Page 1 / Hemant Mukund Kale 
 
HEMANT MUKUND KALE
: 09922446285 / 020-25389365 |: hems_kale@yahoo.co.in
	
	
Specialist Mechanical Engineer ~ Project Management & Planning
~ Specialties: Water & Sewage Treatment Projects ~	
	
~	Senior	professional	with	verifiable	year‐after‐year	success	in	achieving	project	set	objectives	within	turn	around	&	rapid	
changing	environments	~	
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐	
18	years	of	experience	in:	Project	Management	|	Strategic	Planning	|	Feasibility	Studies	|	Customer	Relationship	Management|	
Budgeting	&	Forecasting	|	Design	Engineering	|	Process	Enhancement	|	Liaising	&	Coordination	|	Quality	Assurance	/	Control	|	
Testing	|	Training	&	Development	|	Team	Management	|	Material	Management	
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐	
 Successfully	managed	multiple	projects	and	milestones	while	ensuring	that	the	projects	complied	with	all	the	cost	and	scope	
specifications;	deft	in	overseeing	project	 activities	from	conceptualization	 to	 execution	including	 technical	specifications,	
stage	inspections,	progress	monitoring,	site	management	and	manpower	planning	
 An	 astute	 leader	 with	 ability	 to	 motivate	 subordinates	 in	 optimizing	 their	 performance	 levels	 &	 possesses	 excellent	
analytical,	organizational	&	interpersonal	skills	
	
Accomplishments		
 Played	a	key	role	in	developing	more	than	100	Kaizen	which	saved	in	time,	money	and	efforts	of	employees	
 Contributed	in	developing	&	introducing:	
o Unique	worksheet	for	grinding	machine	by	lead	to	reduction	in	breakdown	time	and	increase	in	saving	money		
o Worksheets	 for	 induction	 hardening	 machine	 and	 maintaining	 softness	 of	 water	 which	 reduced	 breakdown	 time	 &	
frequency	and	saved	company’s	money	
 Successfully	saved	more	than	Rs.	1.2	crores	cost	in	the	assigned	project	by	changing	design	and	drawing	of	450	MLD	Water	
Treatment	Plant	at	Navi	Mumbai	Corporation;	approved	by	IIT	‐	Powai	
 Skillfully	designed	harness	for	Military	R&D	Engineering	for	Foot	Bridge	and	Floating	Bridge	
 Instrumental	role	in	designing	&	executing	Underground	Sewage	Treatment	Plant	leading	to	saving	of	money	&	area;	the	
area	was	then	used	for	garden	&	parking	purposes	
 Contributed	in	preparing,	suggesting	&	executing	highest	Kaizen	in	Bharat	Forge	Company	
 Played	a	key	role	in	maintain	zero	breakdown	in	grinding	and	induction	hardening	machine	
	
Independent	Assignments	
	
Reliance	Industries	Ltd.,	Ghansoli	 	 	 	 	 	 	 	 													Since	Jan	2014	
	
 Working	with	Reliance	Industries’	Research	Department	on	their	ambitious	R&D	efforts	for	developing	various	experimental	
apparatus	and	prototypes.	
	
Water	Treatment,	Sewage	Treatment	&	All	Types	of	Fabrication	Work					 											Since	Apr	2010	
	
 Spearheaded	design	&	execution	of	sewage	treatment	plant	&	water	treatment	plant	
 Supervised	 drawing,	 design,	 execution	 &	 heavy	 duty	 fabrication	 work	 of	 MS	 &	 SS	 Material	 for	 Vardhana	 Builders,	
Coimbatore;	Vastushodh	Builders,	Pune;	Cummins,	Bharat	Forge,	Cybage,	Bosch,	Bekaert,	Amtek,	Rehau	Polymers,	etc.	
	
