ALMOUSTAFA GOUDA SAAD
June 1, 2015
ALMOUSTAFA GOUDA SAAD HASSAN
147 ABU ELFARAG St. –ROD ELFARAG -Cairo
Tel: +20 224595489 mgouda@mobiserveholding.com.
Mobile: +201223280415 moustafagouda111@gmail.com
Mobile: +201002881221 engstrong69@yahoo.com
Carrier Objective:
I have extensive experience about solar photovoltaic and wind power systems, standby power
systems, Generator Systems, Electro-Mechanical installations, Utilities Construction and
Maintenance, Proposals and tendering all kinds of solar cell for telecom sector
Professional Experience:
Since January 2006 till NOW
Renewable energy
Major Responsibilities
I have hands-on experience in Design, installation and commissioning of various solar photovoltaic
and wind systems for different applications like
1. Solar PV Stand-alone power supply system’s with backup batteries AC and DC loads more than
40 sites for Mobinil first operator for mobile network in Egypt,
70 sites for Etisalat third operator for mobile network in Egypt
2. Grid Standby backup systems using batteries only.
3. Solar PV Grid connected (AC coupled).
4. Hybrid system (Solar PV+wind Turbine, Solar PV+Diesel Generator and PV+wind+Diesel
Gen.)
Now, I am working as RENEWABLE ENERGY SYSTEMS Project Manager, mainly I am
responsible about project phases starting Design, installation, commissioning and maintenance of
Solar PV Systems and Wind-Turbine Systems, I am responsible about all Mechanical and
electrical work activities, I used to supervise execution by myself in Emergency Case
5. Project Manager for Project Free Cooling & Passive Cooling
6. Good Experience in LED Light/Street Light/Solar Light
7. Good Experience IN BIPV
8- Good Experience IN DC Air Condition
9- Good Experience IN Solar Cell Air Condition
ALMOUSTAFA GOUDA SAAD
June 1, 2015
Mobiserve, (GSM Main contractor for Mobinil) And Subcontractor for
Etisalat, Egypt
Duration: Since January 2004 till 2006
Designation: Technical Support (BSS Department)
Site Solutions
Technical Consultant
Project Manager (Power Management)
Major Responsibilities
 Scheduling the Technical work process to confirm with the Client Requirements
 Studying the resources availability to plan these resources to meet the company targets.
 Organizing the materials For New Projects and ensure that these materials meet with the
specification of Clients (Shelter ,AC ,Generators, C.Bs, Cables, Cable Trays, Earthing System
materials, Surge Arrestors, etc...)
 scheduling the Technical work process to confirm with the Client plan.
 Managing the Technical Teams and distribute the Tasks among these Teams.
 supervising the team activities during the installation.
 leading the company Lab. where we make assembling for all of the MDPs for all sites and ensure
the quality for all the panels.
 Modification required during the operation (site modification or repair) for the enhancement the
site performance or the quality according to plans like :( Antenna swapping, feeder installation,
VSWR measurement, Light Beacon, side arms …etc).
 Supervising the activities of the suppliers and the subcontractors for ensuring quality of materials
and work.
 Maintain the site document to submit the Technical file to Mobinil & Ericsson
 Following the BOQ for all sites to submit the RFQ to Mobinil &Ericsson
 Establishing training plans for field engineers on the site master and any other technical tools.
 Provides field engineers with technical support.
 Insuring that all Technical data are delivered to field engineers according to Latest update.
 Maintain a project management structure that provides clear responsibilities, accountability &
interfaces.
 Reporting and presenting the sites status to the higher management.
 Evaluating the project documents, drawings, designs and material usage to meet the company
specs.
 Fire fighting system (Design and specification).
 Access control system. (Design and specification).
 Light, power socket, emergency light, cables type (design and specification).
 Following up within the team the milestones achievements to determine the progress of the
project to take the necessary action when any deviation may occur in the plan (if the direct manager
in vacation or absent)
 Supervising the installation and commissioning activities of the sites.
