SlideShare a Scribd company logo
Copyright @ 2014 JobStreet.com
Expected Salary:
Chian Ming Ngo
Senior Staff Equipment Engineer (CMP) at United Microelectronics
Corporation (S)
(+65) 94234481 | nchian@hotmail.com | 39 years old | Johor Bahru, Johor
Experience 17 years
Previous CMP EquipmentEngineer
Chartered Semiconductor Manufacturing
Education Oklahoma State University
Bach Degree,E&E Engineering (1998)
Nationality Malaysian / Singapore PR
Experience
Aug 2004 - Present
(10 years 6 months )
Senior Staff Equipment Engineer (CMP)
United Microelectronics Corporation (S) | Singapore, Singapore
Monthly Salary
Duties:
Holding responsibility as Senior Staff engineer in Chemical Mechanical Polishing (CMP).
Job Scope include:
- Managing one group of engineers to maintain & improve machine uptime.
- Advice on process defect troubleshooting and improvement
- Module cost driver. Managing parts usage (commodity, upkeep & slurry) and module spending in order to
meet module cost target.
- Manpow er planning. Arranging manpow er support forline coverage and preventive maintenance activity,
and managing yearly annualshutdow n project to make sure all the tools are able to recover ontime and
w ithout any defect issues.
- Scrap monitoring & improvement
- Develop UMC first TPM project (Total product maintenance) , include OPL (one point lessen) & 5S
maintain
Accomplishment:
Productivity Improvement & Cost down :
1. Improve BEOL CMP productivity : (2nd prize w inner of 2012 Taiw an Competition)
1.1 Uptime time improve from75% to 86.5%
- PE optimization and extension
- Defect pilot rules enhancement, optimize defect scan recipe and scan flow
- Streamline plan of daily monitoring event
1.2 Throughput improvement from17w ph to25wph
- PE optimize and shorten recipe step
- P2 P1 polishing time balancing through APC to reduce w aiting time to minimum
1.3 Cost benefit
- Throughput improvement w ith current tools quantity (20tools), cost benefit
approximately -over US$10milliom
2. CMP retaining re-use on different process, cost saving NT4.3mil
3. Backside chemical bypass project for BEOL CMP process, annualcost saving USD850K
4. LK tools cleaner quick exchanger hardware modification to prolong service cycle from
6months to 12months.
Copyright @ 2014 JobStreet.com
5. Contribute in blanket w afer reclaimproject, such as PA w aferrecycling flow enhancement to achieve cost
Saving. Cost saving of USD1.8mil per year.
Yield Improvement:
1. Scratch improvement:
1.1 Through analysis of scratch pattern ( physicaldimension, location, distribution) to determine scratch
Sources. Focus on particular source takes corresponded action to reduce micro and macro-scratch.
2. Residue improvement (Fall on/Slurry) :
2.1 Air flow management
2.2 Chemical conductivity control
2.3 pad clean enhancement, Atomizer design of slurry armspray nozzle
3. Removal stability controlto prevent over polish issue:
3.1 Pad conditional arm online vibration controlto prevent by product accumulate effect to cause removal
Rate drift
3.2 Pad condition disk cutting rate controlby SPC control
Tool and Parts management :
1. PMM systemsetup and implementation
1.1 Systematic controlPM schedule and PM items to avoid PM skip/delay and make sure all PM items has
been carried out and done in time to prevent excursion
2. E-parts management :parts management and eCOA management
2.1 Parts management: serialno controlof parts, part's status traceability and w arranty control
2.2 eCOA management : SPC controlof part's criticalparameter, such as flatness, hardness, cutting rate,
