BASICS OF POWER
BY
KHALID AYAZ SOOMRO
INSTRUCTOR OPERATION/ (INTERN ENGINEERS)
TRAINING CENTER TPS, GUDDU
SAFETY & HEALTH
GOALS
The following goals have been
established for XYZ Company:
(1) Provide workers with a safe work
environment.
(2) Conduct routine/regular
workplace inspections.
(3) Provide Personal Protective
Equipment.
(4) Develop and implement safe
work procedures and rules.
(5) Provide on-going safety training
(6) Enforce safety rules and
appropriate discipline.
(7) Provide on-going property
conservation practices.
SAFETY RULES
All safety rules must be obeyed. Failure to do so will
result in strict disciplinary action.
All injuries must be reported as soon as
possible.
No horseplay, alcohol, or drugs allowed on
premises.
No alcohol usage allowed during lunch
break.
PPE must be worn as prescribed by
management.
All tools/equipment must be maintained in
All tools/equipment must be maintained in
good condition.
Only appropriate tools shall be used for
specific jobs.
All guards must be kept in place.
No spliced electrical cords/wiring allowed.
Only authorized personnel can operate forklift
vehicles.
Smoking allowed only in lunchroom.
Seat belt use required of all
drivers/passengers.
Power Plant
Power Plant
Conventional
Power Plant
Conventional
Power Plant
Hydel Power Plant
Non-Conventional
Power Plant
Non-Conventional
Power Plant
Thermal Power Plant
Thermal Power Plant
Steam Power Plant
Combined Cycle Power Plant
Gas Turbine Power Plant
Diesel Power Plant
Steam Power Plant
Combined Cycle Power Plant
Gas Turbine Power Plant
Diesel Power Plant
Hydel Power Plant
Hydel Power Plant
Low Head Power Plant
Medium Head Power Plant
High Head Power Plant
Run of River Power Plant
Low Head Power Plant
Medium Head Power Plant
High Head Power Plant
Run of River Power Plant
Nuclear Power Plant
Solar Power Plant
Tidal Power Plant
Nuclear Power Plant
Solar Power Plant
Tidal Power Plant
Geo Thermal Power Plant
Wind Power Plant
Bio-mass Power Plant
Geo Thermal Power Plant
Wind Power Plant
Bio-mass Power Plant
• GAS TURBINE PREPERATION / CHECKS BEFORE STARTING
• 1- Auxilary power supply 6.6kv ON (internal/external)source for all equepment which are in
servece before strating .
• 2- DC power supplt for control and protection system ON (thrugh Rectifire) and batteries on
stand by position
• 3- No any PTW are in Panding
• 4- Clearence from all maintanence sections
• 5- Check all Mechanical,Instrumentations,and Electrical Equepments are ready for
operation
• 6- Cooling Water circuit are in operation
• 7- Lube oil circuit are in operation and lube oil Temp >35c and turning Gear On
• 7- Lube oil circuit are in operation and lube oil Temp >35c and turning Gear On
• 8-Checke no any Leakage,Vibration,rubbing Noise and over Heating occures
• 9- Filtter house ready for operation
• 10-Anounciator pannel clear no any indication persists
• 11- Fuel (Gas/ Oil) raedy for operation
• 12-H2/Air cooling and sealing system ON
• 13- Gas Turbine Ready For operatoin indication ON.
GAS TURBINE STRARTING PROCEDURE
OF GE WITH RELAYS AND SIEMENS WITH SPEED (STARTING PROCEDURE ALMOST
SAME )
A- GT Ready for operation indication ON
B-Operation mode selector put on Generator and indication must on Generator
C-Master Control selector ON AUTO
D-Synchronizing Selector put on AUTO/Manual
E-Load selector put on BASE LOAD/PEAK LOAD
F- Fuel slector put on GAS/OIL
G-Give strart pulse to master control and starting sequence start
1- starting sequence progress On and ready to start Light OFF
2-14HR relay Light ON and Starting Divice Energize ( it meanse no Zero speed )
3-14HM relay Light On (it meanse speed at 16%)
- speadtronice signal
-for( GCE) for gas and (LCE )for oil , values on for ignition
-IGNITION SEQUENCE ON and Flame detector light ON
-IGNITION SEQUENCE ON and Flame detector light ON
GCE/LCE values decreased up to warm up value for warm up time before
acceleration
4- GCE/LCE values increased for Acceleration speed
5-Accceleration control/speed control light ON
6- 14HA relay light ON (when speed at 50%
-Feild braeker ON for feild flashing
7-14HC relay light ON (when speed at 70%) and Starting Divice Disengage s
8-14HS lrelay light ON -Auxilary Lube oil pump OFF and Axilary Hydrulic pump
OFF
9-Starting Sequence Complet light ON
10-m/c Synchronized through AUTO/Manual
-Spnning Reserve Load On (That is 5 to 8MW)
11- GT Laoding start according to gradient select (normal gradient
11MW/minute and fast gradie
NOTE:- During Inital operation Master Control Switch put on Crank,Fire ,and Auto
to check the Leakages, Rubbing Noise,Overheating.from Lubrication,Automizing
air,fuel gas manifold ,fuel oil, flow devider,cumustion chamber
/combustors,crossfire tube,Liner
check all these things during start up sequence from diffrent comportments.
Steam Turbine
Steam turbine is a prime mover that drives its energy of rotation due to
