CONTACT INFORMATION:
VELMURUGAN SUBRAMANIAM (P.Eng)
Email Id: malavels@yahoo.com
Contact: +1-780-215-2241
PROFESSIONAL SUMMARY:
 Over 20 years of professional experience in the areas of Engineering, Project
management, Installation, Commissioning & Maintenance in Refinery heavy Oil,
Upgrading, Power and Petrochemicals plants.
 Presently working with Suncor Energy as Lead Reliability Engineer.
Professional Engineer and registered as member in APEGA and Member in IEEE
association
 Managing assets reliability in operation & maintenance of equipment’s and reducing
downtime and enhancing operational effectiveness of equipment’s in large plants
 Expertise in handling front end design (FEED) and detailed engineering packages (EDS),
related to Electrical systems.
 Familiar with ExxonMobil safety in design practices and Project Management system
 Familiar with IEEE/IEC/NEMA/CEC/CSA codes and standards
 Strong interpersonal, communication and negotiation skills, proactively keeps
management, customers, peers, and subordinates focussed on the job.
CAREER OBJECTIVE:
To contribute as a member in a dynamic team of Engineering and Project department for a
corporate environment with the objective of creating a better competitive edge in a global energy
demand.
A Professionally Qualified and international experienced Electrical Engineer involved in Front
End Engineering Design (FEED), Management of EPC project, Contracting and project
execution. Reliability Management, Maintenance management and Turnaround planning and
execution
With the above background, I am confident that you will find my skill and experience invaluable
to your organization. I have enclosed my detailed resume for your reference. I feel confident that
a career with your firm will further enrich my career advancements.
Thanks,
VELMURUGAN.
Page 2 of 6
RESUME
Education :
 BSEE, Bachelor of Engineering in Electrical and Electronics Engineering, 1994
Awards:
 Management recognition awards for completion of safe complex Turn Around 2007 as a
IE lead team at Exxon Mobil, refinery
 Management appreciation and recognition awards for completion of safe high complex
substation job during Turn Around 2006 at Exxon Mobil, refinery
 Safety Leader ship committee member and contribution award
 Operations recognition awards for completion of complex compressor surge,
performance and antisurge control job migration into single platform Triconex control
Experience Summary :
 Since July2009 till date Lead Electrical Engineer with Suncor Inc
 September 2001-June 2009 Senior Electrical Engineer with
Exxon Mobil
 February 1998-April 2001 Senior Electrical Engineer with Petronas
 July 1994-January 1998 Electrical Engineer with Birla chemicals
Electrical skill:
 Reliability and Technical support to improve plant existing switch gears and LV MCC
/MV MCC (22/6.6KV/415V) system
 Cable sizing calculation and cable routing
 Substation design and calculations on fault current
 NER and grounding system and Lightning protection system
 Relay coordination and power system protection using EATP/SKM software
 Auto transfer with secondary selective scheme time and residual voltage based system
 Low Voltage (LV <1000V) Switchgear/MCC design as per IEEE C37.13-20.2/IEC-
60439/
NEMA ICS 1, 2
 Medium Voltage (MV>1000V to 33KV) Switchgear/MCC design as per IEEE C37.20.7/
IEC-62271/NEMA ICS 3
 Transformers/Variable Speed Drives (VSDs) Soft starters /UPS Power
 LV/MV Motors selection as per IEEE 112,841/IEC-60034,60085
NEMA MG 1, 2
 LV/MV Motors/Bus ducts/Power cable
Conceptual design & Detail engineering skill:
 Scoping studies, Basic Engineering (DBM & EDS, Front End Loading), Detail Design,
Load estimation, Equipment sizing, Power System Studies
 Motor starting and voltage dip, protection relay co-ordination, load flow studies under
dynamic and steady state conditions using ETAP/SKM computer tools
 Preparation of specifications/requisitions of electrical equipments for LV/MV system
 Review technical bids, Design protection & control schemes, Vendor drawing review,
Prepare and check single line diagrams
 Plant layouts for lighting, cable and cable tray routings and grounding
Page 3 of 6
 Design substation layouts, DCS interface, MTO for bulk items.
 Continuous improvement of Reliability on Electrical equipments in the plants
 Developing scope of work for Electrical repair work and provide technical supports
 Develop Preventive Maintenance strategies and tracking implementation
 Critical equipments strategies and develop for spares strategies
