CURRICULUM VITAE
Post Applied for: Quantity Surveyor
NIXON T JACOB,
Quantity Surveyor,
Shell,
Basra, Iraq
Mobile: +964 7814632359 (Iraq), +91 9747421906 (India)
Email: nixontjacob@yahoo.com
Objective:
To expand & share knowledge, experience as well as improve leadership skills and grow in management level to
take challenge in a part of a committed team contributing to the growth of the organization.
Professional Summary
An Engineering professional with cumulative experience of about Thirteen Years which includes experience in
Construction & Commercial especially upstream Oil & Gas facilities development projects.
Shell Iraq Petroleum Development, Basra, Iraq
Feb 2014 to Present: Quantity Surveyor
Shell is vertically integrated and is active in every area of the oil and gas industry, including exploration and
production, refining, distribution and marketing, petrochemicals, power generation and trading
 MTO
 Measurement and quantification
 Bill of Quantity preparation from IFC drawings as per scope of work in contract
 Document preparation especially bills of quantities
 Verifying the construction progress
 Interim valuations and payments
 Issue Payment Letters after valuation of progress and Contractor invoice
 Provides support to the lead cost engineer and assists with monitoring project
progress
 Settlement of contractual claims
 Prepare VOWD & Forecast
 Cash Flow Register Preparation
 Assistance in dispute resolution
 Payment process of invoices through SAP
 Bid Tabulation
 Verifying the subcontractor quotations and claims etc...
Petrofac International, UAE/IRAQ
2011 to Present: Quantity Surveyor
This Company is one of the major Engineering, Procurement and Construction contracting especially Oil & Gas
projects.
 MTO
 Read construction drawings and consider the work that includes in our Scope of
Work which items that are reflected in the Bill of Quantities.
 Estimation
 Cost planning
 Procurement advice
 Measurement and quantification
 Bill of Quantity preparation from IFC drawings as per scope of work in contract.
 identifying, analysing and developing responses to commercial risks
 Document preparation especially bills of quantities
 Cost control during construction
 Verifying the construction progress
 Interim valuations and payments
 Issue Payment Letters after valuation of progress and Subcontractor invoice
 Settlement of contractual claims
 Earned value reporting
 Assistance in dispute resolution
 Payment process of invoices through SAP
 Bid Tabulation
 Verifying the subcontractor quotations and claims etc..
JGC Arabia Ltd, Saudi Arabia.
2010- 2011: Quantity Surveyor (E&I)
This Company is one of the major Engineering, Procurement and Construction contracting especially Oil & Gas
projects.
 MTO
 Reviewing all contract documents to ensure scope of work, verifying bill of
Quantities as per IFC drawings.
 Able to read construction drawings and consider the work that includes in our
Scope of Work which items that are reflected in the Bill of Quantities.
 Bill of Quantity preparation from IFC drawings as per scope of work in contract.
 Checking the progress at site with Subcontractor for approving the progress.
 Verifying invoices submission of Subcontractors.
 Verifying the subcontractor quotations and claims.
 Preparing Cost Analysis for additional works apart from the Bill of Quantities by
proposing new unit Rates.
 Verifying Lump sum Cost proposal of Subcontractor submission.
 Working Closely with Project Management team to ensure smooth co-ordination
and achievements in all aspects of the Project.
Qatar Kentz, Qatar.
2006- 2010: Quantity Surveyor (E&I)
This Company is one of the major Engineering, Procurement and Construction contracting especially Oil & Gas
projects.
My Main Achievements in this Job Includes:
 MTO
 Read construction drawings and consider the work that includes in our Scope of
Work which items that are reflected in the Bill of Quantities.
 Material Take off from IFC drawings as per scope of work in contract.
 Reviewing all contract documents to ensure scope of work, preparing bill of
Materials and also man power required as per Bill of Quantities.
 Measuring the progress at site and preparing the measurement sheets & BOQ.
 Advise the construction team in cost control matters.
 Periodical construction work site inspection with the client for the approval of
work progress.
 Submission of weekly reports within the cutoff date as per client requirement.
 Preparation & Submission of the monthly invoice within the cutoff date as per
client requirements.
 Tracking the variations and claims.
 Worked as a lead of Cable Management System.
 Preparing Cost Analysis for additional works apart from the Bill of Quantities by
proposing new unit Rates.
 Preparing & Claiming (Time Rate works) of day Works as Per Company
Schedules & standards for the additional works.
