Around 10 years of extensive experience in the field of Civil engineering in various positions like
Quality control / assurance, Site execution & Surveying.
OBJECTIVE:
To work in the vital position of the Project team in believing strong Construction, Oil & Gas field of
Civil Engineering by Applying accomplished engineering and practical knowledge.
SELF STRENGTH:
 Good exposure in India, Middle East Projects (Oman, Qatar & Iraq)
 Experienced Projects like Oil and Gas, Refinery and Residential Building as a Quality
Control, Site execution, Surveying & Estimation
 Computer proficiency to prepare and manage various project related tasks
 Familiar with International Standards and practice & Awareness of ISO 9001:2008
 Strong Minded and self-confident, Involvement, contribution, Decision-making
 Good communication and Organizational skills
QUALIFICATION: DIPLOMA IN CIVIL ENGINEERING & B.TECH CIVIL
WORK EXPERIENCE:
1. HYUNDAI ENGINEERING AND CONSTRUCTION HDGSK JV (IRAQ)
Position : QC Inspector
Duration : June 2015 to Till Date
Project : Karbala Refinery Project
Client : State Corporation of Oil Projects
2. SAI CONSULTING ENGINEERS PVT LTD, PMC (INDIA)
Position : QAQC Engineer Civil
Duration : June 2013 to May 20152015 to Till Date
Project : Unity Enclave Project
Client : State Bank of India Officer’s Association
Main Contractor : Simplex Infrastructure Ltd
3. SKY ORYX JV (JAPAN TAISE & TURKEY TAV joint venture)- QATAR
4. OLYMPIA INFRATECH PVT LTD, ( INDIA)
5. DOUGLAS OHI LLC, OMAN
6. SHOBA DEVELOPERS LTD-BANGALORE, INDIA
AS A QA/QC ENGINEER
 QUALITY CONTROL AT SITE:
 Inspection of all the works as per the latest drawings and co-ordinate with consultant and
get the approval from the consultant for the further activities
 Establish Bench mark and conducting site survey inspection with advance survey
equipment to ensure Elevation, Coordinate and Alignment of Road, Pipeline and Building
line
 Co-ordinate with Ready mix concrete supplier for timely supply of concrete
Position : QC Inspector Civil
Duration : Mar 2012 to Feb 2013
Project : HAMAAD INTERNATIONAL AIRPORT
Client : Qatar Airways
Main Contractor : BECHTEL
Position : Civil Engineer
Duration : Mar 2011 to Feb 2012
Project : Opaline (B+G+19) APPARTMENTS,Chennai
Position : QC Engineer Civil
Duration : April 2008 to Jan 2011
Project : SOHAR AROMATICS
: ODC PROJECT AT MARMUL -PDO
: ON PLOT AT NIMR - PDO
Client : PETROLEUM DEVELOPMENT OF OMAN
Position : Site Supervisor
Duration : July 2008 to Mar 2008
Project : SOBHA DAHLIA (B+G+11)
: SOBHA DAFFODIL (2B+G+14) apartments
 Checking for slump & Temperature of Concrete at site, casting & testing of cubes in site
laboratory and external laboratory for testing, receiving and reviewing of reports and
submitting to clients
 Prepare Checklist for all works and get the approval from the consultant / Clients and
maintain the records
 Ensure that the supervisors understand the requirements of the work method statement,
MAR, Specification, drawings and Inspection Testing plan. And conducting toolbox talk
when it required
 Maintain liaison between the project team, consultants and subcontractors to solve the
quality issues
 Educate the project team, subcontractors on the project quality plan as to ensure all
parties of the project are fully aware and understand the operational procedures and the
project contractual quality requirements
 Taking initiatives to promote the quality culture throughout the company
 Identify the document of non-conformities, communicate the non-conformance to the
concerned personnel
 Monitoring of Curing, Block work, Plastering, painting, tile work, doors and installations.
Witnessing of compaction, formwork, reinforcement, Anchor bolt, concrete pouring, pipe
laying, waterproofing as per approved ITP
 QUALITY ASSURANCE AND IMPLEMENTATION
 Prepare the QCP and maintenance of related records and creating general awareness of
QA/QC activities amongst workers at site as per ISO 9001:2008
 Distribute the project Quality plan to the project team, inclusive of the consultants and
subcontractors. Continually review the Projects Quality Plan as to ensure its
effectiveness
 Prepare & Review the proposed work of Method Statements and get the approval from
client
 Conduct the Internal Quality Audits as per the Audit plan to all departments within the
projects with objectives to enhance their operational effectiveness and efficiencies
 Prepare the projects QA/QC report on a periodical basis as agreed with the Project
Manager
 Prepare the subcontractors/suppliers Evaluation report in the required interval
 Monitor and report the achievement of the company Quality objectives
 Ensure that appropriate corrective and preventive actions are taken to address Non-
Conformance Reports (NCRs) and complaints rom the Employer / Employer’s
representative
 Implementation of corrective / preventive action in consultation with Project Managers
wherever required
 AS AN ENGINEER
 Planning and Scheduling work within period given
 Organizing Team under me as per Duration approved
 Prepare MTC list and Material Request
 Prepare MAR for Client Approval
 Participation of Method of Statement as per spec and company standard
 Assure material Quality and quantity during material inspection. Verify MTC and DO prior
to Documentation
 Preparation of Method of Statement as per spec and company standard
 Ensure revised drawing in site and obtain revised drawing from DC
 Execute work through company HSE and Quality policy
 Attending Client Minutes of meeting and HSE & QA/QC meeting
 Coordination between management and client
 Reporting HSE, QA/QC, Store, Planning and casting Departments.