 Relay co-ordination and providing technical work scope for relay testing
 Turnaround Planning /Coordination and execution of E&I works
 Testing of LV/MV Panels and motors.
 Prepare and Execute Equipment Inspection plan based on Risk Based Inspection
approach
 Attend techno commercial meetings, participate Factory Acceptance Testing (FAT), Site
A Acceptance Testing (SAT)
 Resource planning, Progress monitoring, and expedite.
 Involved in project audits as per company’s audit procedure, Mentoring engineers, EPC
contractors and site construction contractors team.
Reliability skill:
 Carry out RCFA for equipment failures, proposed suitable Corrective /Preventive action
and responsible for preparation of detailed analysis reports
 Involved as an Integral part of the Global Reliability of Management system(GRS) and
responsible for all quality related matters
 Applying Reliability Centered Maintenance (RCM) principles to understand how each
class of equipment impacts reliability in the operating context
Key Trainings Undergone:
 Undergone Electrical safety and hazard awareness training conducted by CSA
 Undergone Electrical CSA code standards training conducted by CSA
 ETAP power system protection and coordination analysis
 Safety in plant design & construction ( Exxon Mobil)
 Risk Assessment course ( Exxon Mobil )
 Chemical Engineering for Non-chemical Engineers ( Exxon Mobil )
 Failure Analysis of Electrical equipment ( PE board of Singapore )
 “Assertiveness –Achieving Win-Win” – Course (Exxon Mobil)
 Project Management and Contracts Course ( Exxon Mobil )
 Project Cost estimation and Schedule Course ( Exxon Mobil )
 Siemens PLC automation Training in Singapore.
Safety :
 Under gone Suncor safety training (100% compliance)
 Oil /Petrochemical Industrial Safety Course for Supervisors ( MOM-Singapore)
 Hot Work –Cold Work Permit Process ( Exxon Mobil)
 Emergency Response substation power Training ( Exxon Mobil)
 Exxon’s Safety Engineering Course
Instrumentation skill:
 Process instruments Technical feasibility studies
 Compressor TMR control Triconex with antisurge /performance/speed control
 Towers/drums/Tank ages instruments/control valves
 Technical Evaluation of Instrumentation bids by vendors and compliance with GP/DP/
NEMA/IEC
Page 4 of 6
 Loop drawings review of contractors documents compliance with GP/DP/NEMA/IEC
 Reliability studies
 Under gone Siemens PLC automation Training in Singapore.
 Under gone Invensys Triconex Course
 Under gone Honeywell DCS Course
Work Experience Details:
Suncor Energy Inc: Lead Electrical Engineer
Upgrading oil sands: Since July 2009
Responsibilities
 Emergency plant restoration of upgrading refinery complex damaged due to major fires.
 Testing of LV/MV Panels and motors.
 Prepare and Execute Equipment Inspection plan based on Risk Based Inspection
approach
 Attend techno commercial meetings, participate Factory Acceptance Testing (FAT), Site
A Acceptance Testing (SAT)
 Continuous improvement of Reliability on Electrical equipments in the plants
 Developing scope of work for Electrical repair work and provide technical supports
 Develop Preventive Maintenance strategies and tracking implementation
 Critical equipments strategies and develop for spares strategies
 Relay co-ordination and providing technical work scope for relay testing
Exxon Mobil: Senior Electrical Engineer
Projects: Since September 2001
 Turn around 2007 Upgrade of wood ward control compressor into TMR control Triconex
with antisurge/performance/speed control /Load sharing with steam driven compressors
project
 Turn around 2007 main substation revamp project online with live units migration
without interruption to running units (22KV/6.6KV Switch gears )
 Turn around 2006 substations revamp project online with live units migration
(6.6KV/460V Switch gears )
 Turn around 2005 substations revamp project (6.6KV/460V Switch gears )
 Equipment Health Monitoring system(EHM) project
 Boiler Control Modernization project
 UPS upgrade project
 Technical support for electrical and instrumentation equipment's in plants
 E&I support for other major projects
Responsibilities
 Responsible for overall project from Feed, approval, developing EPC package together
with
Umbrella contractors Jacobs/Foster Wheelers
 Detail Engineering, alignment with maintenance/Operation and EPC contractors
 Procurement activities, Bid process and alignment with approval limits(DAOG)
 Developing contracting strategy, coordination meeting and liaise with vendors
 Electrical and Instrumentation project implementation and technical support for process