conversion of heat energy of steam into kinetic energy as it expands through a
series of nozzles mounted on the casing or produced by the fixed blades.
That machine converts heat energy into mechanical energy called steam
turbine.
Definition of a steam turbine?
A steam turbine is a prime mover that derives its energy of rotation
due to conversion of the heat energy of steam into kinetic energy as it
due to conversion of the heat energy of steam into kinetic energy as it
expands through a series of nozzles mounted on the casing or
produced by the fixed blades.
1-Neilson defines it: The turbine is a machine in which a rotary motion
is obtained by the gradual change of the momentum of the fluid.
2-Graham's definition: The turbine is a prime mover in which a rotary
motion is obtained by the centrifugal force brought into action by changing
the direction of a jet of a fluid (steam) escaping from the nozzle at high
velocity.
Ts diagram of a typical Rankine cycle operating between pressures of
0.06bar and 50bar
There are four processes in the Rankine cycle. These states are identified by
numbers (in brown) in the above Ts diagram.
 Process 1-2: The working fluid is pumped from low to high pressure. As the fluid
is a liquid at this stage the pump requires little input energy.
 Process 2-3: The high pressure liquid enters a boiler where it is heated at
constant pressure by an external heat source to become a dry saturated
vapor. The input energy required can be easily calculated using mollier
vapor. The input energy required can be easily calculated using mollier
diagram or h-s chart or enthalpy-entropy chart also known as steam tables.
 Process 3-4: The dry saturated vapor expands through a turbine, generating
power. This decreases the temperature and pressure of the vapor, and some
condensation may occur. The output in this process can be easily calculated
using the Enthalpy-entropy chart or the steam tables.
 Process 4-1: The wet vapor then enters a condenser where it is condensed at
a constant temperature to become a saturated liquid.
• Synchronization
• When do different electrical systems are coupled together it is called synchronization or to connect the generator with system.
•
• There are three main aspects during synchronization
•
• Generator and system voltage should be same.
• Generator and system frequency should be same.
• Generator and system phase angle should be equal.
•
• Thus, if above three conditions are equal then generator should be synchronized with system
•
• Advantages of A.C Generator
• Field winding on rotor
• Less insulation
• Weight of rotor less
• Easy to retain centrifugal force
• Size of rotor is smaller
• High voltage on rotor
• High voltage on rotor
• Transmission of voltage is easy
• Easy cooling system
•
• Generator protections
• Generator differential protection
• Generator over current protection
• Stator earth fault protection
• Rotor earth fault protection
• Under excitation protection
• Reverse power protection generator motoring
• Negative phase sequence protection… system unbalance
• Over / under frequency protection
• Breaker pole failure protection
• Synchronous check protection “When you system supply is dead and you are the 1st one in the system.. no need of
synchronization”
• Over excitation
D.C Supply
As we all know that AC supply can’t be stored. Thus the back systems in power houses are used built on
DC supply system. It is a stand by source of electricity available at every movement in shape of storage
batteries in order to protect our main system to damage.
•Importance of DC supply
All the control and protection system is based on DC supply. Usually the AC supply is converted to DC
through rectifier. Further battery bank is also used which is charge through rectifier. This DC produced by
battery bank is used in emergency when AC is not available. Moreover, during charging the chemical
energy converts into electrical energy.
•Different parts of DC supply
•Rectifier
•Battery charger
•Battery cell 24VDC or 220VDC
•Kinds of batteries
There are so many kinds of batteries; however below mentioned are the one
who have been chosen on their type of material and electrode.
•Lead acid batteries
•Nickel cadmium alkaline batteries
•Nickel cadmium alkaline batteries
Nickel iron alkaline batteries
•Use of battery if power station
•Control of electrical equipment
•Open / close of breakers
•Position indicators
•Emergency lights
•Field flashing
•Control and protection system
•Emergency pumps
Note: The charge battery has 11% water and 89% sulphuric acid and when it
discharged it become 15% sulphric acid and 15% water.
•Thank You for
Your Time and
Attention !!!!
If you Gets Some Points
Please Remember Me
in your Prayers
KHALID AYAZ SOOMRO
INSTRUCTOR OPERATION/ (INTERN ENGINEERS)
TRAINING CENTER TPS, GUDDU
REGARDS:

