CURRICULAM VITAE
RAVI BHUSHAN RAI
B.E. Mechanical
Project Management in Power
Plant, Air Separation Unit with
rich experiences of managing
clients & contractors.
Total Experience:
5 years 10 Months
Current Location:
Jajpur Road,Orrisa
Notice Period:
45 Days
E-mail:
ravibhushanrai88@rediffmail.com
ravibhushanrai88@gmail.com
Cell No :
+ 91 9692004374,
+91 9631064231
Educational Qualification:
B.E. Mechanical Engineering from
RGPV University, Bhopal.
Core Competencies :
 Project Planning &
Execution
 Piping & Tank Fabrication
& Erection
 Structural Support
Fabrication & Erection
 Equipment Erection &
Alignment.
 Resource Management
Computer Skills:
• MS-Office
Date of Birth:
• 10 March 1988
Marital Status:
• Married
Passport Details:
• J9934886
Valid up to 20/11/2021
Career Objective: To work in a corporate environment with optimum use of my
skills and experience in order to grow with the organization.
Professional Experience:
Project Engineer having more than 5 years Experiences in Planning and
Executing the Construction of multi-dimensional projects like Power, Air
Separation Plants and Steels.
Organization : M/s LINDE INDIA LIMITED
Duration : June 2014 to Till date
Designation : Project Engineer.
Project (1) : 2X1200 Ts ASU TATA KPO.
Owner : Linde India Ltd.
Description : Erection & Alignment of Oxygen, Nitrogen and Argon
Tanks capacity of 3700M3, 3350M3 & 800M3 respectively with related Piping.
Project (2) : NITROGEN UNIT MRPL PHASE-II.
Owner : MRPL.
Duration : June. ‘2013 To May’2014
Description : Erection & Alignment of Pressure Tanks, Static
Equipments, compressor, Fabrication and erection of Piping and Structures etc.
Project ( 3) : 2X600 MW Jindal India Thermal Power Limited.
Organization : M/s UB ENGINEERING LIMITED
Owner : JITPL, Derang, Kaniha Odisha.
EPC Contractor : BHEL
Duration : Dec. ‘2012 To May 2013’
Description : Erection & Alignment of Rotator and Static Equipment like
Generator, HP&IP Turbine, HP&LP Heaters, Oil Coolers, MOT and Turbine Piping
such as Lube Oil, Jacking Water Piping, etc.
Project (4) : 4X350 MW Kamalanga Thermal Power Project.
Organization : M/s UB ENGINEERING LIMITED
Client : GMR Kamalanga Energy Ltd, Dhenkanal, Odisha.
EPC Contractor : SEPCO II
Duration : Jan. ‘2011 To Dec. 2012’
Description : Fabrication & Erection of BTG Area Piping such as Main
Steam Piping, Hot Reheat System and Cold Reheat System. HP Feed Water Piping,
Turbine HP & LP Piping Pressure Parts, Silencer Piping, CBD & IBD Piping etc.
Project (5) : 2X650 TPD Air Separation Unit.
Organization : M/s UB ENGINEERING LIMITED
Client : Air Liquide Engineering Limited
Owner : Rashtriya Inspat Nigam Ltd. (Visakhapatnam)
Duration : Feb. ‘2010 To Jan. 2011’
Description : Air Separation Unit of 650TPD Capacity, total mechanical
Erection and Commissioning job 450MT Equipment Erection, 510 MT Structural
Fabrication & Erection, 32500 Inch dia and 41500 Inch Meter of Piping Work.
Professional
Achievements:
 Successfully
commissioned the cryo
plant like nitrogen unit .
 Successfully completed
the Hydro test of Critical
&Turbine Piping and Boiler
of 350MW Thermal Power
Plant.
 Also completed the Hydro
test and Pneumatic test of
2X650TPD Air Separation
Unit.
 Got the Bronze Medal for
the 3rd
rank in collage.
Present Address:
Ravi Bhushan Rai
Linde India Ltd.
C/o-Pravasini Rao,Holding No-
542, Khanheipur, Jajpur Roadl,
Orissa-7550197
Permanent Address:
S/O-Uma Shankar Rai
IOCL-IBP Division
Mauzamatigarha Nanadkhurpi
Dhanbad-828307,Jharkhand
Project (6) : 2X600MW Lanco Thermal Power Project.
Organization : Karpara Project Engineering PVT Ltd
Client : Lanco Infratech Limited
Owner : Lanco Power
Duration : Jun. ‘2009 To Feb. 2010’
Description : Fabrication & Erection of Boiler Structure, Pressure
Parts and Critical Piping.
Job Responsibilities :
I) Project Planning, Scheduling & Execution
 Make an Execution/Micro Schedule based on Master Schedule and
circulate to all concern departments before submission to client for
review.
 Make a List for work starting of subcontractor manpower with tools &
tackles as per schedule and arrange necessary items for site office &
store.
 Review and Monitor the Bills of Contractors and get them processed.
 Through knowledge in interpretation of P & ID, G.A., Isometric drawings,
preparation of field change drawings and As-built drawings ensure the
latest revised documents are used in the job execution.
II) Project Quality and Safety
 Ensuring Quality Control Records maintained and filed.
 Conducting NDT’s like Visual Inspection, RT, UT of welded joints for
mechanical clearance.
 Conducting & coordinating of hydro testing and pneumatic testing.
 Handled various piping materials like CS(A106 B, A106 C), Alloy
Steels( P 91, P 22, 12CrMoV, 10CrMoV, 15NiCuMoNb-5-6-4), Stainless
Steel, of various sizes.
 Implementation of HSE Policies of the company.
III) Project Closure
 Reconciliation of materials, Bills.
 Handing over the project to clients and take Formal Acceptance Report.
IV) Trainings
A.)Organization : NTPC, Vindhyanagar,M.P
Duration : 1 Month
Description : Thermal Power Plant-Functions of Boiler, Turbine,
Generator and DM Plant
B.) Organization : CWS (NCL), M.P
Duration : 15 Days
Description : Details of Welding and manufacturing machines like
Lathe, Drilling, etc.
Declaration : I hereby declare that the information furnished above is
true to the best of my knowledge.
(Ravi Bhushan Rai)

