Richa Industries Limited customizes structural steel system for heavy construction and offers design,engineering and construction solution from concept to completion.
2. INTRODUCTION
Richa customizes structural steel system for heavy construction and
offers design,engineering and construction solution from concept to
completion
Richa adopts innovative concepts in engineering and strives to go
beyond the realm of conventional construction with its team of leading
engineers, designers with world class manufacturing and efficient project
handling for heavy project construction.
RICHA INDUSTRIES LIMITED
3. OVERVIEW
India’s Leading Turnkey Metal Building & Steel Construction Company
Over 300 Steel Buildings executed across India for various applications.
Acknowledged for Quality, Safety and Timely Execution of Projects
Net worth in excess of Rs. 100 cr
One of the major leader in Pre-Engineered steel construction/off-shore manufacturing
industry.
Some of the most prestigious industrial and commercial projects engineered and delivered.
Timely delivery, Timely completion of projects & Countrywide support of project management
services for your projects
Most diverse steel building solution portfolio in India.
RICHA INDUSTRIES LIMITED
4. RICHA INDUSTRIES
LIMITED
A leading Construction & Engineering company operational in
Pre-Engineered Building, Structural Steel, Turnkey solutions and Textile
sectors.
WIPRO
MADHU SILICA
RICHA
CORPORATE
OFFICE
5. WHY RICHA
INDUSTRIES ?
Started its PEB division in 2008, Richa Industries has created an exclusive niche for itself in
the PEB industry with the excellent support of its well qualified and experienced team.
Richa is committed to Design, Manufacture and Install Pre-Engineered Steel Buildings,
which are 100% custom built and designed in accordance with sound principle of
Engineering using Computer aided designing.
We offer hi-tech solutions to our customers by utilizing MBS (Metal Building Software), Staad
Pro (3D Structural analysis and design software) and Tekla (Model-based software) with
highest precision to meet the structural requirements of the Pre-Engineered Steel Building
Systems.
Richa deputes qualified experienced safety inspectors to ensure complete project safety and
provide good after sales service to its customers.
The company has presence in more than 120 cities across India with Sales office in more
than 8 cities enriched with government as well as private clients.
An ISO 9001:2008 certified company, Richa Industries is listed at Bombay Stock Exchange.
6. USPs RICHA
INDUSTRIES
Richa is the only
company
offering galvanized
Flange brace angles,
Sag rods and Gutter
Straps
Richa provides
galvanized (275 GSM)
Secondary members
which enhance the life
of Purlins and provide
maintenance free
solutions
Richa offers
galvanized Anchor
bolts (36 dia)
7. MANAGEMENT
TEAM
Mr. Sushil Gupta (Chairman)
An IIT engineer by profession, Mr. Gupta holds a B. Tech. (Mechanical) and M.
Tech. (Applied Mechanics) degree from IIT- Delhi. With an experience of more
than 25 years in the industry, is a “Father Figure” of Richa Industries. Mr. Sushil
Gupta serves as Chairman and Managing Director of Richa Industries Ltd. His
core area of focus remains on R&D, cost effectiveness and new developments.
Dr. Sandeep Gupta (Jt.MD)
Dr. Sandeep Gupta is a Doctor of Philosophy in Management. He has
accomplished his MBA from University of Bhartiya Vidyapeeth, Pune. He initiated
Richa’s backward integration journey from textiles into Pre Engineered Buildings
and further into Turnkey Solutions and going up-stream into structural steel.
Mr. Manish Gupta (Director)
Mr. Manish Gupta is the Director of the Company. Striving towards economic,
environmental and social progression of the organization and the society on the
whole, Mr. Manish Gupta firmly believes in the principles of respect, rigor and
involvement. Mr. Gupta is the leading light in textile development and innovation
insuring quality at all levels of operations.
RICHA INDUSTRIES LIMITED
8. SOLUTIONS FOR HIGH
RISE APPLICATIONS
Richa Steel structure is an ideal solution for High Rise applications as today in urban
Infrastructure there is a space crunch and such buildings are an appropriate solution to this
problem and are cost effective too due to optimized use of steel.