plants.
 Progress review meeting with stake holders and EPC contractors
 Monthly progress report to all stake holders
Page 5 of 6
 Manage to control progress of work, manpower, material delivery and contractor
 Job method statement /JSA review with maintenance/Operation and EPC contractors
 Job Safety communication to all contractors and stake holders
 Safety Operation Committee(SOC) review on critical jobs
 Leadership for review and work process to ensure consistent quality of electrical data
sheets and instrument specification with Design practices(DP/NEMA/IEC)
 Constructability review alignment with maintenance/Operation and EPC contractors
 Review of vendors drawings/documents comply with Exxon’s GP/DP
 Providing engineering design, trouble-shooting for LV/MV Switch gears. Supporting
operators in process start up safety review team (PSSR).
 Execution of continuous improvement of plant electrical network distribution and
reliability studies.
 Project hand over and on the job training to maintenance/Operation
 Facilitate Root Cause Analysis (RCA) on equipment related failure and develop effective
solutions to eliminate recurrence and implement new facilities
Petronas Malaysia: Senior Electrical Engineer
Projects: February 1998-April 2001
 Turn around 2000 substations revamp project (6.6KV/460V Switch gears ) 3MVA
transformer for refinery distribution systems (6nos) upgrade project
 Upgrade of DCS control stations phase II Petronas project
Responsibilities
 Lead Engineer for overall project from Feed, approval, developing EPC package together
with
Clients and subcontractors
 Detail Engineering, alignment with maintenance/Operation and subcontractors
 Technical evaluation on Electrical/Instruments complies with standards.
 Procurement activities, Bid process and alignment with approval limits
 Developing contracting strategy, coordination meeting and liaise with vendors
 Looking after planning and preparation of weekly meeting schedule, attending weekly
Progress review meetings, preparation of method statements for installation, interaction
with petronas engineers for required inputs.
 Field Technical Queries for the problems being faced due to the actual site conditions and
free issue materials and getting Field Instruction for extra works to be carried out and
follow up work to stick on to the schedule
 Single point of coordination to ensure all departments shall progress in accordance with
the client’s schedule
 Review and monitor commercial issues, contract scope of work, field variations and an
additional works.
 Progress review meeting with client and contractors to discuss schedule and delay in
milestone items problems and solutions
 Reporting to management budgets and cash flow requirements
 Execution of continuous improvement of plant electrical network distribution and
reliability studies.
Page 6 of 6
Birla chemicals : Electrical Engineer, Maintenance
Projects: July 1994-January 1998
 IPP Cogeneration power plant (2x74.5 MW )
 Technical support for electrical and instrumentation equipment's in plants
 Technical support for electrical main distribution network 33KV/22KV/11KV/460V
Responsibilities
 Responsible for Electrical Installation and Testing of Centralized Utility Facilities Project
includes 33kV (Siemens), 11kV & 415V switchgears (Alstom), control and protection
panels, fixing of customer cable feeder supports and cable trays using ducting beneath
substation,
 Erection of BHEL makes 20MVA transformers and 1.6 MVA transformers, Neutral
Earthing resistors and substation earthing. Executed 31.5MVA, 8MVA and 1.6MVA
transformers erection
 Developing contracting strategy, coordination meeting and liaise with vendors
 Attending coordination meetings with consultant, Tata Consulting Engineers and
vendors.
 Looking after planning and preparation of Two Week Look Ahead Schedule, attending
weekly Progress review meetings, preparation of method statements for installation,
interaction with Electricity board.
 Field Technical Queries for the problems being faced due to the actual site conditions
and free issue materials and getting Field Instruction for extra works to be carried out
and follow up work to stick on to the schedule.
 Liaise with Electricity board, Professional Engineer and contractors
 Manage to control progress of work, manpower, material delivery and contractor
 Execution of continuous improvement of plant electrical network distribution and
reliability studies.
References:
Available shall be furnished upon request.