More Related Content

What's hot

What's hot (20)

Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS CV Rev 1
Yeoh KS CV Rev 1
 
Resume (engineer)
Resume (engineer)Resume (engineer)
Resume (engineer)
 
TAN CHUN CHIA resume 2016.01
TAN CHUN CHIA resume 2016.01TAN CHUN CHIA resume 2016.01
TAN CHUN CHIA resume 2016.01
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 
Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]
 
updated
updatedupdated
updated
 
Abdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrs
 
DILKASH(resume)
DILKASH(resume)DILKASH(resume)
DILKASH(resume)
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineer
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerage
 
Ashok kumar Verma
Ashok kumar VermaAshok kumar Verma
Ashok kumar Verma
 
Srinivas Naidu Rakula new (1)
Srinivas Naidu Rakula new (1)Srinivas Naidu Rakula new (1)
Srinivas Naidu Rakula new (1)
 
RESUME
RESUMERESUME
RESUME
 
Venkatesh planning cv
Venkatesh  planning cv Venkatesh  planning cv
Venkatesh planning cv
 
resume_milind___3_
resume_milind___3_resume_milind___3_
resume_milind___3_
 
resume-01
resume-01resume-01
resume-01
 
Research development
Research developmentResearch development
Research development
 
Ashok Kumar Das-Biodata
Ashok Kumar Das-BiodataAshok Kumar Das-Biodata
Ashok Kumar Das-Biodata
 
LATEST CV
LATEST CVLATEST CV
LATEST CV
 
Arun_Resume
Arun_ResumeArun_Resume
Arun_Resume
 

Similar to Experienced Project Engineer CV

Similar to Experienced Project Engineer CV (20)

