Page | 1
Nabil wageh emannuel yacoub
eng.nabil_wageh@hotmail.com
01229960175
An shams , Cairo, Egypt
PERSONAL STATEMENT
Desire a position utilizing organizational, interpersonal and communication skills. Particular interest in
production or operations management. I’m also looking forward for a position that enables me to
develop my company's business processes, enhance the work environment, and add new, efficient
methods and styles to my work
KEY SKILLS
Technical Skills
 PLC Siemens STEP 7 ( 200 & 300 )
 Technical & commercial proposals.
 Electrical designs on AutoCAD 2D.
 Designing power & control panels.
 Tendering & technical assay.
 CCTV System
 Access Control System.
 Audio and Video equipment.
 MS Windows , MS office
 Internet Usage and Research
 Studying Electrical contracting projects.
Training courses
 PLC advanced course with general grade Very Good in the JELECOM – EGYPT
 PLC S7-200 advanced course with general grade Very Good in the DON- BOSCO
 PLC S7-300 advanced course with general grade Very Good in the DON- BOSCO
 AutoCAD 2014 DON- BOSCO
 English conversation course in VISION ACADMY& ASEB ACADMY
 Electrical engineer training in the ORASCOM - Construction industries in sultanate OMAN
 LENEL light current design and maintenance training
 S2 –Security Certification access control & IP Cameras
 Dialux 4.12 design lighting indoor & outdoor by my self
Page | 2
EDUCATION
University Degree: B.SC. Electrical Engineering – Year 2011
Major: Power and control system
Graduation Project: speed control
Project Grade: Excellent
EMPLOYMENT
Professional
Experience
[ July 2016 – up to now ] CompuGeorge Cairo-Egypt
Team Leader
 New Installation surveys, design and BOQ preparation.
 Responsible for Security Systems Installations, Maintenance and Technical Support (Security
Systems include: Access Control, IP CCTV, Physical Security andTotal Security Management).
 Planning and scheduling of installation and implementation time frames and fulfilling those plans.
 Do preventive & predictive maintenance of equipment and systems.
 Follow up with concerned departments to avoid delays and pending schedules checking and
confirming of specifications, ensuring a good quality of work ata minimum cost.
[ May 2015 – June 2016 ] Italian factory Cairo-Egypt
Supervisor electrical engineer
 Prepare estimates used by management for purposes such as planning, organizing, and scheduling
work
 Prepare cost and expenditure statements and other necessary documentation at regular intervals
for the duration of the project
 Assess cost effectiveness of products, projects or services, tracking actual costs relative to bids as
the project develops
 Set up costmonitoring and reporting systems and procedures
 Conduct special studies to develop and establish standard hour and related cost data or to effect
cost reduction
 Review material andlabor requirements to decide whether itis more cost-effective to construct or
sub-contract components
 Prepare andmaintain a directory of suppliers, contractors and subcontractors
 Establish and maintain tendering process, and conduct negotiations
Page | 3
[ April 2014 – May 2015 ] CONCORDE ELSALAM HOTEL Cairo-Egypt
Senior electrical engineer
 Supervising Installing base frames, panel installation and inspection
 Supervising Cable trays installation.
 Supervising Cable pulling, Termination& testing.
 Supervising Installing Cable connection into junction boxes, MCC panels, Motors.
 Supervision for site construction activities (transformers , MV & LV switchgear erection)
 Apply Motor Testing.
 Installation of lighting system (indoor & outdoor)& lighting panels.
 Apply commissioning tests for package units.
 Installation & commissioning of the Intercom system.
 Earthling& lightning System.
[ April 2013 – March 2014 ] Economic electrical office Cairo-Egypt
TECHNICAL office engineer
 Revise installation drawing, calculating materials required.
 Electrical Q.S.
 Prepare shop drawing
 Check subcontractor’s progress tomeet the time schedule.
 Prepare RFI, RMA, invoices, material approve request.
 Check the BOQ with the construction drawing
 Prepare as built
[ March 2011 – March 2013 ] Ceramic factory venous 10 th of Ramadan -Egypt
Maintenance electrical engineer
 Motor Testing (Running test )
 Installation of lighting system (indoor & outdoor)& lighting panels.
 Cable testing
 inspecting motor connection & control junction boxes
 Earthling & Lightning system.
 Prepare As-Built document.
 Punch list clearance.
