SlideShare a Scribd company logo
RESUME-WASEEM SIDDIQUE (MECHANICAL ENGINEER)
Dubai|(M)971509704486|(H)97143426856|WaseemSiddique@outlook.com
Waseem is looking for an opportunity as MEP lead engineer in large projects to ensure that
projects complete as per schedule, budget and scope. Special interest in commissioning,
automation and integration of mechanical systems.
Education
Bachelor of Engineering: Mechanical 1994, Shivaji University Maharashtra, India
Completed 35 contact hours of PMP education.
Professional experience (12 yrs GCC exp)
Senior Manager Mechanical- Dubai Parks and Resorts Project Aug 2016 - Oct 2017
DXB Entertainments (Formerly Dubai Parks and Resorts) Dubai, UAE
• Six Flag theme park (Back of House buildings construction)
• Bollywood theme park project closeout and handover to Operations team.
Key Achievements:
● DPR is the largest integrated theme park in the region and my role was to manage
the construction of Six Flags theme park back of house buildings and hand over to
Operations team Bollywood theme park.
● Organised teams for Civil defence inspection
● Independently led to complete and hand over the automation and integration of Fire
and life safety systems, BMS, SCADA, Kitchens, potable and drainage system and
chilled water control equipments to the Facilities management team.
● Independently led successfully the integration/commissioning of HVAC system
controls to service providers SCADA system, fire alarm cause and effect.
● Desnagging and trouble shooting of post powering up of mechanical equipments
within buildings and infrastructure. Leading and Supporting FM team to ensure that
the MEP systems operate optimally and without any issues.
● Overview and advise supervision consultants and contractor for ensuring
compliance to contractual obligations, approvals of shop drawings, material
submittals, method statements, site safety for MEP work, services integration with
infrastructure, highlighting and mitigating potential cost and time impact issues,
quality inspections and monitoring of site activities
Mechanical Superintendant, Bollywood Theme park Nov 2014 – July 2016
Hill International, Dubai (UAE)
● Part of a joint venture PMC between Hill International and Samsung to deliver the
Middle East's largest Hollywood inspired theme park worth over 2 billion GBP,
Bollywood Theme Park is DXBE’s own branded Theme Park consisting of rides and
shows from Broadway musical, Dabaang, Krishh, RaOne, Sholay, Don, MughalEAzam,
Lagaan.
● Completed and delivered 8# rides and shows, 8# F&B and retail, 10# BoH Utilities,
Area development.
● Developed existing delivery strategies for the facilities build, highlighting and
mitigating potential cost and time impact issues, site co-ordination risk analysis,
quality inspections, feedback and liase with project design control team, leading &
followup of procurement of all provision sums, site progress reviews and
highlighting improvements where required, developing new control procedures and
training consultants and contractors to meet contractual obligations, overseeing cash
flow forecasting and valuations, managing and tracking the change control process
and development of the commissioning and handover strategy for the park's
operational team.
● Effectively saw through completion of the mechanical and automation services
contractors to construct and commission the HVAC, Fire and life safety, plumbing,
drainage, BMS, SCADA, pump room, underground utilities.
● Ensured Bollywood theme park was built to the correct specifications and value
engineered specific works and coordination of design
● Monitored site activities and programmes from the main contractor, effectively
implementing and follow up of delay mitigation measures.
● Examined shop drawings on PM Web, method statement and risk assessment
proofing and safety audits
Senior MEP Engineer – Banana Island Resort, Anantara May 2012 – October 2014
Hill International, Doha (Qatar)
● Al Rayyan Hospitality (Qatar PEO office) developed an island 14 kms off sea based on
Maldivian hotel resort, and hotel operator is Anantara (Costing QAR 1.4 billion)
awarded as design and built contract to UCC.
● Apart from resort island, a visitor welcome building with pontoons for transfer and
BOH facility was developed and completed on the mainland in Doha.
● The project scope within purview of my design & execution consisted of 141(keys)
units, including 26 suites and 45 villas Holistic wellness centre and indoor botanical
garden, Spa, Gym, Surf pool,tennis court, private beach,four swimming pools
totalling 10,000m², fully-equipped diving centre, Reef Conservation Centre, Private
marina for up to 30 boats, Nine-hole golf putting course, kids play areas, an eight-
pin bowling alley and cinema, Helipad, power & water (RO) generation plant, Diesel
& LPG storage facility, Sewage treatment plant (MBR), Telecom facility, large
complicated underground MEP.
● Undersea power and telecom cabling: prepared the report and submitted with
costing to client.
● Successfully supervised independently and ensured the contractors & consultants
design, built and commission the mep systems within their scope and time, ensuring
the drawing quality and material specified are to client requirements.
● Successfully ensured the MEP design coordination are as per scope and delivered on
time, by coordinating between Hotel operator, Architect, MEP, Audio Video, lighting,