Steel Buildings can be built as per architectural design for optimized energy requirement,
such as Natural cooling, solar gains & natural day light
These buildings incorporate a high level of services which can be easily interfaced within
our system: Air conditioning system ducts, flooring, electric power plants for essential
facilities , fire protection system and all other Mechanical and electrical services easily
designed in our Structural system
RICHA INDUSTRIES LIMITED
9. BENEFITS OF USING
STEEL STRUCTURES
Beter ROI due to speedy construction of superstructure
Lighter in weight due to use of High strength steel, hence lighter foundations required
Internal dry wall partition system and acoustic proofing helps to keep structure lighter
along with quick erection time
Provision for all MEP and other services offsite planning
Large span are possible in reception, lobby, function halls, food court etc
Architectural aesthetics and energy efficient views
Modern amenities provision and efficient work space
Customized solution to each and every need
RICHA INDUSTRIES LIMITED
10. ADVANTAGES OF
RICHA STRUCTURAL
STEEL SYSTEM
Steel buildings are manufactured using automated equipment in-house
Better quality control as manufacturing takes place under controlled quality system in plant
Flexibility in selection of member section or can be made from built up
Mass Production resulting in cost control and highest degree of quality
Excellent accuracy of product dimension within close tolerance as per code requirement
Just-In-Time Logical Delivery
Faster erection at site
Easy to fabricate in any shape for any application
High load bearing strength and excellent ductile properties
Cost effective
Eco-friendly
11. MULTISTOREY
BUILDINGS
Cost Comparison - High Rise Buildings
Lowest Construction Cost
Low Rise Medium Rise High Rise
Small Grid
8.6 m X 8.6 m
Concrete Concrete Steel
Mid Range Grid
11 m X 11 m
Concrete Steel Steel
Long Span Grid
15 X 7.5 m
Steel Steel Steel
Cost effective solution for medium rise buildings of grid size 11X11
More cost effective solutions for medium or high rise buildings of grid size
more than 11m
RICHA INDUSTRIES LIMITED
12. MULTISTOREY
BUILDINGS
Cost Comparison - High Rise Buildings
Construction cost with 11m x 11m Grid Structure will be cheaper than one built in
concrete
Medium and Longer spans in steel will be more cost effective
RICHA INDUSTRIES LIMITED
13. MULTISTOREY
BUILDINGS
Cost Comparison - High Rise Buildings
Earlier revenue generation (Warm Shell @ Rs 250 per sq ft per month calculated on built
area)
Reduction in financing cost (approx. at 13%)
Earlier return on investment
Faster speed to market (game changer and need of hour)
Key Benefits of Early Completion of Project
Pre - Construction and
Construction Periods
Concrete Framed
Building Months
Steel Framed
Building Months
Total Months 32 22
Earlier Revenue Generation
Built Area – Sq Ft. Rent
INR/ SqFt /
Month
Steel Framed
Building
Months
Earlier
Revenue
INR Cr.
533,998 250 6 133
RICHA INDUSTRIES LIMITED
15. FABRICATION
Structural steel members are fabricated by precisely cutting, sharing, punching, drilling, fitting
and welding in order to produce the configurations detailed in the shop drawings. Each member
is labeled with a piece mark, length, and job number for identification.
16. LABELLING
Once fabricated, each finished structural steel member is labeled. In this case the fabricator
labels each steel member with its piece mark, sequence number, and the last two digits of the
job number. Richa uses specific labeling practices. In the image, the label color is yellow to
differentiate it from previous labels. Labeling of the steel pieces is crucial because it helps
identify members on the job site.
RICHA INDUSTRIES LIMITED
17. STORAGE
After fabrication, finished structural steel members are stored in the storage yard. The yard is
properly organized and it makes easier to transport steel to the site in phased manner. Steel
structures are stored according to erection sequence. Sequences define areas of the frame
and are used to organize their delivery and erection. The practice of planning and storing by
sequence improves the efficiency of loading, delivery, offloading and erection.