 Rise RFI liaise with Client during site visit
 Liable with Client/Consultant/Subcontract while inspection
 Optimum utilization of Material, Manpower and Machineries
 Coordinate with site/Third party lab for material test and sample collection
 Assisting to evaluate subcontractor and subcontractor management and billing and report
to management and Client
 TECHNICAL TRAINING COURSE:
 ISO 9001:2008 Internal Audit training course in Quality management system
by Velosi oman .
 COMPUTER SKILLS:
 Windows ( Micro soft word & Excel)
 Auto Cad 2012
 Microsoft Project
 ZUTEC
 OTHER SKILLS:
 GCC DRIVING LICENSE No: 76650228 & Indian Driving license
ACADEMIC HISTORY:
SL. NO INSTITUTIONS COURSES YEAR
1 KARNATAKA STATE OPEN UNIVERSITY B.TECH CIVIL ENGINEERING Jan 2014
2
VENKATESVARA POLYTECHNIC
COLLEGE,PUDUKKOTTAI
DIPLOMA IN CIVIL
ENGINEERING
April 2006
3
T.E.L.C HIGHER SECONDARY SCHOOL
PUDUKKOTTAI
XII STD April 2004
LANGUAGES KNOWN:
 English & Tamil (Read, Write & Speak Fluently)
 Hindi & Malayalam (Speak Fluently)
Interest: Driving, Swimming, Reading newspapers.
PERSONAL INFORMATION
Father’s Name : A. Shahul Hameed
Date of Birth : 25.03.1987
Place of Birth : Pudukkottai
Citizenship : Indian
Passport No : G1913677
Date of Expiry : 06.03.2017
Gender : Male
Marital Status : Single
Permanent Address : # 35 Samathi Street
: Adappan Vayal,
: Pudukottai
: Tamil Nadu - 622 002
: India
I hereby all the details are true to my knowledge
Date :
Place : PEER MOHAMED.S

peercv- 1

  • 1.
    PEER MOHAMED.S Emailid: prmohamed23@gmail.com +964 78212 51848 (Iraq) SKYPE ID: PeerM4501 +91 99944 04842 (India) # 35 SAMATHI STREET, ADAPPAN VAYAL, PUDUKOTTAI, TAMILNADU - INDIA PROFILE Around 10 years of extensive experience in the field of Civil engineering in various positions like Quality control / assurance, Site execution & Surveying. OBJECTIVE: To work in the vital position of the Project team in believing strong Construction, Oil & Gas field of Civil Engineering by Applying accomplished engineering and practical knowledge. SELF STRENGTH:  Good exposure in India, Middle East Projects (Oman, Qatar & Iraq)  Experienced Projects like Oil and Gas, Refinery and Residential Building as a Quality Control, Site execution, Surveying & Estimation  Computer proficiency to prepare and manage various project related tasks  Familiar with International Standards and practice & Awareness of ISO 9001:2008  Strong Minded and self-confident, Involvement, contribution, Decision-making  Good communication and Organizational skills QUALIFICATION: DIPLOMA IN CIVIL ENGINEERING & B.TECH CIVIL WORK EXPERIENCE: 1. HYUNDAI ENGINEERING AND CONSTRUCTION HDGSK JV (IRAQ) Position : QC Inspector Duration : June 2015 to Till Date Project : Karbala Refinery Project Client : State Corporation of Oil Projects 2. SAI CONSULTING ENGINEERS PVT LTD, PMC (INDIA) Position : QAQC Engineer Civil Duration : June 2013 to May 20152015 to Till Date Project : Unity Enclave Project Client : State Bank of India Officer’s Association Main Contractor : Simplex Infrastructure Ltd
  • 2.
    3. SKY ORYXJV (JAPAN TAISE & TURKEY TAV joint venture)- QATAR 4. OLYMPIA INFRATECH PVT LTD, ( INDIA) 5. DOUGLAS OHI LLC, OMAN 6. SHOBA DEVELOPERS LTD-BANGALORE, INDIA AS A QA/QC ENGINEER  QUALITY CONTROL AT SITE:  Inspection of all the works as per the latest drawings and co-ordinate with consultant and get the approval from the consultant for the further activities  Establish Bench mark and conducting site survey inspection with advance survey equipment to ensure Elevation, Coordinate and Alignment of Road, Pipeline and Building line  Co-ordinate with Ready mix concrete supplier for timely supply of concrete Position : QC Inspector Civil Duration : Mar 2012 to Feb 2013 Project : HAMAAD INTERNATIONAL AIRPORT Client : Qatar Airways Main Contractor : BECHTEL Position : Civil Engineer Duration : Mar 2011 to Feb 2012 Project : Opaline (B+G+19) APPARTMENTS,Chennai Position : QC Engineer Civil Duration : April 2008 to Jan 2011 Project : SOHAR AROMATICS : ODC PROJECT AT MARMUL -PDO : ON PLOT AT NIMR - PDO Client : PETROLEUM DEVELOPMENT OF OMAN Position : Site Supervisor Duration : July 2008 to Mar 2008 Project : SOBHA DAHLIA (B+G+11) : SOBHA DAFFODIL (2B+G+14) apartments
  • 3.
