- Material Requirements Planning (MRP) is a production planning and inventory control system that determines material requirements based on a master production schedule, bill of materials, and inventory status.
- MRP aims to ensure availability of materials for production while maintaining low inventory levels. It determines gross requirements, nets requirements based on inventory and scheduled receipts, and plans order releases over time.
- MRP can be improved by accounting for capacity constraints, dealing with uncertainty through safety stocks and lead time adjustments, and using different lot sizing rules at different levels.