Contents  of the presentation What is Organization Behaviour? Some Definitions Why study organizational behaviour? Elements of Organizational behaviour Contributing factors Evolution of  OB(Historical Development) Models of Organizational Behaviour fundamental concepts social systems and organizational culture
International dimensions of organizational behaviour The future of OB.
What is Organizational Behavior? The study and application of how employees behave within organizations Known as people skills  Field of study that investigates the  impact that individuals, groups and structure have on behavior within organizations for the purpose of applying such knowledge toward improving an organization.
O.B. is a field of study that investigates the impact that individuals , groups and structures have on behaviour within organizations for the purpose of applying such knowledge towards improving an organization’s effectiveness. O.B. can be defined as the systematic study of the actions and reactions of individuals, groups and sub-systems. O.B. is the study and understanding of individual and group behaviour, patterns of structure in order to help improve organizational performance and effectiveness. O.B. is one of the most complex and perhaps least understood academic elements of modern general management, but since it concerns the behaviour of people within organizations it is also one of the most central- its concern with individual and group patterns of behaviour makes it an essential element in dealing with the complex behavioural issues thrown up in the modern business world. O.B. is an inter-disciplinary behaviour science studying phenomena and dynamics(processes) of organizations and their various units. Some definitions of OB
Definition: The study of human behavior, attitudes, and performance in organizations. Value of OB: Helps people attain the competencies needed to become effective employees, team leaders/members, or managers Competency = an interrelated set of abilities, behaviors, attitudes, and knowledge needed by an individual to be effective in most professional and managerial positions Organizational Behavior
Why Study Organizational Behavior? Chart the evolution of management thought on the nature of the organization Understanding of the organizational factors that influence work Understanding of how the work environment shapes organizational performance
The study of Organisational Behaviour involves... consideration of the interaction among the formal structure (organisational context in which the process of management takes place) the tasks to be undertaken the technology employed and the methods of carrying out work the behaviour of people the process of management the external environment
ORGANISATION BEHAVIOUR Interrelated dimensions influencing behaviour: The Individual - working environment should satisfy individual needs as well as attainment of organisational goals. The Group - formal and informal.  Understanding of groups complements a knowledge of individual behaviour. The Organisation - impact of organisation structure and design, and patterns of management, on behaviour. The Environment - technological and scientific development, economic activity, governmental actions.
 
Figure 1.1  What is Organizational Behavior? Insert Figure 1.1 here
e.g., Selection Systems e.g., Groupthink e.g., Personality Group Level Individual  Level Organizational Level
Components of Organizational Behavior Understanding  organizational behavior  requires studying Individuals in Organizations Group and Team Processes Organizational Processes
Note that organizations are “ open systems , ” such that their long term effectiveness is determined by their ability to anticipate, manage, and respond to changes in their environment, with such changes resulting from external forces and/or stakeholders External forces   include the labor force, the natural environment, the economy, and different cultures, while   stakeholders  include shareholders, customers, competitors, suppliers, creditors, governmental agencies and their regulations  Note the impact of these environmental influences on individual, interpersonal, team, and organizational processes; organizations that do not effectively adapt to environmental change will fail Organizations as Open systems
What is an Organization? Consciously coordinated social unit   Composed of two or more people   Functions on a continuous basis to achieve a common goal   Characterized by formal roles that define the behavior of its members
Organization :  An organization has four essential elements (a) Group of people (b) Interacting with each other (c )In a structured manner (d) Towards a common objective Management: Implies getting things done through and with people Manager: He is the dynamic, life-giving element in every organization. And it is the quality and performance of its managers which is the only effective advantage an enterprise in a competitive economy can have and particularly in a business enterprise. Basic Definitions related to OB
To provide an understanding of what goes on at the workplace. Four aspects need to be explained viz. Definition, goals, forces and O. B. ’s major characteristics O.B.  is the systematic study and careful application of knowledge about how people- as individuals and as members of groups –act within organizations. It strives to identify ways in which people can act more effectively. O.B. provides managers with the tools to: (a) to understand the behavior of individuals (b) to understand the complexities of inter-personal relations (c )to examine the dynamics of relationships within small groups –both formal teams and informal groups (d) organizations can be viewed as whole systems that have inter-organizational relationships  What is organizational Behaviour?
