SlideShare a Scribd company logo
1 of 6
Download to read offline
International Refereed Journal of Engineering and Science (IRJES)
ISSN (Online) 2319-183X, (Print) 2319-1821
Volume 6, Issue 1 (January 2017), PP.53-58
www.irjes.com 53 | Page
An Analysis of The Road Parking At The Area of Laelangi
Market In Baubau City, Southeast Sulawesi Province - Indonesia
Asidin¹,M. Yamin Jinca²,Ganding Sitepu³
1
Postgraduate Student, At Master Degree Of Transportation, Faculty Of Postgraduate, Hasanuddin University,
²Professor, For Infrastructure And Transportation Planning, Hasanuddin University,
³Lecturer, Transportation Engineering, Hasanuddin University, Makassar-Indonesia
Abstract: An increasing number of vehicles showed better economic level in society, resulting in increased
mobility of people and give rise to the movement of high and needs space parking facility. The phenomenon that
occurs at the area of Laelangi market in Baubau city is parked vehicles occurred on the road and have an impact
on traffic congestion on the peak hours, it will conduct research of the phenomenon. This research aims to
develop a concept of spatial parking and explain the capacity and effectiveness of parking based on the parking
layout and needs parking area on Laelangi market in Baubau city, so it becomes an input to the policy makers.
This research uses descriptive quantitative method to analyze the characteristics of the park to find parking
capacity, the volume of parking, the accumulated parking, usage levels of parking, and the parking demand both
two wheelers and four wheels that use the parking area during the week (Monday up to Sunday) begin at 06.00
pm until 18.00 pm. The results showed that the concept of spatial planning is necessary a parking on the location
of Laelangi market in Baubau city and recommend vertical parking spaces (Parking Garage) due to the
availability of parking spaces, as well as management parking good to be a source of Local Revenue.
Keywords: Road parking, , space capacity, the growth of the vehicle.
I. INTRODUCTION
In the rapid development and progress of the region, the need for parking is very important to
accommodate community activities and traffic of the city. Urban areas with population densities and high
economic levels resulting in personal vehicle ownership rate are high and a problem in parking provision.
Increased construction in particular city business centers was not yet able to provide sufficient parking area, so
that the road around it is used for parking space, causing traffic problems (speed decreased and increased travel
time).
Parking service facilities is a substantial problem that often occurs in large cities and towns that are
developing in Indonesia, is also happening in Baubau city. This is due to the difficulty of obtaining parking
spaces, especially in the area of offices and shopping centers. The parking issue was predominantly due to the
limited available land and high land prices. Also due to an imbalance between the ratio of vehicles to be
accommodated with the existing parking area, so that the areas of parking a vehicle will run over along the way
at shopping centers and offices, and the impact on the problem of congestion in the region. This happened at the
Laelangi market in Baubau city.
According to Abubakar et al, 1998. Parking is defined as a state of no movement of a vehicle that is not
temporary; parking included in the definition is any vehicle that stops at certain places either by manual signs or
not, and not solely for the sake of raising or lowering the people or logistics [1]. According Morlok 2010.
Parking facilities are classified according to three main characteristics, the first is whether the parking is
provided on the road or off the road, which both depends on whether the park was carried out by the driver
himself and by special parking attendant and the third is the difference facility single storey or storey parking lot
[2].
Availability of the parking on the area of Laelangi market is urgently needed, the authority to
determine the provision of parking facilities are to be fully authorized by the local government. The absence of
parking area at the areas of Laelangi market traders and visitors to use the street to park the vehicle, both of
which use two-wheeled vehicles and four wheels, resulting in reduction of the width of the road that always
leads to chaos and congestion at these locations.
II. OBSERVATIONS AND METHODS
This research was conducted in the area of Laelangi market in Baubau city as in Figure 1. The selection
of this area is caused at the Laelangi market surrounded by roads namely Kartini Road, Sudirman Road,
Mongensidi and D.I. Panjaitan Road which the segment is already happening streets parking chaos resulting in
accumulation of vehicles that cause congestion on the road segment. If the area of the parking lot is not created
An Analysis of the Road Parking At the Area of Laelangi Market in Baubau City, Southeast ….
www.irjes.com 54 | Page
for a special parking place, then it will cause problems in the future congestion on road segments that exist
around the market of Laelangi in Baubau city.
Figure 1. Locus of Research
Figure 2. Locus of Research
Data retrieval is done by Surveyor on the area activities parking of vehicles on the road at the site of
the research that Laelangi market in Baubau city as shown in Figure 2. The Surveyor placed on each road
namely R. A. Kartini Road, Sudirman Road, Mongensidi and D.I. Panjaitan Road. Each surveyor on the road
section will record the number of vehicles as well as vehicles parked long time, as well as measure the
dimensions of the road into a parking area either vehicle two-wheeled or four or pickup and truck/canvas
porters. Observations were made for seven days (a week) and starts at 06.00 pm until 18.00 pm every day by
dividing four periods of analysis that are; Period I is an analysis of parking that occurs between the hours of
6:00 to 09:00 a.m,
Period II is an analysis of parking that occurs between the hours of 09:00 to 12:00 am, Period III is an analysis
of parking that occurs between the hours of 12:00 to 15:00 pm, and Period IV is an analysis of parking that
occurs between the hours of 15:00 to 18:00 pm.
Data were analyzed using quantitative methods in accordance problems occurred by analyzing the
characteristics of parking related to the large number of parking needs to be provided Hobbs in 1995 [3], based
on the capacity of the road, parking capacity of the road, the volume of parking, the accumulation of parking of
vehicles parked at a spot on specific time which shows the parking load per a specified time period, calculated
as follows:
The capacity of the road
C = Co x FCW x FCsp x FCsf x FCcs (1)
C = Co x FC
An Analysis of the Road Parking At the Area of Laelangi Market in Baubau City, Southeast ….
www.irjes.com 55 | Page
Where:
C = capacity of roads (pcu/hour)
Co = basic capacity (pcu/hour)
FC = Correction factors
FCw = adjustment factor width of traffic lanes
FCsp = adjustment factor separation direction
FCsf = adjustment factor due to side friction
FCcs = adjustment factor size cities
Accumulated Parking = Ei - Ex + X (2)
by:
Ei = Entry (vehicles entering the parking area)
Ex = Exit (exit the vehicle parking area)
X = the number of vehicles that have been parked before the observation
The duration of parking is the span of a vehicle parked in a parking space in one unit of time, whereas to
determine the average length of the parking of all vehicles during the time of the survey can be seen from the
following formula Oppenlender 1995. [4] Calculated using the formula:
Σ ( Nx ).( X ).( I )
D = ---------------------- (3)
Nt
D : average parking duration (h/vehicle).
Σ (Nx) : The number of vehicles parked for x interval
X : The number of intervals.
I : The time interval surveys (h).
Nt : The total number of vehicles during the survey period.
Parking space requirement is calculated using the formula:
KRP = Parking Volume x SRP (motorcycle/car)
Parking Turn over (PTO) that parking turn over rate indicates the level of use of a parking space
in a certain time unit. Parking turn over rate indicates the level of use of parking space, calculated by the
formula:
The number of vehicles entered in one period
PTO = -------------------------------------------------------- (4)
Accumulated maximum parking in one day
Parking Index is the percentage of the number of parked vehicles occupy parking area; can be
determined by using the formula:
Accumulated Parking
IP = ------------------------------ (5)
Parking capacity
