Waseem Siddique is a mechanical engineer seeking a position as an MEP lead engineer. He has over 12 years of experience managing large construction projects in the GCC region. His most recent role was as Senior Manager Mechanical for Dubai Parks and Resorts, where he oversaw the construction and commissioning of theme park buildings.
MEP Manager with outstanding skills and experience to complete challenging large projects, I believe in teamwork and strengthening colleagues with information and tools necessary to make project success.
MEP Manager with outstanding skills and experience to complete challenging large projects, I believe in teamwork and strengthening colleagues with information and tools necessary to make project success.
I, Mr. Shaikh Ateeq (Mechanical), with 5.5 years of experience as Mechanical Engineer, currently seeking a position as a Mechanical engineer in your esteemed organization and I would like to submit my resume for your kind perusal. I believe my qualifications will match your requirements. I have had the opportunity to function in a variety of mass projects making it easy to adapt to new situations.
Please consider this letter as an expression of my sincere interest in pursuing the
vacancy in your prestigious organization. I am capable of working hard, self confident, optimistic, sincere and honest with good leadership qualities. I would like to have opportunity to talk to you about my background and the areas in
which I can benefit your organization.
I look forward to hear from you.
Thanking You.
Yours Truly,
SHAIKH ATEEQ
Mechanical Engineer
I, Mr. Shaikh Ateeq (Mechanical), with 5.5 years of experience as Mechanical Engineer, currently seeking a position as a Mechanical engineer in your esteemed organization and I would like to submit my resume for your kind perusal. I believe my qualifications will match your requirements. I have had the opportunity to function in a variety of mass projects making it easy to adapt to new situations.
Please consider this letter as an expression of my sincere interest in pursuing the
vacancy in your prestigious organization. I am capable of working hard, self confident, optimistic, sincere and honest with good leadership qualities. I would like to have opportunity to talk to you about my background and the areas in
which I can benefit your organization.
I look forward to hear from you.
Thanking You.
Yours Truly,
SHAIKH ATEEQ
Mechanical Engineer
I, Mr. Shaikh Ateeq (Mechanical), with 5.5 years of experience as Mechanical Engineer, currently seeking a position as a Mechanical engineer in your esteemed organization and I would like to submit my resume for your kind perusal. I believe my qualifications will match your requirements. I have had the opportunity to function in a variety of mass projects making it easy to adapt to new situations.
Please consider this letter as an expression of my sincere interest in pursuing the
vacancy in your prestigious organization. I am capable of working hard, self confident, optimistic, sincere and honest with good leadership qualities. I would like to have opportunity to talk to you about my background and the areas in
which I can benefit your organization.
I look forward to hear from you.
Thanking You.
Yours Truly,
SHAIKH ATEEQ
Mechanical Engineer
I, Mr. Shaikh Ateeq (Mechanical), with 5.5 years of experience as Mechanical Engineer, currently seeking a position as a Mechanical engineer in your esteemed organization and I would like to submit my resume for your kind perusal. I believe my qualifications will match your requirements. I have had the opportunity to function in a variety of mass projects making it easy to adapt to new situations.
Please consider this letter as an expression of my sincere interest in pursuing the
vacancy in your prestigious organization. I am capable of working hard, self confident, optimistic, sincere and honest with good leadership qualities. I would like to have opportunity to talk to you about my background and the areas in
which I can benefit your organization.
I look forward to hear from you.
Thanking You.
Yours Truly,
SHAIKH ATEEQ
Mechanical Engineer
Result oriented engineer skilled in defining tasks objectively to manage and deliver MEP projects meeting quality expectations of all stakeholders. Presently open to new opportunities to take a challenging role in a consultancy or contracting company.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
1. RESUME-WASEEM SIDDIQUE (MECHANICAL ENGINEER)
Dubai|(M)971509704486|(H)97143426856|WaseemSiddique@outlook.com
Waseem is looking for an opportunity as MEP lead engineer in large projects to ensure that
projects complete as per schedule, budget and scope. Special interest in commissioning,
automation and integration of mechanical systems.
Education
Bachelor of Engineering: Mechanical 1994, Shivaji University Maharashtra, India
Completed 35 contact hours of PMP education.
Professional experience (12 yrs GCC exp)
Senior Manager Mechanical- Dubai Parks and Resorts Project Aug 2016 - Oct 2017
DXB Entertainments (Formerly Dubai Parks and Resorts) Dubai, UAE
• Six Flag theme park (Back of House buildings construction)
• Bollywood theme park project closeout and handover to Operations team.