More Related Content

What's hot

Normas tecnicas de seguridad industrial
Normas tecnicas de seguridad industrialNormas tecnicas de seguridad industrial
Normas tecnicas de seguridad industrial
Heidy Palacios
 
Scaffold
ScaffoldScaffold
Scaffold
Faiz Ahmed
 
03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf
RajkumarArikumar
 
Welding and cutting safety
Welding and cutting safetyWelding and cutting safety
Welding and cutting safety
YAWAR HASSAN
 
HEIGHT WORK SAFETY REPORT
HEIGHT WORK SAFETY REPORTHEIGHT WORK SAFETY REPORT
HEIGHT WORK SAFETY REPORT
Er Abhishek Kumar
 
PRESENTACIÓN NOM-004-STPS-2020 SEGURIDAD EN MAQUINARIA
PRESENTACIÓN NOM-004-STPS-2020 SEGURIDAD EN MAQUINARIAPRESENTACIÓN NOM-004-STPS-2020 SEGURIDAD EN MAQUINARIA
PRESENTACIÓN NOM-004-STPS-2020 SEGURIDAD EN MAQUINARIA
gisellgarcia92
 
Pp working safely ppe
Pp working safely   ppePp working safely   ppe
Pp working safely ppe
Maxy2001
 
Water cooler monthly
Water cooler monthlyWater cooler monthly
Water cooler monthly
Azmeel Contracting Company
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
Karnav Rana
 
Office safety procedure cabinet
Office safety procedure   cabinetOffice safety procedure   cabinet
Office safety procedure cabinet
yoyo priyono
 
Uso y conservación de las áreas de trabajo
Uso y conservación de las áreas de trabajoUso y conservación de las áreas de trabajo
Uso y conservación de las áreas de trabajo
Alfredo Rico
 
8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout
Creative Safety Supply
 
HSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.pptHSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.ppt
MohammedAmer415272
 
nom-001-stps2008.pptx
nom-001-stps2008.pptxnom-001-stps2008.pptx
nom-001-stps2008.pptx
AntonioLopez808351
 
Safe Material Handling
Safe Material Handling Safe Material Handling
Safe Material Handling
Reliance
 
Check list for conveyor belt inspection
Check list for conveyor belt inspectionCheck list for conveyor belt inspection
Check list for conveyor belt inspection
Bimal Chandra Das
 
Equipo de protección personal.pdf
Equipo de protección personal.pdfEquipo de protección personal.pdf
Equipo de protección personal.pdf
Unidad de Emprendimiento ambulante
 
Loto basics.
Loto basics.Loto basics.
Lifting tools and tackle
Lifting tools and tackle Lifting tools and tackle
Lifting tools and tackle
AmarkumarSingh25
 
Work permit system
Work permit systemWork permit system
Work permit system
smithgeigle
 

What's hot (20)

Normas tecnicas de seguridad industrial
Normas tecnicas de seguridad industrialNormas tecnicas de seguridad industrial
Normas tecnicas de seguridad industrial
 
Scaffold
ScaffoldScaffold
Scaffold
 
03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf
 
Welding and cutting safety
Welding and cutting safetyWelding and cutting safety
Welding and cutting safety
 