3 GOALS: Most sciences share four goals-to describe, understand, predict and control some phenomena.  The field of OB seeks to replace intuitive explanations with systematic study  O.B. has the following goals, 1. Describe , systematically, how people behave under a variety of circumstances 2. Understand  why people behave as they do. 3. Predicting  future employee behavior. 4. Control  at least partially, and develop some human activity at work Managers can utilize the tool of O.B.to influence human behavior , skill development, team effort and productivity. 4 FORCES: There are a wide array of issues and trends that affect the nature of organizations today.  They can be classified under four areas PEOPLE, STRUCTURE, TECHNOLOGY and the ENVIRONMENT
Goals of  Organizational Behaviour Organizational Behaviour Research Understand organizational events Predict organizational events Influence organizational events
ORGANIZATIONAL BEHAVIOUR Key forces affecting Organizational Behavior People Individuals Groups Environment Government Competition Societal pressure Organizational Behavior Technology Machinery Computer hardware ,software Structure Jobs Relationships
The organization's base rests on management's philosophy, values, vision and goals.  This in turn drives the organizational culture which is composed of the formal organization, informal organization, and the social environment. The culture determines the type of leadership, communication, and group dynamics within the organization.  The workers perceive this as the quality of work life which directs their degree of motivation.  The final outcome are performance, individual satisfaction, and personal growth and development.  All these elements combine to build the model or framework that the organization operates from.   The Elements of Organizational Behavior
Coordination  Common Goals  Division of labor Integration The elements of an Organization
Psychology : The science or study of individual human behaviour Sociology :  The study of group human behaviour Social Psychology : Studies influences of people on one another Anthropology : Study of the human race, and culture Political Science  :Behavior of individuals in political environment. Bases of Organizational Behaviour
Contributing Disciplines Psychology   seeks to  measure, explain,  and change  behavior Sociology  studies  people in relation to their  fellow human beings   Social psychology focuses on the  influence of people on one another Anthropology   is the  study of societies to learn about human  beings and their activities Political science  is the  study of the  behavior of individuals  and groups within  a political environment
Toward an OB Discipline
Evolution of Management Thought  History of management.ppt Organizational Behaviour Human Relations Hawthorne Studies Scientific Management 1900’s 1940’s 1970’s Classical Organization Theory
Scientific Management Founded by F.W.Taylor. (1856-1917) Often criticized but to remember that he was studying this around time of major industrial changes ‘ Father of Scientific Management’ Increasing levels of output by monetary incentives as a motivator as well as formal organisation structures. ‘ One Best Way’ to carry out a job.  Ford Motors Manufacturing Plant and Pig Iron Experiment. Hand Washing Procedure ● Counter Merchandising Procedures ● Special/Additional Merchandising Procedures ● Food Preparation ● Packaging Procedures
The Classical Organization Theory Personalities Frederick W. Taylor Frank and Lillian Gilbreth Henry Gantt Advocated the application of scientific methods to analyze work and to determine how to complete production tasks efficiently
Four principles develop a scientific approach for each element of one’s work scientifically select, train, teach and develop each worker cooperate with workers to ensure that jobs match plans and principles ensure appropriate division of labor
Used scientific methods to determine the “one best way’ Emphasized study of tasks, selection and training of workers, and cooperation between workers and management Improved factory productivity and efficiency Introduced scientific analysis to the workplace Piecerate system equated worker rewards and performance Simplistic motivational assumptions Workers viewed as parts of a machine Potential for exploitation of labor Excluded senior management tasks Key concepts Limitations Contributions
Hawthorne Studies Hawthorne Effect  - workers perform and react differently when researchers observe them Argued that managers should stress primarily employee welfare, motivation, and communication
“ The Hawthorne Studies” Illumination Study  (November 1924) Designed to test the effect of lighting intensity on worker productivity Heuristic value:  influence of human relations on work behavior Relay Assembly Test Room Study  (1927-1932) Assembly of telephone relays (35 parts - 4 machine screws)  Production and satisfaction increased regardless of IV manipulation Workers’ increased production and satisfaction related to supervisory practices Human interrelationships are important contributing factors to worker productivity Bottom Line:  Supervisory practices increase employee morale AND productivity
Interviewing Program  (1928-1930) Investigate connection between supervisory practices and employee morale Employees expressed their ideas and feelings (e.g.,  likes and dislikes) Process more important than actual results Bank Wiring Room Observation Study  (November 1931 - May 1932) Social groups can influence production and individual work behavior RQ:  How is social control manifested on the shop floor? Informal organization constrains employee behavior within formal organizational structure
Hawthorne Studies - Implications Illumination Study  (November 1924) The mere practice of observing people’s behavior tends to alter their behavior (Hawthorne Effect) Relay Assembly Test Room Study  (1927-1932) Relationships between workers and their supervisors are powerful Human interrelationships increase the amount and quality of worker participation in decision making Interviewing Program  (1928-1930) Demonstrated powerful influence of upward communication Workers were asked for opinions, told they mattered, and positive attitudes toward company increased Bank Wiring Room Observation Study  (November 1931 - May 1932) Led future theorists to account for the existence of informal communication Taken together, these studies helped to document the powerful nature of social relations in the workplace and moved managers more toward the interpersonal aspects of organizing.
