SlideShare a Scribd company logo
1 of 2
N.SRINIVASAN
{ Sr.G.M (Retd), L&T ECCD,}
CHIEF EXECUTIVE-VIJAY CONSULTANT SERVICES
OLD NO-22, NewNo-11, New Bangaru Colony 1st Street,
K.K.Nagar West, Chennai, India-600078
Tel; 91 (044) 23641844,9444981844,
Email; nsrinivasan1940@gmail.com
Web; welding-qa.net
 Before tendering thoroughly read the tender clauses and prepare documentation for
clarification if required for Pre Bid Conference
 Helping the Tendering department for getting the consumable prices for precise tendering
price and helping man power schedule based on Productivity Norms of each category of
workmen
 Preparing the Project Quality Assurance Manual and Quality Plan for the respective job
site requirements
 Calibration of all measuring instruments and keeping track of records
 Coordinates and manages different type of Construction Projects while in progress.
, * Establishing / Writing / Arranging - Quality Procedures Welding (WPS,PQR) etc., ,
Ensures that the project quality is accurate and possible to achieve within the budgeted cost,/
resources to complete the project.
 Technological improvement / Maintaining the Quality/ Target achievable
*Reviewing Planning Progress viz Planned /Achieved) and if necessary corrective action
suggested to get back to the original planned
 Six Sigma Principle/ Time Management/ Control Consumable Cost and Procurement on time
 Co-coordinating with Inter department Construction Personnel and Client’s Representatives in
settling Critical Issues
 Carrying out the Investigation on Product Failures(Fish/Bone or Cause and Effect )
 as well on / the Goal /Target Failures and Suggest to Improve the Efficiency.
 Training of Sub-ordinates is today’s need and Developing the Sub-ordinates is
tomorrow’s need
 Ensures that all equipment are put to full use without break down –Maximum Capacity
Utilization of the Plant and Machinery
 Keeping Productivity by adopting JIT (Just In Time)
 Keeping Safety and Quality at the most Top level in all the construction projects
 Thorough knowledge on the latest Technological Development and International Code of
Practice(Standards and Specifications)
 Problem Solving- Carrying out Failure Analysis (CAUSE AND EFFECT or FISH
BONE)- Technical Analysis for future Development against Competitive Market
 Insisting on Productivity Improvement and Cost Reduction in Project related matters with
concerned Colleagues
 Conducting and coordinating periodical Quality/Safety Audit and reviewing the results
and arranging for corrective action on Non Conformities.
 Reviewing the productivity viz Labor / Consumables
 Motivates and train the team members to achieve business goal
 Takes the necessary actions needed to secure that the ongoing construction project will meet
the expected results within determined parameters as per tender clause
 Keep management informed about the project progression by sending a monthly progress
report to the Management.

More Related Content

What's hot

Value Engineering
Value EngineeringValue Engineering
Value EngineeringEdwinJacob5
 
Hemant-Mukund-Kale-Resume
Hemant-Mukund-Kale-ResumeHemant-Mukund-Kale-Resume
Hemant-Mukund-Kale-ResumeHemant Kale
 
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMEngr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMMuhammad Awais
 
Murukesh_resume_(_Supervisor_strl_) (1)
Murukesh_resume_(_Supervisor_strl_) (1)Murukesh_resume_(_Supervisor_strl_) (1)
Murukesh_resume_(_Supervisor_strl_) (1)Janardhanan Murukesh
 
Craig Sheehan Resume 2016_JUNE
Craig Sheehan Resume 2016_JUNECraig Sheehan Resume 2016_JUNE
Craig Sheehan Resume 2016_JUNECraig Sheehan
 
ManufacturingProcessEngineerResume (4.1)
ManufacturingProcessEngineerResume (4.1)ManufacturingProcessEngineerResume (4.1)
ManufacturingProcessEngineerResume (4.1)Michael Baril
 
Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...Essam Lotffy, PMP®, CCP®
 
CV - Emad Fathi
CV - Emad FathiCV - Emad Fathi
CV - Emad Fathiemad salim
 
Ben Franke Resume 3-1-16
Ben Franke Resume 3-1-16Ben Franke Resume 3-1-16
Ben Franke Resume 3-1-16Ben Franke
 
GS Nayer - Resume
GS Nayer - ResumeGS Nayer - Resume
GS Nayer - ResumeGS Nayer
 
James Kostek_Internal Resume
James Kostek_Internal ResumeJames Kostek_Internal Resume
James Kostek_Internal ResumeJames Kostek
 

What's hot (20)

Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
Hemant-Mukund-Kale-Resume
Hemant-Mukund-Kale-ResumeHemant-Mukund-Kale-Resume
Hemant-Mukund-Kale-Resume
 
Ketan's resume
Ketan's resumeKetan's resume
Ketan's resume
 
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMEngr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
 
