Robin Jacob|Curriculum Vitae 1
ROBIN JACOB BE , MECHANICAL ENGINNERING
Contact details +973-36589355 / +973-33828683
Mail ID robinjacob001@gmail.com
Visa Status: Valid BAHRAIN Residence Visa
Driving License: Bahrain and India
JOB PROFILE
Talented and experienced young professional, with job experience of 8.5 years as Project Engineer and Estimation
Engineer in A - grade Construction Companies across The Kingdom of Bahrain. Equipped with good managerial
and communication skills along with in-depth technical and installation knowledge of MEP Services; mainly
Firefighting, Plumbing and Drainage system.Willing to relocate and work in a global team of professionals to pursue
my career in a prestigious, reputable and progressive company.
KEYHIGHLIGHTS
 Successfully completed 8 years of experience in MEP industry as a Project Engineer in various countries.
 In-depth experience in handling multiple projects simultaneously.
 Sound knowledge in all mechanical services including HVAC / Water Supply / Drainage / Fire fighting
System, Electrical & BMS.
 Execution and supervision of project activities such as drawings, submittals, design,estimation, procurement,
follow-ups, manpower handling, installation, commissioning, handing over etc.
 Installation , Execution, Estimation, Testing and Commission experience in Firefighting,Plumbing and
Drainage system.
 Ability to understand Electrical / Mechanical Drawings and design layouts in AutoCAD.
 Coordination with consultants and subcontractors for engineering and design issues.
 Planning and Scheduling the work based on Recovery program or Base line program.
 Preparing the scope of work and Finalizing the sub contractors.
ACADEMICQUALIFICATION
Bachelor of Engineering (Mechanical Engineering) May 2008
AMS Engineering college Namakal, Anna University affiliated,Tamilnadu,India
CERTIFICATES AND TRAININGS
 Bahrain engineers Registration Jan 2012
(EPP License:EPP/C2558/ME/03-C)
 Training from Tritech Design Academy for MEP designing June 2008
AREAS OF EXPERTISE
 Engineering & Planning
 Procurement & Material Management
 Project Execution
 Client Relationship Management
PROFESSIONAL EXPERIENCE ( 8 + YEARS OF TOTAL EXPERIENCE )
MEP Project Engineer June 2016 –Present
ALGHANA GROUP W.L.L Kingdom ofBahrain
Responsibilities in current company
 Execution and supervision of project activities such as drawings, submittals, design,estimation, procurement,
follow-ups, manpower handling, installation, commissioning, handing over etc.
 Day to day Execution and co-ordination for various sites under development, site visits, meetings with site
in-charge.
 Monitoring approval of submittals by the consultant.
 Follow up with sub contractors for material submittals in line with approved schedule.
 Performing inspection for materials delivered by different suppliers, sub contractors and client.
 Ensures that all the contractors and Sub-Contractors works are done in accordance with the project
specifications & approved construction drawings, contract documents,agreed procedures ,method of
statements and all applicable standards whether local, national or international standards.
Robin Jacob|Curriculum Vitae 2
 Directly manages and provide engineering and technical supports in the installation,testing and
commissioning of the MEP system.
 Coordination with all MEP (HVAC,Electrical, Plumbing & Firefighting) works
 Planning and Scheduling the work based on Recovery program or Base line program.
 Coordinates with Client / Consultant’s representatives for any site instructions, assign targets for
accomplishments and ensure targets are met on Weekly / daily basis for all MEP services at site.
 Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular
basis or as required.
 Monitoring close out of snags raised by the consultant and supervise the temporary services items at project
close out.
Costing and Estimation
 Preparation and review of cost benefits analysis and tender documents.
 Preparing cost proposals for Variation works.
 Estimating the completion status of works for Monthly Payment Application.
 Review and reporting as required on internal audit reports.
 Estimates,prepares and assigns various resources such as manpower, materials, consumables, equipment and
tools etc.,required for all MEP and related works prior to execution.
Design Analysis
 Ensuring that As Built Drawings, layout drawings ,O&M Manuals, method of statements, Bills of Material
and other related documentation is prepared and submitted in a timely manner in line with the contract.
 Coordinate subcontractor and external suppliers for technical submittal requirements.
 Interprets construction drawings and studies the contract documents and applicable standards or
specifications prior to execution of any jobs.
