Knud Larsen is a surveyor, technical superintendent, and chief engineer with over 25 years of experience in the global offshore oil and gas and shipping industries. He has expertise in surveying, commissioning, inspection, classification, technical operations, maintenance, project management, HSE, and training. He is seeking a new position where he can apply his skills and experience to make a valuable contribution.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Immunizing Image Classifiers Against Localized Adversary Attacks
Knud larsen
1. Knud Larsen
3519 St. Clair Parkway – Box 171 – Sombra, ON, Canada, N0P 2H0
Tel: +(351) 915 900 525
Email: knud@larsen.tf
LinkedIn: https://ca.linkedin.com/in/knudlarsen2
Surveyor, Technical Superintendent & Chief Engineer with experience demonstrated in the global
onshore & offshore oil & gas & shipping sectors. Areas of expertise include: surveying,
commissioning, inspection & classification (ABS, DNV and Lloyd’s Register); technical operations;
maintenance operations; project management; HSE; technical writing; technical support & training.
Gained experience on semi-submersibles & jack-up vessels; well-developed knowledge of emerging
technology. Equipped with the skills to work with multiple stakeholder groups (OIM, Rig Managers
& Chief Engineers) to ensure vessels, machinery and safety-critical equipment operated efficiently
and continuously maintained in a safe condition. Knowledge of international regulations and
standards within the marine and offshore sector. Currently seeking a career-enhancing position
where skill set can be used to make a valuable contribution.
KEY ACHIEVEMENTS
Awarded the Lloyd’s Register’s “Power of You Award’ in 2012/2013 for producing a
comprehensive condition survey report that was delivered to the satisfaction of key client
within stringent timelines and with the use of limited resources/information.
Presented initiative to Towmaster and OIM of the Maersk Convincer to operate pre/loading
ballast system manually to mitigate risks of delay due to software issue and to support move
from shipyard in Singapore to commence operations on Shell site in Brunei. Initiative was well
received and enabled operations to commence in line with contract.
Enhanced delivery of CFST (Crew Familiarization System Training) on drillship as Surveyor at
Lloyd’s. Created innovative, engaging team-led approach which was well received by Captain
& crew on board. Further familiarization training was subsequently procured.
Wrote CFST modules for mechanical, marine & lifesaving equipment for a drilling company for
use across all rigs, which was well received.
Supported 3rd
party suppliers performing complex coring operations to mitigate against project
delays on Senusret jack-up (formation much harder than originally anticipated & tools
damaged/destroyed). Rig subsequently achieved full drilling day rate as planned.
Supported installation of the ZOSER; sourced spare parts which fell under warranty securing
significant cost savings.
CAREER SUMMARY
Lloyd’s Register Drilling Integrity Services Canada Ltd Jan 2012 – Feb 2015
Surveyor
Conducting full condition selection surveys, rig acceptance & rig commissioning of drill ships,
semi-subs, land rigs and construction facilities across global sites & projects.
Participating in job start-up and close-out meetings; completing reports to Lloyd’s standards
and in line with schedules.
Conducting incident investigations on drilling equipment, feasibility studies and maintenance
system reviews as required (including dropped object survey in Canada). Recommendations
subsequently adopted by client.
Commissioning DP drill ships at Hyundai Heavy Industries in South Korea.
Leading crew familiarization & systems training on new and old DP drill ships and jack-ups.
Technical Superintendent, Maersk Drilling Oct 2010 – Jan 2011
Supported offshore operations on semi-sub KAN TAN IV in New Zealand & Australia.
Conducted critical, time-sensitive projects as required. Ensured safe operation of vessel and
rig operations in compliance with regulatory requirements and standards outlined by ABS.
Planned and coordinated maintenance, repair and modifications. Approved the level of stores
and spares inventory.
Monitored HSE and pollution prevention according to international rules and company policies.
Coordinated review; updated and approved drawings and documents.
