Curriculum Vitae
Personal Information:
Name: Mohammed Alissa
Nationality: Syrian - Jan 1/1982
Marital Status: Married
Mobile: 00971 501323715
E-mail: Eng-alissa@hotmail.com
Driving license: Yes (Emirates Driving License)
Qualifications:
B.Sc. Civil Engineering, Aleppo University, Syria - Major: Structural
Data of Graduation: 2006
Languages:
Arabic: Mother Tongue - English: very Good
Computer Skills:
 PMP : Project Management professional Training
(CAMBRIDGE Institute - Abu Dhabi)
 AutoCAD , Structural Analysis Programs – British Standard @ ACI Standard
MS Office, Outlook
Other Skills:
 Strong Communication and Presentation Skills
 Solid leadership, Team worker & Ability to work under pressure
RELEVANT EXPERIENCE
In the United Arab Emirates:
HANS KNUTZEN ASSOCIATES, INC (Abu Dhabi) - Consultant
(Current Employers)
Project: Al Bateen Palace
Owner: Crown Prince Court
Position: Project manager
Description:
 Manage, supervise and review design documents and drawings, provide technical
guidance and managing project , Following Estidama Requirement
 Planning, schedule, Cost Control, Management and Coordination with parties involved
 Reviewing Contractor's Submittals
(Shop drawings, Method Statements, Material Approvals)
 Attend all meetings with Client, Contractor and all other concerned parties
 Liaise with Client and Contractor for resolution of project issues, in addition to
concerned Authorities when required, Supervise, review, monitor and report on
progress.
 Give final approval to works and arrange handover
Project: Privet Project
Owner: Crown Prince Court
Position: Project manager
Description:
The project consists of Small Palace with Service Blocks
CONSTRUCTION GENERAL CONTRACTING HOUSE LTD. (ABU DHABI)
Al Raha Gardens
Owner: Sorouh Real Estate
Consultant: EWAN
Position: Construction Manager
Description:
The project consists of a 136 villas complex that is scheduled to be finalized in a 9 month period.
Duties:
 Supervising construction activities and following the all infrastructure works on site.
 Following the schedule and follow up the progress and coordinate accordingly with the
assigned planning engineer.
 Monitoring and verifying the progress of subcontractors.
 Attending internal meetings, consultant meetings, subcontractors and clients meetings.
 Daily and weekly progress reporting to management.
RELEVANT EXPERIENCE
Danet Abu Dhabi Tower: (4 Basements – 23 floors)
Management: QPI International
Consultant : Crown Engineering
Position : Construction Manager
Description:
The project consists of a high rise tower comprising 4 Basements and 23 Floors.
Duties:
 Supervising construction activities on site (diaphragm wall, piles, strutting pipe, Steel wailer
Beam, etc...).
 Arrange meetings with subcontractors to discuss and manage technical issues in order to
reach an agreement on a timeframe.
 Calculating and measuring quantities from drawings and compare it with the
subcontractor's quantity survey. Thus, arrange the payments as per the invoice and the
correct quantity.
 Ensuring systems of work is carried out in accordance with our Quality and HSE systems.
 Attending internal meetings, consultant meetings, subcontractors and clients meetings.
RELEVANT EXPERIENCE
Abu Dhabi Tower: (3 Basements – 30 floors)
Owner: H.E Sheikh Mansour bin Zayed Al Nahyan
Consultant: Al Suweidi Consultancy
Position: Project Engineer
Description:
The project consists of a high rise tower comprising 3 Basements and 30 Typical Floors.
Duties:
 Supervising construction activities on site.
 Following the execution of construction plans using the specified resources and equipment.
 Planning and following up day-to-day activities and programs.
 Prepare shop drawings & Coordinate between all services.
 Preparing reports related to various construction operations.
RELEVANT EXPERIENCE
GOLDEN PLANNERS CONSULTANTS (ABU DHABI)
Mussaffah, ICAD, and Mohammed bin Zayed Zones:
Owner: Different Owners for each project (12 projects)
Position: Resident Engineer
Description:
Multiple projects comprising of 11 Commercial Residential Buildings at Mohammed bin Zayed
area and one steel structure factory in ICAD.
Duties:
 Ensure that the works carried out by the Contractor(s) are inspected and the quality of the
jobs done meets the standards of Golden Planners Consultants.
 Attend Technical Coordination Meetings to discuss Contractor(s) submissions, shop
drawings and construction related issues.
 Ensure that safety measures on site are adequate.
 Monitor the progress of the work against the approved contractor submitted programme of work.
RELEVANT EXPERIENCE
Project Name: Al Mushrif Gardens Villas: (UAE, Abu Dhabi)
Owner: Private Department of H.E Sheikh Mohammad bin Khaled Al Nahyan
Management: EC Harris
Position: Site inspector
Description:
This project comprises of 142 Villas Complex along with Mosque and a Community Center in
Mushrif Area in Abu Dhabi.
Duties:
 Perform all inspections as per the approved QC/QA procedures.
 Monitor and follow up as necessary and complete records concerning the execution of the works
 Initiate issuance of NCR for non-conforming activities and logs and follow up the closing-out.
 Weekly progress reporting to the project management
 Snagging & Handing Over
RELEVANT EXPERIENCE
In Syria:
DELTA ENGINEERING COMPANY (ALEPPO)
Description:
At this stage, I worked during my study in the University. I became a member of the
construction team for many projects in Sheikh Najjar Industrial Zone.
