Ensuring
Energy Security, Reliable
Power Supply and Affordable
Power Rates

PCCI Energy Committee
1
Energy Security




International Energy Agency (IEA) Definition
1. Adequate
2. Affordable
3. Reliable
European Commission Definition

“Uninterrupted physical availability of energy products
on the market, at a price which is affordable for all
consumers (private and industrial)”
Considering the above definition, one can say that the Philippine
energy is NOT SECURED because we have been experiencing the
cycle of power capacity deficiencies and high prices
2
Adequate and Reliable Power Supply
LOLE –number of days
that there will be power
curtailment

1 day/yr LOLE = 28.7% Reserve

(Daily peak demand will
exceed available
generating capacity due to
simultaneous scheduled
and forced outages of
power plants)
1 day/year Loss-of-Load
Expectation to meet the
optimal level of reliability of
power supply in the
Philippines [Viray & del Mundo,
UPNEC, 1991]

Source: R. del Mundo, et. al., “Philippine Electric Power Industry Market and Policy Assessment”,
University of the Philippines – National Engineering Center, 2011
3
Adequate and Reliable Power Supply


Luzon Grid
New Power Plant
Capacity added courtesy
of PPAs signed in 1990s

US & European criteria

• Generation deficiency started
in 2010. WESM prices reflects
this first stage of power crisis.
• There will be generation
deficiency even with BacMan
rehabilitation (2012) and
GNPower new 600 MW Power
plant in (2013)
• Worst situation in 2014

Year
2011
2012
2013
2014

Capacity
(MW
9583
9624
9657
9657

Demand
(MW)
7581
7827
8085
8356

Reserve
(%)
26.41%
22.96%
19.44%
15.57%

• Malaya and Limay Oil Thermal

LOLE
Plant cannot be retired
(Days/Yr)
(uneconomic dispatch)
5.07
12.08
5.27
Assuming Malaya Oil Thermal Plant
82.27
will not be operated

4
Adequate and Reliable Power Supply
Minimum Requirement to maintain 1 day/year LOLE


Luzon Grid (in addition to 600MW Mariveles CTPP)
 200 MW Peaking Plant (2013)
 600 MW Baseload Plant (2015)
 600 MW Baseload Plant (2015 for Malaya Retirement)



Visayas Grid
 50 MW Intermediate Plant (2017)
 100 MW Intermediate Plant (2018)



Mindanao Grid


600 MW Baseload Plant (ASAP)



100 MW Baseload Plant (2015)



100 MW Baseload Plant (2016)



100 MW Baseload Plant (2017)

Source: R. del Mundo, et. al., “Philippine
Electric Power Industry Market and Policy
Assessment”, University of the Philippines
– National Engineering Center, 2011
5
Adequate and Reliable Power Supply


Visayas Grid had power crisis in 2009 after which
Distribution Utilities signed power supply contracts with
Gencos to build new power plant.



Mindanao Grid is currently in crisis. Modular Diesel plants
were recently procured by ECs for emergency power and
power supply contracts signed to build new capacity (2015
– 2017).



Luzon Grid will soon experience power crisis
 DUs signed contract only with existing plants
 DUs hesitated to sign power supply contract for new
capacity because of threat of Open Access and Retail
Competition [Concern on contracted capacity that will be
stranded]
6
Energy Security under EPIRA


Power Generation is liberalized and competitive
(deregulated) sector of the power industry
 DOE Power Development Plan only provides outlook.
 Private Generation Companies will decide what capacity, what type
of plant, when and where to build power plants
 NPC no longer allowed to build new power plants or sign new PPA
with IPPs

EPIRA in 11 Years:
Plan did not convert to Plant on time
Power Rates also went up instead of reduction
Lack of policy, regulation and implementation mechanism that
will ensure new power plant capacity will be available on time to
meet growing demand in the liberalized and competitive
electricity market .
7
Energy Security under EPIRA
Ownership of Installed Power Generating Capacity, 2011
Luzon Grid