 Testing and commissioning : Firefighting system (Automatic Sprinkler System,Co2 System,FM-200 &
Alarm system, External Hydrant Network , Firepump D+E+J)
 Supervision of plumbing and drainage installation,Inspection, pressure testing, leak test , Site modification as
required at site condition, discuss & finalize with clients for the changes required at site, Co-ordination with
vendor representative for special Instruments/Commissioning.
PROJECTS ONGOING
 10 Storey building for Ministry of Interior at Riffa, Kingdom of Bahrain.
 33 Storey building for Alghanah Group at Juffair, Kingdom of Bahrain.
 Jana Tower multi storey building at Juffair, Kingdom of Bahrain.
 Gelnaar Tower at Juffair, Kingdom of Bahrain.
 HRR - 30 storey residence at Juffair, Kingdom of Bahrain.
 15 storey residential building for Amfa Holdings at Seef,Kingdom of Bahrain.
 West point Bussiness tower at Seef,Kingdom of Bahrain.
 9 Villa project for Alghana Group at Tubli, Kingdom of Bahrain.
Project Engineer - Firefighting and Pump Division Nov 2012 – Jun 2016
BANZTRADING AND CONTRACTING COMPANY Kingdom ofBahrain
Duties and responsibilities
 Study the agreements with contractors,drawings, specifications, BOQ etc.
 Planning and Scheduling the work base on Recovery program or Base line program and finalizing
subcontractors.
 Day to day Execution co-ordination for various sites under development, site visits, meetings with site in
charge.
 Coordination with all MEP (HVAC,Electrical, Plumbing & Firefighting) works .
 Reporting to the Department Manager on a regular basis to ensure effective communications.
 Co-ordination and administration of material, equipment and drawing submittals in accordance to the
specifications.
 Follow up closely procurement schedule and confirmations of delivery for material and equipment.
 Ensuring that the work is executed on site in accordance with the contract drawings, specifications and
agreed procedures .
 Carry out inspections on site and ensure that the installation is in accordance with the specification.
Robin Jacob|Curriculum Vitae 3
 Ensuring that the subcontractor provides and adheres to the necessary control documentation in an orderly
and organized way.
 Checking that Project valuations/ Invoice correspond with progress and checking of variations.
 Coordination for reflected ceiling drawing preparations.
 Arrangements of all the materials on time for smooth functioning of all site activities.
 Attend design coordination meetings with Project Management team, Consultants and other contractors as
required.
 Preparation of as Built Drawings and O&M Manuals and other related documentation.
PROJECTS COMPLETED
 Moharaq health centre project at muharaq, kingdom of Bahrain.
 Eagle eye project at biip hidd,kingdom of Bahrain.
 Dragon city project at diyar al muharaq,kingdom of Bahrain.
 Golden tulip project at manama,kingdom of Bahrain.
 B&B logistics warehouse project at minasalman,kingdom of Bahrain.
 Sukoon tower project at juffair,kingdom of Bahrain.
 Kraft food extension project at biip hidd,kingdom of Bahrain.
 Amwaj waves project at amwaj,kingdom of Bahrain.
 Ibis hotel project ,kingdom of Bahrain,kingdom of Bahrain.
 Abdul nabi commercial centre at hidd,kingdom of Bahrain.
Site Engineer - Plumbing and Drainage Aug 2011 - Oct 2012
TAGORE CONTRACTING COMPANY Kingdom of Bahrain
Duties and responsibilities
 Execution and supervision of project activities such as drawings, submittals, design,estimation, procurement,
follow-ups, manpower handling, installation, commissioning, handing over etc.
 Study the drawings, specifications, BOQ and coordinate the work with other contractors.
 Executing the work based on the construction program or Base line program.
 Estimating the completion status of works for Monthly Payment Application.
 Performing inspection for materials delivered by different suppliers, sub contractors and client.
 Day to day reporting to the department head and the Client.
 Coordination with all MEP (HVAC,Electrical, Plumbing & Firefighting) works.
 Co-ordination and administration of material, equipment and drawing submittals in accordance to the
specifications.
 Follow up closely procurement schedule and confirmations of delivery for material and equipment.
PROJECTS COMPLETED
 Three story Villa at for Salah Al-Kooheji Engineering at Riffa, Kingdom of Bahrain.
 Motor City Project for E.K.Kanoo at Maameer,Kingdom of Bahrain.
 Two Storey Villa for Ahmad Mansoor at Hammed Town. Kingdom of Bahrain.
 Three storey villa for Sheikh Ahmed at Riffa,Kingdom of Bahrain.