Grove depth, torque, vibration level...
3. ECMS (Equipment Constant Management System) :
Online checkmachine EC before every lots job in to prevent user/vendor human error to cause huge
Scrapped
4. Equipment SPC (PDS/FDC) controlenhancement :
Through recipe step and define important parameters at main and sub steps to achieve effectivemonitor of
Process condition
Tool improvement:
1. Condition monitoring of tool's health condition :
1.1 Collaborated w ith localvendor to develop economy high speed vibration sensor to detect vibration
behavior of machine moving parts, such as robot, transfer arm, pad conditioner arm and bearing
condition
1.2 Early detection project : Online extra sensor to realtime monitor of equipment criticalparameter w ith
SPC control
2. Tool's criticalparts enhancement and modification
2.1 Replace of bearing type of LK tool's quick exchanger to prolong part's lifetime, and increase cleaning
Efficiency by low idle torque
2.2 Replaced metal sealw ith O-ring to prevent DIW seek into spindle bearing compartment to induce rusty
take place, to cause scratch issue
2.3 Cross cover latch design to prevent w arpage induce rubbing to cause scratch issue
2.4 Reflexion tool's w afer roller assembly modification, design w ith plug/unplug concept to prevent
helicoids damage and reduce changing time from3 hrs to 15mins. And integrated w afer idler design
to detect actual w afer rotation speed to prevent wafer rotation unsmooth issue
2.5 CULKCMP UPS bypass to prevent systemre-boot due to UPS battery issue and prevent w afer
scrapped due to software restart itself
Special project:
1. Setup pilot line for specialprocess BSI(Backside illumination)
Jul 2000 - Aug 2004
(4 years 1 month )
CMP Equipment Engineer
Chartered Semiconductor Manufacturing
Monthly Salary
Duties:
Copyright @ 2014 JobStreet.com
Troubleshooting the m/c, installation new m/c, forecosting allthe neccessaryparts, second sourcesfinding,
evaluation on new consumables and monitoring the production move.
Accomplishment:
Forecasting all spare parts, troubleshooting the m/c, installation new equipment and completed some cost
saving project.
Reason for leaving:
Wish to learn new technology (90um), new type of machine (low K CMP machine).
Sep 1998 - Jul 2000
(1 year 9 months )
Sales and Service Engineer
Maruko (M) Sdn. Bhd.
Monthly Salary MYR 1,800
Duties:
Sales, installation and servicing ITC components.
Accomplishment:
Incharged a project in Chunghua Picture Tude (M).
Education
1998 Oklahoma State University
Bachelor's Degree in Engineering (Electrical/Electronic) | United States
Major Computer and Electronic
CGPA 2.67/4
1993 Foon Yew High School
Diploma in Science & Technology | Malaysia
Grade Grade B/2nd Class Upper
Skills
Advanced project handling
Intermediate Forecast managing, Lotus Notes, MS Office, MS DOS, Window s 2000, Window s95/98, AutoCad, MatLab
Basic C Language, DBASE, UNIX, Window s NT4.0, Java Applets
Languages
Proficiencylevel: 0 - Poor, 10 - Excellent
Language Spoken Written Relevant Certificates
Chinese 10 10 -
English 7 7 -
Bahasa Malaysia 5 5 -
Japanese 2 0 -
Copyright @ 2014 JobStreet.com
Additional Info
Expected Salary
Preferred WorkLocation Anywherein Singapore, Anywhere in Malaysia
About Me
Gender Male
Telephone Number (+60) 12-7761981
Address (local)
Address (Oversea)
Date of birth
Nationality
26 Riverina Walk, Singapore 518332
6, Jalan Jati, Taman Melodies,, 80250, Johor Bahru, Johor, Malaysia
24 June 1975
Malaysian / Singapore PR

