 training calendar
2020 training calendar
 
Case Study : National Oil Company - Indonesia
Case Study : National Oil Company - IndonesiaCase Study : National Oil Company - Indonesia
Case Study : National Oil Company - Indonesia
 
Case Study : National Oil Company - Malaysia
Case Study : National Oil Company - MalaysiaCase Study : National Oil Company - Malaysia
Case Study : National Oil Company - Malaysia
 
Case study - EnQuest Malaysia
Case study - EnQuest MalaysiaCase study - EnQuest Malaysia
Case study - EnQuest Malaysia
 
Deepwater Depositional Systems
Deepwater Depositional SystemsDeepwater Depositional Systems
Deepwater Depositional Systems
 
API 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory CourseAPI 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory Course
 
Strategic Innovation In Oil & Gas
Strategic Innovation In Oil & GasStrategic Innovation In Oil & Gas
Strategic Innovation In Oil & Gas
 
Distributed Control System (DCS) Applications, Selection & Troubleshooting
Distributed Control System (DCS) Applications, Selection & TroubleshootingDistributed Control System (DCS) Applications, Selection & Troubleshooting
Distributed Control System (DCS) Applications, Selection & Troubleshooting
 
Pipe Work Design & Fabrication
Pipe Work Design & FabricationPipe Work Design & Fabrication
Pipe Work Design & Fabrication
 
Petronas activity outlook 2018 - 2020
Petronas activity outlook 2018 - 2020Petronas activity outlook 2018 - 2020
Petronas activity outlook 2018 - 2020
 
Advanced Heat Exchanger Design, Inspection and Troubleshooting
Advanced Heat Exchanger Design, Inspection and TroubleshootingAdvanced Heat Exchanger Design, Inspection and Troubleshooting
Advanced Heat Exchanger Design, Inspection and Troubleshooting
 
Liquid & Gas Flowmetering & Custody Measurement
Liquid & Gas Flowmetering & Custody MeasurementLiquid & Gas Flowmetering & Custody Measurement
Liquid & Gas Flowmetering & Custody Measurement
 
Sand Control Operations
Sand Control OperationsSand Control Operations
Sand Control Operations
 
Webinar: Scenario planning for long term decision making
Webinar: Scenario planning for long term decision makingWebinar: Scenario planning for long term decision making
Webinar: Scenario planning for long term decision making
 
Risk volume assessment in exploration
Risk  volume assessment in explorationRisk  volume assessment in exploration
Risk volume assessment in exploration
 
ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)
 
Rig Safety Awareness
Rig Safety AwarenessRig Safety Awareness
Rig Safety Awareness
 
Well reservoir and management
Well reservoir and managementWell reservoir and management
Well reservoir and management
 
Safety awareness
Safety awarenessSafety awareness
Safety awareness
 
Major changes in 2020 for the global refining industry
Major changes in 2020 for the global refining industryMajor changes in 2020 for the global refining industry
Major changes in 2020 for the global refining industry
 

Recently uploaded

Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 

Recently uploaded (20)

Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 

PE976 Offshore Platform Decommissioning

  • 1. OFFSHORE PLATFORM DECOMMISSIONING Your Expert Course Director Thor Sterker Thor Sterker has over 35 years of hand-on offshore engineering & project management experience in drilling, offshore transport and installation work. Since 1990 he has been specializing in decommissioning projects. In a client representative role, he has been involved in the Gulf of Mexico, North Sea and South East Asia platform removal projects. Over the years he specialized in ROV, diving and subsea cutting projects. As a consultant he has performed FEED studies as well as PEER reviews of FPSO projects and participated in Environmental Impact Assessments. www.petroEDGEasia.net
  • 2. Conduct this training course in-house for more effective savings! Call us at +65 6741 9927 or email to info@asiaedge.net. For more information, visit us at www.petroedgeasia.net OFFSHORE PLATFORM DECOMMISSIONING Course overview Each offshore platform reaches the end of its lifetime at some point, and this necessitates decommissioning. This activity must be done safely, cost effectively and with as little environmental pollution as possible. While the life spans of these installations cover decades, they have not generally been designed with efficient decommissioning in mind. Moreover, the places where the facilities have been constructed are pivotal in defining the safest and most sustainable decommissioning method. This 3 day training course will address the key issues surrounding an offshore decommissioning project. You will be exposed to key lessons learnt from Frigg, NW Hutton and Ekofisk, as well as lesson specifically derived from projects in based in Asia. The course will also assist in understanding the planning and decision analysis in decommissioning projects and costs involved. By attending this training, participants will: - * Review the standard supply chain and decommissioning plan * Get to grips with the financial and organizational implication * Evaluate the various methodologies for well P&A, platform removal, transport and onshore recycling * Examine the environmental regimes for handling of hazardous waste * Identify key risks, market situation and supply chain opportunities * Learn how to other oil companies have executed recent projects * Analyse key issues in planning a decommissioning project * Understand implication of the decommissioning supply chain and Management of Change * Compare best practice with colleagues from across global industry Who should attend? * Project managers and engineers * Supply chain managers * Finance & tax managers * HSE managers * Operational managers * Well work-over specialists About your Expert Trainer: Thor Sterker After graduating as a mechanical engineer in 1977, Thor commenced his career in the oil & gas industry as a mud logger data engineer for ultra-deep onshore wells in Europe. In 1979, he joined, offshore construction company Heerema Marine Contractors as field engineer. As Field Engineer he was involved in more than 65 offshore installation projects, and as Consultant / Superintendant he was involved in almost every North Sea decommissioning project and worldwide in more than 175 decommissioning projects. Thor has over 35 years of hands-on offshore engineering & project management experience in drilling, offshore transport and installation work. Since 1990 he has specialized in decommissioning projects. In the early days of platform decommissioning he Researched & Developed innovative subsea cutting tools, offshore installation and decommissioning techniques and platform decontamination methods. Since 2011, as Technical Advisor to the Lenders (Mortgagee in Possession) he was involved in repossessing assets such as the repossession of the Platform Etesco Millenium, FPSO OSX 2, and a Deep DP Drilling Vessel in Brazil. In an effort to change the “mind set” about decommissioning he co-organized four International Conferences in Aberdeen, Petten and Den Helder on the subject of “Decommissioning & Re-using of Platform Facilities” and presented several papers on the subject of decommissioning, subsea cutting and re-use of platforms. In 1994 he took the initiative to develop the platform re-use software (now called an App) and has participated in the development of the project since that time. His HSE performance to date is: NO Lost Time Incidents on any project.
  • 3. Conduct this training course in-house for more effective savings! Call us at +65 6741 9927 or email to info@asiaedge.net. For more information, visit us at www.petroedgeasia.net OFFSHORE PLATFORM DECOMMISSIONING 3 DAY COURSE OUTLINE DAY ONE  Introduction and learning objectives - Each attendant introduces her/himself and indicates what questions / issues she /he has and would like to highlight during the workshop  Decommissioning Roadmap, Regulatory issues - Geneva Convention on the Continental shelf 1958 - IMO guidelines and Standards for the removal of Offshore Platforms - London Dumping Convention 1972 - OSPAR - UN Convention on the Law of the Sea 1982 (UNCLOS) - Decommissioning of Offshore Installations and Pipelines under the Petroleum Act - ASCOPE decommissioning guidelines / DMF guidelines - Who are the Competent Authorities  Reputational compliance and management, Issues in worldwide decommissioning - Public Relations - Health Safety and Environmental Issues - Consultation Public Interest Groups, Government, Provincial and Local Authorities, - Navigational Safety - Fisheries and other sub sea interests - Pipeline abandonment - Residual Liability  Funding - Funds for decommissioning - Accountants view towards decommissioning - IFRS 16 and FAS 143  Record management - Waste and hazardous materials survey - Normally Unmanned Installation (NUI) - Inventory equipment - Original data, as-builds, weight records, C.O.G.  