Hawthorne Studies - Criticisms Not conducted with the appropriate scientific rigor necessary Too few subjects (N=5) No control groups Subjects replaced with more “cooperative” participants WORTHLESS GROSS ERRORS INCOMPETENCE
Origins of Human Relations Theory “ The Hawthorne Studies Hawthorne Works of Western Electric Company 1924 - Chicago Research focus:  Relation of quality and quantity of illumination to efficiency in industry Four Important Studies
Human Relations Aimed to understand how psychological and social processes interact with the work situation to influence performance Personalities Abraham Maslow
Principles of Human Relations Theory Human relations theory is characterized by a shift in emphasis from TASK to WORKER Go beyond physical contributions to include creative, cognitive, and emotional aspects of workers Based on a more dyadic (two-way) conceptualization of communication. SOCIAL RELATIONSHIPS are at the heart of organizational behavior--effectiveness is contingent on the social well-being of workers Workers communicate opinions, complaints, suggestions, and feelings to increase satisfaction and production Origins (Hawthorne Studies & work of Chester Barnard) Human Relations School of Management - Elton Mayo (Harvard
Human Relations (cont.) Productivity and employee behavior are influenced by the informal work group Cohesion, status, and group norms determine output Social needs have precedence over economic needs Psychological and social processes influence performance Maslow’s hierarchy of need Ignored workers’ rational side and the formal organization’s contributions to productivity Research overturned the simplistic belief that happy workers are more productive Key concepts Limitations Contributions
Theory X and Theory Y:  Douglas McGregor Douglas McGregor (1906-1964 ) Articulated basic principles of human relations theory The Human Side of Enterprise  (1960, 1985) To understand human behavior, one must discover the theoretical assumptions upon which behavior is based Especially interested in the behavior of managers toward workers “ Every managerial act rests on assumptions, generalizations, and hypotheses--that is to say, on theory . . . Theory and practice are inseparable.” Two Objectives: Predict and control behavior Tap Unrealized potential Theory X - Classical Theory Theory Y - Human Relations Theory FOCUS:  Manager’s assumptions about HUMAN NATURE
Assumptions Physical and mental effort in work is similar to play / rest. External control and the threat of punishment are not the only strategies Commitment to objectives is a function of the rewards associated with their achievement The average human being learns, under proper conditions, not only to accept but to seek responsibility The capacity to exercise a high degree of imagination, ingenuity, and creativity in the solution of organizational problems is widely distributed in the population Intellectual potentialities of the average human being are underutilized A more positive perspective of human nature The KEY to control and quality production is  commitment to organizational objectives
Organizational Behavior Studies management activities that promote employee effectiveness  investigates the complex nature of individual, group, and organizational processes Theory X managers assume that workers are lazy, irresponsible, and require constant supervision Theory Y   managers assume employees want to work and control themselves Personalities Douglas McGregor
Theory X and Theory Y:  Douglas McGregor Theory X - Classical Theory Three Assumptions The average human being has an inherent dislike of work and will avoid it. Most people must be coerced, controlled, directed, and  threatened with punishment The average human being prefers to be directed, wishes to avoid responsibility, has relatively little ambition, wants security. Neither explains nor describes human nature Theory Y - Human Relations Theory
Theory Y Prototype:  The Scanlon Plan Participative Management Two Central Features Cost-reduction sharing for organizational members -  sharing the economic gains from improvements in organizational performance Effective participation  - a formal means of providing opportunities to every member of the organization to contribute ideas for improving organizational effectiveness. Must be implemented appropriately Wastes time and undermines managerial power? Magic formula for every organizational problem? CONCERN for RELATIONSHIPS in the organization. As the need to increase commitment grows, so does the need to develop strong, communication-based relationships among organizational members, particularly between supervisor and subordinate.
Concern for PEOPLE Degree of personal commitment to one’s job Trust-based accountability (vs. obedience-based accountability) Self-esteem for the individual Interpersonal relationships with co-workers Concern for PRODUCTION Use of people and technology to accomplish organizational tasks Concern for is not about quantity or quality Assessment instrument does not represent personality traits of the manager -- instead, indicate a specific orientation to production and people
Organizational Behavior (cont.) Promotes employee effectiveness through understanding of individual, group, and organizational processes Stresses relationships among employees, managers, and work performed Assumes employees want to work and can control themselves Increased participation, greater autonomy, individual challenge and initiative, and enriched jobs may increase participation Recognized the importance of developing human resources Some approaches ignored situational factors, such as the environment and technology Key concepts Limitations Contributions
There are four major models or frameworks that organizations operate out of:  Autocratic  - The basis of this model is power with a managerial orientation of  authority.  The employees in turn are oriented towards obedience and dependence on the boss. The employee need that is met is subsistence. The performance result is minimal.  Models of organizational behaviour
Custodial  - The basis of this model is economic resources with a managerial orientation of  money.  The employees in turn are oriented towards security and benefits and dependence on the organization. The employee need that is met is security. The performance result is passive cooperation.  Supportive  - The basis of this model is leadership with a managerial orientation of  support . The employees in turn are oriented towards job performance and participation. The employee need that is met is status and recognition. The performance result is awakened drives.
Collegial  - The basis of this model is partnership with a managerial orientation of  teamwork . The employees in turn are oriented towards responsible behavior and self-discipline. The employee need that is met is self-actualization. The performance result is moderate enthusiasm.  Although there are four separate models, almost no organization operates exclusively in one.  There will usually be a predominate one, with one or more areas over-lapping in the other models.
The first model, autocratic, has its roots in the industrial revolution. The managers of this type of organization operate out of McGregor's Theory X.  The next three models begin to build on McGregor's Theory Y.  They have each evolved over a period of time and there is no one "best" model.  The collegial model should not be thought as the last or best model, but the beginning of a new model or paradigm.
Douglas McGregor -Theory X and Theory Y Theory Y Theory X Work is Natural Self- Direction Seek Responsibility Good Decisions Widely Dispersed Avoid Work Must be  Controlled Avoid Responsibility Seek Security
Fundamental Concepts of Organizational Behaviour In every field of social science, or even physical science, has a philosophical foundation of basic concepts that guide its development. There are some certain philosophical concepts in organizational behaviour also. The concepts are-
Individual differences: Every individual in the world is different from others. This idea is supported by science (DNA).  The idea of individual difference comes originally from psychology. From the day of birth, each person is unique, and individual experiences after birth tend to make people even more different. Motivated behaviour: An employee has so many needs inside him. So, they want to fulfil those needs. That's why; they had to perform well in the organization. A path toward increased need fulfilment is the better way of enriches the quality of work.
Perception:  Peoples perceptions are also differ when they see an object. Two people can differently present a same object.  A person always organizes and interprets what he sees according to his lifetime of experience and accumulated value. Employees also see work differently for differ in their personalities, needs, demographics factors, past experiences and social surrounding.
A whole person: An employee's personal life is not detached from his working life. As an example, A women who attend the office at 8:30 AM is always anxious for her children's school time (if her children able to attend the school or not). As a result, its impact falls on her concentration that means her working life. For this reason, we cannot separate it. So manager should treat an employee as a whole person.
