PARKING SYSTEM’S MANUFACTURE
PRODUCTS
Car Stacker (1+1) Car Stacker (1+2)
Puzzle Parking Tower Parking
CAR STACK (1+1) – DEPENDENT TYPE
Description:
• Hydraulic Driven or Mechanical
• Doubles the car space by stacking the
cars one above the other.
•
Safety locks for safety
One Hydraulic unit for group of upto 5
Stack
• Simple installation
• Operates on Single Phase 230VAC
• Single point lock release
•
Diamond plate runway and ramps for
easy use
CAR STACK (2+1)
 Standard Features :
• Allow maximum car in same parking space ie. Three    cars
per system.
• Ground level car has to be remove to retrieve top
• Smooth & Quiet hydraulic operation.
• Four Pole Design make system more rigid & StableWide
deck platform accommodates maximum car  variants.
• Durable construction for maximum stability.
Dual hydraulic cylinders combined with heavy    duty lifting
chain & Equalizing mechanism. .Automatic safety lock.
Maintenance free composite carriage bearings.
Pass 120% capacity dynamic load text and 150% static load
test.
PUZZLE
 Surface Type Puzzle Parking is fixed on
the Ground Level and could be used to
fit in upto three cars one above the
other i.e. two additional cars above the
ground level also in one Column.
Minimum 3 and Maximum of 6 such
columns are possible which creates
parking space for upto 19 cars where
only 7 cars would have fit in.
 Stack parking uses Micro-Processor
Based logic controller along with a
combination of various types of sensors
and actuators to bring to you a parking
solution that is robust and safe.
 Semi Automatic.
TOWER CAR PARKING
 Tower Parking is a Fully automated parking
solution where is a separate tower/Building
is constructed
 The lift moves vertically only and it stores
the cars in multiple levels.
 micro processor based logic controller
 Each car is stored on steel Pallet (movable
platform) which is carried by lifts
TECHNICAL
BIKE PARKING SYSTEM
OUR FEATURES :-
 Being manufacture we customize our all product as per client
requirement
 Me have done many project of stack parking, triple parking ,tower &
puzzle .
 Our all product are Indian made which make it easily serviceable .
 We will give you onsite emergency service within 1 hr. as we are
located in Thane.
 We have repaired many unworkable foreign parking machine .
 We will charge you 5% for Non Comprehensive AMC after 1 year.
 Power consumption
STRATEGY FOR TOTAL PLANNING
• Initial site survey: perform survey of the site proposed by the
client including investigation of circumstances of neighboring area.
• Adoption: propose the best suited model of car parking system
having befitting car accommodation capacity, by taking account of
land area, its conditions, soil bearing capacity, ambient
surroundings, etc.
• Schematic drawing and initial cost estimate: prepare
optimal layout and work out preliminary cost estimate based on the
initial survey and the result of the site selection. And also submit to
client operation running cost estimate after commencement of
operation of the car parking system.
• Confirmation of specification: Ask client to confirm
specifications of the proposed parking system and scope of work.
11
STRATEGY FOR TOTAL PLANNING
Contracting: Set up a contract with client after contract
amount, specifications, production and construction
schedule have been confirmed.
Construction & Schedule control: establish
administrative structure and undertake construction work
in accordance with progress schedule by placing top
priority on safety.
Turnover of Car Parking System: Turnover to the client
the pertinent and completed car system as soon as
completion test and explanation on operation has been
performed.
Maintenance and management services after
completion and renewal of such car parking system.
12
TOWER CAR PARKING
Tower car parking is of
30 cars in space of 3 car
PUZZLE CAR PARKING
STACK 1+1
STACK (1+2)
 Cosmos Horizon 116Nos Mechanical car parking (Mechanical)—Thane
 Marry Park Soc. 50Nos car parking (Mechanical)--Thane
 Spring Soc. 64Nos car parking (Hydraulic & Mechanical)--Thane
 Uthalsar Soc. 20Nos parking (Hydraulic)--Ahmdebad
 Uday Industrial Complex. 32Nos parking(Puzzel Two layer)--Mumbai
 Oasis Tower 44Nos parking (Puzzle Three Layer)--Mumbai
 Parmeshwari Tower 12Nos (Rotary Car Parking)--Thane
 Jagadesh complex 24Nos (Rotary Car Parking)--Mumbai
 Parmeshwari Tower 30Nos (Hydraulic)--Noida
 Dosti Group 34Nos (Tower Car Parking) –Mumbai
 Cosmos Pride 28Nos (Tower Car Parking)--Thane
 DHIL Group 32Nos. (Puzzel Car Parking 3 Layer)--Mumbai
 Chohan Construction 10Nos parking (Mechanical)-- Noida
 Sankalp Construction 40Nos Parking ( Tower Car Parking)
Mumbai
 Nandhivardhan Construction 30 Nos parking (Puzzel Car Parking 4 level)
Ahmdebad
 Hardikar Hospital 22 Nos (Hydraulic Car Parking) – Pune
 Shivtech Construction Pvt Ltd 24Nos (Puzzle Car Parking) -- Assam
Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

  • 2.