 Successfully	managed	design	&	drawing	work	of	retrieval	lifting	arrangement	for	Sewage	Treatment	Plant	for	Bangalore	
Corporation	in	Ss	316	Material				
	
Research	&	Development	of	Armanant	Technology	(R&D	Engineering,	Pune)	Military	Projects		 								Since	Apr	2013	
	
 Developed	two	types	of	harness	&	safety	jackets	for	Indian	Army;	received	appreciation	from	Indian	Army	as	they	put	it	in	
the	Army	Material	Authorized	List	
 Conducted	&	executed	research	work	of:	
o Aluminum	Foot	Bridge	&	Water	Floating	Bridge	of	60	meters;	foldable	and	can	assemble	&	de‐assemble	in	40	minutes	
time		
o Aluminum	Foot	Bridge	and	Water	Floating	Bridge	of	60	meters	for	Leh,	Laddakh	&	Kashmir	Region;	foldable	and	can	
assemble	&	de‐assemble	in	40	minutes	time		
Gharpure	Engineering	&	Contractors	 	 	 	 	 	 	 																Apr	2012	–	Mar	2013	
	
 Instrumental	role	in	executing	mechanical	engineering	work	for	Water	Treatment	and	Sewage	Treatment	Plant	
 Played	a	key	executing	mechanical	work	at	site	of	Water	Treatment	Plant	of	Kalyan	Dombiwali	Municipal	Corporation	
	
Space	Kraetors	&	Developers	Pvt.	Ltd.	Pune		 	 	 	 	 	 	 Oct	2010	–	Mar	2013	
	
 Deployed	mechanical	work	at	site	of	Water	Treatment	Plant	for	Navi	Mumbai	and	Panvel	Municipal	Corporation	
 Enhanced	capacity	of	Drinking	Water	Treatment	Plant	from	300	MLD	to	450	MLD	
 Ensured	smooth	working	of	all	mechanical	instruments,	designs,	drawings,	electrical,	electronics	&	fabrication	work	on	site	
 Successfully	performed	changes	in	design	&	drawing	of	Plant	Mechanical	Work	approved	by	IIT	Powai;	saved	more	than	130	
tons	of	steel	and	more	than	Rs.	1.2	crores	of	project	cost
Page 2 / Hemant Mukund Kale 
 
Previous	Experience		
	
Bharat	Forge	Ltd.,	Pune		 Apr	1999	–	Jan	2010	
Senior	Maintenance	Engineer	
	
Key	Deliverables		
	
 Project	 Management:	 Developed	 project	 baselines,	 monitoring	 &	 controlling	 projects	 with	 respect	 to	 cost,	 resource	
deployment,	 time	 over‐runs	 and	 quality	 compliance	 to	 ensure	 satisfactory	 execution.	 Formulated	 operating	 budgets	 &	
managed	overall	operations	for	executing	projects	within	cost	&	time	norms.	Participated	in	project	review	meetings	for	
evaluating	 progress	 &	 de‐bottlenecking.	 Inspected	 field	 sites	 to	 observe,	 evaluate	 condition	 &	 operability	 of	 facilities	 &	
structures,	collecting	field	survey	data	&	measurements.	Deployed	projects	using	computer	aided	design	systems	&	related	
software.	Faced	audits	and	prepared	organization	for	TS	16949.		
 Maintenance	Operations:	Implemented	stringent	systems	and	quality	plans	/	manuals	to	ensure	high	quality	standards	
during	all	stages	of	project	as	per	set	norms.	Served	as	In‐Charge	of	shift	and	looked	after	breakdown	maintenance	&	smooth	
functioning	of	all	types	of	Grinding	Machines,	HMC,	VMC,	CNC,	Induction	Hardening	Machine,	Machines,	Drilling,	Tapping,	
Balancing,	 Magnaflux,	 Milling,	 Atlas	 Copco,	 Screw	 Compressor	 Model	 GA	 –2007,	 GA	 –	 11ff	 and	 GA	 –	 45,	 Air	 Dryer,	 Heat	
Exchanger,	Cooling	Tower,	Centrifugal	Pump,	Air	Hoist,	Grinding	Guns,	Anchoring	Machines,	Material	Handling	Pallet	Trucks,	
etc.	[	
 Planning	 &	 Reporting:	 Successfully	 applied	 &	 adopted	 computer	 programs	 to	 improve	 efficiency	 &	 effectiveness,	
organizing	 records	 and	 compiling	 reports.	 Reviewed	 method	 statements,	 work	 specific	 quality	 control	 plans	 and	 other	
documents.	 Prepared,	 recorded	 &	 maintained	 engineering	 records,	 equipment	 database	 and	 risk	 schedules	 to	 identify	 &	
quantify	 risks	 &	 mitigation	 measures.	 Prepared	 &	 reviewed	 all	 documentations,	 machine	 scheduling	 &	 execution	 of	
preventive	maintenance	work	as	per	checklist,	record	updation,	chart	preparation,	machine	planning	&	execution	for	major	
maintenance	work,	etc.	Maintained	data	of	preventive	activities,	calculate	b/d%,	MTTR,	MTBF,	etc.	Worked	on	SAP	System	
for	documentation	work.		
 Stores	&	Spare	Maintenance:	Monitored	&	maintained	stock	of	consumables	&	 general	purpose	items.	Prepared	list	of	
shortage	and	maintained	level	of	critical	spares	&	excellent	vendor	relations		
 Team	 Management:	 Led	 a	 team	 of	 professionals;	 ensured	 suitable	 deployment	 and	 timely	 availability	 of	 manpower	
(designers	&	engineers).	Liaised	with	clients,	consultants,	contractors,	sub‐contractors	&	external	agencies	for	determining	
technical	specifications,	approvals	and	obtaining	statutory	clearances.	
	