Parking Space Unit (PSU) is a measure of the effective area to park one vehicle (passenger car,
bus/truck or motorbike), including free space and door openings. PSU can also be said to be the size of a
parking space requirements for a vehicle with a comfortable and safe with the amount of space as efficiently as
possible.
III. RESULTS
There are on average approximately 950 to 250 two-wheelers and four-wheeled vehicles were recorded
entering and exiting the parking area on the road around the market of Laelangi in Baubau city. Accumulated
number of vehicles on Saturday as much as 1,020 two-wheeled vehicles, and on Wednesday as much as 276
four-wheeled vehicle that is a day that the number of vehicles at most. The surge in parking vehicles occurred in
the period II to period III is due in that period is the peak activity in the market of Laelangi in Baubau city,
while the surge in vehicle exit or leave the park during the period IV which in these hours is the time the activity
was ending. On Monday, the number of two-wheeled vehicles parked there were 32 motorcycles, while the four-
wheel vehicle that is parked recorded on Sunday as many as 14 cars.
An Analysis of the Road Parking At the Area of Laelangi Market in Baubau City, Southeast ….
www.irjes.com 56 | Page
Figure 3. Total Accumulated Parking Two Wheel Vehicles
Figure 4. Total Accumulated Four Wheel Vehicle Parking
Volume parking is calculated by assigning the highest accumulation of a vehicle parked for two wheels
and four wheels. Number of parking two-wheeled vehicle that is highest on Saturday by the number of motor
vehicles in 1020, while the number of four-wheeled vehicles parking highs on Wednesday that as many as 276
cars.
Parking space requirement is obtained by calculating the amount of Parking Space Units (PSU)
obtained by shifting the overall volume of vehicles with the highest parking standard PSU each vehicle type.
Count KRP two-wheeled vehicles:
The number of KPR standards = 1428.00 m2
/motors
Count KPR four-wheeled vehicles:
The number of KPR standard = 3450.00 m2
/car
In the calculation of Parking Turn over (PTO) is known that parking turnover rate for cars and motors
on the fourth observation period, one plot parking two vehicles used by 2 vehicles for two hours.
IV. DISCUSSION
Road capacity on the area of Laelangi market in Baubau city reduced due to the parking of vehicles on
the road; this can be seen in Figure 5.
The Capacity of Kartini Road:
FC = 1.25 x 1.00 x 0.80 x 0.83 = 0.83
C = 2900 x 0.83 = 2407.00 pcu/hour
0
20
40
60
80
100
120
140
160
180
06.00-07.00
07.01-08.00
08.01-09.00
09.01-10.00
10.01-11.00
11.01-12.00
12.01-13.00
13.01-14.00
14.01-15.00
15.01-16.00
16.01-17.00
17.01-18.00
TotalofVehicle
Observation Time
Total of Parking Road
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
0
10
20
30
40
06.00-07.00
07.01-08.00
08.01-09.00
09.01-10.00
10.01-11.00
11.01-12.00
12.01-13.00
13.01-14.00
14.01-15.00
15.01-16.00
16.01-17.00
17.01-18.00
NumberofVehicle
Observation Time
Total Parking Road
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
An Analysis of the Road Parking At the Area of Laelangi Market in Baubau City, Southeast ….
www.irjes.com 57 | Page
Figure 5. The Capacity of Kartini and Jend. Sudriman Road
The capacity of Wolter Monginsidi road:
FC = 1.25 x 1.00 x 0.85 x 0.83 = 0.8819
C = 2900 x 0.8819 = 2557.44 pcu/hour
Figure 6. The Capacity of Wolter Monginsidi Road
The Capacity of D.I. Panjaitan Road:
FC = 1.25 x 1.00 x 0.75 x 0.83 = 0.7781
C = 2900 x 0.7781 = 2256.56 pcu/hour
Figure 7. The Capacity of D.I. Panjaitan Road
An Analysis of the Road Parking At the Area of Laelangi Market in Baubau City, Southeast ….
www.irjes.com 58 | Page
In the calculation of the need for parking spaces obtained for four-wheeled vehicles the number of
parking spaces that there are 123 parking plots, while plots of parking spaces for two-wheeled vehicles provided
are 436 parking plots. Needs a parking space when compared with the accumulated maximum parking where
maximum accumulation for four-wheel vehicles was 276 cars and for two-wheeled vehicles are 950 motors, for
the days not too crowded as in the early morning activities and afternoon at the end of community activities.
These conditions indicate parking plots available do not meet, for four-wheel vehicles need at least 2400.00 m2
of parking spaces, while the two-wheeled vehicle requires 1237.60 m2
of parking space. At certain times greatly
increased the number of vehicles up to two times as much as on the day of the week before the day of Eid.
From the calculation for the PTO can be seen that in each hour, good parking space four-wheeled
vehicle and two wheels can only serve two vehicles only. PTO low value indicates that the vehicle is parked in a
long term. From the calculation results can be seen an increase PTO is highest in the period II. This period is
hours of 09:00 to 12:00 at which time the public's flurry of activity both traders and visitors who are shopping
for daily needs in the research location of Laelangi market in Baubau city. With parking time of approximately
15 minutes up to 90 minutes for one vehicle, compared with the existing parking spaces at odd hours, the busiest
(period II) vehicles coming in abundance, but the parking area is there to be used less.
The movement of people in the study site of Laelangi market in Baubau city that vary according to the
needs of each lead to differences in the timing and space vehicles as transport people and logistics, one of which
is a parking space. Today, with the increasing number of two-wheeled vehicles or four wheels greatly affect
parking facilities. Density parking occurring on the streets in the research location indication can be seen from
the volume of vehicles both two-wheelers and four-wheeled vehicles that have exceeded the number of plots
parking is ideal, even though conditions in the study site were not so crowded, with conditions on the area of
Laelangi market in Baubau city require a parking space arrangement well ordered in accordance with criteria
required in planning will parking.
The solutions offered to solve the problem of the parking area of research by making a parking area by
no longer using the road to park the vehicle. Making parking using vertical parking system due to the available
land at the research sites were very narrow, using a model of vertical parking will eat far more accommodating
both two-wheeled vehicles and four-wheeled vehicles.
The diversity of the purpose of each vehicle should be created zone for four-wheeled vehicles, and for
two-wheeled vehicles are placed one floor and a parking space reserved for persons with disabilities.
V. CONCLUSIONS AND RECOMMENDATIONS
Based on the results of the discussion is concluded that the parking capacity of the road at the research
location of Laelangi market in Baubau City is very dense so the site is often the case clutter cause congestion on
the street around the study site, especially during the peak of activity in the market of Laelangi in Baubau City.
The need for a special location for a parking space at the location of such research is needed considering the
number of vehicles continues to increase is, recommended to the Local Government authorities as development
in the area to the make special parking area around the market of Laelangi in Baubau city.
The number of vehicles parked four-wheel vehicles as much as 276 cars and need a parking space
3450.00 m2
, while land-street parking available is 1537.00 M2
and for two-wheeled vehicles are motorcycles
1020 m2
1428.00 need a parking space, the parking lot road is 436.00 m2
.
Parking availability orderly and proper management, it will be a source of Local Revenue, which is not
managed by the Government.
REFERENCES
[1]. Abubakar I. et al. (1998). Guidelines for Planning and Operation of Parking Facilities. Directorate of
Traffic Systems City Transport, Directorate General of Land Transportation, Jakarta
[2]. Morlok (2010). Introduction to Engineering and Transport Planning. Jakarta: Erland.
[3]. Sekaran U. (2003). Research Method for Business (4th ed.). New York: John Wiley & Sons, Inc.
[4]. Soejono. (1996). Technical Implementation Guidelines parking facilities. Jakarta: Directorate General
of Land Transportation Decree No. 272 / HK.105 / DrJD / 96
[5]. Hobbs.1995. Planning and Traffic Engineering. Gajah Mada University Press, Yogyakarta.
[6]. Oppenlender J.C and P.C. Box, 1976, Ma- nual of Traffic Engineering Studies, Institute of
Transportation Engineering Washington DC.
[7]. Salter J.R, 1974, Highway Traffic Analysis and Design, The Macmillan Press Ltd. New York .