More Related Content

What's hot

Maintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryMaintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive Industry
Nishant Patil
 
Almoustafa_-2015_CV2nn
Almoustafa_-2015_CV2nnAlmoustafa_-2015_CV2nn
Almoustafa_-2015_CV2nn
Moustafa Gouda
 
Daljeet CV (2)
Daljeet CV (2)Daljeet CV (2)
Daljeet CV (2)
Daljeet Kukreja
 
Resume
ResumeResume
Resume
Daleep Kumar
 
MJLM Capabilities Briefing 2016 v1
MJLM Capabilities Briefing   2016 v1MJLM Capabilities Briefing   2016 v1
MJLM Capabilities Briefing 2016 v1
Allison Marie Rhen
 
Company Profile Improvia v2_2014
Company Profile Improvia v2_2014Company Profile Improvia v2_2014
Company Profile Improvia v2_2014
Rulli Rachman
 
Eng . Nabil Wageh C.V
Eng . Nabil Wageh C.V Eng . Nabil Wageh C.V
Eng . Nabil Wageh C.V
nabil yacoub
 
Session 17 project management & monitoring
Session 17   project management & monitoringSession 17   project management & monitoring
Session 17 project management & monitoring
Chirag Jain
 
Profile Krishnaraja
Profile KrishnarajaProfile Krishnaraja
Profile Krishnaraja
nkrrao
 
HABIB NAWAZ
HABIB NAWAZHABIB NAWAZ
HABIB NAWAZ
malik habib
 
Akshay Updated CV
Akshay Updated CVAkshay Updated CV
Akshay Updated CV
Akshay Ajbani ( Brahmbhatt)
 
Rabi Kumar Purohita
Rabi Kumar PurohitaRabi Kumar Purohita
Rabi Kumar Purohita
Rabi Kumar Purohita
 
Malikjan Resume New
Malikjan Resume NewMalikjan Resume New
Malikjan Resume New
Malikjan Nadaf
 
Nagaraj.K-Resume
Nagaraj.K-ResumeNagaraj.K-Resume
Nagaraj.K-Resume
Nagaraj Krishnan
 
Latest
LatestLatest
Resume - Anirvan
Resume - AnirvanResume - Anirvan
Resume - Anirvan
Anirvan Chakrabarti
 
Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...
Ashish Verma
 
Carl schuetts resume
Carl schuetts resumeCarl schuetts resume
Carl schuetts resume
Carl Schuett
 

What's hot (18)

Maintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryMaintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive Industry
 
Almoustafa_-2015_CV2nn
Almoustafa_-2015_CV2nnAlmoustafa_-2015_CV2nn
Almoustafa_-2015_CV2nn
 
Daljeet CV (2)
Daljeet CV (2)Daljeet CV (2)
Daljeet CV (2)
 
Resume
ResumeResume
Resume
 
MJLM Capabilities Briefing 2016 v1
MJLM Capabilities Briefing   2016 v1MJLM Capabilities Briefing   2016 v1
MJLM Capabilities Briefing 2016 v1
 
Company Profile Improvia v2_2014
Company Profile Improvia v2_2014Company Profile Improvia v2_2014
Company Profile Improvia v2_2014
 
Eng . Nabil Wageh C.V
Eng . Nabil Wageh C.V Eng . Nabil Wageh C.V
Eng . Nabil Wageh C.V
 
Session 17 project management & monitoring
Session 17   project management & monitoringSession 17   project management & monitoring
Session 17 project management & monitoring
 
Profile Krishnaraja
Profile KrishnarajaProfile Krishnaraja
Profile Krishnaraja
 
HABIB NAWAZ
HABIB NAWAZHABIB NAWAZ
HABIB NAWAZ
 
Akshay Updated CV
Akshay Updated CVAkshay Updated CV
Akshay Updated CV
 
Rabi Kumar Purohita
Rabi Kumar PurohitaRabi Kumar Purohita
Rabi Kumar Purohita
 
Malikjan Resume New
Malikjan Resume NewMalikjan Resume New
Malikjan Resume New
 
Nagaraj.K-Resume
Nagaraj.K-ResumeNagaraj.K-Resume
Nagaraj.K-Resume
 
Latest
LatestLatest
Latest
 
Resume - Anirvan
Resume - AnirvanResume - Anirvan
Resume - Anirvan
 
Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...
 