structural, marine, kitchen and ride consultants along with specialist suppliers and
contractors along with local authority department coordination for life safety and
MEP services.
Senior MEP Engineer – Barwa City phase 1 April 2009 – April 2012
Hill International, Doha (Qatar)
● The Barwa City project built at cost of QAR 5 billion consists of 128 residential
buildings, 17 commercial and amenities buildings, two utilities compounds of district
cooling, sewage treatment, potable and irrigation water, 28 electrical substations,
28.8 km of interior roads, 228 km of irrigation piping, 22 km of potable water
network piping, 280 km of electrical power cables and 21 km of chilled water
network piping
● Developed existing delivery strategies for the facilities build, highlighting and
mitigating potential cost and time impact issues, site co-ordination risk analysis,
quality inspections, feedback and liase with project design control team, carry out
technical evaluation of variation claims and value engineered items, leading &
followup of procurement of all provision sums, site progress reviews and
highlighting improvements where required, developing new control procedures and
training consultants and contractors to meet contractual obligations, overseeing cash
flow forecasting and valuations, managing and tracking the change control process
and development of the commissioning, snagging and handover strategy for the
city’s operational team.
● Ensured completion of key deliverables including but not limited to Equipment Lists,
Data Sheets, Ducting and Instrumentation Diagrams, Air Flow Diagrams, HVAC
Calculations, OEM Manuals, Inspection and Test Plans, Electrical and Control System
drawings
Senior MEP Engineer – Dubai Marina Mall & Address Hotel Oct 2008 – March 2009
Hill International, Dubai (UAE)
● The project consisted of a mall and 5*Hotel, F&B building and pontoons for yatchs.
● Successfully led Coordination and reporting of MEP commissioning progress,
evaluate contractors variation claims, leading commissioning meetings.
Senior Mechanical Engineer May 2005 - Oct 2008
Al Futtaim Engineering, Dubai, UAE
● Dubai Festival City auto showrooms in Dubai
● Toyota showroom and service centre in Ajman
● G+12 tower in Al Nahda 2
● Supervised construction of MEP services as a contractor in Dubai Festival City Motor
showrooms, maintenance workshops, Residential tower construction activities.
● Proficiently coordinated design, installation and commissioning of HVAC and
plumbing systems.
● Arranged resources, supervise and integrate mechanical and electrical systems
commissioning activities.
● Attended weekly meetings for safety, progress update, commissioning, handover to
clients operating team.
● Responded to RFI's, material/drawing submissions, client requests to changes,
vendor queries.
● Manage technicians and labour as per work demand to ensure cost optimization.
● Ensure construction material inventory is maintained or replenished on time to avoid
delays to work completion.
● Manage BOQ and give monthly feedback to finance department to raise invoices to
client.
● Understand project requirements and arrange labour, material, equipments, safety
equipments, for successful delivery of the MEP systems to client's operation team.
Project Manager Jun 2004 - Apr 2005
LG Electronics India Pvt Ltd Mumbai, India
● Managed design, delivery, installation & commissioning of ductable split AC systems
in malls and offices.
● Coordinated the dealers and after sales service support to customers.
● Supported regional manager in payment collection by attending to all defects in
installations.
Area Planning Manager Jun 1999 - Jun 2004
Voltas Limited Mumbai, India
● Coordinated shop drawings, material and labour for erection commissioning of HVAC
systems in malls, offices, refineries, power plant, telephone exchange.
● Carry out design installation supervision and commissioning of HVAC systems and
plumbing.
● Successfully demonstrated subcontractor and vendor management and development.
● Managed projects costs to ensure that invoiced value to client is always 20% higher
than debit from vendors.
● Coordinate invoicing, payment collection and commercial closing of contracts on
monthly basis with accounts department.
Planning Engineer Jul 1997 - Jun 1999
ETA Engineering India pvt Ltd Mumbai, India
● Validate project estimation and BOQ, review consultant design and issue RFI, attend
project meetings with consultants, coordination approval of prequalification of
vendors, shop drawings, material submissions, method statements and ITP, arrange
labour contracts and assist project manager to start the construction, supported
project manager in variations BOQ, redesigning and as built drawings. Projects:
5star hotel, commercial buildings.
Project Engineer Oct 1995 - Jun 1997
Airpac Laminar Mumbai, India
● Supervised independently installation and commissioning of HVAC systems for clean
rooms, meetings with client, managed site construction activities, follow up for
payments, testing and commissioning of mep systems and hand over to client.
Project: Pharmaceutical factory.
Project Engineer Aug 1994- Aug 1995
Klenzaids Micro Environment Systems Mumbai, India
● worked as trainee project engineer supervising project installation of pharmaceutical
production machines.
● supervised HVAC system installation and commissioning at project sites of pharma
production facility.