ALMOUSTAFA GOUDA SAAD
June 1, 2015
 Monitoring and evaluating the subcontractors’ work efficiency during the running projects.
 Maintaining all of documents (designs, layouts, technical specifications, operation &manuals) to
arrange the technical files and the BOQ for the All Clients (Mobinil-Ericsson–Etisalat Network)
 Insuring that all New Technical Data are delivered To All Engineers
 Professional in submit tenders & Pricing (I can do that by following the latest information about
prices in the local markets).
 Technical assistance BSS-RD department.
 Cost Controller.
 Project Manager for Project Access Control
 Leading and Supervising Acceptance team.
 Project Manager for Project Solar cell System &Wind Power Project
 Project Manager for Project Free Cooling & Passive Cooling
 Professional using site master (Measurement & Submit Reports)
 Ability to deal with many kinds of site master (Anritsu –Bird-R&S)
 Professional in determine false Measurement (with site master)
 Professional in determine Cross Feeder (with site master)
Mobiserve, (GSM Main contractor for Mobinil), Egypt
Senior Engineer: since August 1999 till December 2004
Major Responsibilities
 supervising & Leading the installation of all of Generator sites, (starting from testing the
generators at the generator suppliers up to the commissioning of the sites).
 Technical Consultant at OTH for New Regional Projects (Iraq Year 2003-Yemen Year 2004)
 Assisted in the selection of materials, testing new products and materials sent by suppliers to
ensure the quality of the materials used.
 Responsible for the company lab where all of the electric panels assembled (MDP, ATS, MBTS
panels, Light Beacon, Surge Arrestor).
 Handling and managing crew of 30 – 60 technicians during the site progress in several areas during
the day.
 Supervising installation of Mobile station sites for more than 30 sites.
 Supervising installation of BTS and MBTS sites for more than 160 sites in different zones..
Education:
 Bachelor of Science, Engineering – Communication & Electronics Department,
Faculty of Engineering, ASSU University, July 2004
Graduation project Title: Antenna & Wave Propagation
Graduation project Grade: Very Good
Graduation Grade: Very Good
ALMOUSTAFA GOUDA SAAD
June 1, 2015
Courses
1. Access Control (finished)
2. Fire Fighting Systems (finished)
3. Cellular Cell Systems (CDMA-UMTS-GSM-AMPS) (finished)
4. Generator &ATS (finished)
5. Antenna & Waves (finished)
6. Problem solving & Decision Making (finished)
7. Technical Course (Schnider Group) (finished)
8. Managing Projects successfully (PMP Preparation) (finished)
9. Course Free Cooling (Dantherm- Denmark)
10. Course Batteries'Desigen&Installation EnerSys
11. Course Safety Committee Member (QHSE)
Studding Project Management (PRMG) at AUC for the following subjects
12. Project Planning (in progress)
13. Management of Project Resources (finished)
14. Project Bids &Contracts (in progress)
15. Project Visibility Study (finished)
16. Risk Management (in progress)
17. Project Budgeting & Financial Control (finished)
Computer Skills:
 MS office (Word, Excel, Access and Power point,) all editions till now. OR CAD 3 (for drawing
the electronic circuit)
 dealing with various software programs.
 Installing Operating systems (Dos – Windows) all editions till now.
 setting up all kinds of applications (Under windows).
 fixing all computer software & some hardware problems.
 Good using (Corel & Photoshop) Programs.
 Hardware assembling & Maintenance.
 Expertise in internet research skills.
Language Skills:
 Very good in spoken and written English.
 Fluent Arabic.
Personal Data:
 Nationality: Egyptian.
 Date of Birth: May 31 1975
 Place of Birth: Cairo, Egypt.