Carl schuetts resume
Carl schuetts resumeCarl schuetts resume
Carl schuetts resume
 

Viewers also liked

ABC's of Men's Health Seminar
ABC's of Men's Health SeminarABC's of Men's Health Seminar
ABC's of Men's Health Seminar
Byron Watson
 
ikea-future-website
ikea-future-websiteikea-future-website
ikea-future-website
Johan Wistrand
 
Sardis Plantation Market Report 2016
Sardis Plantation Market Report 2016Sardis Plantation Market Report 2016
Sardis Plantation Market Report 2016
Scott Browder
 
Myers park market report April 2016
Myers park market report April 2016Myers park market report April 2016
Myers park market report April 2016
Scott Browder
 
40Faro_13November_Spencer
40Faro_13November_Spencer40Faro_13November_Spencer
40Faro_13November_Spencer
Steven Spencer
 
Ballantyne Country Club Market Update
Ballantyne Country Club Market UpdateBallantyne Country Club Market Update
Ballantyne Country Club Market Update
Scott Browder
 
ScopHybrid
ScopHybridScopHybrid
ScopHybrid
Simon Corrigan
 
Touchstone Neighborhood Charlotte NC
Touchstone Neighborhood Charlotte NCTouchstone Neighborhood Charlotte NC
Touchstone Neighborhood Charlotte NC
Scott Browder
 
Targetes gràfiques...
Targetes gràfiques...Targetes gràfiques...
Targetes gràfiques...
camamaza camazama
 
PROJECT FOR IPLEMENTATION - LWITIKO FAMILY
PROJECT FOR IPLEMENTATION - LWITIKO FAMILYPROJECT FOR IPLEMENTATION - LWITIKO FAMILY
PROJECT FOR IPLEMENTATION - LWITIKO FAMILYLwitiko, A. MWANGOLELA
 
Real Estate Market Watch 2015
Real Estate Market Watch 2015Real Estate Market Watch 2015
Real Estate Market Watch 2015
Scott Browder
 
Charlotte Real Estate Market
Charlotte Real Estate MarketCharlotte Real Estate Market
Charlotte Real Estate Market
Scott Browder
 
SDLCTesting
SDLCTestingSDLCTesting
SDLCTesting
Gavin Thys
 
Madison Park Market Report
Madison Park Market ReportMadison Park Market Report
Madison Park Market Report
Scott Browder
 
Oakhurst Neighborhood Charlotte NC
Oakhurst Neighborhood Charlotte NCOakhurst Neighborhood Charlotte NC
Oakhurst Neighborhood Charlotte NC
Scott Browder
 
Scop Software Suite
Scop Software SuiteScop Software Suite
Scop Software Suite
Simon Corrigan
 

Viewers also liked (17)

ABC's of Men's Health Seminar
ABC's of Men's Health SeminarABC's of Men's Health Seminar
ABC's of Men's Health Seminar
 
ikea-future-website
ikea-future-websiteikea-future-website
ikea-future-website
 
Sardis Plantation Market Report 2016
Sardis Plantation Market Report 2016Sardis Plantation Market Report 2016
Sardis Plantation Market Report 2016
 
Myers park market report April 2016
Myers park market report April 2016Myers park market report April 2016
Myers park market report April 2016
 
40Faro_13November_Spencer
40Faro_13November_Spencer40Faro_13November_Spencer
40Faro_13November_Spencer
 
Ballantyne Country Club Market Update
Ballantyne Country Club Market UpdateBallantyne Country Club Market Update
Ballantyne Country Club Market Update
 
ScopHybrid
ScopHybridScopHybrid
ScopHybrid
 
Touchstone Neighborhood Charlotte NC
Touchstone Neighborhood Charlotte NCTouchstone Neighborhood Charlotte NC
Touchstone Neighborhood Charlotte NC
 
Targetes gràfiques...
Targetes gràfiques...Targetes gràfiques...
Targetes gràfiques...
 
