RATIO, BURDEN
ADMITTANCE TESTING
Prepared by Tom Lawton, TESCO
The Eastern Specialty Company
For North Carolina Electric Meter School
Advanced
Tuesday, June 14, 2022
AGENDA – ADVANCED SESSION
tescometering.com 2
What we will not cover!
• The Very Basics: meter forms and
• self-contained vs. transformer rated
What we will cover
• CT Functionality Basics
• The Faceplate:
• Terminology and Specifications
• Ratio Testing
• Burden Testing
• Admittance Testing
• Demag Functions
• Roundtable – after Complete Site Testing is finished:
• What you do and why?
WHAT IS A CT? A PT?
tescometering.com 3
“A current transformer (CT) is used for
measurement of alternating electric currents.
Current transformers, together with voltage
(or potential) transformers (VT or PT), are
known as instrument transformers. When
current in a circuit is too high to apply directly
to measuring instruments, a current
transformer produces a reduced current
accurately proportional to the current in the
circuit, which can be conveniently connected
to measuring and recording instruments. A
current transformer isolates the measuring
instruments from what may be very high
voltage in the monitored circuit. Current
transformers are commonly used in metering
and protective relays in the electrical power
industry.” - Wikipedia
SHOP TESTING
• Accuracy Testing
• Ratio and accuracy testing
• Polarity checking
• Accuracy class determination
tescometering.com
SHOP TESTING PROGRAMS
• 100% of all Transformers
• If not possible then sample testing of all and 100% of all those over a certain size for CT’s
and all VT’s (generally not a large volume)
• Transformer testing should include
• Ratio and accuracy testing
• Polarity checking
• Accuracy class determination
• 100% of all transformer rated meters
• If not possible then sample testing of all transformer rated meters and 100% of all those
going into a certain size service and over
• Meter testing should include
• Software & Firmware Verification
• Setting Verification
• Functional Testing
• Disconnect/Reconnect Functionality
and as left setting
tescometering.com 5
CURRENT TRANSFORMERS CONCEPTUAL REPRESENTATION
Real, with core losses
Ideal. No losses
As current is applied in the primary, it produces a magnetic flux in the core.
This flux flows through the core and induces a current in the secondary
windings and circuit that is proportional to the number of turns.
tescometering.com 6
EXAMPLE APPLICATION
tescometering.com 7
9S Meter
Installation
5A
PHASE A
SOURCE
PHASE C
PHASE B
LOAD
400A
400A
400A
5A
5A
FACEPLATE SPECIFICATIONS
tescometering.com 8
Ratio
FACEPLATE SPECIFICATIONS
tescometering.com 9
CT’S RATIO
tescometering.com 10
For instance, a CT with a 400:5 ratio will
produce 5A on the secondary, when 400A
are applied to the primary.
Thermal
factor
FACEPLATE SPECIFICATIONS
tescometering.com 11
CT’S – FUNCTIONS AND TERMINOLOGY
tescometering.com 12
Thermal Rating factor
A value representing the amount by which the
primary current can be increased without
exceeding the allowable temperature rise.
For instance, a RF of 4.0 at 30° ambient on a
400:5 ratio CT would allow for a primary current
up to 1600A.
FACEPLATE SPECIFICATIONS
tescometering.com 13
Accuracy Classifications
All CT’s fall within an accuracy class.
IEEE Standards have defined accuracy classes.
Burden
Rating
FACEPLATE SPECIFICATIONS
tescometering.com 14
The burden range, present in the secondary
circuit, that the manufacturer will guarantee
their CT’s will still accurately function, in
regards to the ratio specification.
BURDEN RATING
tescometering.com 15
RATIO TESTING
tescometering.com 16
Ratio of Primary Current to Secondary Current
5A