HEIGHT WORK SAFETY REPORT
HEIGHT WORK SAFETY REPORTHEIGHT WORK SAFETY REPORT
HEIGHT WORK SAFETY REPORT
 
PRESENTACIÓN NOM-004-STPS-2020 SEGURIDAD EN MAQUINARIA
PRESENTACIÓN NOM-004-STPS-2020 SEGURIDAD EN MAQUINARIAPRESENTACIÓN NOM-004-STPS-2020 SEGURIDAD EN MAQUINARIA
PRESENTACIÓN NOM-004-STPS-2020 SEGURIDAD EN MAQUINARIA
 
Pp working safely ppe
Pp working safely   ppePp working safely   ppe
Pp working safely ppe
 
Water cooler monthly
Water cooler monthlyWater cooler monthly
Water cooler monthly
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
Office safety procedure cabinet
Office safety procedure   cabinetOffice safety procedure   cabinet
Office safety procedure cabinet
 
Uso y conservación de las áreas de trabajo
Uso y conservación de las áreas de trabajoUso y conservación de las áreas de trabajo
Uso y conservación de las áreas de trabajo
 
8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout
 
HSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.pptHSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.ppt
 
nom-001-stps2008.pptx
nom-001-stps2008.pptxnom-001-stps2008.pptx
nom-001-stps2008.pptx
 
Safe Material Handling
Safe Material Handling Safe Material Handling
Safe Material Handling
 
Check list for conveyor belt inspection
Check list for conveyor belt inspectionCheck list for conveyor belt inspection
Check list for conveyor belt inspection
 
Equipo de protección personal.pdf
Equipo de protección personal.pdfEquipo de protección personal.pdf
Equipo de protección personal.pdf
 
Loto basics.
Loto basics.Loto basics.
Loto basics.
 
Lifting tools and tackle
Lifting tools and tackle Lifting tools and tackle
Lifting tools and tackle
 
Work permit system
Work permit systemWork permit system
Work permit system
 

Similar to On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf

J D J
J D JJ D J
J D J
jjinesh
 
Turbine Start Up.pptx
Turbine Start Up.pptxTurbine Start Up.pptx
Turbine Start Up.pptx
ssuser0cdaa1
 
railway workshop jodhpur
railway workshop jodhpur railway workshop jodhpur
railway workshop jodhpur
kalumutha
 
railway workshop jodhpur
railway workshop jodhpurrailway workshop jodhpur
railway workshop jodhpur
kalumutha
 
Gas Turbine Power Plant.pdf
Gas Turbine Power Plant.pdfGas Turbine Power Plant.pdf
Gas Turbine Power Plant.pdf
KIET Group of Institutions
 
LETTER OF AUTHORIZATION
LETTER OF AUTHORIZATIONLETTER OF AUTHORIZATION
LETTER OF AUTHORIZATION
Moiz Akhter
 
Bhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawanaBhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawana
VisheshKumar55
 
Boiler ppt
Boiler pptBoiler ppt
Boiler ppt
Er Ramgarhia
 
PresentationGGSSTP_Atul
PresentationGGSSTP_AtulPresentationGGSSTP_Atul
PresentationGGSSTP_Atul
Atul Kataria
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPT
Shivam Sharma
 
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptxONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx
Timilehinonalaja
 
V.T ppt
V.T pptV.T ppt
V.T ppt
Aditi Tiwari
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
Nipak Banerjee
 
Introduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power PlantIntroduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power Plant
SWAPNILTRIVEDI6
 
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
Affiliated Corporation To Help the International Students of Shenyang Aerospace University
 
Ignition System & Engine Electronics
Ignition System & Engine ElectronicsIgnition System & Engine Electronics
Ignition System & Engine Electronics
Umar Fayyaz
 
Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants Overview
Ridwanul Hoque
 
Motor protection principles
Motor protection principlesMotor protection principles
Motor protection principles
Atiq Sayal
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
Vimal Tripathi
 
Power Cycles and power plants
Power Cycles and power plantsPower Cycles and power plants
Power Cycles and power plants
Sarthak Kohli
 

Similar to On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf (20)

J D J
J D JJ D J
J D J
 
Turbine Start Up.pptx
Turbine Start Up.pptxTurbine Start Up.pptx
Turbine Start Up.pptx
 
railway workshop jodhpur
railway workshop jodhpur railway workshop jodhpur
railway workshop jodhpur
 
railway workshop jodhpur
railway workshop jodhpurrailway workshop jodhpur
railway workshop jodhpur
 
