SlideShare a Scribd company logo
MATERIAL REQUIREMENT PLANNING
Prepared by Mahmoud Eltaweel
1
What is MRP
■ Material requirements planning (MRP) is a production planning, scheduling, and
inventory control system used to manage manufacturing processes.
■ It is a material control system that attempts to keep adequate inventory levels
■ It is to assure that required materials are available wheen needed
2
Question 1
The following structure tree
indicates the components
needed to assemble one unit of
product “W”. Determine the
quantities of each component
needed to assemble 100 units
of W.
3
W
A (1)
9
B (2) C(4)
D(2) E
E(2) F
D (3) G(2)
D
Item Quantity per 1 Quantity per 1 Quantity per 100
W 1 1 100
A 1 1 100
B 2 2 200
C 4 4 400
D (2*1)+(4*3)+(1*2*4) 22 2200
E (1*1)+(2*2) 5 500
F (1*2) 2 200
G (2*4) 8 800
4
W 100
A 100 B (2*100) C(4*100)
D(2*100) E (1*100)
E(2*200) F(200)
D (3*400) G(2*400)
D (800)
Question 2
The following table lists the
components needed to assemble an
end item, lead times, and quantities
on hand.
■ If 20 units of the end items are to
be assembled, how many
additional units of E are needed?
■ An order for the end item is
scheduled to be shipped at the
start of week 11. What is the latest
week that an order can be started
and still be ready to ship on time
■ Draw an assembly time chart for
the process
5
Item End B C D E F G H
LT
(week)
1 2 3 3 1 2 1 2
Amount
on hand
0 10 10 25 12 30 5 0
End Items
B (2) C D
E(2) F(3)
G(2) E(2)
H(4) E(2)
(3)
6
Item Gross Requirements – On Hand = Net Requirements
End Item 20 – 0 = 20
Item Gross Requirements – On Hand = Net Requirements
B (20 * 2) = 40 – 10 = 30
C (20 * 1) = 20 – 10 = 10
D (20 * 3) = 60 – 25 = 35
Item Gross Requirements – On Hand = Net Requirements
E [(30 B * 2) + (10 C * 2) + (35 D * 2)] = 150 – 12 = 138
If 20 units of the end item are to be assembled, how many additional units of E are needed?
Step 1:
Determine the gross requirements and the net requirements for the End Item:
Step 2:
Determine the gross requirements and the net requirements for B, C, & D.
Multiply the net requirements for the end item by the usage quantities of B, C, & D to determine the gross
requirements for B, C, & D.
Step 3:
Determine the gross requirements and net requirements for E.
Multiply the net requirements for B, C, & D by the usage quantities of E to determine gross requirements for E
To solve this, we need to determine the longest sequence through the product structure tree moving
from the end item down to the lowest items. The lead time for each item is indicated in bold to the
left of each item in the product structure tree shown below.
B) An order for the end item is scheduled to be shipped at the start of week 11. What is the latest
week that an order can be started and still be ready to ship on time
End Items
B (2) C D
E(2) F(3)
G(2) E(2)
H(4) E(2)
Item End B C D E F G H
LT
(week)
1 2 3 3 1 2 1 2
The longest sequence is 6 weeks (End Item – D – H). 11 – 6 weeks = start of week 5.
1 wk
2 wk 3 wk 3 wk
1 wk 2 wk
1 wk 1 wk
1 wk2 wk
Total LT = 4 wk 5 wk 5 wk 5 wk 6 wk 5 wk
(3)
8
E
B
F
E
C END
ITEM
G
H
D
E
Wk 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk 6 Wk 7 Wk 8 Wk 9 Wk 10 Wk 11 Wk 12
Draw an assembly time chart for the process
Question 3
Eighty units of end item E are needed at the
beginning of week 6 . Three cases (30 units per case)
of J have been ordered and one case is scheduled to
arrive in week 3, one in week 4 and one in week
5. Note: J must be ordered by the case and B must
be produced in multiple of 120 units.
There are 60 units of B and 20 units of J now on
hand.
Lead times are two weeks for E and B, and one week
for J
a) A prepare material requirement plan for product J
9
10
MRP Schedule Item E
Item Begin
Invento
ry
Week
1
Week
2
Week
3
Week
4
Week 5 Week
6
Gross
requirement
80
Scheduled
receipts
Projected on
hand
Net
Requirements
80
Planned order
receipts
80
Planned order
release
80
Item Quantity per 1 Quantity per 80
E 1 80
B 2 160
J 3+(4*2) =11 880
F 2*2 =4 320
11
MRP Schedule Item B
Item Begin
Inventory
Week
1
Week
2
Week
3
Week
4
Week 5 Week 6
Gross
requirement
160
Scheduled
receipts
Projected on
hand
60 60 60 60
Net
Requirements
100
Planned order
receipts
120
Planned order
release
120
12
MRP Schedule Item J
Item Begin
Invento
ry
Week
1
Week
2
Week
3
Week
4
Week
5
Week
6
Gross
requirement
480 240
Scheduled
receipts
30 30 30
Projected on
hand
20 20 30 60 30
Net
Requirements
460 180
Planned order
receipts
480 180
Planned order
release
480 180
I need 80 from E at week 4 and 120 from B at week 2
One B requires 4 Js
One E requires 3 Js