PHASE A
SOURCE LOAD
400A
400A
400A
5A
5A
Calculate
Ratio
BURDEN TESTING
tescometering.com 17
Functionality with Burden Present on the Secondary Loop
PHASE A
Some burden will always be
present – junctions, meter coils,
test switches, cables, etc.
CT’s must be able to maintain
an accurate ratio with burden on
the secondary.
BURDEN TESTING
tescometering.com 18
Functionality with Burden Present on the
Secondary Loop
PHASE A
Some burden will always be
present – junctions, meter coils,
test switches, cables, etc.
CT’s must be able to maintain
an accurate ratio with burden on
the secondary.
BURDEN TESTING
tescometering.com 19
Functionality with Burden Present on the Secondary Loop
Example Burden Spec:
0.3% @ B0.1, B0.2, B0.5
or
There should be less than the 0.3%
change in secondary current from initial
(“0” burden) reading, when up to
0.5Ohms of burden is applied
BURDEN TESTING
tescometering.com 20
Functionality with Burden Present on the Secondary Loop
ANSI Burden Values
0.1 Ohms
0.2 Ohms
0.5 Ohms
1 Ohms
2 Ohms
4 Ohms
8 Ohms
BURDEN TESTING
0.0000
1.0000
2.0000
3.0000
4.0000
5.0000
6.0000
0 2 4 6 8
tescometering.com 21
Burden Reading
0 5.0000
0.1 4.9999
0.2 4.9950
0.5 4.9900
1 4.9800
2 4.9500
4 4.0000
8 0.8000
0.3% @ B0.1, B0.2, B0.5
Initial Reading = 5Amps
0.3% x 5A = 0.015A
5A – 0.015 = 4.985A
BURDEN TESTING
4.9500
4.9600
4.9700
4.9800
4.9900
5.0000
5.0100
5.0200
5.0300
5.0400
5.0500
0 0.2 0.4 0.6 0.8 1
tescometering.com 22
Burden Reading
0 5.0000
0.1 4.9999
0.2 4.9950
0.5 4.9900
1 4.9800
2 4.9500
4 4.0000
8 0.8000
0.3% @ B0.1, B0.2, B0.5
Initial Reading = 5Amps
0.3% x 5A = 0.015A
5A – 0.015 = 4.985A
At 0.5Ohms of Burden
the secondary current is still at
4.990A – Less than 0.3% change –
Good CT!
ADMITTANCE TESTING
tescometering.com 23
• What is Admittance?
• Admittance testing measures the
overall “health” of the secondary loop
of the CT.
• Measured in units of MiliSiemens (mS)
• Admittance is the inverse of
impedance.
• Impedance is the opposition to current.
• Therefore, admittance testing
measures the overall “health” of the
secondary loop of the CT.
ADMITTANCE TESTING
tescometering.com 24
• Admittance testing devices inject an audio sine
wave signal into the secondary loop of the CT.
• The resulting current is measured.
• The voltage of the initial signal is known.
• From these two parameters, the impedance,
and thus the admittance can be calculated.
ADMITTANCE TESTING
tescometering.com 25
• Admittance test results are not immediately
intuitive.
• Some analysis and interpretation is need.
• What do all these mS values mean?
ADMITTANCE TESTING
tescometering.com 26
Three phase process is recommended.
1.Test each CT individually
2.Test the matched sets
3.Test over time
DE-MAGNETIZATION
tescometering.com 27
CT’s can become magnetized, due to a number of reasons, including
leaving the shorting clip open, near lightning strikes, and harmonic
content.
CT’s can be demagnitized by slowly and smoothly increasing the
secondary resistance until saturation occurs, and then slowly and
smoothly decreasing the secondary resistance.
A resistance that will cause a secondary current reduction of 65% to
75% will typically put the CT into saturation.
*Some information has been taken from Radian Research’s Application Note 1109A: Admittance Testing Verifies CT
Testing Integrity
QUESTIONS AND DISCUSSION
Tom Lawton
President
tom.lawton@tescometering.com
TESCO – The Eastern Specialty Company
Bristol, PA
215-228-0500
This presentation can also be found under Meter Conferences and
Schools on the TESCO website: www.tescometering.com
tescometering.com 28
ISO 9001:2015 Certified Quality Company
ISO 17025:2017 Accredited Laboratory

