Parking Study
Presented By: Pradipta Banik Dip
Student ID: 1204012
Bangladesh University of Engineering & Technology
Department of Civil Engineering
CE 454
Transportation Engineering II: Pavement Design & Traffic Studies
Course Teachers: Dr. Md. Shamsul Hoque & Sanjana Hossain
PRESENTATION SYNOPSIS
Introduction
Objectives
Methodology
Study Site
Condition of Site
Data Collection
Data Analysis
Conclusion
Recommendations
Limitations
 Any vehicle will at one time be parked short time or longer time,
provision of parking facilities is essential.
 need for parking spaces is usually very great in areas of business,
residential, or commercial activities.
 park-and-ride.
 Providing adequate parking space to meet the demand for parking in
the Central Business District (CBD).
 This problem usually confronts a city traffic engineer.
 solution is not simple, Parking studies are used to determine the
demand for and the supply of parking facilities.
Introduction
Objectives
Understanding parking planning is an integral part of
transportation planning.
Know the definition of parking terms.
Learn the methodology of parking studies.
Learn how to find out space requirements for a parking
garage.
To obtain information regarding supply and demand of
parking spaces.
To develop systematic on-street parking
facilities/regulations .
To improve existing on-street facilities.
To develop new off-street parking facilities .
Methodology
Parking facilities can be classified into two categories. They
are-
1. On-Street Parking
2.Off- Street Parking
1. Parallel Parking
2. 30 degree parking
3. 45 degree parking
4. 60 degree Parking
5. 90 degree Parking
On- Street Parking
Off-Street Parking
1. Surface car park
2. Multi-storey parks
3. Roof parks
4. Mechanical car parks
5. Underground car parks
Layouts of On-street parking
Off-street parking
Off-street parking
Study Site
Condition of Site
Objectives: Parking lot design
Location: In front of Civil Engineering Building, BUET
Method of determining demand: Interview method
Equipment: Odometer, tape, camera etc.
Weather: Sunny day
Data was collected by enumerators of group 2 using odometer,
tape for measuring various dimensions and camera for capturing
existing condition.
Data Collection
Existing condition of Parking area of CE building, Buet
Data Analysis
Conclusion
4 wheeled vehicles were determined to be Length=15ft, Width=9ft
Staff Parking Slot=15
General Parking Slot=31
Disable parking slot=1
Total =47
90º parking layouts are provided because they require the
smallest area per car space and can suffice to the current
demand. (According to Larkspur Municipal Code, for 90º
parking layouts, the recommended stall width is 9ft and the
depth of stall perpendicular to aisle is 18ft)
The peak demand in peak hour (11am -12pm) is 50 (in 1 day
observation).
AutoCAD layout of designed parking area of CE building, Buet
Recommendations
The parking sign and markings should be maintained strictly.
No vehicle should be allowed to park under porch and no park regions.
Parking slot for disabled should not be used by other vehicles.
There should be a speed limit in front of the building to control vehicles
movement and ensure safety of people there.
If the demand become higher paid parking could be introduced.
The space in front of Concrete laboratory should be made free of unwanted
things to make more space for the parking slots in future.
In order to facilitate entry and exit of cars in front of civil building, a
roundabout was provided.
Limitations
Resource Constraints
Unskilled surveyors
Inadequate funding to run the survey
Lack of modern instruments
Not having a professional photographer
Parking pradipta banik 1204012

More Related Content

What's hot

Types of parking studies
Types of parking studiesTypes of parking studies
Types of parking studies
Faizan Dhrolwala
 
Parking Problems in Metro cities and their Effecient Handling
Parking Problems in Metro cities and their Effecient HandlingParking Problems in Metro cities and their Effecient Handling
Parking Problems in Metro cities and their Effecient Handling
Himanshu Rao
 
Car parking
Car parkingCar parking
Car parking
prashanth982
 
Analysis of Parking Facilities
Analysis of Parking Facilities Analysis of Parking Facilities
Analysis of Parking Facilities
University of Moratuwa / Sri Lanka Law College
 
On street and off street parking
On street and off street parkingOn street and off street parking
On street and off street parking
Sagar Vekariya
 
Revision of parking code for IRC
Revision of parking code for IRCRevision of parking code for IRC
Revision of parking code for IRC
Akanksha Chopra
 
Ill effects of parking
Ill effects of parking Ill effects of parking
Ill effects of parking
abdul fattah barakzai
 
TYPES OF PARKING
TYPES OF PARKINGTYPES OF PARKING
TYPES OF PARKING
justparkandfly
 
1 a. (parking policy)
1 a. (parking policy)1 a. (parking policy)
1 a. (parking policy)
jiten shah
 
Parking policy in india.
Parking policy in india.Parking policy in india.
Parking policy in india.
Kopal Goyal
 
Automated parking system boon for architects and builders
Automated parking system boon for architects and buildersAutomated parking system boon for architects and builders
Automated parking system boon for architects and builders
Wohr Parking Systems Pvt. Ltd.
 