More Related Content

What's hot

Introduction to Break-Even Analysis
Introduction to Break-Even AnalysisIntroduction to Break-Even Analysis
Introduction to Break-Even Analysis
Dr. C.V. Suresh Babu
 
Inventory models with two supply models
Inventory models with two supply modelsInventory models with two supply models
Inventory models with two supply models
MOHAMMED ASIF
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
Ratan479
 
Chapter 15; Short-Term Scheduling
Chapter 15; Short-Term SchedulingChapter 15; Short-Term Scheduling
Chapter 15; Short-Term Scheduling
Alvaro Alvarez
 
Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009
Akash Maurya
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
sabin kafle
 
Aggregate Planning.pptx
Aggregate Planning.pptxAggregate Planning.pptx
Aggregate Planning.pptx
Dr T.Sivakami
 
The eoq model
The eoq modelThe eoq model
The eoq model
Hasnain Baber
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
Pam Cudal
 
What is master production schedule
What is master production scheduleWhat is master production schedule
What is master production schedule
MRPeasy
 
Rough cut planning
Rough cut planningRough cut planning
Rough cut planning
Bhupesh Bhole
 
inventory management ppt
inventory management pptinventory management ppt
inventory management ppt
Mayank Baheti
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
Atif Ghayas
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
Rajendran Ananda Krishnan
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
Chetan Jha
 
Economic order quantity (eoq) model
Economic order quantity (eoq) modelEconomic order quantity (eoq) model
Economic order quantity (eoq) model
leizel altamia
 
what is Inventory and its classification
what is Inventory and its classificationwhat is Inventory and its classification
what is Inventory and its classification
Priyanka Singh
 
Process planning (lesson 1)
Process planning (lesson 1)Process planning (lesson 1)
Process planning (lesson 1)
Hari Vignesh R
 
Economic Order Quality Eoq
Economic Order Quality  EoqEconomic Order Quality  Eoq
Economic Order Quality Eoq
sikander kushwaha
 
Line balancing
Line balancingLine balancing
Line balancing
Jibin Paulose
 

What's hot (20)

Introduction to Break-Even Analysis
Introduction to Break-Even AnalysisIntroduction to Break-Even Analysis
Introduction to Break-Even Analysis
 
Inventory models with two supply models
Inventory models with two supply modelsInventory models with two supply models
Inventory models with two supply models
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Chapter 15; Short-Term Scheduling
Chapter 15; Short-Term SchedulingChapter 15; Short-Term Scheduling
Chapter 15; Short-Term Scheduling
 
Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Aggregate Planning.pptx
Aggregate Planning.pptxAggregate Planning.pptx
Aggregate Planning.pptx
 