More Related Content

What's hot

Sheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - FinalSheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - FinalMuntazir Sheikh
 
Ateeq cv
Ateeq cv Ateeq cv
Ateeq cv
Shaikh Ateeq
 
How to Prepare your SOP for Real Estate Developer & Contractor
How to Prepare your SOP for Real Estate Developer & ContractorHow to Prepare your SOP for Real Estate Developer & Contractor
How to Prepare your SOP for Real Estate Developer & Contractor
REDceo.net
 
Ateeq cv d
Ateeq cv dAteeq cv d
Ateeq cv d
Shaikh Ateeq
 
HOW TO PREPARE YOUR STANDARD OPERATING PROCEDURES (SOP)
HOW TO PREPARE YOUR STANDARD OPERATING PROCEDURES (SOP) HOW TO PREPARE YOUR STANDARD OPERATING PROCEDURES (SOP)
HOW TO PREPARE YOUR STANDARD OPERATING PROCEDURES (SOP)
REDceo.net
 
Eric_Nager_-resume_Dec 2015
Eric_Nager_-resume_Dec 2015Eric_Nager_-resume_Dec 2015
Eric_Nager_-resume_Dec 2015Eric Nager
 
Updtd tbm-jkf-photo-cv 06032016
Updtd tbm-jkf-photo-cv 06032016Updtd tbm-jkf-photo-cv 06032016
Updtd tbm-jkf-photo-cv 06032016
khaja jeelani
 
CV-Prashant Goyal-Sales Manager
CV-Prashant Goyal-Sales ManagerCV-Prashant Goyal-Sales Manager
CV-Prashant Goyal-Sales ManagerPrashant Goyal
 
ZAKI Michael_CV 042014
ZAKI Michael_CV 042014ZAKI Michael_CV 042014
ZAKI Michael_CV 042014Michael Khalil
 

What's hot (20)

Sheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - FinalSheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - Final
 
CV 11.10.16
CV 11.10.16CV 11.10.16
CV 11.10.16
 
PREMENDRA CV Apr 6
PREMENDRA CV Apr 6PREMENDRA CV Apr 6
PREMENDRA CV Apr 6
 
Emad Hamdy Resume
Emad Hamdy ResumeEmad Hamdy Resume
Emad Hamdy Resume
 
Amr. 2015....
Amr. 2015....Amr. 2015....
Amr. 2015....
 
Gerry_Garciano_resume
Gerry_Garciano_resumeGerry_Garciano_resume
Gerry_Garciano_resume
 
Ashok Upadhyay Resume
Ashok Upadhyay ResumeAshok Upadhyay Resume
Ashok Upadhyay Resume
 
Ateeq cv
Ateeq cv Ateeq cv
Ateeq cv
 
How to Prepare your SOP for Real Estate Developer & Contractor
How to Prepare your SOP for Real Estate Developer & ContractorHow to Prepare your SOP for Real Estate Developer & Contractor
How to Prepare your SOP for Real Estate Developer & Contractor
 
Ateeq cv d
Ateeq cv dAteeq cv d
Ateeq cv d
 
Rajeev CV
Rajeev CVRajeev CV
Rajeev CV
 
HOW TO PREPARE YOUR STANDARD OPERATING PROCEDURES (SOP)
HOW TO PREPARE YOUR STANDARD OPERATING PROCEDURES (SOP) HOW TO PREPARE YOUR STANDARD OPERATING PROCEDURES (SOP)
HOW TO PREPARE YOUR STANDARD OPERATING PROCEDURES (SOP)
 
David Carson CV
David Carson CVDavid Carson CV
David Carson CV
 
CV 2015
CV   2015CV   2015
CV 2015
 
Eric_Nager_-resume_Dec 2015
Eric_Nager_-resume_Dec 2015Eric_Nager_-resume_Dec 2015
Eric_Nager_-resume_Dec 2015
 