More Related Content

Similar to Ratio Burden Admittance Testing

CT Testing: Theory and Practice
CT Testing: Theory and PracticeCT Testing: Theory and Practice
CT Testing: Theory and Practice
TESCO - The Eastern Specialty Company
 
Current Transformers: Ratio & Burden Testing
Current Transformers: Ratio & Burden TestingCurrent Transformers: Ratio & Burden Testing
Current Transformers: Ratio & Burden Testing
TESCO - The Eastern Specialty Company
 
Instrument Transformer Testing in them Shop and Field_Tom Lawton 2023
Instrument Transformer Testing in them Shop and Field_Tom Lawton 2023Instrument Transformer Testing in them Shop and Field_Tom Lawton 2023
Instrument Transformer Testing in them Shop and Field_Tom Lawton 2023
TESCO - The Eastern Specialty Company
 
CT Burden Testing
CT Burden TestingCT Burden Testing
Instrument Transformer Testing in the Shop and Field
Instrument Transformer Testing in the Shop and FieldInstrument Transformer Testing in the Shop and Field
Instrument Transformer Testing in the Shop and Field
TESCO - The Eastern Specialty Company
 
Introduction to Transformer Rated Metering
Introduction to Transformer Rated Metering Introduction to Transformer Rated Metering
Introduction to Transformer Rated Metering
TESCO - The Eastern Specialty Company
 
Introduction to Transformer Rated Metering
Introduction to Transformer Rated MeteringIntroduction to Transformer Rated Metering
Introduction to Transformer Rated Metering
TESCO - The Eastern Specialty Company
 
Transformer Rated Metering 09.27.17
Transformer Rated Metering 09.27.17Transformer Rated Metering 09.27.17
Transformer Rated Metering 09.27.17
TESCO - The Eastern Specialty Company
 
Introduction to Transformer Rated Metering
Introduction to Transformer Rated MeteringIntroduction to Transformer Rated Metering
Introduction to Transformer Rated Metering
TESCO - The Eastern Specialty Company
 
Transformer Rated Metering Site Verification
Transformer Rated Metering Site VerificationTransformer Rated Metering Site Verification
Transformer Rated Metering Site Verification
TESCO - The Eastern Specialty Company
 
Introduction to Transformer Rated Metering
Introduction to Transformer Rated Metering Introduction to Transformer Rated Metering
Introduction to Transformer Rated Metering
TESCO - The Eastern Specialty Company
 
Instrument Transformer Testing
Instrument Transformer TestingInstrument Transformer Testing
Instrument Transformer Testing
TESCO - The Eastern Specialty Company
 
ct pt testing...........................................
ct pt testing...........................................ct pt testing...........................................
ct pt testing...........................................
hiiarindam
 
ECNE - Spring 2017 CT Theory and Practice
ECNE - Spring 2017 CT Theory and PracticeECNE - Spring 2017 CT Theory and Practice
ECNE - Spring 2017 CT Theory and Practice
TESCO - The Eastern Specialty Company
 
Site Verification for Self-Contained Hot Socket Detection
Site Verification for Self-Contained Hot Socket DetectionSite Verification for Self-Contained Hot Socket Detection
Site Verification for Self-Contained Hot Socket Detection
TESCO - The Eastern Specialty Company
 
Transformer Rated Metering
Transformer Rated MeteringTransformer Rated Metering
Transformer Rated Metering
TESCO - The Eastern Specialty Company
 
CT Testing - Theory and Practice
CT Testing - Theory and PracticeCT Testing - Theory and Practice
CT Testing - Theory and Practice
TESCO - The Eastern Specialty Company
 
Current Transformers: Ratio & Burden Testing
Current Transformers: Ratio & Burden TestingCurrent Transformers: Ratio & Burden Testing
Current Transformers: Ratio & Burden Testing
TESCO - The Eastern Specialty Company
 