Desire for involvement:  Every employee is actively seeking opportunities at work to involve in decision-making problems, share what they know and to learn from the experience. So, organization should provide them a chance to express their opinions, ideas and suggestion for decision-making problem.  Value of the person:  An employee wants to be treated separately from other factor of production (land, capital, labour). So, they have to be treated with carrying respect, dignity and etc.. from their employers and society.
Mutual interest:  In order to develop the organization behaviour mutually of interest organizations and people is necessary. Organizations need people and people in tern need organizations.
Ethics:  In order to attract and retain valuable employees in an era in which good workers are constantly required away, ethical treatment is necessary. Every Company is required to establish codes of ethics, publicized statements of ethical values, provided ethics training, rewarded employees for notable ethical behaviour, publicized positive role models, and set up internal procedures to handle misconduct.
International Dimensions of OB Corporate governance. The active oversight of management decisions, corporate strategy, and financial reporting by Boards of Directors. Ethics leadership. Making business and organizational decisions with high moral standards that meet the ethical test of being “good” and not “bad,” and of being “right "and not “wrong.”
Integrity: Acting in ways that are always honest, credible, and consistent in putting one’s values into practice. Positive organizational behaviour. Quality of work life. The overall quality of human experience in the workplace. Commitment to quality of work life is an important value within organizational behaviour. Theory Y provides the theoretical underpinnings for contemporary quality of work life concepts.
Positive organizational behaviour focuses on practices that value human capacities and encourage their full utilization. Positive organizational behaviour is based on the core capacities of: Confidence. Hope. Optimism. Resilience (The ability to recover quickly from illness, change, or misfortune).
Globalization. The worldwide interdependence of resource flows, product markets, and business competition. Job migration. The shifting of jobs from one nation to another
Personal management. understand one’s self, exercising initiative, accepting responsibility, working well with others, and continually learning from experience. Self-monitoring. Observing and reflecting on one’s own behaviour and acting in ways that adapt to the situation.
Social Systems: Organizations are social systems and governed by social and psychological laws. They have social roles and status. Their behaviour influenced by their group's individual drives. Organization environment in a social system is dynamic. All parts of the system are interdependent. The shared values and beliefs among people in organization that affects the way they interacts, behaves and accomplishes certain task that distinguish one organization with other organization .
Organisational Culture Organisational Culture is a sub culture of the organisation, i.e., it comprises of the attitudes, experiences, beliefs and values of an organisation.  It has been defined as "the specific collection of values and norms that are shared by people and groups in an organization and that control the way they interact with each other and outside the organization. 
culture encompasses the shared values, attitudes, standards, and beliefs and other characteristics that define an organization's operating philosophy. Organizational behaviour, meanwhile, can be under-stood in some ways as the academic study of corporate culture and its various elements, as well as other important components of behaviour such as organization structure and organization processes
Four types of organization designs have emerged in response to certain deficiencies in conventional designs and to rapid advances in technology. They are Matrix Network Virtual Learning ORGANISATIONS OF THE FUTURE
Only Learning Organizations will survive in present competitive market It ability is to learn ,create, codify and utilize knowledge faster. It has the capacity to adapt and change. Learning Organizations like individuals constantly learn. Old shibboleth is demolished and a new order created Teaches managers to look at the world afresh
Leader in this field is –’The Fifth Discipline’, He  says Senge Old methods of TQM, learning from mistakes etc are insufficient  He  put forward 5 compact technologies Systems Thinking  Personal Mastery Mental Models Building shared visions Team learning
Challenges for  Organizational Behavior 1: Changing Social/ Cultural Environment 2: Evolving Global Environment 3: Advancing Information Technology 4: Shifting Work/ Employment Relationships
Challenges for  Organizational Behavior Changing Social/ Cultural Environment National culture Organizational ethics and well-being Social responsibility Diverse work force
Figure 1.6 Diversity
Challenges for  Organizational Behavior Diversity Challenges Fairness and Justice Decision-Making and Performance Flexibility
Challenges for  Organizational Behavior 1: Changing Social/ Cultural Environment 2: Evolving Global Environment 3: Advancing Information Technology 4: Shifting Work/ Employment Relationships
Challenges for  Organizational Behavior Evolving Global Environment   Understanding Global Differences Global learning
Challenges for  Organizational Behavior 1: Changing Social/ Cultural Environment 2: Evolving Global Environment 3: Advancing Information Technology 4: Shifting Work/ Employment Relationships
Challenges for  Organizational Behavior Advancing Information Technology Information Knowledge Information Technology Organizational Learning Intranets Creativity Innovation
Challenges for  Organizational Behavior 1: Changing Social/ Cultural Environment 2: Evolving Global Environment 3: Advancing Information Technology 4: Shifting Work/ Employment Relationships
Challenges for  Organizational Behavior Shifting Work/ Employment Relationships Downsizing Empowerment and Self-Managed Teams Contingent Workers Outsourcing
THANK U

Ob first module

  • 1.
    Powerpoint Templates ORGANIZATIONALBEHAVIOUR Module 6 by Ms Lakshmi R B Faculty--DBIT
  • 2.
  • 3.
    Contents ofthe presentation What is Organization Behaviour? Some Definitions Why study organizational behaviour? Elements of Organizational behaviour Contributing factors Evolution of OB(Historical Development) Models of Organizational Behaviour fundamental concepts social systems and organizational culture
  • 4.
    International dimensions oforganizational behaviour The future of OB.
  • 5.
    What is OrganizationalBehavior? The study and application of how employees behave within organizations Known as people skills Field of study that investigates the impact that individuals, groups and structure have on behavior within organizations for the purpose of applying such knowledge toward improving an organization.