Ardante CV
Ardante CVArdante CV
Ardante CV
 
Updtd tbm-jkf-photo-cv 06032016
Updtd tbm-jkf-photo-cv 06032016Updtd tbm-jkf-photo-cv 06032016
Updtd tbm-jkf-photo-cv 06032016
 
CV-Prashant Goyal-Sales Manager
CV-Prashant Goyal-Sales ManagerCV-Prashant Goyal-Sales Manager
CV-Prashant Goyal-Sales Manager
 
mohamed alaa C V
mohamed alaa C Vmohamed alaa C V
mohamed alaa C V
 
ZAKI Michael_CV 042014
ZAKI Michael_CV 042014ZAKI Michael_CV 042014
ZAKI Michael_CV 042014
 

Similar to Waseem siddique (li) (20)

Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
Resume 2016 nadeem siddiqui
Resume   2016 nadeem siddiquiResume   2016 nadeem siddiqui
Resume 2016 nadeem siddiqui
 
latest CV_pradeep
latest CV_pradeeplatest CV_pradeep
latest CV_pradeep
 
RESUME
RESUMERESUME
RESUME
 
Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017
 
MANISH KUMAR GUPTA CV
MANISH KUMAR GUPTA CVMANISH KUMAR GUPTA CV
MANISH KUMAR GUPTA CV
 
M.elsayed CV
M.elsayed CVM.elsayed CV
M.elsayed CV
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
CV 2014 WEB UPLOAD
CV 2014 WEB UPLOADCV 2014 WEB UPLOAD
CV 2014 WEB UPLOAD
 
Saravanan - Profile (2015-16)
Saravanan - Profile (2015-16)Saravanan - Profile (2015-16)
Saravanan - Profile (2015-16)
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016
 
CV
CVCV
CV
 
NM_CV1
NM_CV1NM_CV1
NM_CV1
 
Kodi CV( EM )
Kodi CV( EM )Kodi CV( EM )
Kodi CV( EM )
 
Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.
 
Resume
ResumeResume
Resume
 
CV1
CV1CV1
CV1
 
Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016
 
CURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPCURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEP
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 

More from Waseem Siddique

Waseem siddique cv
Waseem siddique cvWaseem siddique cv
Waseem siddique cv
Waseem Siddique
 
5 scope
5 scope5 scope
8 quality PMBOK
8 quality PMBOK8 quality PMBOK
8 quality PMBOK
Waseem Siddique
 
6 time PMBOK
6 time PMBOK6 time PMBOK
6 time PMBOK
Waseem Siddique
 
9 human resource PMBOK
9 human resource PMBOK9 human resource PMBOK
9 human resource PMBOK
Waseem Siddique
 
7 cost PMBOK
7 cost PMBOK7 cost PMBOK
7 cost PMBOK
Waseem Siddique
 
4 integration
4 integration4 integration
4 integration
Waseem Siddique
 
12 procurement
12 procurement12 procurement
12 procurement
Waseem Siddique
 
10 communication
10 communication10 communication
10 communication
Waseem Siddique
 
11 risk management
11 risk management11 risk management
11 risk management
Waseem Siddique
 

More from Waseem Siddique (10)

Waseem siddique cv
Waseem siddique cvWaseem siddique cv
Waseem siddique cv
 
5 scope
5 scope5 scope
5 scope
 
8 quality PMBOK
8 quality PMBOK8 quality PMBOK
8 quality PMBOK
 
6 time PMBOK
6 time PMBOK6 time PMBOK
6 time PMBOK
 
9 human resource PMBOK
9 human resource PMBOK9 human resource PMBOK
9 human resource PMBOK
 
7 cost PMBOK
7 cost PMBOK7 cost PMBOK
7 cost PMBOK
 
4 integration
4 integration4 integration
4 integration
 
12 procurement
12 procurement12 procurement
12 procurement
 
10 communication
10 communication10 communication
10 communication
 
11 risk management
11 risk management11 risk management
11 risk management
 

Recently uploaded

Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 

Waseem siddique (li)