Gas Turbine Power Plant.pdf
Gas Turbine Power Plant.pdfGas Turbine Power Plant.pdf
Gas Turbine Power Plant.pdf
 
LETTER OF AUTHORIZATION
LETTER OF AUTHORIZATIONLETTER OF AUTHORIZATION
LETTER OF AUTHORIZATION
 
Bhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawanaBhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawana
 
Boiler ppt
Boiler pptBoiler ppt
Boiler ppt
 
PresentationGGSSTP_Atul
PresentationGGSSTP_AtulPresentationGGSSTP_Atul
PresentationGGSSTP_Atul
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPT
 
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptxONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx
 
V.T ppt
V.T pptV.T ppt
V.T ppt
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
 
Introduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power PlantIntroduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power Plant
 
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
Aerospace Propulsion Study For Shenyang Aerospace University by Lale420 (Fina...
 
Ignition System & Engine Electronics
Ignition System & Engine ElectronicsIgnition System & Engine Electronics
Ignition System & Engine Electronics
 
Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants Overview
 
Motor protection principles
Motor protection principlesMotor protection principles
Motor protection principles
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
Power Cycles and power plants
Power Cycles and power plantsPower Cycles and power plants
Power Cycles and power plants
 

More from KhalidAyaz3

Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...
Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...
Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...
KhalidAyaz3
 
FInal Internship Report nust.pdf
FInal Internship Report nust.pdfFInal Internship Report nust.pdf
FInal Internship Report nust.pdf
KhalidAyaz3
 
internship Report Print - Copy.pdf
internship Report Print - Copy.pdfinternship Report Print - Copy.pdf
internship Report Print - Copy.pdf
KhalidAyaz3
 
Cogeneration Power desalination plant - Copy.pdf
Cogeneration Power desalination plant - Copy.pdfCogeneration Power desalination plant - Copy.pdf
Cogeneration Power desalination plant - Copy.pdf
KhalidAyaz3
 
My book on power plant by khalid ayaz soomro.pdf
My book on power plant by khalid ayaz soomro.pdfMy book on power plant by khalid ayaz soomro.pdf
My book on power plant by khalid ayaz soomro.pdf
KhalidAyaz3
 
01. Khalid Ayaz 41 Years pdf.pdf
01. Khalid Ayaz 41 Years pdf.pdf01. Khalid Ayaz 41 Years pdf.pdf
01. Khalid Ayaz 41 Years pdf.pdf
KhalidAyaz3
 
Internship report on 747 mw ccpp Guddu.pdf
Internship report on 747 mw ccpp Guddu.pdfInternship report on 747 mw ccpp Guddu.pdf
Internship report on 747 mw ccpp Guddu.pdf
KhalidAyaz3
 
Engr Ahmad raza Internship report on 600mw ccpp giddupdf
Engr Ahmad raza Internship report on 600mw ccpp giddupdfEngr Ahmad raza Internship report on 600mw ccpp giddupdf
Engr Ahmad raza Internship report on 600mw ccpp giddupdf
KhalidAyaz3
 
A BOOK ON BASIC CONCEPT OF MODERN POWER PLANTS by khalid ayaz soomro.pdf
A BOOK ON BASIC CONCEPT OF MODERN POWER PLANTS by khalid ayaz soomro.pdfA BOOK ON BASIC CONCEPT OF MODERN POWER PLANTS by khalid ayaz soomro.pdf
A BOOK ON BASIC CONCEPT OF MODERN POWER PLANTS by khalid ayaz soomro.pdf
KhalidAyaz3
 
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdf
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdfA BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdf
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdf
KhalidAyaz3
 
GOLDEN BOOK ON STEAM TURBINE TTC GUDDU.pdf
GOLDEN BOOK ON STEAM TURBINE TTC GUDDU.pdfGOLDEN BOOK ON STEAM TURBINE TTC GUDDU.pdf
GOLDEN BOOK ON STEAM TURBINE TTC GUDDU.pdf
KhalidAyaz3
 
GOLDEN BOOK ON BOILER TTC GUDDU.pdf
GOLDEN BOOK ON BOILER TTC GUDDU.pdfGOLDEN BOOK ON BOILER TTC GUDDU.pdf
GOLDEN BOOK ON BOILER TTC GUDDU.pdf
KhalidAyaz3
 

More from KhalidAyaz3 (12)

Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...
Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...
Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...
 
