Operation and Maintenance of NPP
Please try describe process of unloading reactor core (step by step) and transfer fuel from
Reactor Building to spent fuel pond in Fuel Building
The reactor unloading of NPPs is carried out in the loading and unloading area for reactor fuel
assemblies by joint operation of equipment in the fuel handling and storage system.
Step 1: -
The fuel manipulator crane picks up the fuel assemblies to be unloaded from the reactor
in the refuelling cavity and transports them to the fuel building through fuel transfer tube and
gate valve.
Step 2: -
The fuel assembly is transported to the fuel building by the transport trolley.
Step 3: -
With the help of pond fuel handling machine, the fuel assemblies are moved to fuel
storage racks.
[The spent fuel storage rack is installed inside the spent fuel storage pool. Because of a large number
of irradiated fuel assemblies with high radioactivity and residual heat are stored in such rack for a long
period, the issues concerning subcriticality, thermal hydraulics and earthquake resistance arising
therefrom shall be taken into full account and such rack shall be designed according to relevant
standards.
2
The centres of storage units of the spent fuel storage racks are arranged at equal intervals (larger than
the safe distance) and all the storage units can store enough fuel assemblies with several storage units
as the standby. The pool is equipped with sufficient safety features to ensure the nuclear safety.]
Step 4: -
After long period remove of residual heat form the fuel, there are transferred to
irradiated fuel transport flask by mean of fuel building crane.
Step 5: -
This irradiated fuel transport tank are loaded into vehicles for the safe disposal with
help of fuel building crane.
The reactor unloading in the nuclear power plants is performed by unloading the in-
core fuel assemblies in the pool filled with borated water group by group All operations are
conducted in the borated water, to ensure the criticality safety and radiation protection safety
during fuel unloading.
Submitted by
Ojes Sai Pogiri (k-5870)
Ramabrahmendra Kommanaboina (302472)

More Related Content

What's hot

PEBBLE BED MODULAR REACTOR
PEBBLE BED MODULAR REACTOR PEBBLE BED MODULAR REACTOR
PEBBLE BED MODULAR REACTOR
sandeep reddy
 
1727092 634985076667011250
1727092 6349850766670112501727092 634985076667011250
1727092 634985076667011250
akshar56
 

What's hot (20)

STEAM POWER PLANT
STEAM POWER PLANTSTEAM POWER PLANT
STEAM POWER PLANT
 
Unit 4 b nuclear
Unit 4 b nuclearUnit 4 b nuclear
Unit 4 b nuclear
 
Steam Power Plants
Steam Power PlantsSteam Power Plants
Steam Power Plants
 
Identification of fuel pipe and steam pipe(thermal power plant Muzafargha)
Identification of fuel pipe and steam pipe(thermal power plant Muzafargha)Identification of fuel pipe and steam pipe(thermal power plant Muzafargha)
Identification of fuel pipe and steam pipe(thermal power plant Muzafargha)
 
PEBBLE BED MODULAR REACTOR
PEBBLE BED MODULAR REACTOR PEBBLE BED MODULAR REACTOR
PEBBLE BED MODULAR REACTOR
 
A presentation on steam power plant1
A presentation on steam power plant1A presentation on steam power plant1
A presentation on steam power plant1
 
2013edusat lecture on steam plant(2)
2013edusat lecture on steam  plant(2)2013edusat lecture on steam  plant(2)
2013edusat lecture on steam plant(2)
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
 
Fuel Cell Library - Overview
Fuel Cell Library - OverviewFuel Cell Library - Overview
Fuel Cell Library - Overview
 
1727092 634985076667011250
1727092 6349850766670112501727092 634985076667011250
1727092 634985076667011250
 
GT-PP.pptx
GT-PP.pptxGT-PP.pptx
GT-PP.pptx
 
steam pow rplant
steam pow  rplantsteam pow  rplant
steam pow rplant
 
Steam plan
Steam planSteam plan
Steam plan
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
 