  • 1. RESUME-WASEEM SIDDIQUE (MECHANICAL ENGINEER) Dubai|(M)971509704486|(H)97143426856|WaseemSiddique@outlook.com Waseem is looking for an opportunity as MEP lead engineer in large projects to ensure that projects complete as per schedule, budget and scope. Special interest in commissioning, automation and integration of mechanical systems. Education Bachelor of Engineering: Mechanical 1994, Shivaji University Maharashtra, India Completed 35 contact hours of PMP education. Professional experience (12 yrs GCC exp) Senior Manager Mechanical- Dubai Parks and Resorts Project Aug 2016 - Oct 2017 DXB Entertainments (Formerly Dubai Parks and Resorts) Dubai, UAE • Six Flag theme park (Back of House buildings construction) • Bollywood theme park project closeout and handover to Operations team. Key Achievements: ● DPR is the largest integrated theme park in the region and my role was to manage the construction of Six Flags theme park back of house buildings and hand over to Operations team Bollywood theme park. ● Organised teams for Civil defence inspection ● Independently led to complete and hand over the automation and integration of Fire and life safety systems, BMS, SCADA, Kitchens, potable and drainage system and chilled water control equipments to the Facilities management team. ● Independently led successfully the integration/commissioning of HVAC system controls to service providers SCADA system, fire alarm cause and effect. ● Desnagging and trouble shooting of post powering up of mechanical equipments within buildings and infrastructure. Leading and Supporting FM team to ensure that the MEP systems operate optimally and without any issues. ● Overview and advise supervision consultants and contractor for ensuring compliance to contractual obligations, approvals of shop drawings, material submittals, method statements, site safety for MEP work, services integration with infrastructure, highlighting and mitigating potential cost and time impact issues, quality inspections and monitoring of site activities Mechanical Superintendant, Bollywood Theme park Nov 2014 – July 2016 Hill International, Dubai (UAE) ● Part of a joint venture PMC between Hill International and Samsung to deliver the Middle East's largest Hollywood inspired theme park worth over 2 billion GBP, Bollywood Theme Park is DXBE’s own branded Theme Park consisting of rides and shows from Broadway musical, Dabaang, Krishh, RaOne, Sholay, Don, MughalEAzam, Lagaan. ● Completed and delivered 8# rides and shows, 8# F&B and retail, 10# BoH Utilities, Area development.
  • 2. ● Developed existing delivery strategies for the facilities build, highlighting and mitigating potential cost and time impact issues, site co-ordination risk analysis, quality inspections, feedback and liase with project design control team, leading & followup of procurement of all provision sums, site progress reviews and highlighting improvements where required, developing new control procedures and training consultants and contractors to meet contractual obligations, overseeing cash flow forecasting and valuations, managing and tracking the change control process and development of the commissioning and handover strategy for the park's operational team. ● Effectively saw through completion of the mechanical and automation services contractors to construct and commission the HVAC, Fire and life safety, plumbing, drainage, BMS, SCADA, pump room, underground utilities. ● Ensured Bollywood theme park was built to the correct specifications and value engineered specific works and coordination of design ● Monitored site activities and programmes from the main contractor, effectively implementing and follow up of delay mitigation measures. ● Examined shop drawings on PM Web, method statement and risk assessment proofing and safety audits Senior MEP Engineer – Banana Island Resort, Anantara May 2012 – October 2014 Hill International, Doha (Qatar) ● Al Rayyan Hospitality (Qatar PEO office) developed an island 14 kms off sea based on Maldivian hotel resort, and hotel operator is Anantara (Costing QAR 1.4 billion) awarded as design and built contract to UCC. ● Apart from resort island, a visitor welcome building with pontoons for transfer and BOH facility was developed and completed on the mainland in Doha. ● The project scope within purview of my design & execution consisted of 141(keys) units, including 26 suites and 45 villas Holistic wellness centre and indoor botanical garden, Spa, Gym, Surf pool,tennis court, private beach,four swimming pools totalling 10,000m², fully-equipped diving centre, Reef Conservation Centre, Private marina for up to 30 boats, Nine-hole golf putting course, kids play areas, an eight- pin bowling alley and cinema, Helipad, power & water (RO) generation plant, Diesel & LPG storage facility, Sewage treatment plant (MBR), Telecom facility, large complicated underground MEP. ● Undersea power and telecom cabling: prepared the report and submitted with costing to client. ● Successfully supervised independently and ensured the contractors & consultants design, built and commission the mep systems within their scope and time, ensuring the drawing quality and material specified are to client requirements. ● Successfully ensured the MEP design coordination are as per scope and delivered on time, by coordinating between Hotel operator, Architect, MEP, Audio Video, lighting, structural, marine, kitchen and ride consultants along with specialist suppliers and contractors along with local authority department coordination for life safety and MEP services.