More Related Content

What's hot

Parking problems
Parking problemsParking problems
Parking problemsubaidpvkd
 
1 a. (parking policy)
1 a. (parking policy)1 a. (parking policy)
1 a. (parking policy)jiten shah
 
Parking study traffic eng
Parking study traffic engParking study traffic eng
Parking study traffic engamira688
 
Off street parking
Off street parkingOff street parking
Off street parkingankit patel
 
Parking policy in india.
Parking policy in india.Parking policy in india.
Parking policy in india.Kopal Goyal
 
On street and off street parking
On street and off street parkingOn street and off street parking
On street and off street parkingSagar Vekariya
 
Parking pradipta banik 1204012
Parking pradipta banik 1204012Parking pradipta banik 1204012
Parking pradipta banik 1204012Pradipta Banik
 
Car Parking System & Rotary Table by Sky Park Engineering, Mumbai
Car Parking System & Rotary Table by Sky Park Engineering, MumbaiCar Parking System & Rotary Table by Sky Park Engineering, Mumbai
Car Parking System & Rotary Table by Sky Park Engineering, MumbaiIndiaMART InterMESH Limited
 

What's hot (20)

Presentation on parking problem in sector v
Presentation on parking problem in sector vPresentation on parking problem in sector v
Presentation on parking problem in sector v
 
Parking problems
Parking problemsParking problems
Parking problems
 
1 a. (parking policy)
1 a. (parking policy)1 a. (parking policy)
1 a. (parking policy)
 
Ill effects of parking
Ill effects of parking Ill effects of parking
Ill effects of parking
 
Parking study traffic eng
Parking study traffic engParking study traffic eng
Parking study traffic eng
 
Off street parking
Off street parkingOff street parking
Off street parking
 
Private hospitals’ parking health care’s debated contribution in traffic cong...
Private hospitals’ parking health care’s debated contribution in traffic cong...Private hospitals’ parking health care’s debated contribution in traffic cong...
Private hospitals’ parking health care’s debated contribution in traffic cong...
 
Parking study
Parking studyParking study
Parking study
 
Car parking
Car parkingCar parking
Car parking
 
Parking policy in india.
Parking policy in india.Parking policy in india.
Parking policy in india.
 
On street and off street parking
On street and off street parkingOn street and off street parking
On street and off street parking
 
Parking studies
Parking studiesParking studies
Parking studies
 
Parking Lots to Parks Kansas City
Parking Lots to Parks Kansas CityParking Lots to Parks Kansas City
Parking Lots to Parks Kansas City
 
Analysis of Parking Facilities
Analysis of Parking Facilities Analysis of Parking Facilities
Analysis of Parking Facilities
 
Types of parking studies
Types of parking studiesTypes of parking studies
Types of parking studies
 
Parking pradipta banik 1204012
Parking pradipta banik 1204012Parking pradipta banik 1204012
Parking pradipta banik 1204012
 
Parking standards
Parking standardsParking standards
Parking standards
 
Parking study
Parking studyParking study
Parking study
 
Car Parking System & Rotary Table by Sky Park Engineering, Mumbai
Car Parking System & Rotary Table by Sky Park Engineering, MumbaiCar Parking System & Rotary Table by Sky Park Engineering, Mumbai
Car Parking System & Rotary Table by Sky Park Engineering, Mumbai
 
vehicle parking
vehicle parkingvehicle parking
vehicle parking
 

Similar to H615358

IRJET- Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...
IRJET-  	  Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...IRJET-  	  Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...
IRJET- Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...IRJET Journal
 
IRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular ParkingIRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular ParkingIRJET Journal
 
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...IRJET Journal
 
Guidance on parking reform in Indian cities
Guidance on parking reform in Indian cities Guidance on parking reform in Indian cities
Guidance on parking reform in Indian cities Anupama Krishnan
 
thesis Prestation design
thesis Prestation designthesis Prestation design
thesis Prestation designSispap1
 
Health of Urban Roads - IRF-WRM-14-17-November 2017
Health of Urban Roads - IRF-WRM-14-17-November 2017Health of Urban Roads - IRF-WRM-14-17-November 2017
Health of Urban Roads - IRF-WRM-14-17-November 2017SHRISH VERMA
 