  • 6.
    O.B. is afield of study that investigates the impact that individuals , groups and structures have on behaviour within organizations for the purpose of applying such knowledge towards improving an organization’s effectiveness. O.B. can be defined as the systematic study of the actions and reactions of individuals, groups and sub-systems. O.B. is the study and understanding of individual and group behaviour, patterns of structure in order to help improve organizational performance and effectiveness. O.B. is one of the most complex and perhaps least understood academic elements of modern general management, but since it concerns the behaviour of people within organizations it is also one of the most central- its concern with individual and group patterns of behaviour makes it an essential element in dealing with the complex behavioural issues thrown up in the modern business world. O.B. is an inter-disciplinary behaviour science studying phenomena and dynamics(processes) of organizations and their various units. Some definitions of OB
  • 7.
    Definition: The studyof human behavior, attitudes, and performance in organizations. Value of OB: Helps people attain the competencies needed to become effective employees, team leaders/members, or managers Competency = an interrelated set of abilities, behaviors, attitudes, and knowledge needed by an individual to be effective in most professional and managerial positions Organizational Behavior
  • 8.
    Why Study OrganizationalBehavior? Chart the evolution of management thought on the nature of the organization Understanding of the organizational factors that influence work Understanding of how the work environment shapes organizational performance
  • 9.
    The study ofOrganisational Behaviour involves... consideration of the interaction among the formal structure (organisational context in which the process of management takes place) the tasks to be undertaken the technology employed and the methods of carrying out work the behaviour of people the process of management the external environment
  • 10.
    ORGANISATION BEHAVIOUR Interrelateddimensions influencing behaviour: The Individual - working environment should satisfy individual needs as well as attainment of organisational goals. The Group - formal and informal. Understanding of groups complements a knowledge of individual behaviour. The Organisation - impact of organisation structure and design, and patterns of management, on behaviour. The Environment - technological and scientific development, economic activity, governmental actions.
  • 11.
  • 12.
    Figure 1.1 What is Organizational Behavior? Insert Figure 1.1 here
  • 13.
    e.g., Selection Systemse.g., Groupthink e.g., Personality Group Level Individual Level Organizational Level
  • 14.
    Components of OrganizationalBehavior Understanding organizational behavior requires studying Individuals in Organizations Group and Team Processes Organizational Processes
  • 15.
    Note that organizationsare “ open systems , ” such that their long term effectiveness is determined by their ability to anticipate, manage, and respond to changes in their environment, with such changes resulting from external forces and/or stakeholders External forces include the labor force, the natural environment, the economy, and different cultures, while stakeholders include shareholders, customers, competitors, suppliers, creditors, governmental agencies and their regulations Note the impact of these environmental influences on individual, interpersonal, team, and organizational processes; organizations that do not effectively adapt to environmental change will fail Organizations as Open systems
  • 16.
    What is anOrganization? Consciously coordinated social unit Composed of two or more people Functions on a continuous basis to achieve a common goal Characterized by formal roles that define the behavior of its members
  • 17.
    Organization : An organization has four essential elements (a) Group of people (b) Interacting with each other (c )In a structured manner (d) Towards a common objective Management: Implies getting things done through and with people Manager: He is the dynamic, life-giving element in every organization. And it is the quality and performance of its managers which is the only effective advantage an enterprise in a competitive economy can have and particularly in a business enterprise. Basic Definitions related to OB
  • 18.
    To provide anunderstanding of what goes on at the workplace. Four aspects need to be explained viz. Definition, goals, forces and O. B. ’s major characteristics O.B. is the systematic study and careful application of knowledge about how people- as individuals and as members of groups –act within organizations. It strives to identify ways in which people can act more effectively. O.B. provides managers with the tools to: (a) to understand the behavior of individuals (b) to understand the complexities of inter-personal relations (c )to examine the dynamics of relationships within small groups –both formal teams and informal groups (d) organizations can be viewed as whole systems that have inter-organizational relationships What is organizational Behaviour?
  • 19.
    3 GOALS: Mostsciences share four goals-to describe, understand, predict and control some phenomena. The field of OB seeks to replace intuitive explanations with systematic study O.B. has the following goals, 1. Describe , systematically, how people behave under a variety of circumstances 2. Understand why people behave as they do. 3. Predicting future employee behavior. 4. Control at least partially, and develop some human activity at work Managers can utilize the tool of O.B.to influence human behavior , skill development, team effort and productivity. 4 FORCES: There are a wide array of issues and trends that affect the nature of organizations today. They can be classified under four areas PEOPLE, STRUCTURE, TECHNOLOGY and the ENVIRONMENT
  • 20.
    Goals of Organizational Behaviour Organizational Behaviour Research Understand organizational events Predict organizational events Influence organizational events
  • 21.
    ORGANIZATIONAL BEHAVIOUR Keyforces affecting Organizational Behavior People Individuals Groups Environment Government Competition Societal pressure Organizational Behavior Technology Machinery Computer hardware ,software Structure Jobs Relationships
  • 22.
    The organization's baserests on management's philosophy, values, vision and goals. This in turn drives the organizational culture which is composed of the formal organization, informal organization, and the social environment. The culture determines the type of leadership, communication, and group dynamics within the organization. The workers perceive this as the quality of work life which directs their degree of motivation. The final outcome are performance, individual satisfaction, and personal growth and development. All these elements combine to build the model or framework that the organization operates from. The Elements of Organizational Behavior
  • 23.
    Coordination CommonGoals Division of labor Integration The elements of an Organization
  • 24.