Identification of critical cases in lane changing
Identification of critical cases in lane changingIdentification of critical cases in lane changing
Identification of critical cases in lane changing
Sameed Tariq
 
Car Parking System & Rotary Table by Sky Park Engineering, Mumbai
Car Parking System & Rotary Table by Sky Park Engineering, MumbaiCar Parking System & Rotary Table by Sky Park Engineering, Mumbai
Car Parking System & Rotary Table by Sky Park Engineering, Mumbai
IndiaMART InterMESH Limited
 
report on parking. presentation
report on parking. presentationreport on parking. presentation
report on parking. presentation
rajatsharma871
 
Parking standards
Parking standardsParking standards
Parking standards
Anupama Krishnan
 
H615358
H615358H615358
H615358
IRJESJOURNAL
 
Parking
ParkingParking
Smart parking
Smart parkingSmart parking
Smart parking
vishal waghmare
 
Smart Parking Oman
Smart Parking OmanSmart Parking Oman
Smart Parking Oman
prajakta gawande
 
HYDRAULIC CAR PARKING SYSTEMS:VIABLE SOLUTION FOR MODERN-DAY PARKING PROBLEMS
HYDRAULIC CAR PARKING SYSTEMS:VIABLE SOLUTION FOR MODERN-DAY PARKING PROBLEMSHYDRAULIC CAR PARKING SYSTEMS:VIABLE SOLUTION FOR MODERN-DAY PARKING PROBLEMS
HYDRAULIC CAR PARKING SYSTEMS:VIABLE SOLUTION FOR MODERN-DAY PARKING PROBLEMS
Wohr Parking Systems Pvt. Ltd.
 

What's hot (20)

Types of parking studies
Types of parking studiesTypes of parking studies
Types of parking studies
 
Parking Problems in Metro cities and their Effecient Handling
Parking Problems in Metro cities and their Effecient HandlingParking Problems in Metro cities and their Effecient Handling
Parking Problems in Metro cities and their Effecient Handling
 
Car parking
Car parkingCar parking
Car parking
 
Analysis of Parking Facilities
Analysis of Parking Facilities Analysis of Parking Facilities
Analysis of Parking Facilities
 
On street and off street parking
On street and off street parkingOn street and off street parking
On street and off street parking
 
Revision of parking code for IRC
Revision of parking code for IRCRevision of parking code for IRC
Revision of parking code for IRC
 
Ill effects of parking
Ill effects of parking Ill effects of parking
Ill effects of parking
 
TYPES OF PARKING
TYPES OF PARKINGTYPES OF PARKING
TYPES OF PARKING
 
1 a. (parking policy)
1 a. (parking policy)1 a. (parking policy)
1 a. (parking policy)
 
Parking policy in india.
Parking policy in india.Parking policy in india.
Parking policy in india.
 
Automated parking system boon for architects and builders
Automated parking system boon for architects and buildersAutomated parking system boon for architects and builders
Automated parking system boon for architects and builders
 
Identification of critical cases in lane changing
Identification of critical cases in lane changingIdentification of critical cases in lane changing
Identification of critical cases in lane changing
 
Car Parking System & Rotary Table by Sky Park Engineering, Mumbai
Car Parking System & Rotary Table by Sky Park Engineering, MumbaiCar Parking System & Rotary Table by Sky Park Engineering, Mumbai
Car Parking System & Rotary Table by Sky Park Engineering, Mumbai
 
report on parking. presentation
report on parking. presentationreport on parking. presentation
report on parking. presentation
 
Parking standards
Parking standardsParking standards
Parking standards
 
H615358
H615358H615358
H615358
 
Parking
ParkingParking
Parking
 
Smart parking
Smart parkingSmart parking
Smart parking
 
Smart Parking Oman
Smart Parking OmanSmart Parking Oman
Smart Parking Oman
 
HYDRAULIC CAR PARKING SYSTEMS:VIABLE SOLUTION FOR MODERN-DAY PARKING PROBLEMS
HYDRAULIC CAR PARKING SYSTEMS:VIABLE SOLUTION FOR MODERN-DAY PARKING PROBLEMSHYDRAULIC CAR PARKING SYSTEMS:VIABLE SOLUTION FOR MODERN-DAY PARKING PROBLEMS
HYDRAULIC CAR PARKING SYSTEMS:VIABLE SOLUTION FOR MODERN-DAY PARKING PROBLEMS
 