Overview of Thermal Power Plants
Overview of Thermal Power PlantsOverview of Thermal Power Plants
Overview of Thermal Power Plants
 
Adavance Power Plants
Adavance Power PlantsAdavance Power Plants
Adavance Power Plants
 
ThermoDynamics (Working of steam power plant and rankine cyle)
ThermoDynamics (Working of steam power plant and rankine cyle)ThermoDynamics (Working of steam power plant and rankine cyle)
ThermoDynamics (Working of steam power plant and rankine cyle)
 
Power Generation and Steam power plant
Power Generation and Steam power plantPower Generation and Steam power plant
Power Generation and Steam power plant
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
 
Ppe unit 2
Ppe unit 2Ppe unit 2
Ppe unit 2
 

Similar to NPP Operation & Maintenance

Report on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel ReplacementReport on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel Replacement
Sujit Tharakan
 
Portable Fuel Tank - The Application of a New Method of Bunkering for Small S...
Portable Fuel Tank - The Application of a New Method of Bunkering for Small S...Portable Fuel Tank - The Application of a New Method of Bunkering for Small S...
Portable Fuel Tank - The Application of a New Method of Bunkering for Small S...
Kelvin Xu (MRINA)
 
C ktps training-report
C ktps training-reportC ktps training-report
C ktps training-report
Anil Saharan
 

Similar to NPP Operation & Maintenance (20)

Fuelling the Barakah Nuclear Energy Plant
Fuelling the Barakah Nuclear Energy PlantFuelling the Barakah Nuclear Energy Plant
Fuelling the Barakah Nuclear Energy Plant
 
STEAM POWER PLANT / THERMAL POWER PLANT
STEAM POWER PLANT / THERMAL POWER PLANTSTEAM POWER PLANT / THERMAL POWER PLANT
STEAM POWER PLANT / THERMAL POWER PLANT
 
Power plant engineering unit 2 notes by Varun Pratap Singh
Power plant engineering unit 2 notes by Varun Pratap SinghPower plant engineering unit 2 notes by Varun Pratap Singh
Power plant engineering unit 2 notes by Varun Pratap Singh
 
Nuclear power plant mmm
Nuclear power plant mmmNuclear power plant mmm
Nuclear power plant mmm
 
Power plant engineering complete five unit vtu notes pdf download
Power plant engineering complete five unit vtu notes pdf downloadPower plant engineering complete five unit vtu notes pdf download
Power plant engineering complete five unit vtu notes pdf download
 
Chapter 5b -_cracking_ffcu
Chapter 5b -_cracking_ffcuChapter 5b -_cracking_ffcu
Chapter 5b -_cracking_ffcu
 
arc 100
arc 100arc 100
arc 100
 
Report on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel ReplacementReport on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel Replacement
 
Ppe unit 1
Ppe unit 1Ppe unit 1
Ppe unit 1
 
C1072024
C1072024C1072024
C1072024
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
Steam power plants
Steam power plantsSteam power plants
Steam power plants
 
Lecture 12 nuclear power plant
Lecture 12 nuclear power plantLecture 12 nuclear power plant
Lecture 12 nuclear power plant
 
Waste Heat Recovery and Sustainable Energy
Waste Heat Recovery and Sustainable EnergyWaste Heat Recovery and Sustainable Energy
Waste Heat Recovery and Sustainable Energy
 
Portable Fuel Tank - The Application of a New Method of Bunkering for Small S...
Portable Fuel Tank - The Application of a New Method of Bunkering for Small S...Portable Fuel Tank - The Application of a New Method of Bunkering for Small S...
Portable Fuel Tank - The Application of a New Method of Bunkering for Small S...
 
Assessment of the Use of Solar Flat Plate Collectors for Solar Thermal Refrig...
Assessment of the Use of Solar Flat Plate Collectors for Solar Thermal Refrig...Assessment of the Use of Solar Flat Plate Collectors for Solar Thermal Refrig...
Assessment of the Use of Solar Flat Plate Collectors for Solar Thermal Refrig...
 