Fundamentals of Transformer Rated Field Meter Testing and Site Verification
Fundamentals of Transformer Rated Field Meter Testing and Site VerificationFundamentals of Transformer Rated Field Meter Testing and Site Verification
Fundamentals of Transformer Rated Field Meter Testing and Site Verification
TESCO - The Eastern Specialty Company
 
Transformer Rated Metering Site Verification
Transformer Rated Metering Site VerificationTransformer Rated Metering Site Verification
Transformer Rated Metering Site Verification
TESCO - The Eastern Specialty Company
 

Similar to Ratio Burden Admittance Testing (20)

CT Testing: Theory and Practice
CT Testing: Theory and PracticeCT Testing: Theory and Practice
CT Testing: Theory and Practice
 
Current Transformers: Ratio & Burden Testing
Current Transformers: Ratio & Burden TestingCurrent Transformers: Ratio & Burden Testing
Current Transformers: Ratio & Burden Testing
 
Instrument Transformer Testing in them Shop and Field_Tom Lawton 2023
Instrument Transformer Testing in them Shop and Field_Tom Lawton 2023Instrument Transformer Testing in them Shop and Field_Tom Lawton 2023
Instrument Transformer Testing in them Shop and Field_Tom Lawton 2023
 
CT Burden Testing
CT Burden TestingCT Burden Testing
CT Burden Testing
 
Instrument Transformer Testing in the Shop and Field
Instrument Transformer Testing in the Shop and FieldInstrument Transformer Testing in the Shop and Field
Instrument Transformer Testing in the Shop and Field
 
Introduction to Transformer Rated Metering
Introduction to Transformer Rated Metering Introduction to Transformer Rated Metering
Introduction to Transformer Rated Metering
 
Introduction to Transformer Rated Metering
Introduction to Transformer Rated MeteringIntroduction to Transformer Rated Metering
Introduction to Transformer Rated Metering
 
Transformer Rated Metering 09.27.17
Transformer Rated Metering 09.27.17Transformer Rated Metering 09.27.17
Transformer Rated Metering 09.27.17
 
Introduction to Transformer Rated Metering
Introduction to Transformer Rated MeteringIntroduction to Transformer Rated Metering
Introduction to Transformer Rated Metering
 
Transformer Rated Metering Site Verification
Transformer Rated Metering Site VerificationTransformer Rated Metering Site Verification
Transformer Rated Metering Site Verification
 
Introduction to Transformer Rated Metering
Introduction to Transformer Rated Metering Introduction to Transformer Rated Metering
Introduction to Transformer Rated Metering
 
Instrument Transformer Testing
Instrument Transformer TestingInstrument Transformer Testing
Instrument Transformer Testing
 
ct pt testing...........................................
ct pt testing...........................................ct pt testing...........................................
ct pt testing...........................................
 
ECNE - Spring 2017 CT Theory and Practice
ECNE - Spring 2017 CT Theory and PracticeECNE - Spring 2017 CT Theory and Practice
ECNE - Spring 2017 CT Theory and Practice
 
Site Verification for Self-Contained Hot Socket Detection
Site Verification for Self-Contained Hot Socket DetectionSite Verification for Self-Contained Hot Socket Detection
Site Verification for Self-Contained Hot Socket Detection
 
Transformer Rated Metering
Transformer Rated MeteringTransformer Rated Metering
Transformer Rated Metering
 
CT Testing - Theory and Practice
CT Testing - Theory and PracticeCT Testing - Theory and Practice
CT Testing - Theory and Practice
 
Current Transformers: Ratio & Burden Testing
Current Transformers: Ratio & Burden TestingCurrent Transformers: Ratio & Burden Testing
Current Transformers: Ratio & Burden Testing
 
Fundamentals of Transformer Rated Field Meter Testing and Site Verification
Fundamentals of Transformer Rated Field Meter Testing and Site VerificationFundamentals of Transformer Rated Field Meter Testing and Site Verification
Fundamentals of Transformer Rated Field Meter Testing and Site Verification
 