  • 3. Senior MEP Engineer – Barwa City phase 1 April 2009 – April 2012 Hill International, Doha (Qatar) ● The Barwa City project built at cost of QAR 5 billion consists of 128 residential buildings, 17 commercial and amenities buildings, two utilities compounds of district cooling, sewage treatment, potable and irrigation water, 28 electrical substations, 28.8 km of interior roads, 228 km of irrigation piping, 22 km of potable water network piping, 280 km of electrical power cables and 21 km of chilled water network piping ● Developed existing delivery strategies for the facilities build, highlighting and mitigating potential cost and time impact issues, site co-ordination risk analysis, quality inspections, feedback and liase with project design control team, carry out technical evaluation of variation claims and value engineered items, leading & followup of procurement of all provision sums, site progress reviews and highlighting improvements where required, developing new control procedures and training consultants and contractors to meet contractual obligations, overseeing cash flow forecasting and valuations, managing and tracking the change control process and development of the commissioning, snagging and handover strategy for the city’s operational team. ● Ensured completion of key deliverables including but not limited to Equipment Lists, Data Sheets, Ducting and Instrumentation Diagrams, Air Flow Diagrams, HVAC Calculations, OEM Manuals, Inspection and Test Plans, Electrical and Control System drawings Senior MEP Engineer – Dubai Marina Mall & Address Hotel Oct 2008 – March 2009 Hill International, Dubai (UAE) ● The project consisted of a mall and 5*Hotel, F&B building and pontoons for yatchs. ● Successfully led Coordination and reporting of MEP commissioning progress, evaluate contractors variation claims, leading commissioning meetings. Senior Mechanical Engineer May 2005 - Oct 2008 Al Futtaim Engineering, Dubai, UAE ● Dubai Festival City auto showrooms in Dubai ● Toyota showroom and service centre in Ajman ● G+12 tower in Al Nahda 2 ● Supervised construction of MEP services as a contractor in Dubai Festival City Motor showrooms, maintenance workshops, Residential tower construction activities. ● Proficiently coordinated design, installation and commissioning of HVAC and plumbing systems. ● Arranged resources, supervise and integrate mechanical and electrical systems commissioning activities. ● Attended weekly meetings for safety, progress update, commissioning, handover to clients operating team. ● Responded to RFI's, material/drawing submissions, client requests to changes, vendor queries. ● Manage technicians and labour as per work demand to ensure cost optimization. ● Ensure construction material inventory is maintained or replenished on time to avoid delays to work completion.
  • 4. ● Manage BOQ and give monthly feedback to finance department to raise invoices to client. ● Understand project requirements and arrange labour, material, equipments, safety equipments, for successful delivery of the MEP systems to client's operation team. Project Manager Jun 2004 - Apr 2005 LG Electronics India Pvt Ltd Mumbai, India ● Managed design, delivery, installation & commissioning of ductable split AC systems in malls and offices. ● Coordinated the dealers and after sales service support to customers. ● Supported regional manager in payment collection by attending to all defects in installations. Area Planning Manager Jun 1999 - Jun 2004 Voltas Limited Mumbai, India ● Coordinated shop drawings, material and labour for erection commissioning of HVAC systems in malls, offices, refineries, power plant, telephone exchange. ● Carry out design installation supervision and commissioning of HVAC systems and plumbing. ● Successfully demonstrated subcontractor and vendor management and development. ● Managed projects costs to ensure that invoiced value to client is always 20% higher than debit from vendors. ● Coordinate invoicing, payment collection and commercial closing of contracts on monthly basis with accounts department. Planning Engineer Jul 1997 - Jun 1999 ETA Engineering India pvt Ltd Mumbai, India ● Validate project estimation and BOQ, review consultant design and issue RFI, attend project meetings with consultants, coordination approval of prequalification of vendors, shop drawings, material submissions, method statements and ITP, arrange labour contracts and assist project manager to start the construction, supported project manager in variations BOQ, redesigning and as built drawings. Projects: 5star hotel, commercial buildings. Project Engineer Oct 1995 - Jun 1997 Airpac Laminar Mumbai, India ● Supervised independently installation and commissioning of HVAC systems for clean rooms, meetings with client, managed site construction activities, follow up for payments, testing and commissioning of mep systems and hand over to client. Project: Pharmaceutical factory. Project Engineer Aug 1994- Aug 1995 Klenzaids Micro Environment Systems Mumbai, India ● worked as trainee project engineer supervising project installation of pharmaceutical production machines. ● supervised HVAC system installation and commissioning at project sites of pharma production facility.