     Checking forslump & Temperature of Concrete at site, casting & testing of cubes in site laboratory and external laboratory for testing, receiving and reviewing of reports and submitting to clients  Prepare Checklist for all works and get the approval from the consultant / Clients and maintain the records  Ensure that the supervisors understand the requirements of the work method statement, MAR, Specification, drawings and Inspection Testing plan. And conducting toolbox talk when it required  Maintain liaison between the project team, consultants and subcontractors to solve the quality issues  Educate the project team, subcontractors on the project quality plan as to ensure all parties of the project are fully aware and understand the operational procedures and the project contractual quality requirements  Taking initiatives to promote the quality culture throughout the company  Identify the document of non-conformities, communicate the non-conformance to the concerned personnel  Monitoring of Curing, Block work, Plastering, painting, tile work, doors and installations. Witnessing of compaction, formwork, reinforcement, Anchor bolt, concrete pouring, pipe laying, waterproofing as per approved ITP  QUALITY ASSURANCE AND IMPLEMENTATION  Prepare the QCP and maintenance of related records and creating general awareness of QA/QC activities amongst workers at site as per ISO 9001:2008  Distribute the project Quality plan to the project team, inclusive of the consultants and subcontractors. Continually review the Projects Quality Plan as to ensure its effectiveness  Prepare & Review the proposed work of Method Statements and get the approval from client  Conduct the Internal Quality Audits as per the Audit plan to all departments within the projects with objectives to enhance their operational effectiveness and efficiencies  Prepare the projects QA/QC report on a periodical basis as agreed with the Project Manager  Prepare the subcontractors/suppliers Evaluation report in the required interval  Monitor and report the achievement of the company Quality objectives  Ensure that appropriate corrective and preventive actions are taken to address Non- Conformance Reports (NCRs) and complaints rom the Employer / Employer’s representative
  • 4.
     Implementation ofcorrective / preventive action in consultation with Project Managers wherever required  AS AN ENGINEER  Planning and Scheduling work within period given  Organizing Team under me as per Duration approved  Prepare MTC list and Material Request  Prepare MAR for Client Approval  Participation of Method of Statement as per spec and company standard  Assure material Quality and quantity during material inspection. Verify MTC and DO prior to Documentation  Preparation of Method of Statement as per spec and company standard  Ensure revised drawing in site and obtain revised drawing from DC  Execute work through company HSE and Quality policy  Attending Client Minutes of meeting and HSE & QA/QC meeting  Coordination between management and client  Reporting HSE, QA/QC, Store, Planning and casting Departments.  Rise RFI liaise with Client during site visit  Liable with Client/Consultant/Subcontract while inspection  Optimum utilization of Material, Manpower and Machineries  Coordinate with site/Third party lab for material test and sample collection  Assisting to evaluate subcontractor and subcontractor management and billing and report to management and Client  TECHNICAL TRAINING COURSE:  ISO 9001:2008 Internal Audit training course in Quality management system by Velosi oman .  COMPUTER SKILLS:  Windows ( Micro soft word & Excel)  Auto Cad 2012  Microsoft Project  ZUTEC  OTHER SKILLS:  GCC DRIVING LICENSE No: 76650228 & Indian Driving license
  • 5.
    ACADEMIC HISTORY: SL. NOINSTITUTIONS COURSES YEAR 1 KARNATAKA STATE OPEN UNIVERSITY B.TECH CIVIL ENGINEERING Jan 2014 2 VENKATESVARA POLYTECHNIC COLLEGE,PUDUKKOTTAI DIPLOMA IN CIVIL ENGINEERING April 2006 3 T.E.L.C HIGHER SECONDARY SCHOOL PUDUKKOTTAI XII STD April 2004 LANGUAGES KNOWN:  English & Tamil (Read, Write & Speak Fluently)  Hindi & Malayalam (Speak Fluently) Interest: Driving, Swimming, Reading newspapers. PERSONAL INFORMATION Father’s Name : A. Shahul Hameed Date of Birth : 25.03.1987 Place of Birth : Pudukkottai Citizenship : Indian Passport No : G1913677 Date of Expiry : 06.03.2017 Gender : Male Marital Status : Single Permanent Address : # 35 Samathi Street : Adappan Vayal, : Pudukottai : Tamil Nadu - 622 002 : India I hereby all the details are true to my knowledge Date : Place : PEER MOHAMED.S