Operators knowledge transfer.  Case studies from North Sea - Petronas SM-4 and SM-V - BPNE P15-b platform, - Esmond Complex removal (video film) - BAES (UK) NSR platforms, - Total (NO) Froy platform (Video film) - Conoco UK Inde platforms - Gulf of Mexico (various)  Decommissioning risks and costs (due to confidentiality limited to public domain) - Current marine equipment prices - predicting "unknown" decommissioning costs - pipelines, - drill cuttings, - well abandonment - Different categories of risks for operators, contractors, suppliers - Reduce risk and cost by smart contracting  Day 1 wrap up DAY TWO  Environmental considerations - Definition of Waste - Competent Authority - Environmental act. - Environmental Contract (based on TFS guidelines) - Platform disposal, sea or land - Requirements for the Receiving yard  Safety issues - new techniques, - FDDV concept - Using ROV or Divers to prepare jackets for lifting - underwater cutting techniques - Lessons learned  Decommissioning techniques – pro´s and con´s - Semi Submergible Crane vessels - Mono hull Crane vessels, - Shear legs, - Lift Barges - DSV´s - Piece small  Opportunities in decommissioning - Alternative use of facilities in situ - Re-use at other location - Recycling opportunities. - Carbon capture & storage - Re-use of infrastructure - Contracting - Economy of Scale - Flexible planning - Contractor terms and conditions versus Operator terms and conditions  Day 2 wrap up DAY THREE Summarize Day 1 and Day 2, Each attendant writes up which issues she he would like further clarified. Perform a Decommissioning Cost and Planning exercise for a 4 leg, Riser / wellhead platform in 30 to 50 meter water depth, commonly found in Asia (by attendants in small groups) Each group presents their findings  Group discussion on above - Write up discussion notes which will be distributed within the group - Decommissioning cost estimate - What has been learned, - How to kick start decommissioning, - How to optimize re-use. - How to optimize re-use of components, jacket tubular vs scrapping - What is the way forward w.r.t. funding - What technical topics requires further study - What Environmental issues require further study - What would be needed from the Authorities, Oil Co’s, Service Industry - What type of contract should be used - Identify which issues may be put forward as Joint Industry Project.
  • 4. Conduct this training course in-house for more effective savings! Call us at +65 6741 9927 or email to info@asiaedge.net. For more information, visit us at www.petroedgeasia.net OFFSHORE PLATFORM DECOMMISSIONING DELEGATE DETAILS Delegate 1 Please note - Indicate if you have already registered by Phone +Fax +Email +Web - If you have not received an acknowledgement before the training course, please call us to confirm your booking. - Photocopy this form to register multiple delegates. PAYMENT METHODS By Cheque/ Bank Draft Make Payable to Asia Edge Pte. Ltd. By Direct Transfer Please quote your invoice number with the remittance advise Account Name: Asia Edge Pte. Ltd. Bank Number: 508 Account Number: 762903-001 Swift Code: OCBCSGSG All bank charges to be borne by payer. Please ensure that Asia Edge Pte Ltd receives the full invoiced amount. PAYMENT POLICY Payment is due in full at the time of registration. Full payment is mandatory for event attendance. By submitting this registration form, you have agreed to Asia Edge Pte Ltd’s payment terms CANCELLATIONS & SUBSTITUTIONS You may substitute delegates at any time. For cancellations received in writing more than seven (7) days prior to the training course, delegates will receive a 100% credit on the amount paid which can be used in another Asia Edge Pte. Ltd. training course for up to one year from the date of issuance. The credit is transferable to other persons in the same company and applicable against any future Asia Edge Pte. Ltd. public course. For cancellations received seven (7) days or less prior to an event (including day 7), no credit will be issued. In addition, a cancellation fee equivalent to 15% of the course fee will be charged. In the event that Asia Edge Pte. Ltd. postpones or cancels a course, delegate payments at the date of cancellation or postponement will be credited to a future Asia Edge Pte. Ltd. course. This credit will be available for up to one year from the date of issuance, and it is transferable to other persons in the same company and applicable against any future Asia Edge Pte. Ltd. public course. Asia Edge Pte. Ltd. does not provide refunds for cancellations and postponements or waive fees for unpaid invoices upon receipt of registration. PROGRAM CHANGE POLICY Please note that speakers and topics were confirmed at the time of publishing; however, circumstances beyond the control of the organizers may necessitate substitutions, alterations or cancellations of the speakers and/or topics. As such, ASIA EDGE PTE LTD reserves the right to alter or modify the advertised speakers and/or topics if necessary. Any substitutions or alterations will be updated on our web page as soon as possible. This brochure may not be copied, photocopied, reproduced, translated, or converted to any electronic or machine-readable form in whole or in part without prior written approval of ASIA EDGE PTE LTD ASIA EDGE PTE. LTD. Company Registration No: No. 200710561C Copyright@ 2005 ASIA EDGE PTE LTD. All rights reserved. Mr Ms Mrs Dr Others: Name : Job Title : Department : Telephone No. : Email : Delegate 2 Mr Ms Mrs Dr Others: Name : Job Title : Department : Telephone No. : Email : Company : Address : Country : Postcode: Attention Invoice to : Telephone No. : Fax No. : 4 EASY WAYS TO REGISTER  Online: www.petroedgeasia.net  Email: info@asiaedge.net  Phone: +65 6741 9927  Fax: +65 6747 8737 OFFSHORE PLATFORM DECOMMISSIONING R E G I S T R A T I O N F O R M