RICHA INDUSTRIES LIMITED
18. ANCHOR BOLT
PLAN
One of the first drawings prepared by the detailer is the Anchor Bolt Plan. This
plan guides the foundation subcontractor in the placement of anchor bolts. It
contains horizontal and vertical information for placement of anchor rods, as well as
dimensions and elevations of leveling plates (if used).d).
RICHA INDUSTRIES LIMITED
19. ANCHOR BOLT
SURVEY
Before the erection process started, anchor bolts and leveling plates are surveyed to check if they
are correctly positioned. If anchor rods are improperly located, they are corrected by the
foundation subcontractor before the erection process may start. The surveyor uses a total station
to determine the horizontal and vertical location of each leveling plate and anchor bolts.
RICHA INDUSTRIES LIMITED
21. ERECTION TEAM
The Erection Team consists of One Project Manager, One Foreman, 3-4 Iron workers for
hooking steel, three to four iron workers connecting steel and a crane operator.
RICHA INDUSTRIES LIMITED
22. CRANES
Cranes are selected on the basis of cost, availability, speed, reach and capacity. There are
many configurations and sizes of cranes available.
CRAWLER
CRANE
TYER MOUNTED
CRANE
TOWER
CRANE
RICHA INDUSTRIES LIMITED
23. UNLOADING &
SHAKEOUT
Upon delivery to the job site, fabricated steel unloads and places on wood or steel blocking.
The blocking allows for chokers to be attached to each member for subsequent hoisting and
erection. Shakeout of structural steel takes place after unloading. Shakeout is the process of
sorting the steel pieces on the site so that they can be efficiently erected, and involves
organizing and spacing each structural steel piece.
RICHA INDUSTRIES LIMITED
24. ERECTION
DRAWING
This is the erection drawing of floor framing for a project. The numbers one and two inside the
red hexagons on each side of the red line indicates the sequence number for each part of the
structure. The piece marks on the drawing matches those on the beams, girders and columns
and are used to locate and orient each member during erection.
RICHA INDUSTRIES LIMITED
25. ERECTION
SEQUENCE
1. ERECT COLUMN
2. INSTALL BEAMS AND GIRDERS
3. PLUMB STRUCTURES
4. COMPLETE ALL CONNECTIONS (TIGHTEN) INCLUDING BRACING
5. GROUT COLUMN BASE PLATES
RICHA INDUSTRIES LIMITED
26. FIRST COLUMN
This is the first column being hoisted into position. Using ladders, iron workers temporarily
bolted the column. Prior to erection, the erector must consider column stability in accordance
with safety standards and the AISC Code of Standard Practice.
RICHA INDUSTRIES LIMITED
28. BEAMS
Main girders are hoisted after the columns. Beams are then hoisted and connected to the
girders.
RICHA INDUSTRIES LIMITED
29. PRILIMINARY
BOLTING
The connector uses pins to align the holes between structural steel members being connected.
Then several bolts are placed and temporarily tightened with spud wrench. At least two bolts
per connection are used to temporarily fasten each connection.
RICHA INDUSTRIES LIMITED
30. HAND SIGNALS
Teamwork and communication are important when erecting steel. Iron workers use hand
signals to communicate with the crane operator.
RICHA INDUSTRIES LIMITED
31. PLUMBING
Turnbuckles are a common part of the bracing system. A turnbuckle is a device that usually
consists of a link with screw threads at both ends that is turned to bring the ends closer
together. Using several turnbuckles connected to the temporary bracing, the steel frame is
shifted until it is vertically aligned.
RICHA INDUSTRIES LIMITED
32. METAL DECKING
This is a view (right 1st image) of the welding used to fasten metal deck to the
structure.
RICHA INDUSTRIES LIMITED
33. PERIMETER
SAFETY CABLES
On multi-storey structures, perimeter safety cables are installed at the interior and exterior
perimeters of floors and openings as soon as the metal decking has been installed.
RICHA INDUSTRIES LIMITED
34. SHEAR STUDS
This is a view of the welded studs. Shear studs are tested to ensure that they are correctly
welded to the structural steel members in compliance with the bend test of the AWS D 1.1
Structural Welding Code.