 Marital status: Married
 Military service: Exempted
Membership:
1-Egypt Syndicate of Engineers (189/7908983/2006/1)
2-Fedration of Arab Engineers (16/23205-2011)

Almoustafa_-2015_CV2nn

  • 1.
    ALMOUSTAFA GOUDA SAAD June1, 2015 ALMOUSTAFA GOUDA SAAD HASSAN 147 ABU ELFARAG St. –ROD ELFARAG -Cairo Tel: +20 224595489 mgouda@mobiserveholding.com. Mobile: +201223280415 moustafagouda111@gmail.com Mobile: +201002881221 engstrong69@yahoo.com Carrier Objective: I have extensive experience about solar photovoltaic and wind power systems, standby power systems, Generator Systems, Electro-Mechanical installations, Utilities Construction and Maintenance, Proposals and tendering all kinds of solar cell for telecom sector Professional Experience: Since January 2006 till NOW Renewable energy Major Responsibilities I have hands-on experience in Design, installation and commissioning of various solar photovoltaic and wind systems for different applications like 1. Solar PV Stand-alone power supply system’s with backup batteries AC and DC loads more than 40 sites for Mobinil first operator for mobile network in Egypt, 70 sites for Etisalat third operator for mobile network in Egypt 2. Grid Standby backup systems using batteries only. 3. Solar PV Grid connected (AC coupled). 4. Hybrid system (Solar PV+wind Turbine, Solar PV+Diesel Generator and PV+wind+Diesel Gen.) Now, I am working as RENEWABLE ENERGY SYSTEMS Project Manager, mainly I am responsible about project phases starting Design, installation, commissioning and maintenance of Solar PV Systems and Wind-Turbine Systems, I am responsible about all Mechanical and electrical work activities, I used to supervise execution by myself in Emergency Case 5. Project Manager for Project Free Cooling & Passive Cooling 6. Good Experience in LED Light/Street Light/Solar Light 7. Good Experience IN BIPV 8- Good Experience IN DC Air Condition 9- Good Experience IN Solar Cell Air Condition
  • 2.
    ALMOUSTAFA GOUDA SAAD June1, 2015 Mobiserve, (GSM Main contractor for Mobinil) And Subcontractor for Etisalat, Egypt Duration: Since January 2004 till 2006 Designation: Technical Support (BSS Department) Site Solutions Technical Consultant Project Manager (Power Management) Major Responsibilities  Scheduling the Technical work process to confirm with the Client Requirements  Studying the resources availability to plan these resources to meet the company targets.  Organizing the materials For New Projects and ensure that these materials meet with the specification of Clients (Shelter ,AC ,Generators, C.Bs, Cables, Cable Trays, Earthing System materials, Surge Arrestors, etc...)  scheduling the Technical work process to confirm with the Client plan.  Managing the Technical Teams and distribute the Tasks among these Teams.  supervising the team activities during the installation.  leading the company Lab. where we make assembling for all of the MDPs for all sites and ensure the quality for all the panels.  Modification required during the operation (site modification or repair) for the enhancement the site performance or the quality according to plans like :( Antenna swapping, feeder installation, VSWR measurement, Light Beacon, side arms …etc).  Supervising the activities of the suppliers and the subcontractors for ensuring quality of materials and work.  Maintain the site document to submit the Technical file to Mobinil & Ericsson  Following the BOQ for all sites to submit the RFQ to Mobinil &Ericsson  Establishing training plans for field engineers on the site master and any other technical tools.  Provides field engineers with technical support.  Insuring that all Technical data are delivered to field engineers according to Latest update.  Maintain a project management structure that provides clear responsibilities, accountability & interfaces.  Reporting and presenting the sites status to the higher management.  Evaluating the project documents, drawings, designs and material usage to meet the company specs.  Fire fighting system (Design and specification).  Access control system. (Design and specification).  Light, power socket, emergency light, cables type (design and specification).  Following up within the team the milestones achievements to determine the progress of the project to take the necessary action when any deviation may occur in the plan (if the direct manager in vacation or absent)  Supervising the installation and commissioning activities of the sites.