Similar to Parking pradipta banik 1204012

Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011
Pronob Ghosh
 
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIA STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
IRJET Journal
 
thesis Prestation design
thesis Prestation designthesis Prestation design
thesis Prestation design
Sispap1
 
,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdf,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdf
sandipanpaul16
 
Spot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySpot speed studies and speed delay time survey
Spot speed studies and speed delay time survey
Sai Santosh Yakkali
 
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
ijsrd.com
 
Report of parking problem
Report of parking problemReport of parking problem
Report of parking problem
Mukesh909081
 
17 bcl118 (rp)
17 bcl118 (rp)17 bcl118 (rp)
17 bcl118 (rp)
vatsal sheth
 
Parking policy sdmc
Parking policy  sdmcParking policy  sdmc
Parking policy sdmc
Avinash Sinha
 
Parking geometry
Parking geometryParking geometry
Parking geometry
Bhavik A Shah
 
TTE 332 module 3 S2021 Parking Studies
TTE 332 module 3 S2021 Parking StudiesTTE 332 module 3 S2021 Parking Studies
TTE 332 module 3 S2021 Parking Studies
Wael ElDessouki
 
smart parking1 (1) a view of ppt presentation of parking technology
smart parking1 (1) a view of ppt presentation of parking technologysmart parking1 (1) a view of ppt presentation of parking technology
smart parking1 (1) a view of ppt presentation of parking technology
1RN20IS063JNithish
 
Speed study pradipta banik 1204012
Speed study pradipta banik 1204012Speed study pradipta banik 1204012
Speed study pradipta banik 1204012
Pradipta Banik
 
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011
Pronob Ghosh
 
(Paper) Parking Navigation for Alleviating Congestion in Multilevel Parking F...
(Paper) Parking Navigation for Alleviating Congestion in Multilevel Parking F...(Paper) Parking Navigation for Alleviating Congestion in Multilevel Parking F...
(Paper) Parking Navigation for Alleviating Congestion in Multilevel Parking F...
Naoki Shibata
 
IRJET- Optimization of Congested Area for the Parking
IRJET- Optimization of Congested Area for the ParkingIRJET- Optimization of Congested Area for the Parking
IRJET- Optimization of Congested Area for the Parking
IRJET Journal
 
A2114065115
A2114065115A2114065115
A2114065115
Saurav Barua
 
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Avinash Shabade
 
PR3228 - SMART_PARKING_SYSTEM_REPORT - RAJ MANI M.pdf
PR3228 - SMART_PARKING_SYSTEM_REPORT - RAJ MANI M.pdfPR3228 - SMART_PARKING_SYSTEM_REPORT - RAJ MANI M.pdf
PR3228 - SMART_PARKING_SYSTEM_REPORT - RAJ MANI M.pdf
ShravyaKandukuri
 
Smart parking documentation .pdf
Smart parking documentation .pdfSmart parking documentation .pdf
Smart parking documentation .pdf
ShravyaKandukuri
 

Similar to Parking pradipta banik 1204012 (20)

Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011
 
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIA STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
 
thesis Prestation design
thesis Prestation designthesis Prestation design
thesis Prestation design
 
,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdf,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdf
 
Spot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySpot speed studies and speed delay time survey
Spot speed studies and speed delay time survey
 
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
 
Report of parking problem
Report of parking problemReport of parking problem
Report of parking problem
 
17 bcl118 (rp)
17 bcl118 (rp)17 bcl118 (rp)
17 bcl118 (rp)
 
Parking policy sdmc
Parking policy  sdmcParking policy  sdmc
Parking policy sdmc
 
Parking geometry
Parking geometryParking geometry
Parking geometry
 
TTE 332 module 3 S2021 Parking Studies
TTE 332 module 3 S2021 Parking StudiesTTE 332 module 3 S2021 Parking Studies
TTE 332 module 3 S2021 Parking Studies
 
smart parking1 (1) a view of ppt presentation of parking technology
smart parking1 (1) a view of ppt presentation of parking technologysmart parking1 (1) a view of ppt presentation of parking technology
smart parking1 (1) a view of ppt presentation of parking technology
 
Speed study pradipta banik 1204012
Speed study pradipta banik 1204012Speed study pradipta banik 1204012
Speed study pradipta banik 1204012
 
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011
 
(Paper) Parking Navigation for Alleviating Congestion in Multilevel Parking F...
(Paper) Parking Navigation for Alleviating Congestion in Multilevel Parking F...(Paper) Parking Navigation for Alleviating Congestion in Multilevel Parking F...
(Paper) Parking Navigation for Alleviating Congestion in Multilevel Parking F...
 