SEM
Calaca
5%
AES
6%

NPC Others
2% 8%

San
Miguel
27%

First Gen
20%

PSALM
14%

Aboitiz
18%

• Also owners of
Distribution Utilities

Visayas Grid

Others
3%
PSALM
34%

NPC
2% Aboitiz
6%

Global
28%

First
Gen
12%

Salcon
15%

• Big 3 in Electric
Power Industry
control 65% of supply
in Luzon

Mindanao Grid
PSALM
28%

Others
2%

Aboitiz
18%

NPC
52%
Source: DOE

8
Energy Security under EPIRA
AVERAGE POWER RATE OF MERALCO

Source: MERALCO
9
Energy Security under EPIRA
Residential

US¢/kWh

Commercial

Industry

High

30

25

20

15

10

5

0
Brunei

Cambodia

Source: JICA (Sep. 2013)

Indonesia

Lao PDR

Malaysia

Myanmar

Philippines

Singapore

Thailand

Vietnam

Electricity Prices of SEA countries
10
Energy Security under EPIRA

Report of
MERALCO
Consultant on
Subsidies:

Other countries
are using
subsidy for
strategic
competitive
advantage in the
short term

11
Energy Security under EPIRA
25

Comparison of Tariff with Indonesia’s subsidies
(2011)
20.8

US Cents/kWh

20
14.28

15
10

9.92
7.14

6.21

5
0
Thailand

Indonesia with
Subsidies

Indonesia
Without
Subsidies

Philippines

Vietnam

Source: JICA (Sep. 2013)
12
Long-Term Power Supply Security Framework
Demand
Forecast & PS
Contracts

Uncontracted
Demand

Qualified
GENCO
Bid

Long-term
PS
Contract

Lender
Financing

Investor
Capital

Power
Plant
Project
Financing

New Power Plant

Power Plant
Dev’t. &
Construction

Baseload: 3-5 Years Peaking: 1-2 Years
166 Permits & Licenses

• Long-Term Contract for New Capacity
• Short-Term Contract for Existing Capacity

Additional
Generating
Capacity

Competitive Electricity
Market will only work if
Supply deficiency is avoided
13
Options for Energy Security
1. Aggregation of Electric Cooperatives


20 ECs in Mindanao bidded 330 MW of baseload.
Signed long-term power supply contract at
Php4.09/kWh requiring Genco to supply from new
power generation capacity (405 MW in 2017)



12 ECs in Central Luzon bidded (October 18,
2013) 300 MW of uncontracted demand starting
2018. Genco is also required supply from new
capacity. Lowest bid less than Php4.00/kWh
Lessons: Economy-of-scale, Competitive Selection
Process, and Long-term contracting for new capacity!
14
Options for Energy Security
2. Aggregation of Large Customers in Retail
Competition and Open Access (RCOA)


Industry associations and Economic Zones to
organize power supply aggregation similar to
Electric Cooperatives
•
•



Minimum of 100 MW (preferably at least 300 MW)
Long-term contract (at least 10 years). The longer the
term, the lower the price.

Unbundled transmission and distribution wheeling
fees are already in place. Hence, will require only
metering, billing & settlement protocol to
implement
15
Options for Energy Security
3. Embedded Combined Heat and Power
System in Economic Zones for Selfsufficiency and affordability


Economics of CHP based on waste heat utilization
(for heating/cooling) after gas turbines (for power).
Efficiency at least 60% compared to 30% of
conventional thermal plant



Avoids transmission wheeling charges
(~Php1.00/kWh)



Needs Liquified Natural Gas Terminals in
Batangas and Bataan and Transmission pipelines
to Metro Manila through the economic zones
16
Options for Energy Security
4. Distribution Utilities Mandatory Bidding of
Uncontracted demand of Captive Customers
•

Lesson from Latin America (Brazil and Chile) where
spot market did not produce new capacity.
Government designed auction of Long-Term Power
Supply Contracts as mechanism. Mandatory for all DUs
to submit forecast and auction uncontracted demand.
Winning Gencos in auction will build power plants

•

Limit Open Access for Large customers only (at least 1
MW demand) for 10 years. Possible Declaration of ERC
of lower threshold and eventually full retail competition
will continue to threaten DUs.
This will also solve cross-ownership between
generation and distribution under EPIRA!
17
Policy and Regulatory Measures
1.