Key Achievements:
● DPR is the largest integrated theme park in the region and my role was to manage
the construction of Six Flags theme park back of house buildings and hand over to
Operations team Bollywood theme park.
● Organised teams for Civil defence inspection
● Independently led to complete and hand over the automation and integration of Fire
and life safety systems, BMS, SCADA, Kitchens, potable and drainage system and
chilled water control equipments to the Facilities management team.
● Independently led successfully the integration/commissioning of HVAC system
controls to service providers SCADA system, fire alarm cause and effect.
● Desnagging and trouble shooting of post powering up of mechanical equipments
within buildings and infrastructure. Leading and Supporting FM team to ensure that
the MEP systems operate optimally and without any issues.
● Overview and advise supervision consultants and contractor for ensuring
compliance to contractual obligations, approvals of shop drawings, material
submittals, method statements, site safety for MEP work, services integration with
infrastructure, highlighting and mitigating potential cost and time impact issues,
quality inspections and monitoring of site activities
Mechanical Superintendant, Bollywood Theme park Nov 2014 – July 2016
Hill International, Dubai (UAE)
● Part of a joint venture PMC between Hill International and Samsung to deliver the
Middle East's largest Hollywood inspired theme park worth over 2 billion GBP,
Bollywood Theme Park is DXBE’s own branded Theme Park consisting of rides and
shows from Broadway musical, Dabaang, Krishh, RaOne, Sholay, Don, MughalEAzam,
Lagaan.
● Completed and delivered 8# rides and shows, 8# F&B and retail, 10# BoH Utilities,
Area development.
2. ● Developed existing delivery strategies for the facilities build, highlighting and
mitigating potential cost and time impact issues, site co-ordination risk analysis,
quality inspections, feedback and liase with project design control team, leading &
followup of procurement of all provision sums, site progress reviews and
highlighting improvements where required, developing new control procedures and
training consultants and contractors to meet contractual obligations, overseeing cash
flow forecasting and valuations, managing and tracking the change control process
and development of the commissioning and handover strategy for the park's
operational team.
● Effectively saw through completion of the mechanical and automation services
contractors to construct and commission the HVAC, Fire and life safety, plumbing,
drainage, BMS, SCADA, pump room, underground utilities.
● Ensured Bollywood theme park was built to the correct specifications and value
engineered specific works and coordination of design
● Monitored site activities and programmes from the main contractor, effectively
implementing and follow up of delay mitigation measures.
● Examined shop drawings on PM Web, method statement and risk assessment
proofing and safety audits
Senior MEP Engineer – Banana Island Resort, Anantara May 2012 – October 2014
Hill International, Doha (Qatar)
● Al Rayyan Hospitality (Qatar PEO office) developed an island 14 kms off sea based on
Maldivian hotel resort, and hotel operator is Anantara (Costing QAR 1.4 billion)
awarded as design and built contract to UCC.
● Apart from resort island, a visitor welcome building with pontoons for transfer and
BOH facility was developed and completed on the mainland in Doha.
● The project scope within purview of my design & execution consisted of 141(keys)
units, including 26 suites and 45 villas Holistic wellness centre and indoor botanical
garden, Spa, Gym, Surf pool,tennis court, private beach,four swimming pools
totalling 10,000m², fully-equipped diving centre, Reef Conservation Centre, Private
marina for up to 30 boats, Nine-hole golf putting course, kids play areas, an eight-
pin bowling alley and cinema, Helipad, power & water (RO) generation plant, Diesel
& LPG storage facility, Sewage treatment plant (MBR), Telecom facility, large
complicated underground MEP.
● Undersea power and telecom cabling: prepared the report and submitted with
costing to client.
● Successfully supervised independently and ensured the contractors & consultants
design, built and commission the mep systems within their scope and time, ensuring
the drawing quality and material specified are to client requirements.
● Successfully ensured the MEP design coordination are as per scope and delivered on
time, by coordinating between Hotel operator, Architect, MEP, Audio Video, lighting,
structural, marine, kitchen and ride consultants along with specialist suppliers and
contractors along with local authority department coordination for life safety and
MEP services.