Site Engineer - MEP Oct 2010 -July 2011
DELTA ALFURAT PROJECTSYSTEMS Kingdom ofSaudi Arabia
Duties and responsibilities
 Study the drawings, specifications, BOQ and coordinate the work with other contractors.
 Executing the work based on the construction program or Base line program.
 Day to day reporting to the department head and the Client.
 Coordination with all MEP (HVAC,Electrical, Plumbing & Firefighting) works.
 Co-ordination and administration of material, equipment and drawing submittals in accordance to the
specifications.
 Follow up closely procurement schedule and confirmations of delivery for material and equipment.
Robin Jacob|Curriculum Vitae 4
PROJECTS COMPLETED
 MANIS Project, Manifa for MEEDCO & MMG Saudi Arabia.
 KACWC Project,Dahran for Saudi Oger, Saudi Arabia.
 NORTH PARK Office Complex, Dahran for YAMAMA,Saudi Arabia.
 SATORP Project,Jubail for SAMSUNG, Saudi Arabia.
Junior Design Engineer - MEP Jun 2008 - Sep 2010
TRITECH CORPORATION AT COCHIN INDIA
Duties and responsibilities
 Involved in preparation of HVAC Designing including Heat load Estimation, Pump head calculations,
Ducting & Piping Design.
 Design Coordination & Execution in HVAC,Electrical, Plumbing, Firefighting & External Utilities.
 Preparation of specifications, BOQ and design drawings for hospitals, Commercial Buildings, Shopping
malls etc.
 Managed preparation of Tender Drawings.
 Preparing the Scope Of Work and Release the MEP Tender and Finalizing the MEP Contractors
 Ensuring that the project MEP work is carried out in accordance with the required quality, cost and time
constraints.
 Follow up closely procurement schedule and confirmations of delivery for material and equipment
 Review, control and approval of MEP subcontractors work procedures and method statements.
 Involved in checking of material submittals, assisted in design and checking of shop drawings.
 Ensuring that the MEP subcontractor provides and adheres to the necessary controldocumentation in an
orderly and organized way
PROJECTS COMPLETED
Hotels & Resorts
 Thalikulam Beach Resort,Kerala, Indi
 Devonshire greens Pallivasal, Munnar, Kerala, India.
 Ranni hotel Group, Ranni, Kerala,India.
Commercial Building & Hospital
 Joby’s Mall, Palakkad, Kerala, India.
 New High Court Building, Eranakulam, Kerala, India.
 Muthoot Hospital, Kozhencherry, Kerala,India.
IT SKILLS
 Operating Systems: Microsoft Windows 2000 and higher
 MS Office: MS Word, Excel and PowerPoint
 Design Software: AutoCAD
PERSONAL SKILLS
 Confident, strong and influencing personality.
 Listening Skills, patience and emotionally intelligent behavior.
 Attention to details and focus on precision .
 Able to adjust well with people of diverse cultures, religions and backgrounds.
 Able to plan, prioritize and execute work as well as time, so as to attain maximum results.
 Self-disciplined with an exemplary work ethics.
 Ability to work under stress while meeting deadlines.
PROFESSIONAL SKILLS
 Experience in Installation, testing and commissioning of Fire pump 1750 GPM (E+D+J) for Eagly Eye
Project at BIIP Hidd, Kingdom of Bahrain.
 Experience in Installation,testing and commissioning of 2500 GPM Diesel Engine for PS3 ALBA .
Robin Jacob|Curriculum Vitae 5
 Experience in the installation of In rack sprinkler system, FM200 and CO2 System.
 Experience in the testing and commissioning of firefighting system for warehouses,factories and multi
storey buildings.
 Working under pressure and maintaining the quality of work within the span of time.
 Good managerial skills and capable of maintaining good inter-personal relationships with both the
management and coworkers.
LANGUAGE PROFICIENCY
 Malayalam (Fluent in reading, writing and speaking)
 English (Fluent in reading, writing and speaking)
 Hindi & Tamil (Speaking)
PERSONAL DETAIL
Name: Robin Jacob
Marital Status: Married
Nationality: Indian
Date of Birth: May 10th 1987
Driving License: Kingdom of Bahrain and India
Passport no: N 5191600
Bahrain CPR No: 870543334
Visa Status: Valid Bahrain Residence Visa
Contact details +973-36589355 / +973-33828683
Mail ID robinjacob001@gmail.com
REFERENCES
Available upon request
DECLERATION
I hereby assure you that all the details mentioned above are true and correct to the best of my knowledge and belief.