DOE to mandate and oversee a regular international
power generation supply bidding for DUs and large
customers.

2.

ERC to use market-based rules as default in
approving power supply contracts of DUs (for captive
customers) with reserved price such as the prices
Best New Entrant (BNE). Cost-based rules to be used
only if price from competitive selection process did
not achieve competitive results (i.e., higher than
BNE).

3.

Declare Power Projects and Fuel Exploration as
National Major Strategy Programs (“Shovel Ready”).
Streamline & shorten Permitting and Licensing
18
Policy and Regulatory Measures
4.

Certify as urgent the following pending bills in
Congress:


Uniform Franchise Tax on DUs in lieu of any and all taxes



Reduction of electricity rates through utilization of government
share in the discovery, exploration, development, and/or
production of indigenous resources

5.

Fastrack the establishment of ancillary reserve
market and provide mechanism for transparent
procurement and rules on determining optimal level
required and dispatching.

6.

Fastrack Natural Gas program (e.g., accelerated PPP)
and establish regulation (technical and price) to
make LNG for power and industries available ASAP.

7.

.

19
Policy and Regulatory Measures
7.

DOE to tighten the power program in Mindanao that
would assure adequate, reliable and reasonably
priced power supply and total electrification for small
and large utilities and consumers.

8.

ERC to simplify and make more transparent and
understandable the Rate Setting Methodology for
transmission and distribution utilities.

20
Ensuring
Energy Security, Reliable Power Supply and
Affordable Power Rates

PROF. ROWALDO “Wali” DEL MUNDO
National Engineering Center
University of the Philippines
Diliman, Quezon City 1101
Tel/Fax (02) 981-8500 Loc. 3014 / Fax (02) 926-1516
Email: rddelmundo@gmail.com
Cellphone: (0929) 564-2772