 Preparing Star Rates related to Company Standards by means of Pro Rata Basis
as per the Bill of Quantities.
 Preparing Lump sum Cost for the designated work by Company, proposed by
Contract Site Instruction (CSI).
 Working Closely with Project Management team to ensure smooth co-ordination
and achievements in all aspects of the Project.
 Working closely with the planning department in regards to all planning&
scheduling.
 Reconciliation for the project close-out.
Babu Engineering Corporation, India
2003 – 2006: Surveyor
This Company is active in Electrical and Instrumentation works.
My main Achievements in the job Includes:
 Material Take off as per IFC drawings.
 Reviewing Scope of works as per contract.
 Checking of progress measurements based on foreman’s report and as per
construction work site condition, updating the installed quantities in measurement
sheets.
 Periodical construction work site inspection with the client for the approval of
progress of works.
 Submission of weekly and monthly invoices.
 Claiming for additional works.
Paramel Electricals, India
2001– 2003: Electrical Supervisor
This Company is active in Electrical Construction works.
My main Achievements in the job Includes:
 Installation of panel boards, cable tray works, cable laying, glanding & termination,
power& lighting works etc...
Academic Profile
Professional:
1) Graduation in Quantity surveying practice (2 Years), SRICS No-5026960
Reading University, England.
2) B Tech in Electrical Engineering (4Years)
Monad University, India
3) Electrical Engineering Diploma (3yrs)
State Board of Technical Education/MTI Thrissur, India
Secondary:
SSLC, Board of Public Examinations, Kerala, India.
Courses & Trainings attended
IIF (Incident & Injury Free)
H2S Orientation
Cross Cultural Training
Train the Trainer
Time Management
Confined space
Lock Out and Tag Out (LOTO)
Working at heights, etc.
IT Skills:
MS office, SAP 640, AutoCAD, PC Schematic Electrical Automation
Personnel Profile
Work Experience : 13+ Years.
Current Employer : Shell
Role /Designation : Quantity Surveyor
SRICS No : 5026960
Languages Known : Malayalam, English, Hindi, and Tamil.
Gender : Male
Marital Status : Married.
Passport No : Z-3000086
Emigration Status : ECNR
Date of Issue : 13-11-2014
Date of Expire : 12-11-2024
Place of Issue : Cochin
Age & Date of Birth : 32 & 20-12-1982
Visa Valid Up to : 11-02-2015
Driving License : Valid Indian LMV License
Employers Detail
Employer Position Country Duration
Shell Quantity Surveyor
Basra, Iraq (Shell, Early
Production facilities
Project, FCP Gas ,
Majnoon)
19 Feb 2014 to Present
Petrofac International
LLC (ICMT SHELL)
Quantity Surveyor
Basra, Iraq (Shell, Early
Production facilities
Project,CPF, Majnoon)
1 March 2012 to 31 Dec
2013
Petrofac International
LLC
Quantity Surveyor
Sharjah,UAE (Shell, Early
Production facilities
Project,Majnoon)
10 August 2011 to 29 Feb
2012
JGC Arabia Ltd. Quantity Surveyor
KSA(Saudi Aramco,
Manifa Central USSF
Project)
01 September 2010 – 01
Aug 2011
Qatar Kentz Quantity Surveyor
Qatar(Qatar Gas, Fluor
Mideast Ltd, Qatar Gas
Common Lean LNG
Loading Facilities)
May 2009- July 2010
Qatar Kentz Quantity Surveyor
Qatar(Ras Gas, Fluor
Mideast Ltd, Common Off
plot Project)
September 2007 – April
2009
Qatar Kentz Quantity Surveyor
Qatar(Dolphin Energy,
JGC, Dolphin on-Shore
Compression Facilities)
June 2006-September 2007
Babu Engineering
Corporation
Surveyor
India (Neyveli Lignite
Corporation, Ansaldo,
Power Plant)
July 2003-April 2006
Paramel Electricals Electrical Supervisor India(Paramel Electricals) Dec 2001- May 2003
Declaration
I hereby declared that the above statements are true and correct to the best of my knowledge and belief.
Yours faithfully
NIXON T JACOB
Qatar Kentz Quantity Surveyor
Qatar(Dolphin Energy,
JGC, Dolphin on-Shore
Compression Facilities)
June 2006-September 2007
Babu Engineering
Corporation
Surveyor
India (Neyveli Lignite
Corporation, Ansaldo,
Power Plant)
July 2003-April 2006
Paramel Electricals Electrical Supervisor India(Paramel Electricals) Dec 2001- May 2003
Declaration
I hereby declared that the above statements are true and correct to the best of my knowledge and belief.