Transformer Rated Metering Site Verification
Transformer Rated Metering Site VerificationTransformer Rated Metering Site Verification
Transformer Rated Metering Site Verification
 

Recently uploaded

Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 

Recently uploaded (20)

Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 

Ratio Burden Admittance Testing

  • 1. RATIO, BURDEN ADMITTANCE TESTING Prepared by Tom Lawton, TESCO The Eastern Specialty Company For North Carolina Electric Meter School Advanced Tuesday, June 14, 2022
  • 2. AGENDA – ADVANCED SESSION tescometering.com 2 What we will not cover! • The Very Basics: meter forms and • self-contained vs. transformer rated What we will cover • CT Functionality Basics • The Faceplate: • Terminology and Specifications • Ratio Testing • Burden Testing • Admittance Testing • Demag Functions • Roundtable – after Complete Site Testing is finished: • What you do and why?
  • 3. WHAT IS A CT? A PT? tescometering.com 3 “A current transformer (CT) is used for measurement of alternating electric currents. Current transformers, together with voltage (or potential) transformers (VT or PT), are known as instrument transformers. When current in a circuit is too high to apply directly to measuring instruments, a current transformer produces a reduced current accurately proportional to the current in the circuit, which can be conveniently connected to measuring and recording instruments. A current transformer isolates the measuring instruments from what may be very high voltage in the monitored circuit. Current transformers are commonly used in metering and protective relays in the electrical power industry.” - Wikipedia
  • 4. SHOP TESTING • Accuracy Testing • Ratio and accuracy testing • Polarity checking • Accuracy class determination tescometering.com
  • 5. SHOP TESTING PROGRAMS • 100% of all Transformers • If not possible then sample testing of all and 100% of all those over a certain size for CT’s and all VT’s (generally not a large volume) • Transformer testing should include • Ratio and accuracy testing • Polarity checking • Accuracy class determination • 100% of all transformer rated meters • If not possible then sample testing of all transformer rated meters and 100% of all those going into a certain size service and over • Meter testing should include • Software & Firmware Verification • Setting Verification • Functional Testing • Disconnect/Reconnect Functionality and as left setting tescometering.com 5
  • 6. CURRENT TRANSFORMERS CONCEPTUAL REPRESENTATION Real, with core losses Ideal. No losses As current is applied in the primary, it produces a magnetic flux in the core. This flux flows through the core and induces a current in the secondary windings and circuit that is proportional to the number of turns. tescometering.com 6
  • 7. EXAMPLE APPLICATION tescometering.com 7 9S Meter Installation 5A PHASE A SOURCE PHASE C PHASE B LOAD 400A 400A 400A 5A 5A
  • 10. CT’S RATIO tescometering.com 10 For instance, a CT with a 400:5 ratio will produce 5A on the secondary, when 400A are applied to the primary.
  • 12. CT’S – FUNCTIONS AND TERMINOLOGY tescometering.com 12 Thermal Rating factor A value representing the amount by which the primary current can be increased without exceeding the allowable temperature rise. For instance, a RF of 4.0 at 30° ambient on a 400:5 ratio CT would allow for a primary current up to 1600A.
  • 13. FACEPLATE SPECIFICATIONS tescometering.com 13 Accuracy Classifications All CT’s fall within an accuracy class. IEEE Standards have defined accuracy classes.
  • 15. The burden range, present in the secondary circuit, that the manufacturer will guarantee their CT’s will still accurately function, in regards to the ratio specification. BURDEN RATING tescometering.com 15