21

Pcci energy committe twg on power

  • 1.
    Ensuring Energy Security, Reliable PowerSupply and Affordable Power Rates PCCI Energy Committee 1
  • 2.
    Energy Security   International EnergyAgency (IEA) Definition 1. Adequate 2. Affordable 3. Reliable European Commission Definition “Uninterrupted physical availability of energy products on the market, at a price which is affordable for all consumers (private and industrial)” Considering the above definition, one can say that the Philippine energy is NOT SECURED because we have been experiencing the cycle of power capacity deficiencies and high prices 2
  • 3.
    Adequate and ReliablePower Supply LOLE –number of days that there will be power curtailment 1 day/yr LOLE = 28.7% Reserve (Daily peak demand will exceed available generating capacity due to simultaneous scheduled and forced outages of power plants) 1 day/year Loss-of-Load Expectation to meet the optimal level of reliability of power supply in the Philippines [Viray & del Mundo, UPNEC, 1991] Source: R. del Mundo, et. al., “Philippine Electric Power Industry Market and Policy Assessment”, University of the Philippines – National Engineering Center, 2011 3
  • 4.
    Adequate and ReliablePower Supply  Luzon Grid New Power Plant Capacity added courtesy of PPAs signed in 1990s US & European criteria • Generation deficiency started in 2010. WESM prices reflects this first stage of power crisis. • There will be generation deficiency even with BacMan rehabilitation (2012) and GNPower new 600 MW Power plant in (2013) • Worst situation in 2014 Year 2011 2012 2013 2014 Capacity (MW 9583 9624 9657 9657 Demand (MW) 7581 7827 8085 8356 Reserve (%) 26.41% 22.96% 19.44% 15.57% • Malaya and Limay Oil Thermal LOLE Plant cannot be retired (Days/Yr) (uneconomic dispatch) 5.07 12.08 5.27 Assuming Malaya Oil Thermal Plant 82.27 will not be operated 4
  • 5.
    Adequate and ReliablePower Supply Minimum Requirement to maintain 1 day/year LOLE  Luzon Grid (in addition to 600MW Mariveles CTPP)  200 MW Peaking Plant (2013)  600 MW Baseload Plant (2015)  600 MW Baseload Plant (2015 for Malaya Retirement)  Visayas Grid  50 MW Intermediate Plant (2017)  100 MW Intermediate Plant (2018)  Mindanao Grid  600 MW Baseload Plant (ASAP)  100 MW Baseload Plant (2015)  100 MW Baseload Plant (2016)  100 MW Baseload Plant (2017) Source: R. del Mundo, et. al., “Philippine Electric Power Industry Market and Policy Assessment”, University of the Philippines – National Engineering Center, 2011 5
  • 6.
    Adequate and ReliablePower Supply  Visayas Grid had power crisis in 2009 after which Distribution Utilities signed power supply contracts with Gencos to build new power plant.  Mindanao Grid is currently in crisis. Modular Diesel plants were recently procured by ECs for emergency power and power supply contracts signed to build new capacity (2015 – 2017).  Luzon Grid will soon experience power crisis  DUs signed contract only with existing plants  DUs hesitated to sign power supply contract for new capacity because of threat of Open Access and Retail Competition [Concern on contracted capacity that will be stranded] 6
  • 7.
    Energy Security underEPIRA  Power Generation is liberalized and competitive (deregulated) sector of the power industry  DOE Power Development Plan only provides outlook.  Private Generation Companies will decide what capacity, what type of plant, when and where to build power plants  NPC no longer allowed to build new power plants or sign new PPA with IPPs EPIRA in 11 Years: Plan did not convert to Plant on time Power Rates also went up instead of reduction Lack of policy, regulation and implementation mechanism that will ensure new power plant capacity will be available on time to meet growing demand in the liberalized and competitive electricity market . 7
  • 8.
    Energy Security underEPIRA Ownership of Installed Power Generating Capacity, 2011 Luzon Grid SEM Calaca 5% AES 6% NPC Others 2% 8% San Miguel 27% First Gen 20% PSALM 14% Aboitiz 18% • Also owners of Distribution Utilities Visayas Grid Others 3% PSALM 34% NPC 2% Aboitiz 6% Global 28% First Gen 12% Salcon 15% • Big 3 in Electric Power Industry control 65% of supply in Luzon Mindanao Grid PSALM 28% Others 2% Aboitiz 18% NPC 52% Source: DOE 8
  • 9.
    Energy Security underEPIRA AVERAGE POWER RATE OF MERALCO Source: MERALCO 9
  • 10.
    Energy Security underEPIRA Residential US¢/kWh Commercial Industry High 30 25 20 15 10 5 0 Brunei Cambodia Source: JICA (Sep. 2013) Indonesia Lao PDR Malaysia Myanmar Philippines Singapore Thailand Vietnam Electricity Prices of SEA countries 10
  • 11.
    Energy Security underEPIRA Report of MERALCO Consultant on Subsidies: Other countries are using subsidy for strategic competitive advantage in the short term 11
  • 12.