FInal Internship Report nust.pdf
FInal Internship Report nust.pdfFInal Internship Report nust.pdf
FInal Internship Report nust.pdf
 
internship Report Print - Copy.pdf
internship Report Print - Copy.pdfinternship Report Print - Copy.pdf
internship Report Print - Copy.pdf
 
Cogeneration Power desalination plant - Copy.pdf
Cogeneration Power desalination plant - Copy.pdfCogeneration Power desalination plant - Copy.pdf
Cogeneration Power desalination plant - Copy.pdf
 
My book on power plant by khalid ayaz soomro.pdf
My book on power plant by khalid ayaz soomro.pdfMy book on power plant by khalid ayaz soomro.pdf
My book on power plant by khalid ayaz soomro.pdf
 
01. Khalid Ayaz 41 Years pdf.pdf
01. Khalid Ayaz 41 Years pdf.pdf01. Khalid Ayaz 41 Years pdf.pdf
01. Khalid Ayaz 41 Years pdf.pdf
 
Internship report on 747 mw ccpp Guddu.pdf
Internship report on 747 mw ccpp Guddu.pdfInternship report on 747 mw ccpp Guddu.pdf
Internship report on 747 mw ccpp Guddu.pdf
 
Engr Ahmad raza Internship report on 600mw ccpp giddupdf
Engr Ahmad raza Internship report on 600mw ccpp giddupdfEngr Ahmad raza Internship report on 600mw ccpp giddupdf
Engr Ahmad raza Internship report on 600mw ccpp giddupdf
 
A BOOK ON BASIC CONCEPT OF MODERN POWER PLANTS by khalid ayaz soomro.pdf
A BOOK ON BASIC CONCEPT OF MODERN POWER PLANTS by khalid ayaz soomro.pdfA BOOK ON BASIC CONCEPT OF MODERN POWER PLANTS by khalid ayaz soomro.pdf
A BOOK ON BASIC CONCEPT OF MODERN POWER PLANTS by khalid ayaz soomro.pdf
 
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdf
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdfA BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdf
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdf
 
GOLDEN BOOK ON STEAM TURBINE TTC GUDDU.pdf
GOLDEN BOOK ON STEAM TURBINE TTC GUDDU.pdfGOLDEN BOOK ON STEAM TURBINE TTC GUDDU.pdf
GOLDEN BOOK ON STEAM TURBINE TTC GUDDU.pdf
 
GOLDEN BOOK ON BOILER TTC GUDDU.pdf
GOLDEN BOOK ON BOILER TTC GUDDU.pdfGOLDEN BOOK ON BOILER TTC GUDDU.pdf
GOLDEN BOOK ON BOILER TTC GUDDU.pdf
 

Recently uploaded

Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
riddhimaagrawal986
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
GauravCar
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
bijceesjournal
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
bjmsejournal
 
Data Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptxData Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptx
ramrag33
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 

Recently uploaded (20)

Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
 
Data Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptxData Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptx
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 