  • 3.
    PRODUCTS Car Stacker (1+1)Car Stacker (1+2) Puzzle Parking Tower Parking
  • 4.
    CAR STACK (1+1)– DEPENDENT TYPE Description: • Hydraulic Driven or Mechanical • Doubles the car space by stacking the cars one above the other. • Safety locks for safety One Hydraulic unit for group of upto 5 Stack • Simple installation • Operates on Single Phase 230VAC • Single point lock release • Diamond plate runway and ramps for easy use
  • 5.
    CAR STACK (2+1)  StandardFeatures : • Allow maximum car in same parking space ie. Three    cars per system. • Ground level car has to be remove to retrieve top • Smooth & Quiet hydraulic operation. • Four Pole Design make system more rigid & StableWide deck platform accommodates maximum car  variants. • Durable construction for maximum stability. Dual hydraulic cylinders combined with heavy    duty lifting chain & Equalizing mechanism. .Automatic safety lock. Maintenance free composite carriage bearings. Pass 120% capacity dynamic load text and 150% static load test.
  • 6.
    PUZZLE  Surface TypePuzzle Parking is fixed on the Ground Level and could be used to fit in upto three cars one above the other i.e. two additional cars above the ground level also in one Column. Minimum 3 and Maximum of 6 such columns are possible which creates parking space for upto 19 cars where only 7 cars would have fit in.  Stack parking uses Micro-Processor Based logic controller along with a combination of various types of sensors and actuators to bring to you a parking solution that is robust and safe.  Semi Automatic.
  • 7.
    TOWER CAR PARKING Tower Parking is a Fully automated parking solution where is a separate tower/Building is constructed  The lift moves vertically only and it stores the cars in multiple levels.  micro processor based logic controller  Each car is stored on steel Pallet (movable platform) which is carried by lifts
  • 8.
  • 9.
  • 10.
    OUR FEATURES :- Being manufacture we customize our all product as per client requirement  Me have done many project of stack parking, triple parking ,tower & puzzle .  Our all product are Indian made which make it easily serviceable .  We will give you onsite emergency service within 1 hr. as we are located in Thane.  We have repaired many unworkable foreign parking machine .  We will charge you 5% for Non Comprehensive AMC after 1 year.  Power consumption
  • 11.
    STRATEGY FOR TOTALPLANNING • Initial site survey: perform survey of the site proposed by the client including investigation of circumstances of neighboring area. • Adoption: propose the best suited model of car parking system having befitting car accommodation capacity, by taking account of land area, its conditions, soil bearing capacity, ambient surroundings, etc. • Schematic drawing and initial cost estimate: prepare optimal layout and work out preliminary cost estimate based on the initial survey and the result of the site selection. And also submit to client operation running cost estimate after commencement of operation of the car parking system. • Confirmation of specification: Ask client to confirm specifications of the proposed parking system and scope of work. 11
  • 12.
    STRATEGY FOR TOTALPLANNING Contracting: Set up a contract with client after contract amount, specifications, production and construction schedule have been confirmed. Construction & Schedule control: establish administrative structure and undertake construction work in accordance with progress schedule by placing top priority on safety. Turnover of Car Parking System: Turnover to the client the pertinent and completed car system as soon as completion test and explanation on operation has been performed. Maintenance and management services after completion and renewal of such car parking system. 12
  • 13.
    TOWER CAR PARKING Towercar parking is of 30 cars in space of 3 car
  • 14.
  • 15.
  • 16.
  • 17.
     Cosmos Horizon116Nos Mechanical car parking (Mechanical)—Thane  Marry Park Soc. 50Nos car parking (Mechanical)--Thane  Spring Soc. 64Nos car parking (Hydraulic & Mechanical)--Thane  Uthalsar Soc. 20Nos parking (Hydraulic)--Ahmdebad  Uday Industrial Complex. 32Nos parking(Puzzel Two layer)--Mumbai  Oasis Tower 44Nos parking (Puzzle Three Layer)--Mumbai  Parmeshwari Tower 12Nos (Rotary Car Parking)--Thane  Jagadesh complex 24Nos (Rotary Car Parking)--Mumbai  Parmeshwari Tower 30Nos (Hydraulic)--Noida  Dosti Group 34Nos (Tower Car Parking) –Mumbai  Cosmos Pride 28Nos (Tower Car Parking)--Thane  DHIL Group 32Nos. (Puzzel Car Parking 3 Layer)--Mumbai
  • 18.
     Chohan Construction10Nos parking (Mechanical)-- Noida  Sankalp Construction 40Nos Parking ( Tower Car Parking) Mumbai  Nandhivardhan Construction 30 Nos parking (Puzzel Car Parking 4 level) Ahmdebad  Hardikar Hospital 22 Nos (Hydraulic Car Parking) – Pune  Shivtech Construction Pvt Ltd 24Nos (Puzzle Car Parking) -- Assam