Previous	Experience	
		
Remsons	Industries	Ltd.,	Pune		 Nov	1998	–	Apr	1999	
Production	cum	Development	Engineer	
	
Kalpak	Enterprises,	Pune	 Dec	1997	–	Aug	1998			
Maintenance	&	Production	Engineer	
	
Academic	Credentials		
2000	 	 Diploma	in	Office	Automation	from	Suyash	Computers,	Pune	
1998	 	 Diploma	in	Mechanical	Engineering	from	Eklavya	Shikshan	Santha’s	Polytechnic,	MSBTE,	BTE	Board	
	
IT	Skills:	Well	versed	with	Windows,	MS	Office	and	AutoCAD	
	
Professional	Enhancements		
 Shielded	Metal	Arc	Welding	Process	6.03.2002	
 5S	Training		
 SAP	Training	
 Enhancing	 Productivity	 through	 Appropriate	 Automation	 in	 Metal	 Working	 from	 Indian	 Machine	 Tool	 Manufacturer’s	
Association,	2008	
	
Personal	Details	
Date	of	Birth:	15th	Mar	1976	
Languages	Known:	English,	Marathi	and	Hindi	
Address:	Building‐D,	Flat	No.	‐	004,	‘Spring	Field’	Cooperative	Housing	Society,	Behind	Mahesh	Vidyalaya,	Near	Gananjay	Society,	
Kothrud,	Pune‐411029	
Notice	Period:	15	Days	
Location	Preference:	Pune

More Related Content

What's hot

Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
Erwin D. Gibson
 
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
VIDYA VIKAS INSTITUTE OF ENGINEERING AND TECHNOLOGY
 
Cost management plan tyre recycling plant
Cost management plan  tyre recycling plantCost management plan  tyre recycling plant
Cost management plan tyre recycling plant
abhishekthakur309
 
RKS
RKSRKS
QUINTIN GATEWOO2
QUINTIN GATEWOO2QUINTIN GATEWOO2
QUINTIN GATEWOO2
Quintin A. Gatewood
 
5.2 DMADOV Phase.pptx
5.2 DMADOV  Phase.pptx5.2 DMADOV  Phase.pptx
5.2 DMADOV Phase.pptx
nirajchaudhari27
 
Vignesh Nagarajan CV
Vignesh Nagarajan CVVignesh Nagarajan CV
Vignesh Nagarajan CV
vignesh nagarajan, PMP
 
Resume_Buenrostro
Resume_BuenrostroResume_Buenrostro
Resume_Buenrostro
Joana Erika Buenrostro
 
Ketan's resume
Ketan's resumeKetan's resume
Ketan's resume
Ketan Joshi
 
Senior management professional technical
Senior management professional  technicalSenior management professional  technical
Senior management professional technical
Shashi Kant Gupta
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
Chetan Jha
 
Ppc 07.06.2011
Ppc 07.06.2011Ppc 07.06.2011
Ppc 07.06.2011
honeysethi
 
055 KPI'S Success Factor
055 KPI'S Success Factor 055 KPI'S Success Factor
055 KPI'S Success Factor
Dr Fereidoun Dejahang
 