The eoq model
The eoq modelThe eoq model
The eoq model
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
What is master production schedule
What is master production scheduleWhat is master production schedule
What is master production schedule
 
Rough cut planning
Rough cut planningRough cut planning
Rough cut planning
 
inventory management ppt
inventory management pptinventory management ppt
inventory management ppt
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
 
Economic order quantity (eoq) model
Economic order quantity (eoq) modelEconomic order quantity (eoq) model
Economic order quantity (eoq) model
 
what is Inventory and its classification
what is Inventory and its classificationwhat is Inventory and its classification
what is Inventory and its classification
 
Process planning (lesson 1)
Process planning (lesson 1)Process planning (lesson 1)
Process planning (lesson 1)
 
Economic Order Quality Eoq
Economic Order Quality  EoqEconomic Order Quality  Eoq
Economic Order Quality Eoq
 
Line balancing
Line balancingLine balancing
Line balancing
 

Similar to Material requirement planning Q&A

(3 Points)1.The injection molding department of Alvec Inc. use.docx
(3 Points)1.The injection molding department of Alvec Inc. use.docx(3 Points)1.The injection molding department of Alvec Inc. use.docx
(3 Points)1.The injection molding department of Alvec Inc. use.docx
marilynnhoare
 
3351905 ecc lab_manual_prepared by vhh
3351905 ecc lab_manual_prepared by vhh3351905 ecc lab_manual_prepared by vhh
3351905 ecc lab_manual_prepared by vhh
Vipul Hingu
 
Mrp task 1
Mrp task 1Mrp task 1
Mrp task 1
nizamnije
 
Mrp task 1
Mrp task 1Mrp task 1
Mrp task 1
nizamnije
 
Mrpexercise 150427045220-conversion-gate01
Mrpexercise 150427045220-conversion-gate01Mrpexercise 150427045220-conversion-gate01
Mrpexercise 150427045220-conversion-gate01
Karthikeyan Palani
 
Mrp exercise nº7
Mrp exercise nº7Mrp exercise nº7
Mrp exercise nº7
riglcab
 
Ch03pp
Ch03ppCh03pp
inventory control for construction
inventory control for constructioninventory control for construction
inventory control for construction
i-bee general construction
 
MRP exercises
MRP exercisesMRP exercises
MRP exercises
Lucia Garrido
 
Brunswick motors, inc
Brunswick motors, incBrunswick motors, inc
Brunswick motors, inc
Pravin Narwade
 
BRUSNSWICK MOTORS, INC
BRUSNSWICK MOTORS, INCBRUSNSWICK MOTORS, INC
BRUSNSWICK MOTORS, INC
Pravin Narwade
 
Brunswick motors, inc
Brunswick motors, incBrunswick motors, inc
Brunswick motors, inc
Pravin Narwade
 
Network diagram problems
Network diagram problemsNetwork diagram problems
Network diagram problems
Subhra Mishra
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)
Dipesh Pandey
 
Assignment on MRP Calculation
Assignment on MRP CalculationAssignment on MRP Calculation
Assignment on MRP Calculation
Emdadul Huq MBA, PGDSCM
 
Process costing manipal jaipur bba 3 semester
Process costing manipal jaipur bba 3 semesterProcess costing manipal jaipur bba 3 semester
Process costing manipal jaipur bba 3 semester
sachin kumar sharma
 
Process costing explained
Process costing explainedProcess costing explained
Process costing explained
Sam zain
 
OR_Presentation on muli item deterministic inventory model
OR_Presentation on muli item deterministic inventory modelOR_Presentation on muli item deterministic inventory model
OR_Presentation on muli item deterministic inventory model
KiranMittal7
 
Chapter no 8 EOQ
Chapter no 8 EOQChapter no 8 EOQ
Chapter no 8 EOQ
Muhammad Irfan
 
0580 s11 qp_42
0580 s11 qp_420580 s11 qp_42
0580 s11 qp_42
kondal reddy
 

Similar to Material requirement planning Q&A (20)