PERSONAL INTERESTS
Traveling | Reading | Football
REFERENCES
References are available on request.

Eng . Nabil Wageh C.V

  • 1.
    Page | 1 Nabilwageh emannuel yacoub eng.nabil_wageh@hotmail.com 01229960175 An shams , Cairo, Egypt PERSONAL STATEMENT Desire a position utilizing organizational, interpersonal and communication skills. Particular interest in production or operations management. I’m also looking forward for a position that enables me to develop my company's business processes, enhance the work environment, and add new, efficient methods and styles to my work KEY SKILLS Technical Skills  PLC Siemens STEP 7 ( 200 & 300 )  Technical & commercial proposals.  Electrical designs on AutoCAD 2D.  Designing power & control panels.  Tendering & technical assay.  CCTV System  Access Control System.  Audio and Video equipment.  MS Windows , MS office  Internet Usage and Research  Studying Electrical contracting projects. Training courses  PLC advanced course with general grade Very Good in the JELECOM – EGYPT  PLC S7-200 advanced course with general grade Very Good in the DON- BOSCO  PLC S7-300 advanced course with general grade Very Good in the DON- BOSCO  AutoCAD 2014 DON- BOSCO  English conversation course in VISION ACADMY& ASEB ACADMY  Electrical engineer training in the ORASCOM - Construction industries in sultanate OMAN  LENEL light current design and maintenance training  S2 –Security Certification access control & IP Cameras  Dialux 4.12 design lighting indoor & outdoor by my self
  • 2.
    Page | 2 EDUCATION UniversityDegree: B.SC. Electrical Engineering – Year 2011 Major: Power and control system Graduation Project: speed control Project Grade: Excellent EMPLOYMENT Professional Experience [ July 2016 – up to now ] CompuGeorge Cairo-Egypt Team Leader  New Installation surveys, design and BOQ preparation.  Responsible for Security Systems Installations, Maintenance and Technical Support (Security Systems include: Access Control, IP CCTV, Physical Security andTotal Security Management).  Planning and scheduling of installation and implementation time frames and fulfilling those plans.  Do preventive & predictive maintenance of equipment and systems.  Follow up with concerned departments to avoid delays and pending schedules checking and confirming of specifications, ensuring a good quality of work ata minimum cost. [ May 2015 – June 2016 ] Italian factory Cairo-Egypt Supervisor electrical engineer  Prepare estimates used by management for purposes such as planning, organizing, and scheduling work  Prepare cost and expenditure statements and other necessary documentation at regular intervals for the duration of the project  Assess cost effectiveness of products, projects or services, tracking actual costs relative to bids as the project develops  Set up costmonitoring and reporting systems and procedures  Conduct special studies to develop and establish standard hour and related cost data or to effect cost reduction  Review material andlabor requirements to decide whether itis more cost-effective to construct or sub-contract components  Prepare andmaintain a directory of suppliers, contractors and subcontractors  Establish and maintain tendering process, and conduct negotiations
  • 3.
    Page | 3 [April 2014 – May 2015 ] CONCORDE ELSALAM HOTEL Cairo-Egypt Senior electrical engineer  Supervising Installing base frames, panel installation and inspection  Supervising Cable trays installation.  Supervising Cable pulling, Termination& testing.  Supervising Installing Cable connection into junction boxes, MCC panels, Motors.  Supervision for site construction activities (transformers , MV & LV switchgear erection)  Apply Motor Testing.  Installation of lighting system (indoor & outdoor)& lighting panels.  Apply commissioning tests for package units.  Installation & commissioning of the Intercom system.  Earthling& lightning System. [ April 2013 – March 2014 ] Economic electrical office Cairo-Egypt TECHNICAL office engineer  Revise installation drawing, calculating materials required.  Electrical Q.S.  Prepare shop drawing  Check subcontractor’s progress tomeet the time schedule.  Prepare RFI, RMA, invoices, material approve request.  Check the BOQ with the construction drawing  Prepare as built [ March 2011 – March 2013 ] Ceramic factory venous 10 th of Ramadan -Egypt Maintenance electrical engineer  Motor Testing (Running test )  Installation of lighting system (indoor & outdoor)& lighting panels.  Cable testing  inspecting motor connection & control junction boxes  Earthling & Lightning system.  Prepare As-Built document.  Punch list clearance. PERSONAL INTERESTS Traveling | Reading | Football REFERENCES References are available on request.