Wesley H. Riopel - Resume 2017
Wesley H. Riopel - Resume 2017Wesley H. Riopel - Resume 2017
Wesley H. Riopel - Resume 2017
Wesley Riopel
 
CV_Pooranpr
CV_PooranprCV_Pooranpr
CV_Pooranpr
Pooran Shahani
 
Mohamad Husni_Resume
Mohamad Husni_ResumeMohamad Husni_Resume
Mohamad Husni_Resume
Mohammad Husni
 

What's hot (16)

Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
 
Cost management plan tyre recycling plant
Cost management plan  tyre recycling plantCost management plan  tyre recycling plant
Cost management plan tyre recycling plant
 
RKS
RKSRKS
RKS
 
QUINTIN GATEWOO2
QUINTIN GATEWOO2QUINTIN GATEWOO2
QUINTIN GATEWOO2
 
5.2 DMADOV Phase.pptx
5.2 DMADOV  Phase.pptx5.2 DMADOV  Phase.pptx
5.2 DMADOV Phase.pptx
 
Vignesh Nagarajan CV
Vignesh Nagarajan CVVignesh Nagarajan CV
Vignesh Nagarajan CV
 
Resume_Buenrostro
Resume_BuenrostroResume_Buenrostro
Resume_Buenrostro
 
Ketan's resume
Ketan's resumeKetan's resume
Ketan's resume
 
Senior management professional technical
Senior management professional  technicalSenior management professional  technical
Senior management professional technical
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
 
Ppc 07.06.2011
Ppc 07.06.2011Ppc 07.06.2011
Ppc 07.06.2011
 
055 KPI'S Success Factor
055 KPI'S Success Factor 055 KPI'S Success Factor
055 KPI'S Success Factor
 
Wesley H. Riopel - Resume 2017
Wesley H. Riopel - Resume 2017Wesley H. Riopel - Resume 2017
Wesley H. Riopel - Resume 2017
 
CV_Pooranpr
CV_PooranprCV_Pooranpr
CV_Pooranpr
 
Mohamad Husni_Resume
Mohamad Husni_ResumeMohamad Husni_Resume
Mohamad Husni_Resume
 

Viewers also liked

Herramientas telematicas Trabajo final
Herramientas telematicas Trabajo finalHerramientas telematicas Trabajo final
Herramientas telematicas Trabajo final
hasleidy
 
Shining title sequence
Shining title sequenceShining title sequence
Shining title sequence
Joe Hayes
 
lockers
lockerslockers
Candidatura a diretor do agrupamento de escolas de ílhavo_2013_mos_Projeto
Candidatura a diretor do agrupamento de escolas de ílhavo_2013_mos_ProjetoCandidatura a diretor do agrupamento de escolas de ílhavo_2013_mos_Projeto
Candidatura a diretor do agrupamento de escolas de ílhavo_2013_mos_Projeto
FLUC
 
Scan-Professional Document-Realestate Education
Scan-Professional Document-Realestate EducationScan-Professional Document-Realestate Education
Scan-Professional Document-Realestate EducationJoe Griffin
 
Uzaktan eğitim-uzaktan-eğitim-teknolojileri-ve-türkiyede-bir-uygulama
Uzaktan eğitim-uzaktan-eğitim-teknolojileri-ve-türkiyede-bir-uygulamaUzaktan eğitim-uzaktan-eğitim-teknolojileri-ve-türkiyede-bir-uygulama
Uzaktan eğitim-uzaktan-eğitim-teknolojileri-ve-türkiyede-bir-uygulama
MuammetGul
 
2014-12-02 Slide Workshop Immaginazione e Vision
2014-12-02 Slide Workshop Immaginazione e Vision2014-12-02 Slide Workshop Immaginazione e Vision
2014-12-02 Slide Workshop Immaginazione e Vision
Riccardo Guidetti
 
HIV in USA
HIV in USAHIV in USA

Viewers also liked (8)

Herramientas telematicas Trabajo final
Herramientas telematicas Trabajo finalHerramientas telematicas Trabajo final
Herramientas telematicas Trabajo final
 
