The U.S. Budget and Economic Outlook (Presentation)
CONNECTKaro 2015 - Session 10A - Bus Karo - City Bus Services
1. Bus Karo- City Bus Services
Pawan Mulukutla, EMBARQ India
connectkaro.org
2. Status and Trends
• Innovative policy-based initiatives in public transport
• Various pilot reforms to enhance operational
efficiency
• The growing potential of technology applications
• Wide-reaching and successful strategies in branding
and marketing approaches
• A significant increase in Bus Rapid Transit Systems
and the optimisation of city bus services
connectkaro.org #CK2015
11. BRT in Indore
connectkaro.org
Initiated • 2007
Length of route • 11.46 km
Road section • 31.6 / 60 metres
System type • Closed
• Median stations
Stations • 21
# of buses • 18
Type of bus • 12 m long with AC
• 900 mm Semi Low Floor
• 245 hp, BS III engine
Completion • 31st March 2013
Operations • 10th May 2013
Ridership • 30,700 pax/day (avg)
15. Challenges
• Safety of buses
• Bus Availability and Technology of
buses
• Vendor Ecosystem
• Subsidy and Taxation
• Fuels and emissions
connectkaro.org #CK2015
18. Challenges: Manufacturing
• According to China Bus Industry Report
(2014-2017), large, medium-sized and light
buses sold in China totalled 477,000 units in
2013.
• By 2017 the total sales volume of buses
in China will exceed 690,000 units.
• The Indian bus industry is only 10% in size in
comparison to China’s bus industry.
connectkaro.org #CK2015
19. Discussion for Today
• What are the key learnings from the JnNURM program
and what components should be included in new
renewal mission?
• How to improve the ecosystem of bus manufacturers to
ensure delivery of huge requirement of buses?
• How to address the gaps and ground challenges in
implementing the ITS technology?
• What are the operation challenges and the performance
of a BRT system ?
• How to address subsidies and taxation policy ?
connectkaro.org #CK2015