IRJET- Optimization of Congested Area for the Parking
IRJET- Optimization of Congested Area for the ParkingIRJET- Optimization of Congested Area for the Parking
IRJET- Optimization of Congested Area for the Parking
 
A2114065115
A2114065115A2114065115
A2114065115
 
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
 
PR3228 - SMART_PARKING_SYSTEM_REPORT - RAJ MANI M.pdf
PR3228 - SMART_PARKING_SYSTEM_REPORT - RAJ MANI M.pdfPR3228 - SMART_PARKING_SYSTEM_REPORT - RAJ MANI M.pdf
PR3228 - SMART_PARKING_SYSTEM_REPORT - RAJ MANI M.pdf
 
Smart parking documentation .pdf
Smart parking documentation .pdfSmart parking documentation .pdf
Smart parking documentation .pdf
 

Recently uploaded

Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 

Recently uploaded (20)

Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 

Parking pradipta banik 1204012

  • 1. Parking Study Presented By: Pradipta Banik Dip Student ID: 1204012
  • 2. Bangladesh University of Engineering & Technology Department of Civil Engineering CE 454 Transportation Engineering II: Pavement Design & Traffic Studies Course Teachers: Dr. Md. Shamsul Hoque & Sanjana Hossain
  • 3. PRESENTATION SYNOPSIS Introduction Objectives Methodology Study Site Condition of Site Data Collection Data Analysis Conclusion Recommendations Limitations
  • 4.  Any vehicle will at one time be parked short time or longer time, provision of parking facilities is essential.  need for parking spaces is usually very great in areas of business, residential, or commercial activities.  park-and-ride.  Providing adequate parking space to meet the demand for parking in the Central Business District (CBD).  This problem usually confronts a city traffic engineer.  solution is not simple, Parking studies are used to determine the demand for and the supply of parking facilities. Introduction
  • 5. Objectives Understanding parking planning is an integral part of transportation planning. Know the definition of parking terms. Learn the methodology of parking studies. Learn how to find out space requirements for a parking garage. To obtain information regarding supply and demand of parking spaces. To develop systematic on-street parking facilities/regulations . To improve existing on-street facilities. To develop new off-street parking facilities .
  • 6. Methodology Parking facilities can be classified into two categories. They are- 1. On-Street Parking 2.Off- Street Parking
  • 7. 1. Parallel Parking 2. 30 degree parking 3. 45 degree parking 4. 60 degree Parking 5. 90 degree Parking On- Street Parking
  • 8. Off-Street Parking 1. Surface car park 2. Multi-storey parks 3. Roof parks 4. Mechanical car parks 5. Underground car parks
  • 13. Condition of Site Objectives: Parking lot design Location: In front of Civil Engineering Building, BUET Method of determining demand: Interview method Equipment: Odometer, tape, camera etc. Weather: Sunny day Data was collected by enumerators of group 2 using odometer, tape for measuring various dimensions and camera for capturing existing condition.
  • 14. Data Collection Existing condition of Parking area of CE building, Buet
  • 16.
  • 17.
  • 18. Conclusion 4 wheeled vehicles were determined to be Length=15ft, Width=9ft Staff Parking Slot=15 General Parking Slot=31 Disable parking slot=1 Total =47 90º parking layouts are provided because they require the smallest area per car space and can suffice to the current demand. (According to Larkspur Municipal Code, for 90º parking layouts, the recommended stall width is 9ft and the depth of stall perpendicular to aisle is 18ft) The peak demand in peak hour (11am -12pm) is 50 (in 1 day observation).
  • 19. AutoCAD layout of designed parking area of CE building, Buet
  • 20. Recommendations The parking sign and markings should be maintained strictly. No vehicle should be allowed to park under porch and no park regions. Parking slot for disabled should not be used by other vehicles. There should be a speed limit in front of the building to control vehicles movement and ensure safety of people there. If the demand become higher paid parking could be introduced. The space in front of Concrete laboratory should be made free of unwanted things to make more space for the parking slots in future. In order to facilitate entry and exit of cars in front of civil building, a roundabout was provided.
  • 21. Limitations Resource Constraints Unskilled surveyors Inadequate funding to run the survey Lack of modern instruments Not having a professional photographer