Duties:
 Drawing, analyzing and designing different projects with structural programs
 Design buildings against earthquakes and wind loading

Civil Engineer - CV

  • 1.
    Curriculum Vitae Personal Information: Name:Mohammed Alissa Nationality: Syrian - Jan 1/1982 Marital Status: Married Mobile: 00971 501323715 E-mail: Eng-alissa@hotmail.com Driving license: Yes (Emirates Driving License) Qualifications: B.Sc. Civil Engineering, Aleppo University, Syria - Major: Structural Data of Graduation: 2006 Languages: Arabic: Mother Tongue - English: very Good Computer Skills:  PMP : Project Management professional Training (CAMBRIDGE Institute - Abu Dhabi)  AutoCAD , Structural Analysis Programs – British Standard @ ACI Standard MS Office, Outlook Other Skills:  Strong Communication and Presentation Skills  Solid leadership, Team worker & Ability to work under pressure
  • 2.
    RELEVANT EXPERIENCE In theUnited Arab Emirates: HANS KNUTZEN ASSOCIATES, INC (Abu Dhabi) - Consultant (Current Employers) Project: Al Bateen Palace Owner: Crown Prince Court Position: Project manager Description:  Manage, supervise and review design documents and drawings, provide technical guidance and managing project , Following Estidama Requirement  Planning, schedule, Cost Control, Management and Coordination with parties involved  Reviewing Contractor's Submittals (Shop drawings, Method Statements, Material Approvals)  Attend all meetings with Client, Contractor and all other concerned parties  Liaise with Client and Contractor for resolution of project issues, in addition to concerned Authorities when required, Supervise, review, monitor and report on progress.  Give final approval to works and arrange handover Project: Privet Project Owner: Crown Prince Court Position: Project manager Description: The project consists of Small Palace with Service Blocks
  • 3.
    CONSTRUCTION GENERAL CONTRACTINGHOUSE LTD. (ABU DHABI) Al Raha Gardens Owner: Sorouh Real Estate Consultant: EWAN Position: Construction Manager Description: The project consists of a 136 villas complex that is scheduled to be finalized in a 9 month period. Duties:  Supervising construction activities and following the all infrastructure works on site.  Following the schedule and follow up the progress and coordinate accordingly with the assigned planning engineer.  Monitoring and verifying the progress of subcontractors.  Attending internal meetings, consultant meetings, subcontractors and clients meetings.  Daily and weekly progress reporting to management. RELEVANT EXPERIENCE Danet Abu Dhabi Tower: (4 Basements – 23 floors) Management: QPI International Consultant : Crown Engineering Position : Construction Manager
  • 4.
    Description: The project consistsof a high rise tower comprising 4 Basements and 23 Floors. Duties:  Supervising construction activities on site (diaphragm wall, piles, strutting pipe, Steel wailer Beam, etc...).  Arrange meetings with subcontractors to discuss and manage technical issues in order to reach an agreement on a timeframe.  Calculating and measuring quantities from drawings and compare it with the subcontractor's quantity survey. Thus, arrange the payments as per the invoice and the correct quantity.  Ensuring systems of work is carried out in accordance with our Quality and HSE systems.  Attending internal meetings, consultant meetings, subcontractors and clients meetings. RELEVANT EXPERIENCE Abu Dhabi Tower: (3 Basements – 30 floors) Owner: H.E Sheikh Mansour bin Zayed Al Nahyan Consultant: Al Suweidi Consultancy Position: Project Engineer Description: The project consists of a high rise tower comprising 3 Basements and 30 Typical Floors. Duties:  Supervising construction activities on site.  Following the execution of construction plans using the specified resources and equipment.  Planning and following up day-to-day activities and programs.  Prepare shop drawings & Coordinate between all services.  Preparing reports related to various construction operations.
  • 5.
    RELEVANT EXPERIENCE GOLDEN PLANNERSCONSULTANTS (ABU DHABI) Mussaffah, ICAD, and Mohammed bin Zayed Zones: Owner: Different Owners for each project (12 projects) Position: Resident Engineer Description: Multiple projects comprising of 11 Commercial Residential Buildings at Mohammed bin Zayed area and one steel structure factory in ICAD. Duties:  Ensure that the works carried out by the Contractor(s) are inspected and the quality of the jobs done meets the standards of Golden Planners Consultants.  Attend Technical Coordination Meetings to discuss Contractor(s) submissions, shop drawings and construction related issues.  Ensure that safety measures on site are adequate.  Monitor the progress of the work against the approved contractor submitted programme of work.
  • 6.
    RELEVANT EXPERIENCE Project Name:Al Mushrif Gardens Villas: (UAE, Abu Dhabi) Owner: Private Department of H.E Sheikh Mohammad bin Khaled Al Nahyan Management: EC Harris Position: Site inspector Description: This project comprises of 142 Villas Complex along with Mosque and a Community Center in Mushrif Area in Abu Dhabi. Duties:  Perform all inspections as per the approved QC/QA procedures.  Monitor and follow up as necessary and complete records concerning the execution of the works  Initiate issuance of NCR for non-conforming activities and logs and follow up the closing-out.  Weekly progress reporting to the project management  Snagging & Handing Over RELEVANT EXPERIENCE In Syria: DELTA ENGINEERING COMPANY (ALEPPO) Description: At this stage, I worked during my study in the University. I became a member of the construction team for many projects in Sheikh Najjar Industrial Zone. Duties:  Drawing, analyzing and designing different projects with structural programs  Design buildings against earthquakes and wind loading