More Related Content

What's hot

Battery Maintenance Solutions for Critical Facilities: Meeting Regulatory Req...
Battery Maintenance Solutions for Critical Facilities: Meeting Regulatory Req...Battery Maintenance Solutions for Critical Facilities: Meeting Regulatory Req...
Battery Maintenance Solutions for Critical Facilities: Meeting Regulatory Req...
Electrical Reliability Services
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
Puneet Jaggi
 
Mn cv (777)
Mn cv (777)Mn cv (777)
Mn cv (777)
MANNANNATARAJAN
 
Reduce costs by outsourcing solar project management
Reduce costs by outsourcing solar project managementReduce costs by outsourcing solar project management
Reduce costs by outsourcing solar project management
Rick Borry
 
Collecting Economic Data in Power Quality Survey
Collecting Economic Data in Power Quality SurveyCollecting Economic Data in Power Quality Survey
Collecting Economic Data in Power Quality Survey
Leonardo ENERGY
 
Excitation Systems
Excitation Systems Excitation Systems
Excitation Systems
PowerEDGE
 
KEEPING ELECTRICAL SWITCHGEAR SAFE
KEEPING ELECTRICAL SWITCHGEAR SAFEKEEPING ELECTRICAL SWITCHGEAR SAFE
KEEPING ELECTRICAL SWITCHGEAR SAFE
PowerEDGE
 
Work Experience Report - Ganamotse
Work Experience Report - GanamotseWork Experience Report - Ganamotse
Work Experience Report - GanamotseGaenamele Ganamotse
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15Mahboob Iqbal
 
Curriculum Vitae - Hasan
Curriculum Vitae - HasanCurriculum Vitae - Hasan
Curriculum Vitae - Hasanhasan samsudin
 
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenancePhotovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant Maintenance
Leonardo ENERGY
 
Senior Electrical Engineer resume 2016
Senior Electrical Engineer resume  2016Senior Electrical Engineer resume  2016
Senior Electrical Engineer resume 2016Khadar Ali Shaik,P.Eng
 
BALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEBALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEAnil Kumar
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limited
Himanshu9974
 
Pramod cv 04 feb2016
Pramod cv 04 feb2016Pramod cv 04 feb2016
Pramod cv 04 feb2016
pamkesh
 
Solar Power Plant Procurements
Solar Power Plant ProcurementsSolar Power Plant Procurements
Solar Power Plant Procurements
Sunrator Technologies LLP
 

What's hot (20)

Battery Maintenance Solutions for Critical Facilities: Meeting Regulatory Req...
Battery Maintenance Solutions for Critical Facilities: Meeting Regulatory Req...Battery Maintenance Solutions for Critical Facilities: Meeting Regulatory Req...
Battery Maintenance Solutions for Critical Facilities: Meeting Regulatory Req...
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 
Tim Phillips
Tim PhillipsTim Phillips
Tim Phillips
 
Mn cv (777)
Mn cv (777)Mn cv (777)
Mn cv (777)
 
Reduce costs by outsourcing solar project management
Reduce costs by outsourcing solar project managementReduce costs by outsourcing solar project management
Reduce costs by outsourcing solar project management
 
CV
CVCV
CV
 
Collecting Economic Data in Power Quality Survey
Collecting Economic Data in Power Quality SurveyCollecting Economic Data in Power Quality Survey
Collecting Economic Data in Power Quality Survey
 
Excitation Systems
Excitation Systems Excitation Systems
Excitation Systems
 
KEEPING ELECTRICAL SWITCHGEAR SAFE
KEEPING ELECTRICAL SWITCHGEAR SAFEKEEPING ELECTRICAL SWITCHGEAR SAFE
KEEPING ELECTRICAL SWITCHGEAR SAFE
 
Work Experience Report - Ganamotse
Work Experience Report - GanamotseWork Experience Report - Ganamotse
Work Experience Report - Ganamotse
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15
 
Resume-Sudhin
Resume-SudhinResume-Sudhin
Resume-Sudhin
 
Curriculum Vitae - Hasan
Curriculum Vitae - HasanCurriculum Vitae - Hasan
Curriculum Vitae - Hasan
 
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenancePhotovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant Maintenance
 
Senior Electrical Engineer resume 2016
Senior Electrical Engineer resume  2016Senior Electrical Engineer resume  2016
Senior Electrical Engineer resume 2016
 
BALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEBALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUME
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limited
 
Hari Maintenance
Hari MaintenanceHari Maintenance
Hari Maintenance
 
Pramod cv 04 feb2016
Pramod cv 04 feb2016Pramod cv 04 feb2016
Pramod cv 04 feb2016
 
Solar Power Plant Procurements
Solar Power Plant ProcurementsSolar Power Plant Procurements
Solar Power Plant Procurements
 

Similar to Vel Linked In CV (20)

CV - David Kime - January 16_1
CV - David Kime - January 16_1CV - David Kime - January 16_1
CV - David Kime - January 16_1
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 
Sankar_ Vaid
Sankar_ VaidSankar_ Vaid
Sankar_ Vaid
 