    Psychology : Thescience or study of individual human behaviour Sociology : The study of group human behaviour Social Psychology : Studies influences of people on one another Anthropology : Study of the human race, and culture Political Science :Behavior of individuals in political environment. Bases of Organizational Behaviour
  • 25.
    Contributing Disciplines Psychology seeks to measure, explain, and change behavior Sociology studies people in relation to their fellow human beings Social psychology focuses on the influence of people on one another Anthropology is the study of societies to learn about human beings and their activities Political science is the study of the behavior of individuals and groups within a political environment
  • 26.
    Toward an OBDiscipline
  • 27.
    Evolution of ManagementThought History of management.ppt Organizational Behaviour Human Relations Hawthorne Studies Scientific Management 1900’s 1940’s 1970’s Classical Organization Theory
  • 28.
    Scientific Management Foundedby F.W.Taylor. (1856-1917) Often criticized but to remember that he was studying this around time of major industrial changes ‘ Father of Scientific Management’ Increasing levels of output by monetary incentives as a motivator as well as formal organisation structures. ‘ One Best Way’ to carry out a job. Ford Motors Manufacturing Plant and Pig Iron Experiment. Hand Washing Procedure ● Counter Merchandising Procedures ● Special/Additional Merchandising Procedures ● Food Preparation ● Packaging Procedures
  • 29.
    The Classical OrganizationTheory Personalities Frederick W. Taylor Frank and Lillian Gilbreth Henry Gantt Advocated the application of scientific methods to analyze work and to determine how to complete production tasks efficiently
  • 30.
    Four principles developa scientific approach for each element of one’s work scientifically select, train, teach and develop each worker cooperate with workers to ensure that jobs match plans and principles ensure appropriate division of labor
  • 31.
    Used scientific methodsto determine the “one best way’ Emphasized study of tasks, selection and training of workers, and cooperation between workers and management Improved factory productivity and efficiency Introduced scientific analysis to the workplace Piecerate system equated worker rewards and performance Simplistic motivational assumptions Workers viewed as parts of a machine Potential for exploitation of labor Excluded senior management tasks Key concepts Limitations Contributions
  • 32.
    Hawthorne Studies HawthorneEffect - workers perform and react differently when researchers observe them Argued that managers should stress primarily employee welfare, motivation, and communication
  • 33.
    “ The HawthorneStudies” Illumination Study (November 1924) Designed to test the effect of lighting intensity on worker productivity Heuristic value: influence of human relations on work behavior Relay Assembly Test Room Study (1927-1932) Assembly of telephone relays (35 parts - 4 machine screws) Production and satisfaction increased regardless of IV manipulation Workers’ increased production and satisfaction related to supervisory practices Human interrelationships are important contributing factors to worker productivity Bottom Line: Supervisory practices increase employee morale AND productivity
  • 34.
    Interviewing Program (1928-1930) Investigate connection between supervisory practices and employee morale Employees expressed their ideas and feelings (e.g., likes and dislikes) Process more important than actual results Bank Wiring Room Observation Study (November 1931 - May 1932) Social groups can influence production and individual work behavior RQ: How is social control manifested on the shop floor? Informal organization constrains employee behavior within formal organizational structure
  • 35.
    Hawthorne Studies -Implications Illumination Study (November 1924) The mere practice of observing people’s behavior tends to alter their behavior (Hawthorne Effect) Relay Assembly Test Room Study (1927-1932) Relationships between workers and their supervisors are powerful Human interrelationships increase the amount and quality of worker participation in decision making Interviewing Program (1928-1930) Demonstrated powerful influence of upward communication Workers were asked for opinions, told they mattered, and positive attitudes toward company increased Bank Wiring Room Observation Study (November 1931 - May 1932) Led future theorists to account for the existence of informal communication Taken together, these studies helped to document the powerful nature of social relations in the workplace and moved managers more toward the interpersonal aspects of organizing.
  • 36.
    Hawthorne Studies -Criticisms Not conducted with the appropriate scientific rigor necessary Too few subjects (N=5) No control groups Subjects replaced with more “cooperative” participants WORTHLESS GROSS ERRORS INCOMPETENCE
  • 37.
    Origins of HumanRelations Theory “ The Hawthorne Studies Hawthorne Works of Western Electric Company 1924 - Chicago Research focus: Relation of quality and quantity of illumination to efficiency in industry Four Important Studies
  • 38.
    Human Relations Aimedto understand how psychological and social processes interact with the work situation to influence performance Personalities Abraham Maslow
  • 39.
    Principles of HumanRelations Theory Human relations theory is characterized by a shift in emphasis from TASK to WORKER Go beyond physical contributions to include creative, cognitive, and emotional aspects of workers Based on a more dyadic (two-way) conceptualization of communication. SOCIAL RELATIONSHIPS are at the heart of organizational behavior--effectiveness is contingent on the social well-being of workers Workers communicate opinions, complaints, suggestions, and feelings to increase satisfaction and production Origins (Hawthorne Studies & work of Chester Barnard) Human Relations School of Management - Elton Mayo (Harvard
  • 40.
    Human Relations (cont.)Productivity and employee behavior are influenced by the informal work group Cohesion, status, and group norms determine output Social needs have precedence over economic needs Psychological and social processes influence performance Maslow’s hierarchy of need Ignored workers’ rational side and the formal organization’s contributions to productivity Research overturned the simplistic belief that happy workers are more productive Key concepts Limitations Contributions
  • 41.