PROJECT FOR IPLEMENTATION - LWITIKO FAMILY
PROJECT FOR IPLEMENTATION - LWITIKO FAMILYPROJECT FOR IPLEMENTATION - LWITIKO FAMILY
PROJECT FOR IPLEMENTATION - LWITIKO FAMILY
 
inhoud glossy2
inhoud glossy2inhoud glossy2
inhoud glossy2
 
Real Estate Market Watch 2015
Real Estate Market Watch 2015Real Estate Market Watch 2015
Real Estate Market Watch 2015
 
Charlotte Real Estate Market
Charlotte Real Estate MarketCharlotte Real Estate Market
Charlotte Real Estate Market
 
SDLCTesting
SDLCTestingSDLCTesting
SDLCTesting
 
Madison Park Market Report
Madison Park Market ReportMadison Park Market Report
Madison Park Market Report
 
Oakhurst Neighborhood Charlotte NC
Oakhurst Neighborhood Charlotte NCOakhurst Neighborhood Charlotte NC
Oakhurst Neighborhood Charlotte NC
 
Scop Software Suite
Scop Software SuiteScop Software Suite
Scop Software Suite
 

Similar to Ngo Chian Ming profile

10. Jawahar CV latest on 10.06.2016
10. Jawahar CV latest on 10.06.201610. Jawahar CV latest on 10.06.2016
10. Jawahar CV latest on 10.06.2016
M jawahar jawahar
 
NAIK CV(AM)
NAIK CV(AM)NAIK CV(AM)
NAIK CV(AM)
Venkatesh Naik
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
Khubaib Khan
 
Sr Position in Engineering
Sr Position in EngineeringSr Position in Engineering
Sr Position in Engineering
msuresh1946
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
Ajay Gautam
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)
Byron Pang
 
CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510
Arif Nusyirwan
 
Resume_sdy-4-1
Resume_sdy-4-1Resume_sdy-4-1
Resume_sdy-4-1
sanjay yadav
 
CV
CVCV
TAN CHUN CHIA resume 2016.01
TAN CHUN CHIA resume 2016.01TAN CHUN CHIA resume 2016.01
TAN CHUN CHIA resume 2016.01
Tan Chun Chia
 
Resume of Kotian - 2016
Resume of Kotian - 2016Resume of Kotian - 2016
Resume of Kotian - 2016
Taranath Kotian
 
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
IRJET-  	  Six Axis Pneumatic Materials Handling Robotic ArmIRJET-  	  Six Axis Pneumatic Materials Handling Robotic Arm
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
IRJET Journal
 
MuhammadImran(CV)
MuhammadImran(CV)MuhammadImran(CV)
MuhammadImran(CV)
Imran Muhammad Imran
 
resume_MelvinaP_2016
resume_MelvinaP_2016resume_MelvinaP_2016
resume_MelvinaP_2016
Melvina Prananta
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
Rizal Efendi
 
My CV Update 0515
My CV  Update 0515My CV  Update 0515
My CV Update 0515
Thomas Mansoer
 
Krishnan_Resume
Krishnan_ResumeKrishnan_Resume
Krishnan_Resume
Krishnan Virachami
 
Ferdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CVFerdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun
 
N.A. Wijitha CV MEP UD
N.A. Wijitha CV MEP UDN.A. Wijitha CV MEP UD
N.A. Wijitha CV MEP UD
Wijitha Nammuni Arachchige
 
Resume
ResumeResume

Similar to Ngo Chian Ming profile (20)

10. Jawahar CV latest on 10.06.2016
10. Jawahar CV latest on 10.06.201610. Jawahar CV latest on 10.06.2016
10. Jawahar CV latest on 10.06.2016
 
NAIK CV(AM)
NAIK CV(AM)NAIK CV(AM)
NAIK CV(AM)
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
Sr Position in Engineering
Sr Position in EngineeringSr Position in Engineering
Sr Position in Engineering
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)
 
CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510
 
Resume_sdy-4-1
Resume_sdy-4-1Resume_sdy-4-1
Resume_sdy-4-1
 
CV
CVCV
CV
 
TAN CHUN CHIA resume 2016.01
TAN CHUN CHIA resume 2016.01TAN CHUN CHIA resume 2016.01
TAN CHUN CHIA resume 2016.01
 
Resume of Kotian - 2016
Resume of Kotian - 2016Resume of Kotian - 2016
Resume of Kotian - 2016
 