CV-VP-KEMYA
CV-VP-KEMYACV-VP-KEMYA
CV-VP-KEMYA
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
 
RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATEL
 
Resume
ResumeResume
Resume
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
Electrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVElectrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CV
 
ahmed mohamed diaa C.V
ahmed mohamed diaa C.Vahmed mohamed diaa C.V
ahmed mohamed diaa C.V
 
ShrihariB
ShrihariBShrihariB
ShrihariB
 
CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
Resume E&I
Resume E&IResume E&I
Resume E&I
 
Mahmood Hasan Resume 2
Mahmood Hasan Resume 2Mahmood Hasan Resume 2
Mahmood Hasan Resume 2
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Manikandan
ManikandanManikandan
Manikandan
 
SRao_cv
SRao_cvSRao_cv
SRao_cv
 
RESUME october 2016 F
RESUME october 2016 FRESUME october 2016 F
RESUME october 2016 F
 

Vel Linked In CV

  • 1. Page 1 of 6 CONTACT INFORMATION: VELMURUGAN SUBRAMANIAM (P.Eng) Email Id: malavels@yahoo.com Contact: +1-780-215-2241 PROFESSIONAL SUMMARY:  Over 20 years of professional experience in the areas of Engineering, Project management, Installation, Commissioning & Maintenance in Refinery heavy Oil, Upgrading, Power and Petrochemicals plants.  Presently working with Suncor Energy as Lead Reliability Engineer. Professional Engineer and registered as member in APEGA and Member in IEEE association  Managing assets reliability in operation & maintenance of equipment’s and reducing downtime and enhancing operational effectiveness of equipment’s in large plants  Expertise in handling front end design (FEED) and detailed engineering packages (EDS), related to Electrical systems.  Familiar with ExxonMobil safety in design practices and Project Management system  Familiar with IEEE/IEC/NEMA/CEC/CSA codes and standards  Strong interpersonal, communication and negotiation skills, proactively keeps management, customers, peers, and subordinates focussed on the job. CAREER OBJECTIVE: To contribute as a member in a dynamic team of Engineering and Project department for a corporate environment with the objective of creating a better competitive edge in a global energy demand. A Professionally Qualified and international experienced Electrical Engineer involved in Front End Engineering Design (FEED), Management of EPC project, Contracting and project execution. Reliability Management, Maintenance management and Turnaround planning and execution With the above background, I am confident that you will find my skill and experience invaluable to your organization. I have enclosed my detailed resume for your reference. I feel confident that a career with your firm will further enrich my career advancements. Thanks, VELMURUGAN.
  • 2. Page 2 of 6 RESUME Education :  BSEE, Bachelor of Engineering in Electrical and Electronics Engineering, 1994 Awards:  Management recognition awards for completion of safe complex Turn Around 2007 as a IE lead team at Exxon Mobil, refinery  Management appreciation and recognition awards for completion of safe high complex substation job during Turn Around 2006 at Exxon Mobil, refinery  Safety Leader ship committee member and contribution award  Operations recognition awards for completion of complex compressor surge, performance and antisurge control job migration into single platform Triconex control Experience Summary :  Since July2009 till date Lead Electrical Engineer with Suncor Inc  September 2001-June 2009 Senior Electrical Engineer with Exxon Mobil  February 1998-April 2001 Senior Electrical Engineer with Petronas  July 1994-January 1998 Electrical Engineer with Birla chemicals Electrical skill:  Reliability and Technical support to improve plant existing switch gears and LV MCC /MV MCC (22/6.6KV/415V) system  Cable sizing calculation and cable routing  Substation design and calculations on fault current  NER and grounding system and Lightning protection system  Relay coordination and power system protection using EATP/SKM software  Auto transfer with secondary selective scheme time and residual voltage based system  Low Voltage (LV <1000V) Switchgear/MCC design as per IEEE C37.13-20.2/IEC- 60439/ NEMA ICS 1, 2  Medium Voltage (MV>1000V to 33KV) Switchgear/MCC design as per IEEE C37.20.7/ IEC-62271/NEMA ICS 3  Transformers/Variable Speed Drives (VSDs) Soft starters /UPS Power  LV/MV Motors selection as per IEEE 112,841/IEC-60034,60085 NEMA MG 1, 2  LV/MV Motors/Bus ducts/Power cable Conceptual design & Detail engineering skill:  Scoping studies, Basic Engineering (DBM & EDS, Front End Loading), Detail Design, Load estimation, Equipment sizing, Power System Studies  Motor starting and voltage dip, protection relay co-ordination, load flow studies under dynamic and steady state conditions using ETAP/SKM computer tools  Preparation of specifications/requisitions of electrical equipments for LV/MV system  Review technical bids, Design protection & control schemes, Vendor drawing review, Prepare and check single line diagrams  Plant layouts for lighting, cable and cable tray routings and grounding