    Theory X andTheory Y: Douglas McGregor Douglas McGregor (1906-1964 ) Articulated basic principles of human relations theory The Human Side of Enterprise (1960, 1985) To understand human behavior, one must discover the theoretical assumptions upon which behavior is based Especially interested in the behavior of managers toward workers “ Every managerial act rests on assumptions, generalizations, and hypotheses--that is to say, on theory . . . Theory and practice are inseparable.” Two Objectives: Predict and control behavior Tap Unrealized potential Theory X - Classical Theory Theory Y - Human Relations Theory FOCUS: Manager’s assumptions about HUMAN NATURE
  • 42.
    Assumptions Physical andmental effort in work is similar to play / rest. External control and the threat of punishment are not the only strategies Commitment to objectives is a function of the rewards associated with their achievement The average human being learns, under proper conditions, not only to accept but to seek responsibility The capacity to exercise a high degree of imagination, ingenuity, and creativity in the solution of organizational problems is widely distributed in the population Intellectual potentialities of the average human being are underutilized A more positive perspective of human nature The KEY to control and quality production is commitment to organizational objectives
  • 43.
    Organizational Behavior Studiesmanagement activities that promote employee effectiveness investigates the complex nature of individual, group, and organizational processes Theory X managers assume that workers are lazy, irresponsible, and require constant supervision Theory Y managers assume employees want to work and control themselves Personalities Douglas McGregor
  • 44.
    Theory X andTheory Y: Douglas McGregor Theory X - Classical Theory Three Assumptions The average human being has an inherent dislike of work and will avoid it. Most people must be coerced, controlled, directed, and threatened with punishment The average human being prefers to be directed, wishes to avoid responsibility, has relatively little ambition, wants security. Neither explains nor describes human nature Theory Y - Human Relations Theory
  • 45.
    Theory Y Prototype: The Scanlon Plan Participative Management Two Central Features Cost-reduction sharing for organizational members - sharing the economic gains from improvements in organizational performance Effective participation - a formal means of providing opportunities to every member of the organization to contribute ideas for improving organizational effectiveness. Must be implemented appropriately Wastes time and undermines managerial power? Magic formula for every organizational problem? CONCERN for RELATIONSHIPS in the organization. As the need to increase commitment grows, so does the need to develop strong, communication-based relationships among organizational members, particularly between supervisor and subordinate.
  • 46.
    Concern for PEOPLEDegree of personal commitment to one’s job Trust-based accountability (vs. obedience-based accountability) Self-esteem for the individual Interpersonal relationships with co-workers Concern for PRODUCTION Use of people and technology to accomplish organizational tasks Concern for is not about quantity or quality Assessment instrument does not represent personality traits of the manager -- instead, indicate a specific orientation to production and people
  • 47.
    Organizational Behavior (cont.)Promotes employee effectiveness through understanding of individual, group, and organizational processes Stresses relationships among employees, managers, and work performed Assumes employees want to work and can control themselves Increased participation, greater autonomy, individual challenge and initiative, and enriched jobs may increase participation Recognized the importance of developing human resources Some approaches ignored situational factors, such as the environment and technology Key concepts Limitations Contributions
  • 48.
    There are fourmajor models or frameworks that organizations operate out of: Autocratic - The basis of this model is power with a managerial orientation of authority. The employees in turn are oriented towards obedience and dependence on the boss. The employee need that is met is subsistence. The performance result is minimal. Models of organizational behaviour
  • 49.
    Custodial -The basis of this model is economic resources with a managerial orientation of money. The employees in turn are oriented towards security and benefits and dependence on the organization. The employee need that is met is security. The performance result is passive cooperation. Supportive - The basis of this model is leadership with a managerial orientation of support . The employees in turn are oriented towards job performance and participation. The employee need that is met is status and recognition. The performance result is awakened drives.
  • 50.
    Collegial -The basis of this model is partnership with a managerial orientation of teamwork . The employees in turn are oriented towards responsible behavior and self-discipline. The employee need that is met is self-actualization. The performance result is moderate enthusiasm. Although there are four separate models, almost no organization operates exclusively in one. There will usually be a predominate one, with one or more areas over-lapping in the other models.
  • 51.
    The first model,autocratic, has its roots in the industrial revolution. The managers of this type of organization operate out of McGregor's Theory X. The next three models begin to build on McGregor's Theory Y. They have each evolved over a period of time and there is no one "best" model. The collegial model should not be thought as the last or best model, but the beginning of a new model or paradigm.
  • 52.
    Douglas McGregor -TheoryX and Theory Y Theory Y Theory X Work is Natural Self- Direction Seek Responsibility Good Decisions Widely Dispersed Avoid Work Must be Controlled Avoid Responsibility Seek Security
  • 53.
    Fundamental Concepts ofOrganizational Behaviour In every field of social science, or even physical science, has a philosophical foundation of basic concepts that guide its development. There are some certain philosophical concepts in organizational behaviour also. The concepts are-
  • 54.
    Individual differences: Everyindividual in the world is different from others. This idea is supported by science (DNA). The idea of individual difference comes originally from psychology. From the day of birth, each person is unique, and individual experiences after birth tend to make people even more different. Motivated behaviour: An employee has so many needs inside him. So, they want to fulfil those needs. That's why; they had to perform well in the organization. A path toward increased need fulfilment is the better way of enriches the quality of work.
  • 55.
    Perception: Peoplesperceptions are also differ when they see an object. Two people can differently present a same object. A person always organizes and interprets what he sees according to his lifetime of experience and accumulated value. Employees also see work differently for differ in their personalities, needs, demographics factors, past experiences and social surrounding.
  • 56.