Shining title sequence
Shining title sequenceShining title sequence
Shining title sequence
 
lockers
lockerslockers
lockers
 
Candidatura a diretor do agrupamento de escolas de ílhavo_2013_mos_Projeto
Candidatura a diretor do agrupamento de escolas de ílhavo_2013_mos_ProjetoCandidatura a diretor do agrupamento de escolas de ílhavo_2013_mos_Projeto
Candidatura a diretor do agrupamento de escolas de ílhavo_2013_mos_Projeto
 
Scan-Professional Document-Realestate Education
Scan-Professional Document-Realestate EducationScan-Professional Document-Realestate Education
Scan-Professional Document-Realestate Education
 
Uzaktan eğitim-uzaktan-eğitim-teknolojileri-ve-türkiyede-bir-uygulama
Uzaktan eğitim-uzaktan-eğitim-teknolojileri-ve-türkiyede-bir-uygulamaUzaktan eğitim-uzaktan-eğitim-teknolojileri-ve-türkiyede-bir-uygulama
Uzaktan eğitim-uzaktan-eğitim-teknolojileri-ve-türkiyede-bir-uygulama
 
2014-12-02 Slide Workshop Immaginazione e Vision
2014-12-02 Slide Workshop Immaginazione e Vision2014-12-02 Slide Workshop Immaginazione e Vision
2014-12-02 Slide Workshop Immaginazione e Vision
 
HIV in USA
HIV in USAHIV in USA
HIV in USA
 

Similar to Hemant-Mukund-Kale-Resume

resume
resumeresume
fac mgt 2016
fac mgt 2016fac mgt 2016
fac mgt 2016
David Sanders
 
Resumepmlatest
ResumepmlatestResumepmlatest
Resumepmlatest
Rajasekar Sundarajan
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)
Dylan Gonsalves
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
ALPESH CONTRACTOR
 
Saddam Gogi - CV - MECH
Saddam Gogi - CV - MECHSaddam Gogi - CV - MECH
Saddam Gogi - CV - MECH
Saddam Gogi
 
Saddam Gogi - CV - MECH
Saddam Gogi - CV - MECHSaddam Gogi - CV - MECH
Saddam Gogi - CV - MECH
Saddam Gogi
 
CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5
shreyas Shah
 
Ravi CV 2016
Ravi CV 2016Ravi CV 2016
Ravi CV 2016
K.M.V.K. Ravikumar
 
RESUME
RESUMERESUME
Browning.Stuart F1
Browning.Stuart F1Browning.Stuart F1
Browning.Stuart F1
Stuart Browning
 
Resume update PMM Lkdn
Resume update PMM LkdnResume update PMM Lkdn
Resume update PMM Lkdn
ANUJ Varshney
 
Resume Mahendharan Palani.f
Resume  Mahendharan Palani.fResume  Mahendharan Palani.f
Resume Mahendharan Palani.f
Mahendharan Palani
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16
Aew Sanmai
 
MARTY_PATE
MARTY_PATEMARTY_PATE
MARTY_PATE
Marty Pate
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_
shailendra kumar
 
vikas goel
vikas goelvikas goel
vikas goel
vikas goel
 
vikas goel
vikas goelvikas goel
vikas goel
vikas goel
 
Lukas CV
Lukas CVLukas CV
Lukas CV
lukas alberts
 
Royster menezes - Mechanical Engineer
Royster menezes - Mechanical EngineerRoyster menezes - Mechanical Engineer
Royster menezes - Mechanical Engineer
Royster Menezes
 

Similar to Hemant-Mukund-Kale-Resume (20)

resume
resumeresume
resume
 
fac mgt 2016
fac mgt 2016fac mgt 2016
fac mgt 2016
 
Resumepmlatest
ResumepmlatestResumepmlatest
Resumepmlatest
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
Saddam Gogi - CV - MECH
Saddam Gogi - CV - MECHSaddam Gogi - CV - MECH
Saddam Gogi - CV - MECH
 
Saddam Gogi - CV - MECH
Saddam Gogi - CV - MECHSaddam Gogi - CV - MECH
Saddam Gogi - CV - MECH
 
CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5
 
Ravi CV 2016
Ravi CV 2016Ravi CV 2016
Ravi CV 2016
 
RESUME
RESUMERESUME
RESUME
 
Browning.Stuart F1
Browning.Stuart F1Browning.Stuart F1
Browning.Stuart F1
 
Resume update PMM Lkdn
Resume update PMM LkdnResume update PMM Lkdn
Resume update PMM Lkdn
 
Resume Mahendharan Palani.f
Resume  Mahendharan Palani.fResume  Mahendharan Palani.f
Resume Mahendharan Palani.f
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16
 
MARTY_PATE
MARTY_PATEMARTY_PATE
MARTY_PATE
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_
 
vikas goel
vikas goelvikas goel
vikas goel
 
vikas goel
vikas goelvikas goel
vikas goel
 
Lukas CV
Lukas CVLukas CV
Lukas CV
 
Royster menezes - Mechanical Engineer
Royster menezes - Mechanical EngineerRoyster menezes - Mechanical Engineer
Royster menezes - Mechanical Engineer
 

Hemant-Mukund-Kale-Resume

  • 1. Page 1 / Hemant Mukund Kale    HEMANT MUKUND KALE : 09922446285 / 020-25389365 |: hems_kale@yahoo.co.in Specialist Mechanical Engineer ~ Project Management & Planning ~ Specialties: Water & Sewage Treatment Projects ~ ~ Senior professional with verifiable year‐after‐year success in achieving project set objectives within turn around & rapid changing environments ~ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 18 years of experience in: Project Management | Strategic Planning | Feasibility Studies | Customer Relationship Management| Budgeting & Forecasting | Design Engineering | Process Enhancement | Liaising & Coordination | Quality Assurance / Control | Testing | Training & Development | Team Management | Material Management ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  Successfully managed multiple projects and milestones while ensuring that the projects complied with all the cost and scope specifications; deft in overseeing project activities from conceptualization to execution including technical specifications, stage inspections, progress monitoring, site management and manpower planning  An astute leader with ability to motivate subordinates in optimizing their performance levels & possesses excellent analytical, organizational & interpersonal skills Accomplishments  Played a key role in developing more than 100 Kaizen which saved in time, money and efforts of employees  Contributed in developing & introducing: o Unique worksheet for grinding machine by lead to reduction in breakdown time and increase in saving money o Worksheets for induction hardening machine and maintaining softness of water which reduced breakdown time & frequency and saved company’s money  Successfully saved more than Rs. 1.2 crores cost in the assigned project by changing design and drawing of 450 MLD Water Treatment Plant at Navi Mumbai Corporation; approved by IIT ‐ Powai  Skillfully designed harness for Military R&D Engineering for Foot Bridge and Floating Bridge  Instrumental role in designing & executing Underground Sewage Treatment Plant leading to saving of money & area; the area was then used for garden & parking purposes  Contributed in preparing, suggesting & executing highest Kaizen in Bharat Forge Company  Played a key role in maintain zero breakdown in grinding and induction hardening machine Independent Assignments Reliance Industries Ltd., Ghansoli Since Jan 2014  Working with Reliance Industries’ Research Department on their ambitious R&D efforts for developing various experimental apparatus and prototypes. Water Treatment, Sewage Treatment & All Types of Fabrication Work Since Apr 2010  Spearheaded design & execution of sewage treatment plant & water treatment plant  Supervised drawing, design, execution & heavy duty fabrication work of MS & SS Material for Vardhana Builders, Coimbatore; Vastushodh Builders, Pune; Cummins, Bharat Forge, Cybage, Bosch, Bekaert, Amtek, Rehau Polymers, etc.  