On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf

  • 1. PLANT OPERATION IN URDU CENTRAL POWER GENERATION CO. LTD GENCO-II TRAINING CENTER TPS GUDDU BASICS OF POWER BY KHALID AYAZ SOOMRO INSTRUCTOR OPERATION/ (INTERN ENGINEERS) TRAINING CENTER TPS, GUDDU
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7. SAFETY & HEALTH GOALS The following goals have been established for XYZ Company: (1) Provide workers with a safe work environment. (2) Conduct routine/regular workplace inspections. (3) Provide Personal Protective Equipment. (4) Develop and implement safe work procedures and rules. (5) Provide on-going safety training (6) Enforce safety rules and appropriate discipline. (7) Provide on-going property conservation practices.
  • 8. SAFETY RULES All safety rules must be obeyed. Failure to do so will result in strict disciplinary action. All injuries must be reported as soon as possible. No horseplay, alcohol, or drugs allowed on premises. No alcohol usage allowed during lunch break. PPE must be worn as prescribed by management. All tools/equipment must be maintained in All tools/equipment must be maintained in good condition. Only appropriate tools shall be used for specific jobs. All guards must be kept in place. No spliced electrical cords/wiring allowed. Only authorized personnel can operate forklift vehicles. Smoking allowed only in lunchroom. Seat belt use required of all drivers/passengers.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25. Power Plant Power Plant Conventional Power Plant Conventional Power Plant Hydel Power Plant Non-Conventional Power Plant Non-Conventional Power Plant Thermal Power Plant Thermal Power Plant Steam Power Plant Combined Cycle Power Plant Gas Turbine Power Plant Diesel Power Plant Steam Power Plant Combined Cycle Power Plant Gas Turbine Power Plant Diesel Power Plant Hydel Power Plant Hydel Power Plant Low Head Power Plant Medium Head Power Plant High Head Power Plant Run of River Power Plant Low Head Power Plant Medium Head Power Plant High Head Power Plant Run of River Power Plant Nuclear Power Plant Solar Power Plant Tidal Power Plant Nuclear Power Plant Solar Power Plant Tidal Power Plant Geo Thermal Power Plant Wind Power Plant Bio-mass Power Plant Geo Thermal Power Plant Wind Power Plant Bio-mass Power Plant
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51. • GAS TURBINE PREPERATION / CHECKS BEFORE STARTING • 1- Auxilary power supply 6.6kv ON (internal/external)source for all equepment which are in servece before strating . • 2- DC power supplt for control and protection system ON (thrugh Rectifire) and batteries on stand by position • 3- No any PTW are in Panding • 4- Clearence from all maintanence sections • 5- Check all Mechanical,Instrumentations,and Electrical Equepments are ready for operation • 6- Cooling Water circuit are in operation • 7- Lube oil circuit are in operation and lube oil Temp >35c and turning Gear On • 7- Lube oil circuit are in operation and lube oil Temp >35c and turning Gear On • 8-Checke no any Leakage,Vibration,rubbing Noise and over Heating occures • 9- Filtter house ready for operation • 10-Anounciator pannel clear no any indication persists • 11- Fuel (Gas/ Oil) raedy for operation • 12-H2/Air cooling and sealing system ON • 13- Gas Turbine Ready For operatoin indication ON.
  • 52. GAS TURBINE STRARTING PROCEDURE OF GE WITH RELAYS AND SIEMENS WITH SPEED (STARTING PROCEDURE ALMOST SAME ) A- GT Ready for operation indication ON B-Operation mode selector put on Generator and indication must on Generator C-Master Control selector ON AUTO D-Synchronizing Selector put on AUTO/Manual E-Load selector put on BASE LOAD/PEAK LOAD F- Fuel slector put on GAS/OIL G-Give strart pulse to master control and starting sequence start 1- starting sequence progress On and ready to start Light OFF 2-14HR relay Light ON and Starting Divice Energize ( it meanse no Zero speed ) 3-14HM relay Light On (it meanse speed at 16%) - speadtronice signal -for( GCE) for gas and (LCE )for oil , values on for ignition -IGNITION SEQUENCE ON and Flame detector light ON -IGNITION SEQUENCE ON and Flame detector light ON GCE/LCE values decreased up to warm up value for warm up time before acceleration 4- GCE/LCE values increased for Acceleration speed 5-Accceleration control/speed control light ON 6- 14HA relay light ON (when speed at 50% -Feild braeker ON for feild flashing 7-14HC relay light ON (when speed at 70%) and Starting Divice Disengage s 8-14HS lrelay light ON -Auxilary Lube oil pump OFF and Axilary Hydrulic pump OFF 9-Starting Sequence Complet light ON 10-m/c Synchronized through AUTO/Manual -Spnning Reserve Load On (That is 5 to 8MW) 11- GT Laoding start according to gradient select (normal gradient 11MW/minute and fast gradie