(3 Points)1.The injection molding department of Alvec Inc. use.docx
(3 Points)1.The injection molding department of Alvec Inc. use.docx(3 Points)1.The injection molding department of Alvec Inc. use.docx
(3 Points)1.The injection molding department of Alvec Inc. use.docx
 
3351905 ecc lab_manual_prepared by vhh
3351905 ecc lab_manual_prepared by vhh3351905 ecc lab_manual_prepared by vhh
3351905 ecc lab_manual_prepared by vhh
 
Mrp task 1
Mrp task 1Mrp task 1
Mrp task 1
 
Mrp task 1
Mrp task 1Mrp task 1
Mrp task 1
 
Mrpexercise 150427045220-conversion-gate01
Mrpexercise 150427045220-conversion-gate01Mrpexercise 150427045220-conversion-gate01
Mrpexercise 150427045220-conversion-gate01
 
Mrp exercise nº7
Mrp exercise nº7Mrp exercise nº7
Mrp exercise nº7
 
Ch03pp
Ch03ppCh03pp
Ch03pp
 
inventory control for construction
inventory control for constructioninventory control for construction
inventory control for construction
 
MRP exercises
MRP exercisesMRP exercises
MRP exercises
 
Brunswick motors, inc
Brunswick motors, incBrunswick motors, inc
Brunswick motors, inc
 
BRUSNSWICK MOTORS, INC
BRUSNSWICK MOTORS, INCBRUSNSWICK MOTORS, INC
BRUSNSWICK MOTORS, INC
 
Brunswick motors, inc
Brunswick motors, incBrunswick motors, inc
Brunswick motors, inc
 
Network diagram problems
Network diagram problemsNetwork diagram problems
Network diagram problems
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)
 
Assignment on MRP Calculation
Assignment on MRP CalculationAssignment on MRP Calculation
Assignment on MRP Calculation
 
Process costing manipal jaipur bba 3 semester
Process costing manipal jaipur bba 3 semesterProcess costing manipal jaipur bba 3 semester
Process costing manipal jaipur bba 3 semester
 
Process costing explained
Process costing explainedProcess costing explained
Process costing explained
 
OR_Presentation on muli item deterministic inventory model
OR_Presentation on muli item deterministic inventory modelOR_Presentation on muli item deterministic inventory model
OR_Presentation on muli item deterministic inventory model
 
Chapter no 8 EOQ
Chapter no 8 EOQChapter no 8 EOQ
Chapter no 8 EOQ
 
0580 s11 qp_42
0580 s11 qp_420580 s11 qp_42
0580 s11 qp_42
 

More from Mahmoud Eltaweel

Solar thermal Systems Introduction
Solar thermal Systems Introduction Solar thermal Systems Introduction
Solar thermal Systems Introduction
Mahmoud Eltaweel
 
Graphical and analytical acceleration analysis Q&A
Graphical and analytical accelerationanalysis Q&AGraphical and analytical accelerationanalysis Q&A
Graphical and analytical acceleration analysis Q&A
Mahmoud Eltaweel
 
Velocity analysis graphical analytical and IC Q&A
Velocity analysis graphical analytical and IC Q&AVelocity analysis graphical analytical and IC Q&A
Velocity analysis graphical analytical and IC Q&A
Mahmoud Eltaweel
 
Fourbar linkage solution methods Q&A
Fourbar linkage solution methods Q&AFourbar linkage solution methods Q&A
Fourbar linkage solution methods Q&A
Mahmoud Eltaweel
 
Mechanics of machinery graphical position analysis Q&A
Mechanics of machinery graphical position analysis Q&AMechanics of machinery graphical position analysis Q&A
Mechanics of machinery graphical position analysis Q&A
Mahmoud Eltaweel
 
Assembly line balancing Q&A
Assembly line balancing Q&AAssembly line balancing Q&A
Assembly line balancing Q&A
Mahmoud Eltaweel
 
Process layout Q&A
Process layout Q&AProcess layout Q&A
Process layout Q&A
Mahmoud Eltaweel
 
