1. CURRICULAM VITAE
RAVI BHUSHAN RAI
B.E. Mechanical
Project Management in Power
Plant, Air Separation Unit with
rich experiences of managing
clients & contractors.
Total Experience:
5 years 10 Months
Current Location:
Jajpur Road,Orrisa
Notice Period:
45 Days
E-mail:
ravibhushanrai88@rediffmail.com
ravibhushanrai88@gmail.com
Cell No :
+ 91 9692004374,
+91 9631064231
Educational Qualification:
B.E. Mechanical Engineering from
RGPV University, Bhopal.
Core Competencies :
Project Planning &
Execution
Piping & Tank Fabrication
& Erection
Structural Support
Fabrication & Erection
Equipment Erection &
Alignment.
Resource Management
Computer Skills:
• MS-Office
Date of Birth:
• 10 March 1988
Marital Status:
• Married
Passport Details:
• J9934886
Valid up to 20/11/2021
Career Objective: To work in a corporate environment with optimum use of my
skills and experience in order to grow with the organization.
Professional Experience:
Project Engineer having more than 5 years Experiences in Planning and
Executing the Construction of multi-dimensional projects like Power, Air
Separation Plants and Steels.
Organization : M/s LINDE INDIA LIMITED
Duration : June 2014 to Till date
Designation : Project Engineer.
Project (1) : 2X1200 Ts ASU TATA KPO.
Owner : Linde India Ltd.
Description : Erection & Alignment of Oxygen, Nitrogen and Argon
Tanks capacity of 3700M3, 3350M3 & 800M3 respectively with related Piping.
Project (2) : NITROGEN UNIT MRPL PHASE-II.
Owner : MRPL.
Duration : June. ‘2013 To May’2014
Description : Erection & Alignment of Pressure Tanks, Static
Equipments, compressor, Fabrication and erection of Piping and Structures etc.
Project ( 3) : 2X600 MW Jindal India Thermal Power Limited.
Organization : M/s UB ENGINEERING LIMITED
Owner : JITPL, Derang, Kaniha Odisha.
EPC Contractor : BHEL
Duration : Dec. ‘2012 To May 2013’
Description : Erection & Alignment of Rotator and Static Equipment like
Generator, HP&IP Turbine, HP&LP Heaters, Oil Coolers, MOT and Turbine Piping
such as Lube Oil, Jacking Water Piping, etc.
Project (4) : 4X350 MW Kamalanga Thermal Power Project.
Organization : M/s UB ENGINEERING LIMITED
Client : GMR Kamalanga Energy Ltd, Dhenkanal, Odisha.
EPC Contractor : SEPCO II
Duration : Jan. ‘2011 To Dec. 2012’
Description : Fabrication & Erection of BTG Area Piping such as Main
Steam Piping, Hot Reheat System and Cold Reheat System. HP Feed Water Piping,
Turbine HP & LP Piping Pressure Parts, Silencer Piping, CBD & IBD Piping etc.
Project (5) : 2X650 TPD Air Separation Unit.
Organization : M/s UB ENGINEERING LIMITED
Client : Air Liquide Engineering Limited
Owner : Rashtriya Inspat Nigam Ltd. (Visakhapatnam)
Duration : Feb. ‘2010 To Jan. 2011’
Description : Air Separation Unit of 650TPD Capacity, total mechanical
Erection and Commissioning job 450MT Equipment Erection, 510 MT Structural
Fabrication & Erection, 32500 Inch dia and 41500 Inch Meter of Piping Work.
2. Professional
Achievements:
Successfully
commissioned the cryo
plant like nitrogen unit .
Successfully completed
the Hydro test of Critical
&Turbine Piping and Boiler
of 350MW Thermal Power
Plant.
Also completed the Hydro
test and Pneumatic test of
2X650TPD Air Separation
Unit.
Got the Bronze Medal for
the 3rd
rank in collage.
Present Address:
Ravi Bhushan Rai
Linde India Ltd.
C/o-Pravasini Rao,Holding No-
542, Khanheipur, Jajpur Roadl,
Orissa-7550197
Permanent Address:
S/O-Uma Shankar Rai
IOCL-IBP Division
Mauzamatigarha Nanadkhurpi
Dhanbad-828307,Jharkhand
Project (6) : 2X600MW Lanco Thermal Power Project.
Organization : Karpara Project Engineering PVT Ltd
Client : Lanco Infratech Limited
Owner : Lanco Power
Duration : Jun. ‘2009 To Feb. 2010’
Description : Fabrication & Erection of Boiler Structure, Pressure
Parts and Critical Piping.
Job Responsibilities :
I) Project Planning, Scheduling & Execution
Make an Execution/Micro Schedule based on Master Schedule and
circulate to all concern departments before submission to client for
review.
Make a List for work starting of subcontractor manpower with tools &
tackles as per schedule and arrange necessary items for site office &
store.
Review and Monitor the Bills of Contractors and get them processed.
Through knowledge in interpretation of P & ID, G.A., Isometric drawings,
preparation of field change drawings and As-built drawings ensure the
latest revised documents are used in the job execution.
II) Project Quality and Safety
Ensuring Quality Control Records maintained and filed.
Conducting NDT’s like Visual Inspection, RT, UT of welded joints for
mechanical clearance.
Conducting & coordinating of hydro testing and pneumatic testing.
Handled various piping materials like CS(A106 B, A106 C), Alloy
Steels( P 91, P 22, 12CrMoV, 10CrMoV, 15NiCuMoNb-5-6-4), Stainless
Steel, of various sizes.
Implementation of HSE Policies of the company.
III) Project Closure
Reconciliation of materials, Bills.
Handing over the project to clients and take Formal Acceptance Report.
IV) Trainings
A.)Organization : NTPC, Vindhyanagar,M.P
Duration : 1 Month
Description : Thermal Power Plant-Functions of Boiler, Turbine,
Generator and DM Plant
B.) Organization : CWS (NCL), M.P
Duration : 15 Days
Description : Details of Welding and manufacturing machines like
Lathe, Drilling, etc.
Declaration : I hereby declare that the information furnished above is
true to the best of my knowledge.
(Ravi Bhushan Rai)