  • 53. NOTE:- During Inital operation Master Control Switch put on Crank,Fire ,and Auto to check the Leakages, Rubbing Noise,Overheating.from Lubrication,Automizing air,fuel gas manifold ,fuel oil, flow devider,cumustion chamber /combustors,crossfire tube,Liner check all these things during start up sequence from diffrent comportments.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58. Steam Turbine Steam turbine is a prime mover that drives its energy of rotation due to conversion of heat energy of steam into kinetic energy as it expands through a series of nozzles mounted on the casing or produced by the fixed blades. That machine converts heat energy into mechanical energy called steam turbine. Definition of a steam turbine? A steam turbine is a prime mover that derives its energy of rotation due to conversion of the heat energy of steam into kinetic energy as it due to conversion of the heat energy of steam into kinetic energy as it expands through a series of nozzles mounted on the casing or produced by the fixed blades. 1-Neilson defines it: The turbine is a machine in which a rotary motion is obtained by the gradual change of the momentum of the fluid. 2-Graham's definition: The turbine is a prime mover in which a rotary motion is obtained by the centrifugal force brought into action by changing the direction of a jet of a fluid (steam) escaping from the nozzle at high velocity.
  • 59. Ts diagram of a typical Rankine cycle operating between pressures of 0.06bar and 50bar There are four processes in the Rankine cycle. These states are identified by numbers (in brown) in the above Ts diagram.  Process 1-2: The working fluid is pumped from low to high pressure. As the fluid is a liquid at this stage the pump requires little input energy.  Process 2-3: The high pressure liquid enters a boiler where it is heated at constant pressure by an external heat source to become a dry saturated vapor. The input energy required can be easily calculated using mollier vapor. The input energy required can be easily calculated using mollier diagram or h-s chart or enthalpy-entropy chart also known as steam tables.  Process 3-4: The dry saturated vapor expands through a turbine, generating power. This decreases the temperature and pressure of the vapor, and some condensation may occur. The output in this process can be easily calculated using the Enthalpy-entropy chart or the steam tables.  Process 4-1: The wet vapor then enters a condenser where it is condensed at a constant temperature to become a saturated liquid.
  • 60.
  • 61.
  • 62.
  • 63.
  • 64.
  • 65.
  • 66.
  • 67.
  • 68.
  • 69.
  • 70.
  • 71.
  • 72.
  • 73.
  • 74.
  • 75.
  • 76.
  • 77.
  • 78.
  • 79.
  • 80.
  • 81.
  • 82.
  • 83.
  • 84.
  • 85.
  • 86.
  • 87.
  • 88.
  • 89.
  • 90.
  • 91.
  • 92.
  • 93.
  • 94. • Synchronization • When do different electrical systems are coupled together it is called synchronization or to connect the generator with system. • • There are three main aspects during synchronization • • Generator and system voltage should be same. • Generator and system frequency should be same. • Generator and system phase angle should be equal. • • Thus, if above three conditions are equal then generator should be synchronized with system • • Advantages of A.C Generator • Field winding on rotor • Less insulation • Weight of rotor less • Easy to retain centrifugal force • Size of rotor is smaller • High voltage on rotor • High voltage on rotor • Transmission of voltage is easy • Easy cooling system • • Generator protections • Generator differential protection • Generator over current protection • Stator earth fault protection • Rotor earth fault protection • Under excitation protection • Reverse power protection generator motoring • Negative phase sequence protection… system unbalance • Over / under frequency protection • Breaker pole failure protection • Synchronous check protection “When you system supply is dead and you are the 1st one in the system.. no need of synchronization” • Over excitation
  • 95.
  • 96.
  • 97.
  • 98.
  • 99.
  • 100.
  • 101.
  • 102.
  • 103.
  • 104. D.C Supply As we all know that AC supply can’t be stored. Thus the back systems in power houses are used built on DC supply system. It is a stand by source of electricity available at every movement in shape of storage batteries in order to protect our main system to damage. •Importance of DC supply All the control and protection system is based on DC supply. Usually the AC supply is converted to DC through rectifier. Further battery bank is also used which is charge through rectifier. This DC produced by battery bank is used in emergency when AC is not available. Moreover, during charging the chemical energy converts into electrical energy. •Different parts of DC supply •Rectifier •Battery charger •Battery cell 24VDC or 220VDC •Kinds of batteries There are so many kinds of batteries; however below mentioned are the one who have been chosen on their type of material and electrode. •Lead acid batteries •Nickel cadmium alkaline batteries •Nickel cadmium alkaline batteries Nickel iron alkaline batteries •Use of battery if power station •Control of electrical equipment •Open / close of breakers •Position indicators •Emergency lights •Field flashing •Control and protection system •Emergency pumps Note: The charge battery has 11% water and 89% sulphuric acid and when it discharged it become 15% sulphric acid and 15% water.
  • 105. •Thank You for Your Time and Attention !!!! If you Gets Some Points Please Remember Me in your Prayers