RICHA INDUSTRIES LIMITED
35. TEMPORARY
BRACING
Temporary bracing is used to provide temporary lateral stability to the structure and to plumb
up the frame. The temporary bracing is removed once the structural steel frame is secured.
RICHA INDUSTRIES LIMITED
36. FINAL BOLT UP
After a section of the structural frame is assembled and vertically aligned, iron worker
permanently fastens the structural steel members with additional bolts. Tension controlled
black bolts of SS 8.8 grade are widely used. Final bolt-up is performed using a torque wrench.
The wrench stops automatically when the bolt shears at a tension control groove indicating that
the required tension is reached.
RICHA INDUSTRIES LIMITED
37. SLABS
Floor slabs are poured after the structural steel frame is secured to the vertical masonry shafts.
After reinforcing steel and concrete is placed, the slab is leveled and finished.
RICHA INDUSTRIES LIMITED
40. MULTISTOREY PROJECTS
RICHA CORPORATE
OFFICE
Richa Corporate Office Multistorey Steel Structure building in Faridabad
Clear Height: Approx. 29.5 Meters
Total Area: Covered area is
approx. 642 sqm & Super build-up
area is approx 1800 sqm.
Ground + 6 Mezzanine floors
Multistorey Steel Structural building
executed by Richa Industries
Limited
Speedy construction with in two
months
41. MULTISTOREY PROJECTS
MADHU SILICA
Manufacturer of one of the tallest Multistorey Steel Structure building
in Gujarat and India
Clear Height: Approx. 36 Meters
Total Area: Approx. 19000 Sq. mt.
Load: 150 MT each floor
Ground + 6 floors
Speedy Constrution in less than
10 months
Type: Silica Processing Plant
42. MULTISTOREY PROJECTS
WIPRO
Clear Height: Approx. Hig bay - 47
Meters; Low bay - 34 Meters
Total Area: Approx. 2605 Sq. mt.
Live Load: Maximum 10 KN
Machine with maximum load:
97 MT each floor
Ground +7 floors
Type: Wipro Fatty Acid
Manufacturing Plant
Manufacturer of India's tallest Multistorey Steel Structure building in
Haridwar till date
43. MULTISTOREY PROJECTS
WIPRO
Clear Height: Approx. 14.2
Meters
Total Area: Approx. 1956 Sq. mt.
Live Load: Approx. 100 Kg/m2
(first 3 floors); 500 Kg/m2 (4th
Floor)
Ground + 4 floors,
Mezzanine
Type: Manufacturing Unit
Utility Building,
Wipro Multistorey Steel Structure building in Haridwar
50. AWARDS &
RECOGNITION
Richa Industries is the first Indian PEB Public Listed company to receive the internationally
recognized OHSAS 18001:2007 Certification by IRQS
Richa Industries has received Second Runner up award in the "Emerging India Awards" at
London in 2008 organized by ICICI Bank & CNBC TV 18
Certificate of achievement "Innovation in Structural Engineering" presented to Richa
Industries in recognition of the achievement as a Nominee in the 2013 BE INSPIRED
AWARDS by Bentley
The Second Annual Inc. India 500 awards presented to Richa Industries in recognition of
exemplary growth and sustainable success
Richa Industries has been awarded as "Best Promising Pre-Engineering Steel Building
Manufacturer from India" by Indian Achievers Podium in their 10th All India Excellence Award
& 6th Realty award
RICHA INDUSTRIES LIMITED
51. CONTACT US
CORPORATE CUM REGISTERED
OFFICE :
Plot No 29, DLF Industrial Area, PH-II
Faridabad -121003, Haryana
Ph: +91-129-4009262
Fax: +91-129-4133969
Email : richa@richa.in
MANUFACTURING PLANT :
8th Km Stone, Ram Nagar Road ,
Distt Udham Singh Nagar, NH-
121, Kashipur-244713,
Uttarakhand
Ph: +91-9547-223073
Email : kashipur@richa.in
For all latest updates, follow us on
http://www.richa.in
http://richaindustries.wordpress.com/
https://www.facebook.com/richaindustries
https://www.linkedin.com/company/richa-industries-ltd
Thank you for your valuable time !
RICHA INDUSTRIES LIMITED