  • 16. RATIO TESTING tescometering.com 16 Ratio of Primary Current to Secondary Current 5A PHASE A SOURCE LOAD 400A 400A 400A 5A 5A Calculate Ratio
  • 17. BURDEN TESTING tescometering.com 17 Functionality with Burden Present on the Secondary Loop PHASE A Some burden will always be present – junctions, meter coils, test switches, cables, etc. CT’s must be able to maintain an accurate ratio with burden on the secondary.
  • 18. BURDEN TESTING tescometering.com 18 Functionality with Burden Present on the Secondary Loop PHASE A Some burden will always be present – junctions, meter coils, test switches, cables, etc. CT’s must be able to maintain an accurate ratio with burden on the secondary.
  • 19. BURDEN TESTING tescometering.com 19 Functionality with Burden Present on the Secondary Loop Example Burden Spec: 0.3% @ B0.1, B0.2, B0.5 or There should be less than the 0.3% change in secondary current from initial (“0” burden) reading, when up to 0.5Ohms of burden is applied
  • 20. BURDEN TESTING tescometering.com 20 Functionality with Burden Present on the Secondary Loop ANSI Burden Values 0.1 Ohms 0.2 Ohms 0.5 Ohms 1 Ohms 2 Ohms 4 Ohms 8 Ohms
  • 21. BURDEN TESTING 0.0000 1.0000 2.0000 3.0000 4.0000 5.0000 6.0000 0 2 4 6 8 tescometering.com 21 Burden Reading 0 5.0000 0.1 4.9999 0.2 4.9950 0.5 4.9900 1 4.9800 2 4.9500 4 4.0000 8 0.8000 0.3% @ B0.1, B0.2, B0.5 Initial Reading = 5Amps 0.3% x 5A = 0.015A 5A – 0.015 = 4.985A
  • 22. BURDEN TESTING 4.9500 4.9600 4.9700 4.9800 4.9900 5.0000 5.0100 5.0200 5.0300 5.0400 5.0500 0 0.2 0.4 0.6 0.8 1 tescometering.com 22 Burden Reading 0 5.0000 0.1 4.9999 0.2 4.9950 0.5 4.9900 1 4.9800 2 4.9500 4 4.0000 8 0.8000 0.3% @ B0.1, B0.2, B0.5 Initial Reading = 5Amps 0.3% x 5A = 0.015A 5A – 0.015 = 4.985A At 0.5Ohms of Burden the secondary current is still at 4.990A – Less than 0.3% change – Good CT!
  • 23. ADMITTANCE TESTING tescometering.com 23 • What is Admittance? • Admittance testing measures the overall “health” of the secondary loop of the CT. • Measured in units of MiliSiemens (mS) • Admittance is the inverse of impedance. • Impedance is the opposition to current. • Therefore, admittance testing measures the overall “health” of the secondary loop of the CT.
  • 24. ADMITTANCE TESTING tescometering.com 24 • Admittance testing devices inject an audio sine wave signal into the secondary loop of the CT. • The resulting current is measured. • The voltage of the initial signal is known. • From these two parameters, the impedance, and thus the admittance can be calculated.
  • 25. ADMITTANCE TESTING tescometering.com 25 • Admittance test results are not immediately intuitive. • Some analysis and interpretation is need. • What do all these mS values mean?
  • 26. ADMITTANCE TESTING tescometering.com 26 Three phase process is recommended. 1.Test each CT individually 2.Test the matched sets 3.Test over time
  • 27. DE-MAGNETIZATION tescometering.com 27 CT’s can become magnetized, due to a number of reasons, including leaving the shorting clip open, near lightning strikes, and harmonic content. CT’s can be demagnitized by slowly and smoothly increasing the secondary resistance until saturation occurs, and then slowly and smoothly decreasing the secondary resistance. A resistance that will cause a secondary current reduction of 65% to 75% will typically put the CT into saturation. *Some information has been taken from Radian Research’s Application Note 1109A: Admittance Testing Verifies CT Testing Integrity
  • 28. QUESTIONS AND DISCUSSION Tom Lawton President tom.lawton@tescometering.com TESCO – The Eastern Specialty Company Bristol, PA 215-228-0500 This presentation can also be found under Meter Conferences and Schools on the TESCO website: www.tescometering.com tescometering.com 28 ISO 9001:2015 Certified Quality Company ISO 17025:2017 Accredited Laboratory