IRJET- Safety in Petroleum Industry
IRJET- Safety in Petroleum IndustryIRJET- Safety in Petroleum Industry
IRJET- Safety in Petroleum Industry
 
vocational training at DVC andal
 vocational training at DVC andal vocational training at DVC andal
vocational training at DVC andal
 
C ktps training-report
C ktps training-reportC ktps training-report
C ktps training-report
 
Project Report on “WORKING MODEL OF POWER GRID/SMART GRID
Project Report on “WORKING MODEL OF POWER GRID/SMART GRIDProject Report on “WORKING MODEL OF POWER GRID/SMART GRID
Project Report on “WORKING MODEL OF POWER GRID/SMART GRID
 

More from Ojes Sai Pogiri (10)

Design and fabrication of pneumatic loaded simply supported beam apparatus
Design and fabrication of pneumatic loaded simply supported beam apparatusDesign and fabrication of pneumatic loaded simply supported beam apparatus
Design and fabrication of pneumatic loaded simply supported beam apparatus
 
FINITE DIFFERENCE METHOD FOR 2D- HEAT TRANSFER
FINITE DIFFERENCE METHOD FOR 2D- HEAT TRANSFERFINITE DIFFERENCE METHOD FOR 2D- HEAT TRANSFER
FINITE DIFFERENCE METHOD FOR 2D- HEAT TRANSFER
 
Nuclear Infrastructure India
Nuclear Infrastructure IndiaNuclear Infrastructure India
Nuclear Infrastructure India
 
Supercritical Thermal Power plant
Supercritical Thermal Power plantSupercritical Thermal Power plant
Supercritical Thermal Power plant
 
Radioprotection
RadioprotectionRadioprotection
Radioprotection
 
Application Of FMECA
Application Of FMECA Application Of FMECA
Application Of FMECA
 
FTA
FTAFTA
FTA
 
FMEA
FMEAFMEA
FMEA
 
NDT UT in Air crafts
NDT UT in Air craftsNDT UT in Air crafts
NDT UT in Air crafts
 
Airports Authority of Indai
Airports Authority of IndaiAirports Authority of Indai
Airports Authority of Indai
 

Recently uploaded

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 

NPP Operation & Maintenance

  • 1. 1 Operation and Maintenance of NPP Please try describe process of unloading reactor core (step by step) and transfer fuel from Reactor Building to spent fuel pond in Fuel Building The reactor unloading of NPPs is carried out in the loading and unloading area for reactor fuel assemblies by joint operation of equipment in the fuel handling and storage system. Step 1: - The fuel manipulator crane picks up the fuel assemblies to be unloaded from the reactor in the refuelling cavity and transports them to the fuel building through fuel transfer tube and gate valve. Step 2: - The fuel assembly is transported to the fuel building by the transport trolley. Step 3: - With the help of pond fuel handling machine, the fuel assemblies are moved to fuel storage racks. [The spent fuel storage rack is installed inside the spent fuel storage pool. Because of a large number of irradiated fuel assemblies with high radioactivity and residual heat are stored in such rack for a long period, the issues concerning subcriticality, thermal hydraulics and earthquake resistance arising therefrom shall be taken into full account and such rack shall be designed according to relevant standards.
  • 2. 2 The centres of storage units of the spent fuel storage racks are arranged at equal intervals (larger than the safe distance) and all the storage units can store enough fuel assemblies with several storage units as the standby. The pool is equipped with sufficient safety features to ensure the nuclear safety.] Step 4: - After long period remove of residual heat form the fuel, there are transferred to irradiated fuel transport flask by mean of fuel building crane. Step 5: - This irradiated fuel transport tank are loaded into vehicles for the safe disposal with help of fuel building crane. The reactor unloading in the nuclear power plants is performed by unloading the in- core fuel assemblies in the pool filled with borated water group by group All operations are conducted in the borated water, to ensure the criticality safety and radiation protection safety during fuel unloading. Submitted by Ojes Sai Pogiri (k-5870) Ramabrahmendra Kommanaboina (302472)