    A whole person:An employee's personal life is not detached from his working life. As an example, A women who attend the office at 8:30 AM is always anxious for her children's school time (if her children able to attend the school or not). As a result, its impact falls on her concentration that means her working life. For this reason, we cannot separate it. So manager should treat an employee as a whole person.
  • 57.
    Desire for involvement: Every employee is actively seeking opportunities at work to involve in decision-making problems, share what they know and to learn from the experience. So, organization should provide them a chance to express their opinions, ideas and suggestion for decision-making problem. Value of the person: An employee wants to be treated separately from other factor of production (land, capital, labour). So, they have to be treated with carrying respect, dignity and etc.. from their employers and society.
  • 58.
    Mutual interest: In order to develop the organization behaviour mutually of interest organizations and people is necessary. Organizations need people and people in tern need organizations.
  • 59.
    Ethics: Inorder to attract and retain valuable employees in an era in which good workers are constantly required away, ethical treatment is necessary. Every Company is required to establish codes of ethics, publicized statements of ethical values, provided ethics training, rewarded employees for notable ethical behaviour, publicized positive role models, and set up internal procedures to handle misconduct.
  • 60.
    International Dimensions ofOB Corporate governance. The active oversight of management decisions, corporate strategy, and financial reporting by Boards of Directors. Ethics leadership. Making business and organizational decisions with high moral standards that meet the ethical test of being “good” and not “bad,” and of being “right "and not “wrong.”
  • 61.
    Integrity: Acting inways that are always honest, credible, and consistent in putting one’s values into practice. Positive organizational behaviour. Quality of work life. The overall quality of human experience in the workplace. Commitment to quality of work life is an important value within organizational behaviour. Theory Y provides the theoretical underpinnings for contemporary quality of work life concepts.
  • 62.
    Positive organizational behaviourfocuses on practices that value human capacities and encourage their full utilization. Positive organizational behaviour is based on the core capacities of: Confidence. Hope. Optimism. Resilience (The ability to recover quickly from illness, change, or misfortune).
  • 63.
    Globalization. The worldwideinterdependence of resource flows, product markets, and business competition. Job migration. The shifting of jobs from one nation to another
  • 64.
    Personal management. understandone’s self, exercising initiative, accepting responsibility, working well with others, and continually learning from experience. Self-monitoring. Observing and reflecting on one’s own behaviour and acting in ways that adapt to the situation.
  • 65.
    Social Systems: Organizationsare social systems and governed by social and psychological laws. They have social roles and status. Their behaviour influenced by their group's individual drives. Organization environment in a social system is dynamic. All parts of the system are interdependent. The shared values and beliefs among people in organization that affects the way they interacts, behaves and accomplishes certain task that distinguish one organization with other organization .
  • 66.
    Organisational Culture OrganisationalCulture is a sub culture of the organisation, i.e., it comprises of the attitudes, experiences, beliefs and values of an organisation.  It has been defined as "the specific collection of values and norms that are shared by people and groups in an organization and that control the way they interact with each other and outside the organization. 
  • 67.
    culture encompasses theshared values, attitudes, standards, and beliefs and other characteristics that define an organization's operating philosophy. Organizational behaviour, meanwhile, can be under-stood in some ways as the academic study of corporate culture and its various elements, as well as other important components of behaviour such as organization structure and organization processes
  • 68.
    Four types oforganization designs have emerged in response to certain deficiencies in conventional designs and to rapid advances in technology. They are Matrix Network Virtual Learning ORGANISATIONS OF THE FUTURE
  • 69.
    Only Learning Organizationswill survive in present competitive market It ability is to learn ,create, codify and utilize knowledge faster. It has the capacity to adapt and change. Learning Organizations like individuals constantly learn. Old shibboleth is demolished and a new order created Teaches managers to look at the world afresh
  • 70.
    Leader in thisfield is –’The Fifth Discipline’, He says Senge Old methods of TQM, learning from mistakes etc are insufficient He put forward 5 compact technologies Systems Thinking Personal Mastery Mental Models Building shared visions Team learning
  • 71.
    Challenges for Organizational Behavior 1: Changing Social/ Cultural Environment 2: Evolving Global Environment 3: Advancing Information Technology 4: Shifting Work/ Employment Relationships
  • 72.
    Challenges for Organizational Behavior Changing Social/ Cultural Environment National culture Organizational ethics and well-being Social responsibility Diverse work force
  • 73.
  • 74.
    Challenges for Organizational Behavior Diversity Challenges Fairness and Justice Decision-Making and Performance Flexibility
  • 75.
    Challenges for Organizational Behavior 1: Changing Social/ Cultural Environment 2: Evolving Global Environment 3: Advancing Information Technology 4: Shifting Work/ Employment Relationships
  • 76.
    Challenges for Organizational Behavior Evolving Global Environment Understanding Global Differences Global learning
  • 77.
    Challenges for Organizational Behavior 1: Changing Social/ Cultural Environment 2: Evolving Global Environment 3: Advancing Information Technology 4: Shifting Work/ Employment Relationships
  • 78.
    Challenges for Organizational Behavior Advancing Information Technology Information Knowledge Information Technology Organizational Learning Intranets Creativity Innovation
  • 79.
    Challenges for Organizational Behavior 1: Changing Social/ Cultural Environment 2: Evolving Global Environment 3: Advancing Information Technology 4: Shifting Work/ Employment Relationships
  • 80.
    Challenges for Organizational Behavior Shifting Work/ Employment Relationships Downsizing Empowerment and Self-Managed Teams Contingent Workers Outsourcing
  • 81.