    Energy Security underEPIRA 25 Comparison of Tariff with Indonesia’s subsidies (2011) 20.8 US Cents/kWh 20 14.28 15 10 9.92 7.14 6.21 5 0 Thailand Indonesia with Subsidies Indonesia Without Subsidies Philippines Vietnam Source: JICA (Sep. 2013) 12
  • 13.
    Long-Term Power SupplySecurity Framework Demand Forecast & PS Contracts Uncontracted Demand Qualified GENCO Bid Long-term PS Contract Lender Financing Investor Capital Power Plant Project Financing New Power Plant Power Plant Dev’t. & Construction Baseload: 3-5 Years Peaking: 1-2 Years 166 Permits & Licenses • Long-Term Contract for New Capacity • Short-Term Contract for Existing Capacity Additional Generating Capacity Competitive Electricity Market will only work if Supply deficiency is avoided 13
  • 14.
    Options for EnergySecurity 1. Aggregation of Electric Cooperatives  20 ECs in Mindanao bidded 330 MW of baseload. Signed long-term power supply contract at Php4.09/kWh requiring Genco to supply from new power generation capacity (405 MW in 2017)  12 ECs in Central Luzon bidded (October 18, 2013) 300 MW of uncontracted demand starting 2018. Genco is also required supply from new capacity. Lowest bid less than Php4.00/kWh Lessons: Economy-of-scale, Competitive Selection Process, and Long-term contracting for new capacity! 14
  • 15.
    Options for EnergySecurity 2. Aggregation of Large Customers in Retail Competition and Open Access (RCOA)  Industry associations and Economic Zones to organize power supply aggregation similar to Electric Cooperatives • •  Minimum of 100 MW (preferably at least 300 MW) Long-term contract (at least 10 years). The longer the term, the lower the price. Unbundled transmission and distribution wheeling fees are already in place. Hence, will require only metering, billing & settlement protocol to implement 15
  • 16.
    Options for EnergySecurity 3. Embedded Combined Heat and Power System in Economic Zones for Selfsufficiency and affordability  Economics of CHP based on waste heat utilization (for heating/cooling) after gas turbines (for power). Efficiency at least 60% compared to 30% of conventional thermal plant  Avoids transmission wheeling charges (~Php1.00/kWh)  Needs Liquified Natural Gas Terminals in Batangas and Bataan and Transmission pipelines to Metro Manila through the economic zones 16
  • 17.
    Options for EnergySecurity 4. Distribution Utilities Mandatory Bidding of Uncontracted demand of Captive Customers • Lesson from Latin America (Brazil and Chile) where spot market did not produce new capacity. Government designed auction of Long-Term Power Supply Contracts as mechanism. Mandatory for all DUs to submit forecast and auction uncontracted demand. Winning Gencos in auction will build power plants • Limit Open Access for Large customers only (at least 1 MW demand) for 10 years. Possible Declaration of ERC of lower threshold and eventually full retail competition will continue to threaten DUs. This will also solve cross-ownership between generation and distribution under EPIRA! 17
  • 18.
    Policy and RegulatoryMeasures 1. DOE to mandate and oversee a regular international power generation supply bidding for DUs and large customers. 2. ERC to use market-based rules as default in approving power supply contracts of DUs (for captive customers) with reserved price such as the prices Best New Entrant (BNE). Cost-based rules to be used only if price from competitive selection process did not achieve competitive results (i.e., higher than BNE). 3. Declare Power Projects and Fuel Exploration as National Major Strategy Programs (“Shovel Ready”). Streamline & shorten Permitting and Licensing 18
  • 19.
    Policy and RegulatoryMeasures 4. Certify as urgent the following pending bills in Congress:  Uniform Franchise Tax on DUs in lieu of any and all taxes  Reduction of electricity rates through utilization of government share in the discovery, exploration, development, and/or production of indigenous resources 5. Fastrack the establishment of ancillary reserve market and provide mechanism for transparent procurement and rules on determining optimal level required and dispatching. 6. Fastrack Natural Gas program (e.g., accelerated PPP) and establish regulation (technical and price) to make LNG for power and industries available ASAP. 7. . 19
  • 20.
    Policy and RegulatoryMeasures 7. DOE to tighten the power program in Mindanao that would assure adequate, reliable and reasonably priced power supply and total electrification for small and large utilities and consumers. 8. ERC to simplify and make more transparent and understandable the Rate Setting Methodology for transmission and distribution utilities. 20
  • 21.
    Ensuring Energy Security, ReliablePower Supply and Affordable Power Rates PROF. ROWALDO “Wali” DEL MUNDO National Engineering Center University of the Philippines Diliman, Quezon City 1101 Tel/Fax (02) 981-8500 Loc. 3014 / Fax (02) 926-1516 Email: rddelmundo@gmail.com Cellphone: (0929) 564-2772 21