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru city
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru cityAppraisal of multilevel car parking facility at kg road cbd area, bengaluru city
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru cityeSAT Publishing House
 
Demand assessment of multi level car parking in garuda mall
Demand assessment of multi level car parking in garuda mallDemand assessment of multi level car parking in garuda mall
Demand assessment of multi level car parking in garuda malleSAT Publishing House
 
IRJET- Optimization of Congested Area for the Parking
IRJET- Optimization of Congested Area for the ParkingIRJET- Optimization of Congested Area for the Parking
IRJET- Optimization of Congested Area for the ParkingIRJET Journal
 
Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Pronob Ghosh
 
Studying parking policies and proposing solutions for illegally parked vehicl...
Studying parking policies and proposing solutions for illegally parked vehicl...Studying parking policies and proposing solutions for illegally parked vehicl...
Studying parking policies and proposing solutions for illegally parked vehicl...IRJET Journal
 
Effect of the Nipah Mall Development on the Performance Roads of Urip Sumohar...
Effect of the Nipah Mall Development on the Performance Roads of Urip Sumohar...Effect of the Nipah Mall Development on the Performance Roads of Urip Sumohar...
Effect of the Nipah Mall Development on the Performance Roads of Urip Sumohar...ijceronline
 
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...IRJET Journal
 
AGC2022-Project-Submission-Template_ASEAN.docx
AGC2022-Project-Submission-Template_ASEAN.docxAGC2022-Project-Submission-Template_ASEAN.docx
AGC2022-Project-Submission-Template_ASEAN.docxEmmanuelBondad1
 
Theoritical framework
Theoritical frameworkTheoritical framework
Theoritical frameworkIsha Kirti
 
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIA STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIIRJET Journal
 
PERFORMANCE ANALYSIS OF NONSIGNALISED ROAD INTERSECTION USING THE KAJI APPLIC...
PERFORMANCE ANALYSIS OF NONSIGNALISED ROAD INTERSECTION USING THE KAJI APPLIC...PERFORMANCE ANALYSIS OF NONSIGNALISED ROAD INTERSECTION USING THE KAJI APPLIC...
PERFORMANCE ANALYSIS OF NONSIGNALISED ROAD INTERSECTION USING THE KAJI APPLIC...IAEME Publication
 
Construction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) carConstruction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) carDar Hilal
 
@Sispap,motel.2121
@Sispap,motel.2121@Sispap,motel.2121
@Sispap,motel.2121Sispap1
 

Similar to H615358 (20)

IRJET- Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...
IRJET-  	  Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...IRJET-  	  Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...
IRJET- Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...
 
IRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular ParkingIRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular Parking
 
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
 
Guidance on parking reform in Indian cities
Guidance on parking reform in Indian cities Guidance on parking reform in Indian cities
Guidance on parking reform in Indian cities
 
thesis Prestation design
thesis Prestation designthesis Prestation design
thesis Prestation design
 
Health of Urban Roads - IRF-WRM-14-17-November 2017
Health of Urban Roads - IRF-WRM-14-17-November 2017Health of Urban Roads - IRF-WRM-14-17-November 2017
Health of Urban Roads - IRF-WRM-14-17-November 2017
 
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru city
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru cityAppraisal of multilevel car parking facility at kg road cbd area, bengaluru city
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru city
 
Demand assessment of multi level car parking in garuda mall
Demand assessment of multi level car parking in garuda mallDemand assessment of multi level car parking in garuda mall
Demand assessment of multi level car parking in garuda mall
 
IRJET- Optimization of Congested Area for the Parking
IRJET- Optimization of Congested Area for the ParkingIRJET- Optimization of Congested Area for the Parking
IRJET- Optimization of Congested Area for the Parking
 
Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011
 
Pedestrian Friendly Shopping Plaza at M.G. Road, Kochi
Pedestrian Friendly Shopping Plaza at M.G. Road, KochiPedestrian Friendly Shopping Plaza at M.G. Road, Kochi
Pedestrian Friendly Shopping Plaza at M.G. Road, Kochi
 
Studying parking policies and proposing solutions for illegally parked vehicl...
Studying parking policies and proposing solutions for illegally parked vehicl...Studying parking policies and proposing solutions for illegally parked vehicl...
Studying parking policies and proposing solutions for illegally parked vehicl...
 
Effect of the Nipah Mall Development on the Performance Roads of Urip Sumohar...
Effect of the Nipah Mall Development on the Performance Roads of Urip Sumohar...Effect of the Nipah Mall Development on the Performance Roads of Urip Sumohar...
Effect of the Nipah Mall Development on the Performance Roads of Urip Sumohar...
 
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
 
AGC2022-Project-Submission-Template_ASEAN.docx
AGC2022-Project-Submission-Template_ASEAN.docxAGC2022-Project-Submission-Template_ASEAN.docx
AGC2022-Project-Submission-Template_ASEAN.docx
 
Theoritical framework
Theoritical frameworkTheoritical framework
Theoritical framework
 
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIA STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
 
PERFORMANCE ANALYSIS OF NONSIGNALISED ROAD INTERSECTION USING THE KAJI APPLIC...
PERFORMANCE ANALYSIS OF NONSIGNALISED ROAD INTERSECTION USING THE KAJI APPLIC...PERFORMANCE ANALYSIS OF NONSIGNALISED ROAD INTERSECTION USING THE KAJI APPLIC...
PERFORMANCE ANALYSIS OF NONSIGNALISED ROAD INTERSECTION USING THE KAJI APPLIC...
 
Construction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) carConstruction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) car
 
@Sispap,motel.2121
@Sispap,motel.2121@Sispap,motel.2121
@Sispap,motel.2121
 

More from IRJESJOURNAL

Drying of agricultural products using forced convection indirect solar dryer
Drying of agricultural products using forced convection indirect solar dryerDrying of agricultural products using forced convection indirect solar dryer
Drying of agricultural products using forced convection indirect solar dryerIRJESJOURNAL
 
The Problems of Constructing Optimal Onboard Colored RGB Depicting UAV Systems
The Problems of Constructing Optimal Onboard Colored RGB Depicting UAV SystemsThe Problems of Constructing Optimal Onboard Colored RGB Depicting UAV Systems
The Problems of Constructing Optimal Onboard Colored RGB Depicting UAV SystemsIRJESJOURNAL
 
Flexible Design Processes to Reduce the Early Obsolescence of Buildings
Flexible Design Processes to Reduce the Early Obsolescence of BuildingsFlexible Design Processes to Reduce the Early Obsolescence of Buildings
Flexible Design Processes to Reduce the Early Obsolescence of BuildingsIRJESJOURNAL
 
