PUNEETH H (HVAC Project Engineer-6years of experiencein Gulfand India)
Email :puneethsagardbit@gmail.com.
Contact no :(+91) 9148204235
PROFESSIONAL SUMMARY
 Mechanical Engineer with 6 years of work experience in middle east and in India in
installation ,Testing & Commissioning of HVAC services
 Specialist in HVAC& Mechanical Infrastructure project executions.
KEY EXPERTISE
 Budget Analysis and Cost Control of Project
 Vendor Relations /Material Management
 HVAC Installation ,Inspection ,Testing & Commissioning
 Strategic planning and scheduling site supervision and coordination
 Safety Producers/ Quality Control
 Customer relations specialist .
 Project scheduling shop and as built drawing
ACADEMIC QUALIFICATIONS
Bachelor in Mechanical Engineering | VisveshwariaTechnological
university
Completed B.E from DBIT (Don Bosco Institution of technology) Passing in Year
2013
Professional training program in HVAC| ACE HVAC Training Institute
2013
Completed professional training in HVAC system design, project and maintenance
as per ASHRAE standards.
PROFESSIONAL EXPERIENCE
Companies worked with:
 General Electric & Trading CO LLC , Oman .
Working as HVAC Project Engineer from May 2016 – May 2019
 Generic Pvt Ltd, Bangalore, India.
Worked as Mechanical Engineer -- from July 2013 to April 2016.
Personal Data
Data of Birth : 29/03/1986
Passport no : L3389904
Issued at : Bangalore
Date of issue : 19/07/2013
Date of expire : 18/07/2023
Driving License : Oman
Languages Known
English ,Hindi,Tamil & kannada
Driving License
Holding valid Oman driving
license
Acheivements & Extra
Curriculars
1)Certificate of Appreciation for
dedication and hardwork in
ensuring growth of Genetco
business in 2017.
2)Captained team to
championship in the college
VTU Tournament (2011)
)Attended Installation
&Troubleshooting of GREE
VRV system
Major Projects Handled in Genetco LLC
1)HVAC PROJECT ENGINEER
GENETCO LLC ,OMAN MUSCAT May 2016 – May 2019
(3years)
Construction of Administrative Headquarters Building
Client: Salah Free Zone
Consultant /Engineer:Development Techno Power
Project valve:715,000/-R.O
This office area served with VRF System. Here we Installed Duct able units & Commissioned
Successfully.
Rozan Restaurant
Client: Mr. Mohammed Al Taie
Consultant /Engineer:M/S Manarat Muscat Group of Companies
Project Valve: 132,097/-R.O
This office area served with Package unit and VRF System. Here we installed spilt ac, package
unit, vrf Duct able units and Commissioned Successfully.
Muscat Electricity Distribution Centre
Client: MEDC
Consultant /Engineer:M/S MA Design Consultant
Project Valve: 75000/-R.O
This office area served with VRF System and Package unit. Here we Installed Vrf Duct able units
and Commissioned Successfully.
Development of Majan college
Client: Majan College (University college)
Consultant /Engineer:M/s Kamal Ismail Consultant
Project Valve: 164,000/-R.O
This office area served with VRF System. Here we installed spilt unit & Duct able units and
Commissioned Successfully.
Work duties :
 Monitoring the quantities of every item as per BOQ, Certifying the bills and Coordinating with
finance department in advance for further Involved in preliminary site inspections and
Scheduling the project. Selection of vendors and suppliers.
 Inspection of current activities and facilitate the contractor to proceed further works as per
schedule and make them to full fill the requirements of Drawings, Technical & Contractual
Specifications.
 Preparing and analyzing the schedule of work with respect to contractual time frame and
alarming the contractor well in advance to keep up every milestone without any slippage due to
shortage of material, Manpower and improper planning.
 cash flow.
 Presentation of documents to make everybody understand the present situation/ status of
project by briefing with progress chart for every item.
 Organizing for periodical review / progress meetings with Contractor, Consultants and
Architects – representatives to look in to overall schedule, status of schedule in current period,
progress, backlog and clarifications in drawings if any.
 Ordering material required for commissioning, make sure all technical sides were in good
condition to carryout commissioning.
 Preparation of as-built drawings, handing over documents, final bills, raising invoices.
 Preparation of variation statement and actual debit incurred for the project.
 Major Projects Handed in Generic pvt ltd Bangalore
2)HVAC PROJECT ENGINEER July 2013 – April 2016 (3years)
GENERIC PVT LTD ,BANGALORE
 M. Moser Associates (Office Area)
This office area served with 32HP VRF System. Here we Installed Duct able units and
Commissioned Successfully.
 RNS MOTORS YASHWANTHPUR BANGALORE (Residential Area)
80 HP VRV Systems.
Installation, Testing & Commissioning done successful
 KANTEERAVA STADIUM BANGALORE (State Govt. Project)
Installation of Air Handling Units of Total Capacity 320TR. BLUE STAR UNITS
DECLARATION
I hereby declare that above mentioned details are true to best of my knowledge and I bear the
responsibility for correctness of the above mentioned particulars.
(PUNEETH H )