Successfully managed design & drawing work of retrieval lifting arrangement for Sewage Treatment Plant for Bangalore Corporation in Ss 316 Material Research & Development of Armanant Technology (R&D Engineering, Pune) Military Projects Since Apr 2013  Developed two types of harness & safety jackets for Indian Army; received appreciation from Indian Army as they put it in the Army Material Authorized List  Conducted & executed research work of: o Aluminum Foot Bridge & Water Floating Bridge of 60 meters; foldable and can assemble & de‐assemble in 40 minutes time o Aluminum Foot Bridge and Water Floating Bridge of 60 meters for Leh, Laddakh & Kashmir Region; foldable and can assemble & de‐assemble in 40 minutes time Gharpure Engineering & Contractors Apr 2012 – Mar 2013  Instrumental role in executing mechanical engineering work for Water Treatment and Sewage Treatment Plant  Played a key executing mechanical work at site of Water Treatment Plant of Kalyan Dombiwali Municipal Corporation Space Kraetors & Developers Pvt. Ltd. Pune Oct 2010 – Mar 2013  Deployed mechanical work at site of Water Treatment Plant for Navi Mumbai and Panvel Municipal Corporation  Enhanced capacity of Drinking Water Treatment Plant from 300 MLD to 450 MLD  Ensured smooth working of all mechanical instruments, designs, drawings, electrical, electronics & fabrication work on site  Successfully performed changes in design & drawing of Plant Mechanical Work approved by IIT Powai; saved more than 130 tons of steel and more than Rs. 1.2 crores of project cost
  • 2. Page 2 / Hemant Mukund Kale    Previous Experience Bharat Forge Ltd., Pune Apr 1999 – Jan 2010 Senior Maintenance Engineer Key Deliverables  Project Management: Developed project baselines, monitoring & controlling projects with respect to cost, resource deployment, time over‐runs and quality compliance to ensure satisfactory execution. Formulated operating budgets & managed overall operations for executing projects within cost & time norms. Participated in project review meetings for evaluating progress & de‐bottlenecking. Inspected field sites to observe, evaluate condition & operability of facilities & structures, collecting field survey data & measurements. Deployed projects using computer aided design systems & related software. Faced audits and prepared organization for TS 16949.  Maintenance Operations: Implemented stringent systems and quality plans / manuals to ensure high quality standards during all stages of project as per set norms. Served as In‐Charge of shift and looked after breakdown maintenance & smooth functioning of all types of Grinding Machines, HMC, VMC, CNC, Induction Hardening Machine, Machines, Drilling, Tapping, Balancing, Magnaflux, Milling, Atlas Copco, Screw Compressor Model GA –2007, GA – 11ff and GA – 45, Air Dryer, Heat Exchanger, Cooling Tower, Centrifugal Pump, Air Hoist, Grinding Guns, Anchoring Machines, Material Handling Pallet Trucks, etc. [  Planning & Reporting: Successfully applied & adopted computer programs to improve efficiency & effectiveness, organizing records and compiling reports. Reviewed method statements, work specific quality control plans and other documents. Prepared, recorded & maintained engineering records, equipment database and risk schedules to identify & quantify risks & mitigation measures. Prepared & reviewed all documentations, machine scheduling & execution of preventive maintenance work as per checklist, record updation, chart preparation, machine planning & execution for major maintenance work, etc. Maintained data of preventive activities, calculate b/d%, MTTR, MTBF, etc. Worked on SAP System for documentation work.  Stores & Spare Maintenance: Monitored & maintained stock of consumables & general purpose items. Prepared list of shortage and maintained level of critical spares & excellent vendor relations  Team Management: Led a team of professionals; ensured suitable deployment and timely availability of manpower (designers & engineers). Liaised with clients, consultants, contractors, sub‐contractors & external agencies for determining technical specifications, approvals and obtaining statutory clearances. Previous Experience Remsons Industries Ltd., Pune Nov 1998 – Apr 1999 Production cum Development Engineer Kalpak Enterprises, Pune Dec 1997 – Aug 1998 Maintenance & Production Engineer Academic Credentials 2000 Diploma in Office Automation from Suyash Computers, Pune 1998 Diploma in Mechanical Engineering from Eklavya Shikshan Santha’s Polytechnic, MSBTE, BTE Board IT Skills: Well versed with Windows, MS Office and AutoCAD Professional Enhancements  Shielded Metal Arc Welding Process 6.03.2002  5S Training  SAP Training  Enhancing Productivity through Appropriate Automation in Metal Working from Indian Machine Tool Manufacturer’s Association, 2008 Personal Details Date of Birth: 15th Mar 1976 Languages Known: English, Marathi and Hindi Address: Building‐D, Flat No. ‐ 004, ‘Spring Field’ Cooperative Housing Society, Behind Mahesh Vidyalaya, Near Gananjay Society, Kothrud, Pune‐411029 Notice Period: 15 Days Location Preference: Pune