Study on Performance Enhancement of Solar Ejector Cooling System
Study on Performance Enhancement of Solar Ejector Cooling SystemStudy on Performance Enhancement of Solar Ejector Cooling System
Study on Performance Enhancement of Solar Ejector Cooling SystemIRJESJOURNAL
 
Flight Safety Case Study: Adi Sucipto Airport Jogjakarta - Indonesia
Flight Safety Case Study: Adi Sucipto Airport Jogjakarta - IndonesiaFlight Safety Case Study: Adi Sucipto Airport Jogjakarta - Indonesia
Flight Safety Case Study: Adi Sucipto Airport Jogjakarta - IndonesiaIRJESJOURNAL
 
A Review of Severe Plastic Deformation
A Review of Severe Plastic DeformationA Review of Severe Plastic Deformation
A Review of Severe Plastic DeformationIRJESJOURNAL
 
Annealing Response of Aluminum Alloy AA6014 Processed By Severe Plastic Defor...
Annealing Response of Aluminum Alloy AA6014 Processed By Severe Plastic Defor...Annealing Response of Aluminum Alloy AA6014 Processed By Severe Plastic Defor...
Annealing Response of Aluminum Alloy AA6014 Processed By Severe Plastic Defor...IRJESJOURNAL
 
Evaluation of Thresholding Based Noncontact Respiration Rate Monitoring using...
Evaluation of Thresholding Based Noncontact Respiration Rate Monitoring using...Evaluation of Thresholding Based Noncontact Respiration Rate Monitoring using...
Evaluation of Thresholding Based Noncontact Respiration Rate Monitoring using...IRJESJOURNAL
 
Correlation of True Boiling Point of Crude Oil
Correlation of True Boiling Point of Crude OilCorrelation of True Boiling Point of Crude Oil
Correlation of True Boiling Point of Crude OilIRJESJOURNAL
 
Combined Geophysical And Geotechnical Techniques For Assessment Of Foundation...
Combined Geophysical And Geotechnical Techniques For Assessment Of Foundation...Combined Geophysical And Geotechnical Techniques For Assessment Of Foundation...
Combined Geophysical And Geotechnical Techniques For Assessment Of Foundation...IRJESJOURNAL
 
ICT governance in Higher Education
ICT governance in Higher EducationICT governance in Higher Education
ICT governance in Higher EducationIRJESJOURNAL
 
Gobernanzade las TIC en la Educacion Superior
Gobernanzade las TIC en la Educacion SuperiorGobernanzade las TIC en la Educacion Superior
Gobernanzade las TIC en la Educacion SuperiorIRJESJOURNAL
 
The Analysis and Perspective on Development of Chinese Automotive Heavy-duty ...
The Analysis and Perspective on Development of Chinese Automotive Heavy-duty ...The Analysis and Perspective on Development of Chinese Automotive Heavy-duty ...
The Analysis and Perspective on Development of Chinese Automotive Heavy-duty ...IRJESJOURNAL
 
Research on The Bottom Software of Electronic Control System In Automobile El...
Research on The Bottom Software of Electronic Control System In Automobile El...Research on The Bottom Software of Electronic Control System In Automobile El...
Research on The Bottom Software of Electronic Control System In Automobile El...IRJESJOURNAL
 
Evaluation of Specialized Virtual Health Libraries in Scholar Education Evalu...
Evaluation of Specialized Virtual Health Libraries in Scholar Education Evalu...Evaluation of Specialized Virtual Health Libraries in Scholar Education Evalu...
Evaluation of Specialized Virtual Health Libraries in Scholar Education Evalu...IRJESJOURNAL
 
Linking Ab Initio-Calphad for the Assessment of the AluminiumLutetium System
Linking Ab Initio-Calphad for the Assessment of the AluminiumLutetium SystemLinking Ab Initio-Calphad for the Assessment of the AluminiumLutetium System
Linking Ab Initio-Calphad for the Assessment of the AluminiumLutetium SystemIRJESJOURNAL
 
Thermodynamic Assessment (Suggestions) Of the Gold-Rubidium System
Thermodynamic Assessment (Suggestions) Of the Gold-Rubidium SystemThermodynamic Assessment (Suggestions) Of the Gold-Rubidium System
Thermodynamic Assessment (Suggestions) Of the Gold-Rubidium SystemIRJESJOURNAL
 
Elisa Test for Determination of Grapevine Viral Infection in Rahovec, Kosovo
Elisa Test for Determination of Grapevine Viral Infection in Rahovec, KosovoElisa Test for Determination of Grapevine Viral Infection in Rahovec, Kosovo
Elisa Test for Determination of Grapevine Viral Infection in Rahovec, KosovoIRJESJOURNAL
 
Modelling of Sealing Elements Wearing
Modelling of Sealing Elements WearingModelling of Sealing Elements Wearing
Modelling of Sealing Elements WearingIRJESJOURNAL
 
Determining Loss of Liquid from Different Types of Mud by Various Addictives ...
Determining Loss of Liquid from Different Types of Mud by Various Addictives ...Determining Loss of Liquid from Different Types of Mud by Various Addictives ...
Determining Loss of Liquid from Different Types of Mud by Various Addictives ...IRJESJOURNAL
 

More from IRJESJOURNAL (20)

Drying of agricultural products using forced convection indirect solar dryer
Drying of agricultural products using forced convection indirect solar dryerDrying of agricultural products using forced convection indirect solar dryer
Drying of agricultural products using forced convection indirect solar dryer
 
The Problems of Constructing Optimal Onboard Colored RGB Depicting UAV Systems
The Problems of Constructing Optimal Onboard Colored RGB Depicting UAV SystemsThe Problems of Constructing Optimal Onboard Colored RGB Depicting UAV Systems
The Problems of Constructing Optimal Onboard Colored RGB Depicting UAV Systems
 
Flexible Design Processes to Reduce the Early Obsolescence of Buildings
Flexible Design Processes to Reduce the Early Obsolescence of BuildingsFlexible Design Processes to Reduce the Early Obsolescence of Buildings
Flexible Design Processes to Reduce the Early Obsolescence of Buildings
 
Study on Performance Enhancement of Solar Ejector Cooling System
Study on Performance Enhancement of Solar Ejector Cooling SystemStudy on Performance Enhancement of Solar Ejector Cooling System
Study on Performance Enhancement of Solar Ejector Cooling System
 
Flight Safety Case Study: Adi Sucipto Airport Jogjakarta - Indonesia
Flight Safety Case Study: Adi Sucipto Airport Jogjakarta - IndonesiaFlight Safety Case Study: Adi Sucipto Airport Jogjakarta - Indonesia
Flight Safety Case Study: Adi Sucipto Airport Jogjakarta - Indonesia
 
A Review of Severe Plastic Deformation
A Review of Severe Plastic DeformationA Review of Severe Plastic Deformation
A Review of Severe Plastic Deformation
 
Annealing Response of Aluminum Alloy AA6014 Processed By Severe Plastic Defor...
Annealing Response of Aluminum Alloy AA6014 Processed By Severe Plastic Defor...Annealing Response of Aluminum Alloy AA6014 Processed By Severe Plastic Defor...
Annealing Response of Aluminum Alloy AA6014 Processed By Severe Plastic Defor...
 