3. Senior MEP Engineer – Barwa City phase 1 April 2009 – April 2012
Hill International, Doha (Qatar)
● The Barwa City project built at cost of QAR 5 billion consists of 128 residential
buildings, 17 commercial and amenities buildings, two utilities compounds of district
cooling, sewage treatment, potable and irrigation water, 28 electrical substations,
28.8 km of interior roads, 228 km of irrigation piping, 22 km of potable water
network piping, 280 km of electrical power cables and 21 km of chilled water
network piping
● Developed existing delivery strategies for the facilities build, highlighting and
mitigating potential cost and time impact issues, site co-ordination risk analysis,
quality inspections, feedback and liase with project design control team, carry out
technical evaluation of variation claims and value engineered items, leading &
followup of procurement of all provision sums, site progress reviews and
highlighting improvements where required, developing new control procedures and
training consultants and contractors to meet contractual obligations, overseeing cash
flow forecasting and valuations, managing and tracking the change control process
and development of the commissioning, snagging and handover strategy for the
city’s operational team.
● Ensured completion of key deliverables including but not limited to Equipment Lists,
Data Sheets, Ducting and Instrumentation Diagrams, Air Flow Diagrams, HVAC
Calculations, OEM Manuals, Inspection and Test Plans, Electrical and Control System
drawings
Senior MEP Engineer – Dubai Marina Mall & Address Hotel Oct 2008 – March 2009
Hill International, Dubai (UAE)
● The project consisted of a mall and 5*Hotel, F&B building and pontoons for yatchs.
● Successfully led Coordination and reporting of MEP commissioning progress,
evaluate contractors variation claims, leading commissioning meetings.
Senior Mechanical Engineer May 2005 - Oct 2008
Al Futtaim Engineering, Dubai, UAE
● Dubai Festival City auto showrooms in Dubai
● Toyota showroom and service centre in Ajman
● G+12 tower in Al Nahda 2
● Supervised construction of MEP services as a contractor in Dubai Festival City Motor
showrooms, maintenance workshops, Residential tower construction activities.
● Proficiently coordinated design, installation and commissioning of HVAC and
plumbing systems.
● Arranged resources, supervise and integrate mechanical and electrical systems
commissioning activities.
● Attended weekly meetings for safety, progress update, commissioning, handover to
clients operating team.
● Responded to RFI's, material/drawing submissions, client requests to changes,
vendor queries.
● Manage technicians and labour as per work demand to ensure cost optimization.
● Ensure construction material inventory is maintained or replenished on time to avoid
delays to work completion.
4. ● Manage BOQ and give monthly feedback to finance department to raise invoices to
client.
● Understand project requirements and arrange labour, material, equipments, safety
equipments, for successful delivery of the MEP systems to client's operation team.
Project Manager Jun 2004 - Apr 2005
LG Electronics India Pvt Ltd Mumbai, India
● Managed design, delivery, installation & commissioning of ductable split AC systems
in malls and offices.
● Coordinated the dealers and after sales service support to customers.
● Supported regional manager in payment collection by attending to all defects in
installations.
Area Planning Manager Jun 1999 - Jun 2004
Voltas Limited Mumbai, India
● Coordinated shop drawings, material and labour for erection commissioning of HVAC
systems in malls, offices, refineries, power plant, telephone exchange.
● Carry out design installation supervision and commissioning of HVAC systems and
plumbing.
● Successfully demonstrated subcontractor and vendor management and development.
● Managed projects costs to ensure that invoiced value to client is always 20% higher
than debit from vendors.
● Coordinate invoicing, payment collection and commercial closing of contracts on
monthly basis with accounts department.
Planning Engineer Jul 1997 - Jun 1999
ETA Engineering India pvt Ltd Mumbai, India
● Validate project estimation and BOQ, review consultant design and issue RFI, attend
project meetings with consultants, coordination approval of prequalification of
vendors, shop drawings, material submissions, method statements and ITP, arrange
labour contracts and assist project manager to start the construction, supported
project manager in variations BOQ, redesigning and as built drawings. Projects:
5star hotel, commercial buildings.
Project Engineer Oct 1995 - Jun 1997
Airpac Laminar Mumbai, India
● Supervised independently installation and commissioning of HVAC systems for clean
rooms, meetings with client, managed site construction activities, follow up for
payments, testing and commissioning of mep systems and hand over to client.
Project: Pharmaceutical factory.
Project Engineer Aug 1994- Aug 1995
Klenzaids Micro Environment Systems Mumbai, India
● worked as trainee project engineer supervising project installation of pharmaceutical
production machines.
● supervised HVAC system installation and commissioning at project sites of pharma
production facility.