  • 3. Page 3 of 6  Design substation layouts, DCS interface, MTO for bulk items.  Continuous improvement of Reliability on Electrical equipments in the plants  Developing scope of work for Electrical repair work and provide technical supports  Develop Preventive Maintenance strategies and tracking implementation  Critical equipments strategies and develop for spares strategies  Relay co-ordination and providing technical work scope for relay testing  Turnaround Planning /Coordination and execution of E&I works  Testing of LV/MV Panels and motors.  Prepare and Execute Equipment Inspection plan based on Risk Based Inspection approach  Attend techno commercial meetings, participate Factory Acceptance Testing (FAT), Site A Acceptance Testing (SAT)  Resource planning, Progress monitoring, and expedite.  Involved in project audits as per company’s audit procedure, Mentoring engineers, EPC contractors and site construction contractors team. Reliability skill:  Carry out RCFA for equipment failures, proposed suitable Corrective /Preventive action and responsible for preparation of detailed analysis reports  Involved as an Integral part of the Global Reliability of Management system(GRS) and responsible for all quality related matters  Applying Reliability Centered Maintenance (RCM) principles to understand how each class of equipment impacts reliability in the operating context Key Trainings Undergone:  Undergone Electrical safety and hazard awareness training conducted by CSA  Undergone Electrical CSA code standards training conducted by CSA  ETAP power system protection and coordination analysis  Safety in plant design & construction ( Exxon Mobil)  Risk Assessment course ( Exxon Mobil )  Chemical Engineering for Non-chemical Engineers ( Exxon Mobil )  Failure Analysis of Electrical equipment ( PE board of Singapore )  “Assertiveness –Achieving Win-Win” – Course (Exxon Mobil)  Project Management and Contracts Course ( Exxon Mobil )  Project Cost estimation and Schedule Course ( Exxon Mobil )  Siemens PLC automation Training in Singapore. Safety :  Under gone Suncor safety training (100% compliance)  Oil /Petrochemical Industrial Safety Course for Supervisors ( MOM-Singapore)  Hot Work –Cold Work Permit Process ( Exxon Mobil)  Emergency Response substation power Training ( Exxon Mobil)  Exxon’s Safety Engineering Course Instrumentation skill:  Process instruments Technical feasibility studies  Compressor TMR control Triconex with antisurge /performance/speed control  Towers/drums/Tank ages instruments/control valves  Technical Evaluation of Instrumentation bids by vendors and compliance with GP/DP/ NEMA/IEC
  • 4. Page 4 of 6  Loop drawings review of contractors documents compliance with GP/DP/NEMA/IEC  Reliability studies  Under gone Siemens PLC automation Training in Singapore.  Under gone Invensys Triconex Course  Under gone Honeywell DCS Course Work Experience Details: Suncor Energy Inc: Lead Electrical Engineer Upgrading oil sands: Since July 2009 Responsibilities  Emergency plant restoration of upgrading refinery complex damaged due to major fires.  Testing of LV/MV Panels and motors.  Prepare and Execute Equipment Inspection plan based on Risk Based Inspection approach  Attend techno commercial meetings, participate Factory Acceptance Testing (FAT), Site A Acceptance Testing (SAT)  Continuous improvement of Reliability on Electrical equipments in the plants  Developing scope of work for Electrical repair work and provide technical supports  Develop Preventive Maintenance strategies and tracking implementation  Critical equipments strategies and develop for spares strategies  Relay co-ordination and providing technical work scope for relay testing Exxon Mobil: Senior Electrical Engineer Projects: Since September 2001  Turn around 2007 Upgrade of wood ward control compressor into TMR control Triconex with antisurge/performance/speed control /Load sharing with steam driven compressors project  Turn around 2007 main substation revamp project online with live units migration without interruption to running units (22KV/6.6KV Switch gears )  Turn around 2006 substations revamp project online with live units migration (6.6KV/460V Switch gears )  Turn around 2005 substations revamp project (6.6KV/460V Switch gears )  Equipment Health Monitoring system(EHM) project  Boiler Control Modernization project  UPS upgrade project  Technical support for electrical and instrumentation equipment's in plants  E&I support for other major projects Responsibilities  Responsible for overall project from Feed, approval, developing EPC package together with Umbrella contractors Jacobs/Foster Wheelers  Detail Engineering, alignment with maintenance/Operation and EPC contractors  Procurement activities, Bid process and alignment with approval limits(DAOG)  Developing contracting strategy, coordination meeting and liaise with vendors  Electrical and Instrumentation project implementation and technical support for process plants.  Progress review meeting with stake holders and EPC contractors  Monthly progress report to all stake holders