2. Continued…
Maersk Drilling, Egypt, Brunei, Australia & North Sea Dec 1994 – Oct 2010
Maintenance Supervisor/Chief Engineer (Australia) May 2005 – Sep 2010
Coordinated the unloading of SENUSRET from heavy lifter vessel; once established,
reactivated rig. Maintained safety standards and ensured cohesive operations on the rig in
Egypt. Led, coached and mentored rig maintenance crew.
Managed ongoing technical operations, including preventative & reactive maintenance.
Supervised and mentored maintenance crews (including Senior Mechanics, Mechanics, Asst.
Mechanics, Motormen, Senior Electricians, Electricians, Asst. Electricians & Welders).
Acted as troubleshooter; managed repairs to faulty main power, mechanical, electrical,
pneumatic & hydraulic drilling equipment and tools.
Initiated updates to rigs’ preventative maintenance systems (PMS) & databases (Oracle);
coordinated with supervisors and departmental heads to schedule regular maintenance.
Assumed position of Chief Engineer on FPSO MAERSK NGUJIMA-YIN for Woodside (west coast
of Australia). Coordinated maintenance requirements; coached & mentored direct personnel.
Maintained control; updated rig PMS and affiliated databases (SAP).
Maintenance Supervisor, Esbjerg, Denmark Jun 2002 – Apr 2005
Produced new manuals; updated existing manuals; developed new policies & procedures to
support Divisional Management System, fire safety, operations, SOPEP & contingency.
Secured first time approval by classifications societies for all manuals and plans produced.
Rig Engineer & Assistant Rig Engineer Dec 1994 – Jun 2002
Worked on jack-up SENUSRET for 6.5 years & KAMOSE (6 months). Managed daily technical
operations (including maintenance, recording & ordering of technical supplies and spare
parts). Supervised crew involved in ongoing rig maintenance.
Assistant Rig Engineer on the MAERSK ENDEAVOUR & MAERSK EXERTER.
Rig Engineer for MAERSK RIG 61 from build at ship yard in Texas through to loading
equipment for dry tow to Lake Maracaibo in Venezuela.
EDUCATION
Following evaluation of education, training & professional experience by ‘The Trustforte Corporation”
in 2014 qualifications, have been recognised as the US equivalent of a 4-year Bachelor of Science
Degree (BSc) in Marine Engineering Technology.
Marine Engineer & Marine Engineer’s Extra Examination 1988
Certified Mechanist 1983
CERTIFICATIONS
Chief Engineer (not valid for steam ships), STCW; Danish Cert. of Competency – Class III/2 and V/1
Refresher BOSIET Offshore Emergency Training incl. HUET Emergency Breathing System (OPITO,
OLF & NOGEPA) incl. Compressed Air Emergency Breathing System (CA-EBS) (Expires 2019)
Offshore Medical Certificate – Oil and Gas UK
Refresher Fire/Emergency Response Team Member & Team Leader, OPITO
Cyberbase Maintenance, Hydraulics & Mechanics, Petro Jack III – NOV
Management Education Modules I – III, Maersk, Cultivator
Maintenance Management - Planning Maintenance: SAP P3M – Maintenance Supervisor
Senior Management Conference; PLC, Siemens Simatic S7 Service 1: SCR, Ross Hill/Hill Graham: EX/EXI
Equipment: NDT/UT: Hydraulic: SCR GE: WHMIS (Workplace Hazardous Materials Information System):
HUEBA (Expires 13-8-2016): Fall Protection (2days) (Expires 15-8-2016); H2S Alive (Expires 10-11-2017)
Lloyd’s Register’s E-learning Courses
NATIONALITY: Danish Passport Holder; Canadian Resident Permit
LANGUAGES: Fluent English & Danish
KEY IT SKILLS: Oracle; MS Office (Word, Excel and Outlook); Adobe Acrobat & SAP
REFERENCES: Available on request