Yours faithfully
NIXON T JACOB

Nixon T Jacob _CV

  • 1.
    CURRICULUM VITAE Post Appliedfor: Quantity Surveyor NIXON T JACOB, Quantity Surveyor, Shell, Basra, Iraq Mobile: +964 7814632359 (Iraq), +91 9747421906 (India) Email: nixontjacob@yahoo.com Objective: To expand & share knowledge, experience as well as improve leadership skills and grow in management level to take challenge in a part of a committed team contributing to the growth of the organization. Professional Summary An Engineering professional with cumulative experience of about Thirteen Years which includes experience in Construction & Commercial especially upstream Oil & Gas facilities development projects. Shell Iraq Petroleum Development, Basra, Iraq Feb 2014 to Present: Quantity Surveyor Shell is vertically integrated and is active in every area of the oil and gas industry, including exploration and production, refining, distribution and marketing, petrochemicals, power generation and trading  MTO  Measurement and quantification  Bill of Quantity preparation from IFC drawings as per scope of work in contract  Document preparation especially bills of quantities  Verifying the construction progress  Interim valuations and payments  Issue Payment Letters after valuation of progress and Contractor invoice  Provides support to the lead cost engineer and assists with monitoring project progress  Settlement of contractual claims  Prepare VOWD & Forecast  Cash Flow Register Preparation  Assistance in dispute resolution  Payment process of invoices through SAP  Bid Tabulation  Verifying the subcontractor quotations and claims etc... Petrofac International, UAE/IRAQ 2011 to Present: Quantity Surveyor This Company is one of the major Engineering, Procurement and Construction contracting especially Oil & Gas projects.  MTO  Read construction drawings and consider the work that includes in our Scope of Work which items that are reflected in the Bill of Quantities.
  • 2.
     Estimation  Costplanning  Procurement advice  Measurement and quantification  Bill of Quantity preparation from IFC drawings as per scope of work in contract.  identifying, analysing and developing responses to commercial risks  Document preparation especially bills of quantities  Cost control during construction  Verifying the construction progress  Interim valuations and payments  Issue Payment Letters after valuation of progress and Subcontractor invoice  Settlement of contractual claims  Earned value reporting  Assistance in dispute resolution  Payment process of invoices through SAP  Bid Tabulation  Verifying the subcontractor quotations and claims etc.. JGC Arabia Ltd, Saudi Arabia. 2010- 2011: Quantity Surveyor (E&I) This Company is one of the major Engineering, Procurement and Construction contracting especially Oil & Gas projects.  MTO  Reviewing all contract documents to ensure scope of work, verifying bill of Quantities as per IFC drawings.  Able to read construction drawings and consider the work that includes in our Scope of Work which items that are reflected in the Bill of Quantities.  Bill of Quantity preparation from IFC drawings as per scope of work in contract.  Checking the progress at site with Subcontractor for approving the progress.  Verifying invoices submission of Subcontractors.  Verifying the subcontractor quotations and claims.  Preparing Cost Analysis for additional works apart from the Bill of Quantities by proposing new unit Rates.  Verifying Lump sum Cost proposal of Subcontractor submission.  Working Closely with Project Management team to ensure smooth co-ordination and achievements in all aspects of the Project. Qatar Kentz, Qatar. 2006- 2010: Quantity Surveyor (E&I) This Company is one of the major Engineering, Procurement and Construction contracting especially Oil & Gas projects. My Main Achievements in this Job Includes:  MTO  Read construction drawings and consider the work that includes in our Scope of Work which items that are reflected in the Bill of Quantities.  Material Take off from IFC drawings as per scope of work in contract.  Reviewing all contract documents to ensure scope of work, preparing bill of Materials and also man power required as per Bill of Quantities.  Measuring the progress at site and preparing the measurement sheets & BOQ.  Advise the construction team in cost control matters.
  • 3.