Place: Kingdomof Bahrain
Date: 19/01/2017
ROBIN JACOB

MEP ENGINEER

  • 1.
    Robin Jacob|Curriculum Vitae1 ROBIN JACOB BE , MECHANICAL ENGINNERING Contact details +973-36589355 / +973-33828683 Mail ID robinjacob001@gmail.com Visa Status: Valid BAHRAIN Residence Visa Driving License: Bahrain and India JOB PROFILE Talented and experienced young professional, with job experience of 8.5 years as Project Engineer and Estimation Engineer in A - grade Construction Companies across The Kingdom of Bahrain. Equipped with good managerial and communication skills along with in-depth technical and installation knowledge of MEP Services; mainly Firefighting, Plumbing and Drainage system.Willing to relocate and work in a global team of professionals to pursue my career in a prestigious, reputable and progressive company. KEYHIGHLIGHTS  Successfully completed 8 years of experience in MEP industry as a Project Engineer in various countries.  In-depth experience in handling multiple projects simultaneously.  Sound knowledge in all mechanical services including HVAC / Water Supply / Drainage / Fire fighting System, Electrical & BMS.  Execution and supervision of project activities such as drawings, submittals, design,estimation, procurement, follow-ups, manpower handling, installation, commissioning, handing over etc.  Installation , Execution, Estimation, Testing and Commission experience in Firefighting,Plumbing and Drainage system.  Ability to understand Electrical / Mechanical Drawings and design layouts in AutoCAD.  Coordination with consultants and subcontractors for engineering and design issues.  Planning and Scheduling the work based on Recovery program or Base line program.  Preparing the scope of work and Finalizing the sub contractors. ACADEMICQUALIFICATION Bachelor of Engineering (Mechanical Engineering) May 2008 AMS Engineering college Namakal, Anna University affiliated,Tamilnadu,India CERTIFICATES AND TRAININGS  Bahrain engineers Registration Jan 2012 (EPP License:EPP/C2558/ME/03-C)  Training from Tritech Design Academy for MEP designing June 2008 AREAS OF EXPERTISE  Engineering & Planning  Procurement & Material Management  Project Execution  Client Relationship Management PROFESSIONAL EXPERIENCE ( 8 + YEARS OF TOTAL EXPERIENCE ) MEP Project Engineer June 2016 –Present ALGHANA GROUP W.L.L Kingdom ofBahrain Responsibilities in current company  Execution and supervision of project activities such as drawings, submittals, design,estimation, procurement, follow-ups, manpower handling, installation, commissioning, handing over etc.  Day to day Execution and co-ordination for various sites under development, site visits, meetings with site in-charge.  Monitoring approval of submittals by the consultant.  Follow up with sub contractors for material submittals in line with approved schedule.  Performing inspection for materials delivered by different suppliers, sub contractors and client.  Ensures that all the contractors and Sub-Contractors works are done in accordance with the project specifications & approved construction drawings, contract documents,agreed procedures ,method of statements and all applicable standards whether local, national or international standards.
  • 2.