Evaluation of Thresholding Based Noncontact Respiration Rate Monitoring using...
Evaluation of Thresholding Based Noncontact Respiration Rate Monitoring using...Evaluation of Thresholding Based Noncontact Respiration Rate Monitoring using...
Evaluation of Thresholding Based Noncontact Respiration Rate Monitoring using...
 
Correlation of True Boiling Point of Crude Oil
Correlation of True Boiling Point of Crude OilCorrelation of True Boiling Point of Crude Oil
Correlation of True Boiling Point of Crude Oil
 
Combined Geophysical And Geotechnical Techniques For Assessment Of Foundation...
Combined Geophysical And Geotechnical Techniques For Assessment Of Foundation...Combined Geophysical And Geotechnical Techniques For Assessment Of Foundation...
Combined Geophysical And Geotechnical Techniques For Assessment Of Foundation...
 
ICT governance in Higher Education
ICT governance in Higher EducationICT governance in Higher Education
ICT governance in Higher Education
 
Gobernanzade las TIC en la Educacion Superior
Gobernanzade las TIC en la Educacion SuperiorGobernanzade las TIC en la Educacion Superior
Gobernanzade las TIC en la Educacion Superior
 
The Analysis and Perspective on Development of Chinese Automotive Heavy-duty ...
The Analysis and Perspective on Development of Chinese Automotive Heavy-duty ...The Analysis and Perspective on Development of Chinese Automotive Heavy-duty ...
The Analysis and Perspective on Development of Chinese Automotive Heavy-duty ...
 
Research on The Bottom Software of Electronic Control System In Automobile El...
Research on The Bottom Software of Electronic Control System In Automobile El...Research on The Bottom Software of Electronic Control System In Automobile El...
Research on The Bottom Software of Electronic Control System In Automobile El...
 
Evaluation of Specialized Virtual Health Libraries in Scholar Education Evalu...
Evaluation of Specialized Virtual Health Libraries in Scholar Education Evalu...Evaluation of Specialized Virtual Health Libraries in Scholar Education Evalu...
Evaluation of Specialized Virtual Health Libraries in Scholar Education Evalu...
 
Linking Ab Initio-Calphad for the Assessment of the AluminiumLutetium System
Linking Ab Initio-Calphad for the Assessment of the AluminiumLutetium SystemLinking Ab Initio-Calphad for the Assessment of the AluminiumLutetium System
Linking Ab Initio-Calphad for the Assessment of the AluminiumLutetium System
 
Thermodynamic Assessment (Suggestions) Of the Gold-Rubidium System
Thermodynamic Assessment (Suggestions) Of the Gold-Rubidium SystemThermodynamic Assessment (Suggestions) Of the Gold-Rubidium System
Thermodynamic Assessment (Suggestions) Of the Gold-Rubidium System
 
Elisa Test for Determination of Grapevine Viral Infection in Rahovec, Kosovo
Elisa Test for Determination of Grapevine Viral Infection in Rahovec, KosovoElisa Test for Determination of Grapevine Viral Infection in Rahovec, Kosovo
Elisa Test for Determination of Grapevine Viral Infection in Rahovec, Kosovo
 
Modelling of Sealing Elements Wearing
Modelling of Sealing Elements WearingModelling of Sealing Elements Wearing
Modelling of Sealing Elements Wearing
 
Determining Loss of Liquid from Different Types of Mud by Various Addictives ...
Determining Loss of Liquid from Different Types of Mud by Various Addictives ...Determining Loss of Liquid from Different Types of Mud by Various Addictives ...
Determining Loss of Liquid from Different Types of Mud by Various Addictives ...
 

Recently uploaded

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 

Recently uploaded (20)