Murukesh_resume_(_Supervisor_strl_) (1)
Murukesh_resume_(_Supervisor_strl_) (1)Murukesh_resume_(_Supervisor_strl_) (1)
Murukesh_resume_(_Supervisor_strl_) (1)
 
2017 Resume'
2017 Resume'2017 Resume'
2017 Resume'
 
Craig Sheehan Resume 2016_JUNE
Craig Sheehan Resume 2016_JUNECraig Sheehan Resume 2016_JUNE
Craig Sheehan Resume 2016_JUNE
 
QUINTIN GATEWOO2
QUINTIN GATEWOO2QUINTIN GATEWOO2
QUINTIN GATEWOO2
 
ManufacturingProcessEngineerResume (4.1)
ManufacturingProcessEngineerResume (4.1)ManufacturingProcessEngineerResume (4.1)
ManufacturingProcessEngineerResume (4.1)
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
 
Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...
 
CV - Emad Fathi
CV - Emad FathiCV - Emad Fathi
CV - Emad Fathi
 
Ben Franke Resume 3-1-16
Ben Franke Resume 3-1-16Ben Franke Resume 3-1-16
Ben Franke Resume 3-1-16
 
sanjay resume
sanjay resumesanjay resume
sanjay resume
 
Vignesh Nagarajan CV
Vignesh Nagarajan CVVignesh Nagarajan CV
Vignesh Nagarajan CV
 
Prasad Nimbalkar
Prasad NimbalkarPrasad Nimbalkar
Prasad Nimbalkar
 
Krishnendu cv
Krishnendu cvKrishnendu cv
Krishnendu cv
 
GS Nayer - Resume
GS Nayer - ResumeGS Nayer - Resume
GS Nayer - Resume
 
James Kostek_Internal Resume
James Kostek_Internal ResumeJames Kostek_Internal Resume
James Kostek_Internal Resume
 
Resume.DOC
Resume.DOCResume.DOC
Resume.DOC
 

Similar to Ns profile.pdf

Vinoth.s qa qc-ims (qms&ehs)
Vinoth.s   qa qc-ims (qms&ehs)Vinoth.s   qa qc-ims (qms&ehs)
Vinoth.s qa qc-ims (qms&ehs)VINOTH S
 
25383_KHALED GHADBAN_SITE ENGINEER_302
25383_KHALED GHADBAN_SITE ENGINEER_30225383_KHALED GHADBAN_SITE ENGINEER_302
25383_KHALED GHADBAN_SITE ENGINEER_302khaled Ghadban
 
Mithun Pavithran Mechanical QAQC Engineer 1
Mithun Pavithran Mechanical QAQC Engineer 1Mithun Pavithran Mechanical QAQC Engineer 1
Mithun Pavithran Mechanical QAQC Engineer 1Mithun Pavithran
 
Final Resume Syed.compressed
Final Resume Syed.compressedFinal Resume Syed.compressed
Final Resume Syed.compressedSyed Sirajuddin
 
Senior management professional technical
Senior management professional  technicalSenior management professional  technical
Senior management professional technicalShashi Kant Gupta
 
Mechanical Engineer History
Mechanical Engineer HistoryMechanical Engineer History
Mechanical Engineer HistoryMohamed Talkhan
 
Ready for new opportunities
Ready for new opportunities Ready for new opportunities
Ready for new opportunities DeepakSharma2602
 
Metri Plant With utility
Metri Plant With utilityMetri Plant With utility
Metri Plant With utilitychirag patel
 

Similar to Ns profile.pdf (20)

Vinoth.s qa qc-ims (qms&ehs)
Vinoth.s   qa qc-ims (qms&ehs)Vinoth.s   qa qc-ims (qms&ehs)
Vinoth.s qa qc-ims (qms&ehs)
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
 
25383_KHALED GHADBAN_SITE ENGINEER_302
25383_KHALED GHADBAN_SITE ENGINEER_30225383_KHALED GHADBAN_SITE ENGINEER_302
25383_KHALED GHADBAN_SITE ENGINEER_302
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 
RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA
 
Mithun Pavithran Mechanical QAQC Engineer 1
Mithun Pavithran Mechanical QAQC Engineer 1Mithun Pavithran Mechanical QAQC Engineer 1
Mithun Pavithran Mechanical QAQC Engineer 1
 
khushbu cv
khushbu cvkhushbu cv
khushbu cv
 
Final Resume Syed.compressed
Final Resume Syed.compressedFinal Resume Syed.compressed
Final Resume Syed.compressed
 
Senior management professional technical
Senior management professional  technicalSenior management professional  technical
Senior management professional technical
 
Ramonito Jalando-On- Concised
Ramonito Jalando-On- ConcisedRamonito Jalando-On- Concised
Ramonito Jalando-On- Concised
 
Mechanical Engineer History
Mechanical Engineer HistoryMechanical Engineer History
Mechanical Engineer History
 
Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15
 
Ready for new opportunities
Ready for new opportunities Ready for new opportunities
Ready for new opportunities
 
FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014
 
Mohamed Fazil CV
Mohamed Fazil CVMohamed Fazil CV
Mohamed Fazil CV
 
CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016
 
Rajan_SG_CV (1)
Rajan_SG_CV (1)Rajan_SG_CV (1)
Rajan_SG_CV (1)
 
Raguram palnichamy jun 2019
Raguram palnichamy jun 2019Raguram palnichamy jun 2019
Raguram palnichamy jun 2019
 
Metri Plant With utility
Metri Plant With utilityMetri Plant With utility
Metri Plant With utility
 

Recently uploaded

Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.SNSW group8
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© رnafizanafzal
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledCaitlinCummins3
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckHajeJanKamps
 
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxThompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxtmthompson1
 
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdfThe Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdfbelieveminhh
 
Moradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in PenacovaMoradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in Penacovaimostorept
 
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwSCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwadimosmejiaslendon
 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra
 
hyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statementshyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statementsirhcs
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future worldChris Skinner
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...Khaled Al Awadi
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsRajesh Gupta
 
Toyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsToyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsStefan Wolpers
 
Space Tech Expo Exhibitor List 2024 - Exhibitors Data
Space Tech Expo Exhibitor List 2024 - Exhibitors DataSpace Tech Expo Exhibitor List 2024 - Exhibitors Data
Space Tech Expo Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accountshttps://localsmmshop.com/
 

Recently uploaded (20)

Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
 
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxThompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
 
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdfThe Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
 
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di PasuruanObat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
 
Moradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in PenacovaMoradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in Penacova
 
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwSCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
 
hyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statementshyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statements
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future world
 
Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024
 
WAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdfWAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdf
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
 
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di MalangObat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future Prospects
 
Toyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsToyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & Transformations
 
Space Tech Expo Exhibitor List 2024 - Exhibitors Data
Space Tech Expo Exhibitor List 2024 - Exhibitors DataSpace Tech Expo Exhibitor List 2024 - Exhibitors Data
Space Tech Expo Exhibitor List 2024 - Exhibitors Data
 
10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts
 

Ns profile.pdf

  • 1. N.SRINIVASAN { Sr.G.M (Retd), L&T ECCD,} CHIEF EXECUTIVE-VIJAY CONSULTANT SERVICES OLD NO-22, NewNo-11, New Bangaru Colony 1st Street, K.K.Nagar West, Chennai, India-600078 Tel; 91 (044) 23641844,9444981844, Email; nsrinivasan1940@gmail.com Web; welding-qa.net  Before tendering thoroughly read the tender clauses and prepare documentation for clarification if required for Pre Bid Conference  Helping the Tendering department for getting the consumable prices for precise tendering price and helping man power schedule based on Productivity Norms of each category of workmen  Preparing the Project Quality Assurance Manual and Quality Plan for the respective job site requirements  Calibration of all measuring instruments and keeping track of records  Coordinates and manages different type of Construction Projects while in progress. , * Establishing / Writing / Arranging - Quality Procedures Welding (WPS,PQR) etc., , Ensures that the project quality is accurate and possible to achieve within the budgeted cost,/ resources to complete the project.  Technological improvement / Maintaining the Quality/ Target achievable *Reviewing Planning Progress viz Planned /Achieved) and if necessary corrective action suggested to get back to the original planned  Six Sigma Principle/ Time Management/ Control Consumable Cost and Procurement on time  Co-coordinating with Inter department Construction Personnel and Client’s Representatives in settling Critical Issues  Carrying out the Investigation on Product Failures(Fish/Bone or Cause and Effect )  as well on / the Goal /Target Failures and Suggest to Improve the Efficiency.  Training of Sub-ordinates is today’s need and Developing the Sub-ordinates is tomorrow’s need  Ensures that all equipment are put to full use without break down –Maximum Capacity Utilization of the Plant and Machinery  Keeping Productivity by adopting JIT (Just In Time)  Keeping Safety and Quality at the most Top level in all the construction projects  Thorough knowledge on the latest Technological Development and International Code of Practice(Standards and Specifications)  Problem Solving- Carrying out Failure Analysis (CAUSE AND EFFECT or FISH BONE)- Technical Analysis for future Development against Competitive Market  Insisting on Productivity Improvement and Cost Reduction in Project related matters with concerned Colleagues
  • 2.  Conducting and coordinating periodical Quality/Safety Audit and reviewing the results and arranging for corrective action on Non Conformities.  Reviewing the productivity viz Labor / Consumables  Motivates and train the team members to achieve business goal  Takes the necessary actions needed to secure that the ongoing construction project will meet the expected results within determined parameters as per tender clause  Keep management informed about the project progression by sending a monthly progress report to the Management.