    Robin Jacob|Curriculum Vitae2  Directly manages and provide engineering and technical supports in the installation,testing and commissioning of the MEP system.  Coordination with all MEP (HVAC,Electrical, Plumbing & Firefighting) works  Planning and Scheduling the work based on Recovery program or Base line program.  Coordinates with Client / Consultant’s representatives for any site instructions, assign targets for accomplishments and ensure targets are met on Weekly / daily basis for all MEP services at site.  Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.  Monitoring close out of snags raised by the consultant and supervise the temporary services items at project close out. Costing and Estimation  Preparation and review of cost benefits analysis and tender documents.  Preparing cost proposals for Variation works.  Estimating the completion status of works for Monthly Payment Application.  Review and reporting as required on internal audit reports.  Estimates,prepares and assigns various resources such as manpower, materials, consumables, equipment and tools etc.,required for all MEP and related works prior to execution. Design Analysis  Ensuring that As Built Drawings, layout drawings ,O&M Manuals, method of statements, Bills of Material and other related documentation is prepared and submitted in a timely manner in line with the contract.  Coordinate subcontractor and external suppliers for technical submittal requirements.  Interprets construction drawings and studies the contract documents and applicable standards or specifications prior to execution of any jobs.  Testing and commissioning : Firefighting system (Automatic Sprinkler System,Co2 System,FM-200 & Alarm system, External Hydrant Network , Firepump D+E+J)  Supervision of plumbing and drainage installation,Inspection, pressure testing, leak test , Site modification as required at site condition, discuss & finalize with clients for the changes required at site, Co-ordination with vendor representative for special Instruments/Commissioning. PROJECTS ONGOING  10 Storey building for Ministry of Interior at Riffa, Kingdom of Bahrain.  33 Storey building for Alghanah Group at Juffair, Kingdom of Bahrain.  Jana Tower multi storey building at Juffair, Kingdom of Bahrain.  Gelnaar Tower at Juffair, Kingdom of Bahrain.  HRR - 30 storey residence at Juffair, Kingdom of Bahrain.  15 storey residential building for Amfa Holdings at Seef,Kingdom of Bahrain.  West point Bussiness tower at Seef,Kingdom of Bahrain.  9 Villa project for Alghana Group at Tubli, Kingdom of Bahrain. Project Engineer - Firefighting and Pump Division Nov 2012 – Jun 2016 BANZTRADING AND CONTRACTING COMPANY Kingdom ofBahrain Duties and responsibilities  Study the agreements with contractors,drawings, specifications, BOQ etc.  Planning and Scheduling the work base on Recovery program or Base line program and finalizing subcontractors.  Day to day Execution co-ordination for various sites under development, site visits, meetings with site in charge.  Coordination with all MEP (HVAC,Electrical, Plumbing & Firefighting) works .  Reporting to the Department Manager on a regular basis to ensure effective communications.  Co-ordination and administration of material, equipment and drawing submittals in accordance to the specifications.  Follow up closely procurement schedule and confirmations of delivery for material and equipment.  Ensuring that the work is executed on site in accordance with the contract drawings, specifications and agreed procedures .  Carry out inspections on site and ensure that the installation is in accordance with the specification.
  • 3.
    Robin Jacob|Curriculum Vitae3  Ensuring that the subcontractor provides and adheres to the necessary control documentation in an orderly and organized way.  Checking that Project valuations/ Invoice correspond with progress and checking of variations.  Coordination for reflected ceiling drawing preparations.  Arrangements of all the materials on time for smooth functioning of all site activities.  Attend design coordination meetings with Project Management team, Consultants and other contractors as required.  Preparation of as Built Drawings and O&M Manuals and other related documentation. PROJECTS COMPLETED  Moharaq health centre project at muharaq, kingdom of Bahrain.  Eagle eye project at biip hidd,kingdom of Bahrain.  Dragon city project at diyar al muharaq,kingdom of Bahrain.  Golden tulip project at manama,kingdom of Bahrain.  B&B logistics warehouse project at minasalman,kingdom of Bahrain.  Sukoon tower project at juffair,kingdom of Bahrain.  Kraft food extension project at biip hidd,kingdom of Bahrain.  Amwaj waves project at amwaj,kingdom of Bahrain.  Ibis hotel project ,kingdom of Bahrain,kingdom of Bahrain.  Abdul nabi commercial centre at hidd,kingdom of Bahrain. Site Engineer - Plumbing and Drainage Aug 2011 - Oct 2012 TAGORE CONTRACTING COMPANY Kingdom of Bahrain Duties and responsibilities  Execution and supervision of project activities such as drawings, submittals, design,estimation, procurement, follow-ups, manpower handling, installation, commissioning, handing over etc.  Study the drawings, specifications, BOQ and coordinate the work with other contractors.  Executing the work based on the construction program or Base line program.  Estimating the completion status of works for Monthly Payment Application.  Performing inspection for materials delivered by different suppliers, sub contractors and client.  Day to day reporting to the department head and the Client.  Coordination with all MEP (HVAC,Electrical, Plumbing & Firefighting) works.  Co-ordination and administration of material, equipment and drawing submittals in accordance to the specifications.  Follow up closely procurement schedule and confirmations of delivery for material and equipment. PROJECTS COMPLETED  Three story Villa at for Salah Al-Kooheji Engineering at Riffa, Kingdom of Bahrain.  Motor City Project for E.K.Kanoo at Maameer,Kingdom of Bahrain.  Two Storey Villa for Ahmad Mansoor at Hammed Town. Kingdom of Bahrain.  Three storey villa for Sheikh Ahmed at Riffa,Kingdom of Bahrain. Site Engineer - MEP Oct 2010 -July 2011 DELTA ALFURAT PROJECTSYSTEMS Kingdom ofSaudi Arabia Duties and responsibilities  Study the drawings, specifications, BOQ and coordinate the work with other contractors.  Executing the work based on the construction program or Base line program.  Day to day reporting to the department head and the Client.  Coordination with all MEP (HVAC,Electrical, Plumbing & Firefighting) works.  Co-ordination and administration of material, equipment and drawing submittals in accordance to the specifications.  Follow up closely procurement schedule and confirmations of delivery for material and equipment.