CV-PM
CV-PMCV-PM
CV-PM
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CV
 
Mech cv 1
Mech cv 1Mech cv 1
Mech cv 1
 
CV-Pon
CV-PonCV-Pon
CV-Pon
 
aditi
aditiaditi
aditi
 
@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1
 
Mr Jassadaporn CV apply for UAE
Mr Jassadaporn  CV  apply for UAEMr Jassadaporn  CV  apply for UAE
Mr Jassadaporn CV apply for UAE
 
Velpandi CV
Velpandi CV Velpandi CV
Velpandi CV
 
My Resume 2016 July
My Resume 2016 JulyMy Resume 2016 July
My Resume 2016 July
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
Vijay konathala Resume
Vijay konathala ResumeVijay konathala Resume
Vijay konathala Resume
 
Abhishek Resume
Abhishek ResumeAbhishek Resume
Abhishek Resume
 
Swathy CV (1)
Swathy CV (1)Swathy CV (1)
Swathy CV (1)
 
mahadev prasad resume_feb2016
mahadev prasad resume_feb2016mahadev prasad resume_feb2016
mahadev prasad resume_feb2016
 
latest resume
latest resumelatest resume
latest resume
 
Process Design Engineer with 8.0 Years of experience in Oil & Gas and Refinery.
Process Design Engineer with 8.0 Years of experience in Oil & Gas and Refinery.Process Design Engineer with 8.0 Years of experience in Oil & Gas and Refinery.
Process Design Engineer with 8.0 Years of experience in Oil & Gas and Refinery.
 