  • 5. Page 5 of 6  Manage to control progress of work, manpower, material delivery and contractor  Job method statement /JSA review with maintenance/Operation and EPC contractors  Job Safety communication to all contractors and stake holders  Safety Operation Committee(SOC) review on critical jobs  Leadership for review and work process to ensure consistent quality of electrical data sheets and instrument specification with Design practices(DP/NEMA/IEC)  Constructability review alignment with maintenance/Operation and EPC contractors  Review of vendors drawings/documents comply with Exxon’s GP/DP  Providing engineering design, trouble-shooting for LV/MV Switch gears. Supporting operators in process start up safety review team (PSSR).  Execution of continuous improvement of plant electrical network distribution and reliability studies.  Project hand over and on the job training to maintenance/Operation  Facilitate Root Cause Analysis (RCA) on equipment related failure and develop effective solutions to eliminate recurrence and implement new facilities Petronas Malaysia: Senior Electrical Engineer Projects: February 1998-April 2001  Turn around 2000 substations revamp project (6.6KV/460V Switch gears ) 3MVA transformer for refinery distribution systems (6nos) upgrade project  Upgrade of DCS control stations phase II Petronas project Responsibilities  Lead Engineer for overall project from Feed, approval, developing EPC package together with Clients and subcontractors  Detail Engineering, alignment with maintenance/Operation and subcontractors  Technical evaluation on Electrical/Instruments complies with standards.  Procurement activities, Bid process and alignment with approval limits  Developing contracting strategy, coordination meeting and liaise with vendors  Looking after planning and preparation of weekly meeting schedule, attending weekly Progress review meetings, preparation of method statements for installation, interaction with petronas engineers for required inputs.  Field Technical Queries for the problems being faced due to the actual site conditions and free issue materials and getting Field Instruction for extra works to be carried out and follow up work to stick on to the schedule  Single point of coordination to ensure all departments shall progress in accordance with the client’s schedule  Review and monitor commercial issues, contract scope of work, field variations and an additional works.  Progress review meeting with client and contractors to discuss schedule and delay in milestone items problems and solutions  Reporting to management budgets and cash flow requirements  Execution of continuous improvement of plant electrical network distribution and reliability studies.
  • 6. Page 6 of 6 Birla chemicals : Electrical Engineer, Maintenance Projects: July 1994-January 1998  IPP Cogeneration power plant (2x74.5 MW )  Technical support for electrical and instrumentation equipment's in plants  Technical support for electrical main distribution network 33KV/22KV/11KV/460V Responsibilities  Responsible for Electrical Installation and Testing of Centralized Utility Facilities Project includes 33kV (Siemens), 11kV & 415V switchgears (Alstom), control and protection panels, fixing of customer cable feeder supports and cable trays using ducting beneath substation,  Erection of BHEL makes 20MVA transformers and 1.6 MVA transformers, Neutral Earthing resistors and substation earthing. Executed 31.5MVA, 8MVA and 1.6MVA transformers erection  Developing contracting strategy, coordination meeting and liaise with vendors  Attending coordination meetings with consultant, Tata Consulting Engineers and vendors.  Looking after planning and preparation of Two Week Look Ahead Schedule, attending weekly Progress review meetings, preparation of method statements for installation, interaction with Electricity board.  Field Technical Queries for the problems being faced due to the actual site conditions and free issue materials and getting Field Instruction for extra works to be carried out and follow up work to stick on to the schedule.  Liaise with Electricity board, Professional Engineer and contractors  Manage to control progress of work, manpower, material delivery and contractor  Execution of continuous improvement of plant electrical network distribution and reliability studies. References: Available shall be furnished upon request.