Inventory management Q&A
Inventory management Q&AInventory management Q&A
Inventory management Q&A
Mahmoud Eltaweel
 
Acceptance sampling Q&A
Acceptance sampling Q&AAcceptance sampling Q&A
Acceptance sampling Q&A
Mahmoud Eltaweel
 
variable non-confirming Q&A
variable non-confirming Q&Avariable non-confirming Q&A
variable non-confirming Q&A
Mahmoud Eltaweel
 
S chart
S chart S chart
Double sampling quality control
Double sampling quality control Double sampling quality control
Double sampling quality control
Mahmoud Eltaweel
 
Control Charts rules for quality control
Control Charts rules for quality control Control Charts rules for quality control
Control Charts rules for quality control
Mahmoud Eltaweel
 

More from Mahmoud Eltaweel (13)

Solar thermal Systems Introduction
Solar thermal Systems Introduction Solar thermal Systems Introduction
Solar thermal Systems Introduction
 
Graphical and analytical acceleration analysis Q&A
Graphical and analytical accelerationanalysis Q&AGraphical and analytical accelerationanalysis Q&A
Graphical and analytical acceleration analysis Q&A
 
Velocity analysis graphical analytical and IC Q&A
Velocity analysis graphical analytical and IC Q&AVelocity analysis graphical analytical and IC Q&A
Velocity analysis graphical analytical and IC Q&A
 
Fourbar linkage solution methods Q&A
Fourbar linkage solution methods Q&AFourbar linkage solution methods Q&A
Fourbar linkage solution methods Q&A
 
Mechanics of machinery graphical position analysis Q&A
Mechanics of machinery graphical position analysis Q&AMechanics of machinery graphical position analysis Q&A
Mechanics of machinery graphical position analysis Q&A
 
Assembly line balancing Q&A
Assembly line balancing Q&AAssembly line balancing Q&A
Assembly line balancing Q&A
 
Process layout Q&A
Process layout Q&AProcess layout Q&A
Process layout Q&A
 
Inventory management Q&A
Inventory management Q&AInventory management Q&A
Inventory management Q&A
 
Acceptance sampling Q&A
Acceptance sampling Q&AAcceptance sampling Q&A
Acceptance sampling Q&A
 
variable non-confirming Q&A
variable non-confirming Q&Avariable non-confirming Q&A
variable non-confirming Q&A
 
S chart
S chart S chart
S chart
 
Double sampling quality control
Double sampling quality control Double sampling quality control
Double sampling quality control
 
Control Charts rules for quality control
Control Charts rules for quality control Control Charts rules for quality control
Control Charts rules for quality control
 

Recently uploaded

一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
bjmsejournal
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
Yasser Mahgoub
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
ijaia
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
mahaffeycheryld
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
AjmalKhan50578
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
edwin408357
 
AI for Legal Research with applications, tools
AI for Legal Research with applications, toolsAI for Legal Research with applications, tools
AI for Legal Research with applications, tools
mahaffeycheryld
 

Recently uploaded (20)

一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
 
AI for Legal Research with applications, tools
AI for Legal Research with applications, toolsAI for Legal Research with applications, tools
AI for Legal Research with applications, tools
 