RAMESH PIPING STRESS ENGINEER
RAMESH PIPING STRESS ENGINEERRAMESH PIPING STRESS ENGINEER
RAMESH PIPING STRESS ENGINEER
 
paramasivam resume
paramasivam resume paramasivam resume
paramasivam resume
 
DRS
DRSDRS
DRS
 
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
 

Experienced Project Engineer CV

  • 1. CURRICULAM VITAE RAVI BHUSHAN RAI B.E. Mechanical Project Management in Power Plant, Air Separation Unit with rich experiences of managing clients & contractors. Total Experience: 5 years 10 Months Current Location: Jajpur Road,Orrisa Notice Period: 45 Days E-mail: ravibhushanrai88@rediffmail.com ravibhushanrai88@gmail.com Cell No : + 91 9692004374, +91 9631064231 Educational Qualification: B.E. Mechanical Engineering from RGPV University, Bhopal. Core Competencies :  Project Planning & Execution  Piping & Tank Fabrication & Erection  Structural Support Fabrication & Erection  Equipment Erection & Alignment.  Resource Management Computer Skills: • MS-Office Date of Birth: • 10 March 1988 Marital Status: • Married Passport Details: • J9934886 Valid up to 20/11/2021 Career Objective: To work in a corporate environment with optimum use of my skills and experience in order to grow with the organization. Professional Experience: Project Engineer having more than 5 years Experiences in Planning and Executing the Construction of multi-dimensional projects like Power, Air Separation Plants and Steels. Organization : M/s LINDE INDIA LIMITED Duration : June 2014 to Till date Designation : Project Engineer. Project (1) : 2X1200 Ts ASU TATA KPO. Owner : Linde India Ltd. Description : Erection & Alignment of Oxygen, Nitrogen and Argon Tanks capacity of 3700M3, 3350M3 & 800M3 respectively with related Piping. Project (2) : NITROGEN UNIT MRPL PHASE-II. Owner : MRPL. Duration : June. ‘2013 To May’2014 Description : Erection & Alignment of Pressure Tanks, Static Equipments, compressor, Fabrication and erection of Piping and Structures etc. Project ( 3) : 2X600 MW Jindal India Thermal Power Limited. Organization : M/s UB ENGINEERING LIMITED Owner : JITPL, Derang, Kaniha Odisha. EPC Contractor : BHEL Duration : Dec. ‘2012 To May 2013’ Description : Erection & Alignment of Rotator and Static Equipment like Generator, HP&IP Turbine, HP&LP Heaters, Oil Coolers, MOT and Turbine Piping such as Lube Oil, Jacking Water Piping, etc. Project (4) : 4X350 MW Kamalanga Thermal Power Project. Organization : M/s UB ENGINEERING LIMITED Client : GMR Kamalanga Energy Ltd, Dhenkanal, Odisha. EPC Contractor : SEPCO II Duration : Jan. ‘2011 To Dec. 2012’ Description : Fabrication & Erection of BTG Area Piping such as Main Steam Piping, Hot Reheat System and Cold Reheat System. HP Feed Water Piping, Turbine HP & LP Piping Pressure Parts, Silencer Piping, CBD & IBD Piping etc. Project (5) : 2X650 TPD Air Separation Unit. Organization : M/s UB ENGINEERING LIMITED Client : Air Liquide Engineering Limited Owner : Rashtriya Inspat Nigam Ltd. (Visakhapatnam) Duration : Feb. ‘2010 To Jan. 2011’ Description : Air Separation Unit of 650TPD Capacity, total mechanical Erection and Commissioning job 450MT Equipment Erection, 510 MT Structural Fabrication & Erection, 32500 Inch dia and 41500 Inch Meter of Piping Work.
  • 2. Professional Achievements:  Successfully commissioned the cryo plant like nitrogen unit .  Successfully completed the Hydro test of Critical &Turbine Piping and Boiler of 350MW Thermal Power Plant.  Also completed the Hydro test and Pneumatic test of 2X650TPD Air Separation Unit.  Got the Bronze Medal for the 3rd rank in collage. Present Address: Ravi Bhushan Rai Linde India Ltd. C/o-Pravasini Rao,Holding No- 542, Khanheipur, Jajpur Roadl, Orissa-7550197 Permanent Address: S/O-Uma Shankar Rai IOCL-IBP Division Mauzamatigarha Nanadkhurpi Dhanbad-828307,Jharkhand Project (6) : 2X600MW Lanco Thermal Power Project. Organization : Karpara Project Engineering PVT Ltd Client : Lanco Infratech Limited Owner : Lanco Power Duration : Jun. ‘2009 To Feb. 2010’ Description : Fabrication & Erection of Boiler Structure, Pressure Parts and Critical Piping. Job Responsibilities : I) Project Planning, Scheduling & Execution  Make an Execution/Micro Schedule based on Master Schedule and circulate to all concern departments before submission to client for review.  Make a List for work starting of subcontractor manpower with tools & tackles as per schedule and arrange necessary items for site office & store.  Review and Monitor the Bills of Contractors and get them processed.  Through knowledge in interpretation of P & ID, G.A., Isometric drawings, preparation of field change drawings and As-built drawings ensure the latest revised documents are used in the job execution. II) Project Quality and Safety  Ensuring Quality Control Records maintained and filed.  Conducting NDT’s like Visual Inspection, RT, UT of welded joints for mechanical clearance.  Conducting & coordinating of hydro testing and pneumatic testing.  Handled various piping materials like CS(A106 B, A106 C), Alloy Steels( P 91, P 22, 12CrMoV, 10CrMoV, 15NiCuMoNb-5-6-4), Stainless Steel, of various sizes.  Implementation of HSE Policies of the company. III) Project Closure  Reconciliation of materials, Bills.  Handing over the project to clients and take Formal Acceptance Report. IV) Trainings A.)Organization : NTPC, Vindhyanagar,M.P Duration : 1 Month Description : Thermal Power Plant-Functions of Boiler, Turbine, Generator and DM Plant B.) Organization : CWS (NCL), M.P Duration : 15 Days Description : Details of Welding and manufacturing machines like Lathe, Drilling, etc. Declaration : I hereby declare that the information furnished above is true to the best of my knowledge. (Ravi Bhushan Rai)