  • 3.
    ALMOUSTAFA GOUDA SAAD June1, 2015  Monitoring and evaluating the subcontractors’ work efficiency during the running projects.  Maintaining all of documents (designs, layouts, technical specifications, operation &manuals) to arrange the technical files and the BOQ for the All Clients (Mobinil-Ericsson–Etisalat Network)  Insuring that all New Technical Data are delivered To All Engineers  Professional in submit tenders & Pricing (I can do that by following the latest information about prices in the local markets).  Technical assistance BSS-RD department.  Cost Controller.  Project Manager for Project Access Control  Leading and Supervising Acceptance team.  Project Manager for Project Solar cell System &Wind Power Project  Project Manager for Project Free Cooling & Passive Cooling  Professional using site master (Measurement & Submit Reports)  Ability to deal with many kinds of site master (Anritsu –Bird-R&S)  Professional in determine false Measurement (with site master)  Professional in determine Cross Feeder (with site master) Mobiserve, (GSM Main contractor for Mobinil), Egypt Senior Engineer: since August 1999 till December 2004 Major Responsibilities  supervising & Leading the installation of all of Generator sites, (starting from testing the generators at the generator suppliers up to the commissioning of the sites).  Technical Consultant at OTH for New Regional Projects (Iraq Year 2003-Yemen Year 2004)  Assisted in the selection of materials, testing new products and materials sent by suppliers to ensure the quality of the materials used.  Responsible for the company lab where all of the electric panels assembled (MDP, ATS, MBTS panels, Light Beacon, Surge Arrestor).  Handling and managing crew of 30 – 60 technicians during the site progress in several areas during the day.  Supervising installation of Mobile station sites for more than 30 sites.  Supervising installation of BTS and MBTS sites for more than 160 sites in different zones.. Education:  Bachelor of Science, Engineering – Communication & Electronics Department, Faculty of Engineering, ASSU University, July 2004 Graduation project Title: Antenna & Wave Propagation Graduation project Grade: Very Good Graduation Grade: Very Good
  • 4.
    ALMOUSTAFA GOUDA SAAD June1, 2015 Courses 1. Access Control (finished) 2. Fire Fighting Systems (finished) 3. Cellular Cell Systems (CDMA-UMTS-GSM-AMPS) (finished) 4. Generator &ATS (finished) 5. Antenna & Waves (finished) 6. Problem solving & Decision Making (finished) 7. Technical Course (Schnider Group) (finished) 8. Managing Projects successfully (PMP Preparation) (finished) 9. Course Free Cooling (Dantherm- Denmark) 10. Course Batteries'Desigen&Installation EnerSys 11. Course Safety Committee Member (QHSE) Studding Project Management (PRMG) at AUC for the following subjects 12. Project Planning (in progress) 13. Management of Project Resources (finished) 14. Project Bids &Contracts (in progress) 15. Project Visibility Study (finished) 16. Risk Management (in progress) 17. Project Budgeting & Financial Control (finished) Computer Skills:  MS office (Word, Excel, Access and Power point,) all editions till now. OR CAD 3 (for drawing the electronic circuit)  dealing with various software programs.  Installing Operating systems (Dos – Windows) all editions till now.  setting up all kinds of applications (Under windows).  fixing all computer software & some hardware problems.  Good using (Corel & Photoshop) Programs.  Hardware assembling & Maintenance.  Expertise in internet research skills. Language Skills:  Very good in spoken and written English.  Fluent Arabic. Personal Data:  Nationality: Egyptian.  Date of Birth: May 31 1975  Place of Birth: Cairo, Egypt.  Marital status: Married  Military service: Exempted Membership: 1-Egypt Syndicate of Engineers (189/7908983/2006/1) 2-Fedration of Arab Engineers (16/23205-2011)