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 

H615358

  • 1. International Refereed Journal of Engineering and Science (IRJES) ISSN (Online) 2319-183X, (Print) 2319-1821 Volume 6, Issue 1 (January 2017), PP.53-58 www.irjes.com 53 | Page An Analysis of The Road Parking At The Area of Laelangi Market In Baubau City, Southeast Sulawesi Province - Indonesia Asidin¹,M. Yamin Jinca²,Ganding Sitepu³ 1 Postgraduate Student, At Master Degree Of Transportation, Faculty Of Postgraduate, Hasanuddin University, ²Professor, For Infrastructure And Transportation Planning, Hasanuddin University, ³Lecturer, Transportation Engineering, Hasanuddin University, Makassar-Indonesia Abstract: An increasing number of vehicles showed better economic level in society, resulting in increased mobility of people and give rise to the movement of high and needs space parking facility. The phenomenon that occurs at the area of Laelangi market in Baubau city is parked vehicles occurred on the road and have an impact on traffic congestion on the peak hours, it will conduct research of the phenomenon. This research aims to develop a concept of spatial parking and explain the capacity and effectiveness of parking based on the parking layout and needs parking area on Laelangi market in Baubau city, so it becomes an input to the policy makers. This research uses descriptive quantitative method to analyze the characteristics of the park to find parking capacity, the volume of parking, the accumulated parking, usage levels of parking, and the parking demand both two wheelers and four wheels that use the parking area during the week (Monday up to Sunday) begin at 06.00 pm until 18.00 pm. The results showed that the concept of spatial planning is necessary a parking on the location of Laelangi market in Baubau city and recommend vertical parking spaces (Parking Garage) due to the availability of parking spaces, as well as management parking good to be a source of Local Revenue. Keywords: Road parking, , space capacity, the growth of the vehicle. I. INTRODUCTION In the rapid development and progress of the region, the need for parking is very important to accommodate community activities and traffic of the city. Urban areas with population densities and high economic levels resulting in personal vehicle ownership rate are high and a problem in parking provision. Increased construction in particular city business centers was not yet able to provide sufficient parking area, so that the road around it is used for parking space, causing traffic problems (speed decreased and increased travel time). Parking service facilities is a substantial problem that often occurs in large cities and towns that are developing in Indonesia, is also happening in Baubau city. This is due to the difficulty of obtaining parking spaces, especially in the area of offices and shopping centers. The parking issue was predominantly due to the limited available land and high land prices. Also due to an imbalance between the ratio of vehicles to be accommodated with the existing parking area, so that the areas of parking a vehicle will run over along the way at shopping centers and offices, and the impact on the problem of congestion in the region. This happened at the Laelangi market in Baubau city. According to Abubakar et al, 1998. Parking is defined as a state of no movement of a vehicle that is not temporary; parking included in the definition is any vehicle that stops at certain places either by manual signs or not, and not solely for the sake of raising or lowering the people or logistics [1]. According Morlok 2010. Parking facilities are classified according to three main characteristics, the first is whether the parking is provided on the road or off the road, which both depends on whether the park was carried out by the driver himself and by special parking attendant and the third is the difference facility single storey or storey parking lot [2]. Availability of the parking on the area of Laelangi market is urgently needed, the authority to determine the provision of parking facilities are to be fully authorized by the local government. The absence of parking area at the areas of Laelangi market traders and visitors to use the street to park the vehicle, both of which use two-wheeled vehicles and four wheels, resulting in reduction of the width of the road that always leads to chaos and congestion at these locations. II. OBSERVATIONS AND METHODS This research was conducted in the area of Laelangi market in Baubau city as in Figure 1. The selection of this area is caused at the Laelangi market surrounded by roads namely Kartini Road, Sudirman Road, Mongensidi and D.I. Panjaitan Road which the segment is already happening streets parking chaos resulting in accumulation of vehicles that cause congestion on the road segment. If the area of the parking lot is not created
  • 2. An Analysis of the Road Parking At the Area of Laelangi Market in Baubau City, Southeast …. www.irjes.com 54 | Page for a special parking place, then it will cause problems in the future congestion on road segments that exist around the market of Laelangi in Baubau city. Figure 1. Locus of Research Figure 2. Locus of Research Data retrieval is done by Surveyor on the area activities parking of vehicles on the road at the site of the research that Laelangi market in Baubau city as shown in Figure 2. The Surveyor placed on each road namely R. A. Kartini Road, Sudirman Road, Mongensidi and D.I. Panjaitan Road. Each surveyor on the road section will record the number of vehicles as well as vehicles parked long time, as well as measure the dimensions of the road into a parking area either vehicle two-wheeled or four or pickup and truck/canvas porters. Observations were made for seven days (a week) and starts at 06.00 pm until 18.00 pm every day by dividing four periods of analysis that are; Period I is an analysis of parking that occurs between the hours of 6:00 to 09:00 a.m, Period II is an analysis of parking that occurs between the hours of 09:00 to 12:00 am, Period III is an analysis of parking that occurs between the hours of 12:00 to 15:00 pm, and Period IV is an analysis of parking that occurs between the hours of 15:00 to 18:00 pm. Data were analyzed using quantitative methods in accordance problems occurred by analyzing the characteristics of parking related to the large number of parking needs to be provided Hobbs in 1995 [3], based on the capacity of the road, parking capacity of the road, the volume of parking, the accumulation of parking of vehicles parked at a spot on specific time which shows the parking load per a specified time period, calculated as follows: The capacity of the road C = Co x FCW x FCsp x FCsf x FCcs (1) C = Co x FC
  • 3. An Analysis of the Road Parking At the Area of Laelangi Market in Baubau City, Southeast …. www.irjes.com 55 | Page Where: C = capacity of roads (pcu/hour) Co = basic capacity (pcu/hour) FC = Correction factors FCw = adjustment factor width of traffic lanes FCsp = adjustment factor separation direction FCsf = adjustment factor due to side friction FCcs = adjustment factor size cities Accumulated Parking = Ei - Ex + X (2) by: Ei = Entry (vehicles entering the parking area) Ex = Exit (exit the vehicle parking area) X = the number of vehicles that have been parked before the observation The duration of parking is the span of a vehicle parked in a parking space in one unit of time, whereas to determine the average length of the parking of all vehicles during the time of the survey can be seen from the following formula Oppenlender 1995. [4] Calculated using the formula: Σ ( Nx ).( X ).( I ) D = ---------------------- (3) Nt D : average parking duration (h/vehicle). Σ (Nx) : The number of vehicles parked for x interval X : The number of intervals. I : The time interval surveys (h). Nt : The total number of vehicles during the survey period. Parking space requirement is calculated using the formula: KRP = Parking Volume x SRP (motorcycle/car) Parking Turn over (PTO) that parking turn over rate indicates the level of use of a parking space in a certain time unit. Parking turn over rate indicates the level of use of parking space, calculated by the formula: The number of vehicles entered in one period PTO = -------------------------------------------------------- (4) Accumulated maximum parking in one day Parking Index is the percentage of the number of parked vehicles occupy parking area; can be determined by using the formula: Accumulated Parking IP = ------------------------------ (5) Parking capacity Parking Space Unit (PSU) is a measure of the effective area to park one vehicle (passenger car, bus/truck or motorbike), including free space and door openings. PSU can also be said to be the size of a parking space requirements for a vehicle with a comfortable and safe with the amount of space as efficiently as possible. III. RESULTS There are on average approximately 950 to 250 two-wheelers and four-wheeled vehicles were recorded entering and exiting the parking area on the road around the market of Laelangi in Baubau city. Accumulated number of vehicles on Saturday as much as 1,020 two-wheeled vehicles, and on Wednesday as much as 276 four-wheeled vehicle that is a day that the number of vehicles at most. The surge in parking vehicles occurred in the period II to period III is due in that period is the peak activity in the market of Laelangi in Baubau city, while the surge in vehicle exit or leave the park during the period IV which in these hours is the time the activity was ending. On Monday, the number of two-wheeled vehicles parked there were 32 motorcycles, while the four- wheel vehicle that is parked recorded on Sunday as many as 14 cars.