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
IRJET-  	  Six Axis Pneumatic Materials Handling Robotic ArmIRJET-  	  Six Axis Pneumatic Materials Handling Robotic Arm
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
 
MuhammadImran(CV)
MuhammadImran(CV)MuhammadImran(CV)
MuhammadImran(CV)
 
resume_MelvinaP_2016
resume_MelvinaP_2016resume_MelvinaP_2016
resume_MelvinaP_2016
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
My CV Update 0515
My CV  Update 0515My CV  Update 0515
My CV Update 0515
 
Krishnan_Resume
Krishnan_ResumeKrishnan_Resume
Krishnan_Resume
 
Ferdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CVFerdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CV
 
N.A. Wijitha CV MEP UD
N.A. Wijitha CV MEP UDN.A. Wijitha CV MEP UD
N.A. Wijitha CV MEP UD
 
Resume
ResumeResume
Resume
 

Ngo Chian Ming profile

  • 1. Copyright @ 2014 JobStreet.com Expected Salary: Chian Ming Ngo Senior Staff Equipment Engineer (CMP) at United Microelectronics Corporation (S) (+65) 94234481 | nchian@hotmail.com | 39 years old | Johor Bahru, Johor Experience 17 years Previous CMP EquipmentEngineer Chartered Semiconductor Manufacturing Education Oklahoma State University Bach Degree,E&E Engineering (1998) Nationality Malaysian / Singapore PR Experience Aug 2004 - Present (10 years 6 months ) Senior Staff Equipment Engineer (CMP) United Microelectronics Corporation (S) | Singapore, Singapore Monthly Salary Duties: Holding responsibility as Senior Staff engineer in Chemical Mechanical Polishing (CMP). Job Scope include: - Managing one group of engineers to maintain & improve machine uptime. - Advice on process defect troubleshooting and improvement - Module cost driver. Managing parts usage (commodity, upkeep & slurry) and module spending in order to meet module cost target. - Manpow er planning. Arranging manpow er support forline coverage and preventive maintenance activity, and managing yearly annualshutdow n project to make sure all the tools are able to recover ontime and w ithout any defect issues. - Scrap monitoring & improvement - Develop UMC first TPM project (Total product maintenance) , include OPL (one point lessen) & 5S maintain Accomplishment: Productivity Improvement & Cost down : 1. Improve BEOL CMP productivity : (2nd prize w inner of 2012 Taiw an Competition) 1.1 Uptime time improve from75% to 86.5% - PE optimization and extension - Defect pilot rules enhancement, optimize defect scan recipe and scan flow - Streamline plan of daily monitoring event 1.2 Throughput improvement from17w ph to25wph - PE optimize and shorten recipe step - P2 P1 polishing time balancing through APC to reduce w aiting time to minimum 1.3 Cost benefit - Throughput improvement w ith current tools quantity (20tools), cost benefit approximately -over US$10milliom 2. CMP retaining re-use on different process, cost saving NT4.3mil 3. Backside chemical bypass project for BEOL CMP process, annualcost saving USD850K 4. LK tools cleaner quick exchanger hardware modification to prolong service cycle from 6months to 12months.
  • 2. Copyright @ 2014 JobStreet.com 5. Contribute in blanket w afer reclaimproject, such as PA w aferrecycling flow enhancement to achieve cost Saving. Cost saving of USD1.8mil per year. Yield Improvement: 1. Scratch improvement: 1.1 Through analysis of scratch pattern ( physicaldimension, location, distribution) to determine scratch Sources. Focus on particular source takes corresponded action to reduce micro and macro-scratch. 