     Periodical constructionwork site inspection with the client for the approval of work progress.  Submission of weekly reports within the cutoff date as per client requirement.  Preparation & Submission of the monthly invoice within the cutoff date as per client requirements.  Tracking the variations and claims.  Worked as a lead of Cable Management System.  Preparing Cost Analysis for additional works apart from the Bill of Quantities by proposing new unit Rates.  Preparing & Claiming (Time Rate works) of day Works as Per Company Schedules & standards for the additional works.  Preparing Star Rates related to Company Standards by means of Pro Rata Basis as per the Bill of Quantities.  Preparing Lump sum Cost for the designated work by Company, proposed by Contract Site Instruction (CSI).  Working Closely with Project Management team to ensure smooth co-ordination and achievements in all aspects of the Project.  Working closely with the planning department in regards to all planning& scheduling.  Reconciliation for the project close-out. Babu Engineering Corporation, India 2003 – 2006: Surveyor This Company is active in Electrical and Instrumentation works. My main Achievements in the job Includes:  Material Take off as per IFC drawings.  Reviewing Scope of works as per contract.  Checking of progress measurements based on foreman’s report and as per construction work site condition, updating the installed quantities in measurement sheets.  Periodical construction work site inspection with the client for the approval of progress of works.  Submission of weekly and monthly invoices.  Claiming for additional works. Paramel Electricals, India 2001– 2003: Electrical Supervisor This Company is active in Electrical Construction works. My main Achievements in the job Includes:  Installation of panel boards, cable tray works, cable laying, glanding & termination, power& lighting works etc... Academic Profile Professional: 1) Graduation in Quantity surveying practice (2 Years), SRICS No-5026960 Reading University, England. 2) B Tech in Electrical Engineering (4Years) Monad University, India 3) Electrical Engineering Diploma (3yrs) State Board of Technical Education/MTI Thrissur, India Secondary: SSLC, Board of Public Examinations, Kerala, India. Courses & Trainings attended IIF (Incident & Injury Free) H2S Orientation
  • 4.
    Cross Cultural Training Trainthe Trainer Time Management Confined space Lock Out and Tag Out (LOTO) Working at heights, etc. IT Skills: MS office, SAP 640, AutoCAD, PC Schematic Electrical Automation Personnel Profile Work Experience : 13+ Years. Current Employer : Shell Role /Designation : Quantity Surveyor SRICS No : 5026960 Languages Known : Malayalam, English, Hindi, and Tamil. Gender : Male Marital Status : Married. Passport No : Z-3000086 Emigration Status : ECNR Date of Issue : 13-11-2014 Date of Expire : 12-11-2024 Place of Issue : Cochin Age & Date of Birth : 32 & 20-12-1982 Visa Valid Up to : 11-02-2015 Driving License : Valid Indian LMV License Employers Detail Employer Position Country Duration Shell Quantity Surveyor Basra, Iraq (Shell, Early Production facilities Project, FCP Gas , Majnoon) 19 Feb 2014 to Present Petrofac International LLC (ICMT SHELL) Quantity Surveyor Basra, Iraq (Shell, Early Production facilities Project,CPF, Majnoon) 1 March 2012 to 31 Dec 2013 Petrofac International LLC Quantity Surveyor Sharjah,UAE (Shell, Early Production facilities Project,Majnoon) 10 August 2011 to 29 Feb 2012 JGC Arabia Ltd. Quantity Surveyor KSA(Saudi Aramco, Manifa Central USSF Project) 01 September 2010 – 01 Aug 2011 Qatar Kentz Quantity Surveyor Qatar(Qatar Gas, Fluor Mideast Ltd, Qatar Gas Common Lean LNG Loading Facilities) May 2009- July 2010 Qatar Kentz Quantity Surveyor Qatar(Ras Gas, Fluor Mideast Ltd, Common Off plot Project) September 2007 – April 2009
  • 5.
    Qatar Kentz QuantitySurveyor Qatar(Dolphin Energy, JGC, Dolphin on-Shore Compression Facilities) June 2006-September 2007 Babu Engineering Corporation Surveyor India (Neyveli Lignite Corporation, Ansaldo, Power Plant) July 2003-April 2006 Paramel Electricals Electrical Supervisor India(Paramel Electricals) Dec 2001- May 2003 Declaration I hereby declared that the above statements are true and correct to the best of my knowledge and belief. Yours faithfully NIXON T JACOB
  • 6.
    Qatar Kentz QuantitySurveyor Qatar(Dolphin Energy, JGC, Dolphin on-Shore Compression Facilities) June 2006-September 2007 Babu Engineering Corporation Surveyor India (Neyveli Lignite Corporation, Ansaldo, Power Plant) July 2003-April 2006 Paramel Electricals Electrical Supervisor India(Paramel Electricals) Dec 2001- May 2003 Declaration I hereby declared that the above statements are true and correct to the best of my knowledge and belief. Yours faithfully NIXON T JACOB