Material requirement planning Q&A

  • 2. What is MRP ■ Material requirements planning (MRP) is a production planning, scheduling, and inventory control system used to manage manufacturing processes. ■ It is a material control system that attempts to keep adequate inventory levels ■ It is to assure that required materials are available wheen needed 2
  • 3. Question 1 The following structure tree indicates the components needed to assemble one unit of product “W”. Determine the quantities of each component needed to assemble 100 units of W. 3 W A (1) 9 B (2) C(4) D(2) E E(2) F D (3) G(2) D
  • 4. Item Quantity per 1 Quantity per 1 Quantity per 100 W 1 1 100 A 1 1 100 B 2 2 200 C 4 4 400 D (2*1)+(4*3)+(1*2*4) 22 2200 E (1*1)+(2*2) 5 500 F (1*2) 2 200 G (2*4) 8 800 4 W 100 A 100 B (2*100) C(4*100) D(2*100) E (1*100) E(2*200) F(200) D (3*400) G(2*400) D (800)
  • 5. Question 2 The following table lists the components needed to assemble an end item, lead times, and quantities on hand. ■ If 20 units of the end items are to be assembled, how many additional units of E are needed? ■ An order for the end item is scheduled to be shipped at the start of week 11. What is the latest week that an order can be started and still be ready to ship on time ■ Draw an assembly time chart for the process 5 Item End B C D E F G H LT (week) 1 2 3 3 1 2 1 2 Amount on hand 0 10 10 25 12 30 5 0 End Items B (2) C D E(2) F(3) G(2) E(2) H(4) E(2) (3)
  • 6. 6 Item Gross Requirements – On Hand = Net Requirements End Item 20 – 0 = 20 Item Gross Requirements – On Hand = Net Requirements B (20 * 2) = 40 – 10 = 30 C (20 * 1) = 20 – 10 = 10 D (20 * 3) = 60 – 25 = 35 Item Gross Requirements – On Hand = Net Requirements E [(30 B * 2) + (10 C * 2) + (35 D * 2)] = 150 – 12 = 138 If 20 units of the end item are to be assembled, how many additional units of E are needed? Step 1: Determine the gross requirements and the net requirements for the End Item: Step 2: Determine the gross requirements and the net requirements for B, C, & D. Multiply the net requirements for the end item by the usage quantities of B, C, & D to determine the gross requirements for B, C, & D. Step 3: Determine the gross requirements and net requirements for E. Multiply the net requirements for B, C, & D by the usage quantities of E to determine gross requirements for E
  • 7. To solve this, we need to determine the longest sequence through the product structure tree moving from the end item down to the lowest items. The lead time for each item is indicated in bold to the left of each item in the product structure tree shown below. B) An order for the end item is scheduled to be shipped at the start of week 11. What is the latest week that an order can be started and still be ready to ship on time End Items B (2) C D E(2) F(3) G(2) E(2) H(4) E(2) Item End B C D E F G H LT (week) 1 2 3 3 1 2 1 2 The longest sequence is 6 weeks (End Item – D – H). 11 – 6 weeks = start of week 5. 1 wk 2 wk 3 wk 3 wk 1 wk 2 wk 1 wk 1 wk 1 wk2 wk Total LT = 4 wk 5 wk 5 wk 5 wk 6 wk 5 wk (3)
  • 8. 8 E B F E C END ITEM G H D E Wk 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk 6 Wk 7 Wk 8 Wk 9 Wk 10 Wk 11 Wk 12 Draw an assembly time chart for the process
  • 9. Question 3 Eighty units of end item E are needed at the beginning of week 6 . Three cases (30 units per case) of J have been ordered and one case is scheduled to arrive in week 3, one in week 4 and one in week 5. Note: J must be ordered by the case and B must be produced in multiple of 120 units. There are 60 units of B and 20 units of J now on hand. Lead times are two weeks for E and B, and one week for J a) A prepare material requirement plan for product J 9
  • 10. 10 MRP Schedule Item E Item Begin Invento ry Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Gross requirement 80 Scheduled receipts Projected on hand Net Requirements 80 Planned order receipts 80 Planned order release 80 Item Quantity per 1 Quantity per 80 E 1 80 B 2 160 J 3+(4*2) =11 880 F 2*2 =4 320
  • 11. 11 MRP Schedule Item B Item Begin Inventory Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Gross requirement 160 Scheduled receipts Projected on hand 60 60 60 60 Net Requirements 100 Planned order receipts 120 Planned order release 120
  • 12. 12 MRP Schedule Item J Item Begin Invento ry Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Gross requirement 480 240 Scheduled receipts 30 30 30 Projected on hand 20 20 30 60 30 Net Requirements 460 180 Planned order receipts 480 180 Planned order release 480 180 I need 80 from E at week 4 and 120 from B at week 2 One B requires 4 Js One E requires 3 Js