2. Residue improvement (Fall on/Slurry) : 2.1 Air flow management 2.2 Chemical conductivity control 2.3 pad clean enhancement, Atomizer design of slurry armspray nozzle 3. Removal stability controlto prevent over polish issue: 3.1 Pad conditional arm online vibration controlto prevent by product accumulate effect to cause removal Rate drift 3.2 Pad condition disk cutting rate controlby SPC control Tool and Parts management : 1. PMM systemsetup and implementation 1.1 Systematic controlPM schedule and PM items to avoid PM skip/delay and make sure all PM items has been carried out and done in time to prevent excursion 2. E-parts management :parts management and eCOA management 2.1 Parts management: serialno controlof parts, part's status traceability and w arranty control 2.2 eCOA management : SPC controlof part's criticalparameter, such as flatness, hardness, cutting rate, Grove depth, torque, vibration level... 3. ECMS (Equipment Constant Management System) : Online checkmachine EC before every lots job in to prevent user/vendor human error to cause huge Scrapped 4. Equipment SPC (PDS/FDC) controlenhancement : Through recipe step and define important parameters at main and sub steps to achieve effectivemonitor of Process condition Tool improvement: 1. Condition monitoring of tool's health condition : 1.1 Collaborated w ith localvendor to develop economy high speed vibration sensor to detect vibration behavior of machine moving parts, such as robot, transfer arm, pad conditioner arm and bearing condition 1.2 Early detection project : Online extra sensor to realtime monitor of equipment criticalparameter w ith SPC control 2. Tool's criticalparts enhancement and modification 2.1 Replace of bearing type of LK tool's quick exchanger to prolong part's lifetime, and increase cleaning Efficiency by low idle torque 2.2 Replaced metal sealw ith O-ring to prevent DIW seek into spindle bearing compartment to induce rusty take place, to cause scratch issue 2.3 Cross cover latch design to prevent w arpage induce rubbing to cause scratch issue 2.4 Reflexion tool's w afer roller assembly modification, design w ith plug/unplug concept to prevent helicoids damage and reduce changing time from3 hrs to 15mins. And integrated w afer idler design to detect actual w afer rotation speed to prevent wafer rotation unsmooth issue 2.5 CULKCMP UPS bypass to prevent systemre-boot due to UPS battery issue and prevent w afer scrapped due to software restart itself Special project: 1. Setup pilot line for specialprocess BSI(Backside illumination) Jul 2000 - Aug 2004 (4 years 1 month ) CMP Equipment Engineer Chartered Semiconductor Manufacturing Monthly Salary Duties:
  • 3. Copyright @ 2014 JobStreet.com Troubleshooting the m/c, installation new m/c, forecosting allthe neccessaryparts, second sourcesfinding, evaluation on new consumables and monitoring the production move. Accomplishment: Forecasting all spare parts, troubleshooting the m/c, installation new equipment and completed some cost saving project. Reason for leaving: Wish to learn new technology (90um), new type of machine (low K CMP machine). Sep 1998 - Jul 2000 (1 year 9 months ) Sales and Service Engineer Maruko (M) Sdn. Bhd. Monthly Salary MYR 1,800 Duties: Sales, installation and servicing ITC components. Accomplishment: Incharged a project in Chunghua Picture Tude (M). Education 1998 Oklahoma State University Bachelor's Degree in Engineering (Electrical/Electronic) | United States Major Computer and Electronic CGPA 2.67/4 1993 Foon Yew High School Diploma in Science & Technology | Malaysia Grade Grade B/2nd Class Upper Skills Advanced project handling Intermediate Forecast managing, Lotus Notes, MS Office, MS DOS, Window s 2000, Window s95/98, AutoCad, MatLab Basic C Language, DBASE, UNIX, Window s NT4.0, Java Applets Languages Proficiencylevel: 0 - Poor, 10 - Excellent Language Spoken Written Relevant Certificates Chinese 10 10 - English 7 7 - Bahasa Malaysia 5 5 - Japanese 2 0 -
  • 4. Copyright @ 2014 JobStreet.com Additional Info Expected Salary Preferred WorkLocation Anywherein Singapore, Anywhere in Malaysia About Me Gender Male Telephone Number (+60) 12-7761981 Address (local) Address (Oversea) Date of birth Nationality 26 Riverina Walk, Singapore 518332 6, Jalan Jati, Taman Melodies,, 80250, Johor Bahru, Johor, Malaysia 24 June 1975 Malaysian / Singapore PR