  • 4. An Analysis of the Road Parking At the Area of Laelangi Market in Baubau City, Southeast …. www.irjes.com 56 | Page Figure 3. Total Accumulated Parking Two Wheel Vehicles Figure 4. Total Accumulated Four Wheel Vehicle Parking Volume parking is calculated by assigning the highest accumulation of a vehicle parked for two wheels and four wheels. Number of parking two-wheeled vehicle that is highest on Saturday by the number of motor vehicles in 1020, while the number of four-wheeled vehicles parking highs on Wednesday that as many as 276 cars. Parking space requirement is obtained by calculating the amount of Parking Space Units (PSU) obtained by shifting the overall volume of vehicles with the highest parking standard PSU each vehicle type. Count KRP two-wheeled vehicles: The number of KPR standards = 1428.00 m2 /motors Count KPR four-wheeled vehicles: The number of KPR standard = 3450.00 m2 /car In the calculation of Parking Turn over (PTO) is known that parking turnover rate for cars and motors on the fourth observation period, one plot parking two vehicles used by 2 vehicles for two hours. IV. DISCUSSION Road capacity on the area of Laelangi market in Baubau city reduced due to the parking of vehicles on the road; this can be seen in Figure 5. The Capacity of Kartini Road: FC = 1.25 x 1.00 x 0.80 x 0.83 = 0.83 C = 2900 x 0.83 = 2407.00 pcu/hour 0 20 40 60 80 100 120 140 160 180 06.00-07.00 07.01-08.00 08.01-09.00 09.01-10.00 10.01-11.00 11.01-12.00 12.01-13.00 13.01-14.00 14.01-15.00 15.01-16.00 16.01-17.00 17.01-18.00 TotalofVehicle Observation Time Total of Parking Road Monday Tuesday Wednesday Thursday Friday Saturday Sunday 0 10 20 30 40 06.00-07.00 07.01-08.00 08.01-09.00 09.01-10.00 10.01-11.00 11.01-12.00 12.01-13.00 13.01-14.00 14.01-15.00 15.01-16.00 16.01-17.00 17.01-18.00 NumberofVehicle Observation Time Total Parking Road Monday Tuesday Wednesday Thursday Friday Saturday Sunday
  • 5. An Analysis of the Road Parking At the Area of Laelangi Market in Baubau City, Southeast …. www.irjes.com 57 | Page Figure 5. The Capacity of Kartini and Jend. Sudriman Road The capacity of Wolter Monginsidi road: FC = 1.25 x 1.00 x 0.85 x 0.83 = 0.8819 C = 2900 x 0.8819 = 2557.44 pcu/hour Figure 6. The Capacity of Wolter Monginsidi Road The Capacity of D.I. Panjaitan Road: FC = 1.25 x 1.00 x 0.75 x 0.83 = 0.7781 C = 2900 x 0.7781 = 2256.56 pcu/hour Figure 7. The Capacity of D.I. Panjaitan Road
  • 6. An Analysis of the Road Parking At the Area of Laelangi Market in Baubau City, Southeast …. www.irjes.com 58 | Page In the calculation of the need for parking spaces obtained for four-wheeled vehicles the number of parking spaces that there are 123 parking plots, while plots of parking spaces for two-wheeled vehicles provided are 436 parking plots. Needs a parking space when compared with the accumulated maximum parking where maximum accumulation for four-wheel vehicles was 276 cars and for two-wheeled vehicles are 950 motors, for the days not too crowded as in the early morning activities and afternoon at the end of community activities. These conditions indicate parking plots available do not meet, for four-wheel vehicles need at least 2400.00 m2 of parking spaces, while the two-wheeled vehicle requires 1237.60 m2 of parking space. At certain times greatly increased the number of vehicles up to two times as much as on the day of the week before the day of Eid. From the calculation for the PTO can be seen that in each hour, good parking space four-wheeled vehicle and two wheels can only serve two vehicles only. PTO low value indicates that the vehicle is parked in a long term. From the calculation results can be seen an increase PTO is highest in the period II. This period is hours of 09:00 to 12:00 at which time the public's flurry of activity both traders and visitors who are shopping for daily needs in the research location of Laelangi market in Baubau city. With parking time of approximately 15 minutes up to 90 minutes for one vehicle, compared with the existing parking spaces at odd hours, the busiest (period II) vehicles coming in abundance, but the parking area is there to be used less. The movement of people in the study site of Laelangi market in Baubau city that vary according to the needs of each lead to differences in the timing and space vehicles as transport people and logistics, one of which is a parking space. Today, with the increasing number of two-wheeled vehicles or four wheels greatly affect parking facilities. Density parking occurring on the streets in the research location indication can be seen from the volume of vehicles both two-wheelers and four-wheeled vehicles that have exceeded the number of plots parking is ideal, even though conditions in the study site were not so crowded, with conditions on the area of Laelangi market in Baubau city require a parking space arrangement well ordered in accordance with criteria required in planning will parking. The solutions offered to solve the problem of the parking area of research by making a parking area by no longer using the road to park the vehicle. Making parking using vertical parking system due to the available land at the research sites were very narrow, using a model of vertical parking will eat far more accommodating both two-wheeled vehicles and four-wheeled vehicles. The diversity of the purpose of each vehicle should be created zone for four-wheeled vehicles, and for two-wheeled vehicles are placed one floor and a parking space reserved for persons with disabilities. V. CONCLUSIONS AND RECOMMENDATIONS Based on the results of the discussion is concluded that the parking capacity of the road at the research location of Laelangi market in Baubau City is very dense so the site is often the case clutter cause congestion on the street around the study site, especially during the peak of activity in the market of Laelangi in Baubau City. The need for a special location for a parking space at the location of such research is needed considering the number of vehicles continues to increase is, recommended to the Local Government authorities as development in the area to the make special parking area around the market of Laelangi in Baubau city. The number of vehicles parked four-wheel vehicles as much as 276 cars and need a parking space 3450.00 m2 , while land-street parking available is 1537.00 M2 and for two-wheeled vehicles are motorcycles 1020 m2 1428.00 need a parking space, the parking lot road is 436.00 m2 . Parking availability orderly and proper management, it will be a source of Local Revenue, which is not managed by the Government. REFERENCES [1]. Abubakar I. et al. (1998). Guidelines for Planning and Operation of Parking Facilities. Directorate of Traffic Systems City Transport, Directorate General of Land Transportation, Jakarta [2]. Morlok (2010). Introduction to Engineering and Transport Planning. Jakarta: Erland. [3]. Sekaran U. (2003). Research Method for Business (4th ed.). New York: John Wiley & Sons, Inc. [4]. Soejono. (1996). Technical Implementation Guidelines parking facilities. Jakarta: Directorate General of Land Transportation Decree No. 272 / HK.105 / DrJD / 96 [5]. Hobbs.1995. Planning and Traffic Engineering. Gajah Mada University Press, Yogyakarta. [6]. Oppenlender J.C and P.C. Box, 1976, Ma- nual of Traffic Engineering Studies, Institute of Transportation Engineering Washington DC. [7]. Salter J.R, 1974, Highway Traffic Analysis and Design, The Macmillan Press Ltd. New York .