  • 4.
    Robin Jacob|Curriculum Vitae4 PROJECTS COMPLETED  MANIS Project, Manifa for MEEDCO & MMG Saudi Arabia.  KACWC Project,Dahran for Saudi Oger, Saudi Arabia.  NORTH PARK Office Complex, Dahran for YAMAMA,Saudi Arabia.  SATORP Project,Jubail for SAMSUNG, Saudi Arabia. Junior Design Engineer - MEP Jun 2008 - Sep 2010 TRITECH CORPORATION AT COCHIN INDIA Duties and responsibilities  Involved in preparation of HVAC Designing including Heat load Estimation, Pump head calculations, Ducting & Piping Design.  Design Coordination & Execution in HVAC,Electrical, Plumbing, Firefighting & External Utilities.  Preparation of specifications, BOQ and design drawings for hospitals, Commercial Buildings, Shopping malls etc.  Managed preparation of Tender Drawings.  Preparing the Scope Of Work and Release the MEP Tender and Finalizing the MEP Contractors  Ensuring that the project MEP work is carried out in accordance with the required quality, cost and time constraints.  Follow up closely procurement schedule and confirmations of delivery for material and equipment  Review, control and approval of MEP subcontractors work procedures and method statements.  Involved in checking of material submittals, assisted in design and checking of shop drawings.  Ensuring that the MEP subcontractor provides and adheres to the necessary controldocumentation in an orderly and organized way PROJECTS COMPLETED Hotels & Resorts  Thalikulam Beach Resort,Kerala, Indi  Devonshire greens Pallivasal, Munnar, Kerala, India.  Ranni hotel Group, Ranni, Kerala,India. Commercial Building & Hospital  Joby’s Mall, Palakkad, Kerala, India.  New High Court Building, Eranakulam, Kerala, India.  Muthoot Hospital, Kozhencherry, Kerala,India. IT SKILLS  Operating Systems: Microsoft Windows 2000 and higher  MS Office: MS Word, Excel and PowerPoint  Design Software: AutoCAD PERSONAL SKILLS  Confident, strong and influencing personality.  Listening Skills, patience and emotionally intelligent behavior.  Attention to details and focus on precision .  Able to adjust well with people of diverse cultures, religions and backgrounds.  Able to plan, prioritize and execute work as well as time, so as to attain maximum results.  Self-disciplined with an exemplary work ethics.  Ability to work under stress while meeting deadlines. PROFESSIONAL SKILLS  Experience in Installation, testing and commissioning of Fire pump 1750 GPM (E+D+J) for Eagly Eye Project at BIIP Hidd, Kingdom of Bahrain.  Experience in Installation,testing and commissioning of 2500 GPM Diesel Engine for PS3 ALBA .
  • 5.
    Robin Jacob|Curriculum Vitae5  Experience in the installation of In rack sprinkler system, FM200 and CO2 System.  Experience in the testing and commissioning of firefighting system for warehouses,factories and multi storey buildings.  Working under pressure and maintaining the quality of work within the span of time.  Good managerial skills and capable of maintaining good inter-personal relationships with both the management and coworkers. LANGUAGE PROFICIENCY  Malayalam (Fluent in reading, writing and speaking)  English (Fluent in reading, writing and speaking)  Hindi & Tamil (Speaking) PERSONAL DETAIL Name: Robin Jacob Marital Status: Married Nationality: Indian Date of Birth: May 10th 1987 Driving License: Kingdom of Bahrain and India Passport no: N 5191600 Bahrain CPR No: 870543334 Visa Status: Valid Bahrain Residence Visa Contact details +973-36589355 / +973-33828683 Mail ID robinjacob001@gmail.com REFERENCES Available upon request DECLERATION I hereby assure you that all the details mentioned above are true and correct to the best of my knowledge and belief. Place: Kingdomof Bahrain Date: 19/01/2017 ROBIN JACOB