More Related Content

What's hot

HVAC ENGINEER
HVAC ENGINEERHVAC ENGINEER
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
robinjacob0101
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
Mudassir Nazar Dabilkar
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
Mohammed Akbar
 
New C_V (ARMAN)
New C_V (ARMAN)New C_V (ARMAN)
New C_V (ARMAN)
ARMAN ALAM
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
sathish kumar
 
Mechanical/HVAC Engineer
Mechanical/HVAC EngineerMechanical/HVAC Engineer
Mechanical/HVAC Engineer
Waqar Sardar
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
MOHAMMED ASLAM SHAREEF
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
Arun Arun
 
PABITRA HVAC DRAFTSMAN
PABITRA HVAC DRAFTSMANPABITRA HVAC DRAFTSMAN
PABITRA HVAC DRAFTSMAN
pabitra kumar sahu
 
Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CV
Rameez K
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
Khalid Eltahir
 
MEP Engineer Resume
MEP Engineer ResumeMEP Engineer Resume
MEP Engineer Resume
Mohamed Aboobakkar Sidiq
 
Kashif CV PDF
Kashif CV PDFKashif CV PDF
Kashif CV PDF
MOHAMMED KASHIF ALI
 
Resume
ResumeResume
Resume
Prasanth P
 
MEP ENGINEER
MEP ENGINEER MEP ENGINEER
MEP ENGINEER
robinjacob0101
 
Banesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBanesh Pai _ MEP Engineer
Banesh Pai _ MEP Engineer
Baneshwar Pai
 
CV Muhammed Salahuddeen, Fire Protection Engineer
CV Muhammed Salahuddeen, Fire Protection EngineerCV Muhammed Salahuddeen, Fire Protection Engineer
CV Muhammed Salahuddeen, Fire Protection Engineer
Muhammed Salahuddeen
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
Mostafa Sayed
 
MEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr ResumeMEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr Resume
Amr Sakr
 

What's hot (20)

HVAC ENGINEER
HVAC ENGINEERHVAC ENGINEER
HVAC ENGINEER
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
 
New C_V (ARMAN)
New C_V (ARMAN)New C_V (ARMAN)
New C_V (ARMAN)
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Mechanical/HVAC Engineer
Mechanical/HVAC EngineerMechanical/HVAC Engineer
Mechanical/HVAC Engineer
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
 
PABITRA HVAC DRAFTSMAN
PABITRA HVAC DRAFTSMANPABITRA HVAC DRAFTSMAN
PABITRA HVAC DRAFTSMAN
 
Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CV
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
MEP Engineer Resume
MEP Engineer ResumeMEP Engineer Resume
MEP Engineer Resume
 
Kashif CV PDF
Kashif CV PDFKashif CV PDF
Kashif CV PDF
 
Resume
ResumeResume
Resume
 
MEP ENGINEER
MEP ENGINEER MEP ENGINEER
MEP ENGINEER
 
Banesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBanesh Pai _ MEP Engineer
Banesh Pai _ MEP Engineer
 
CV Muhammed Salahuddeen, Fire Protection Engineer
CV Muhammed Salahuddeen, Fire Protection EngineerCV Muhammed Salahuddeen, Fire Protection Engineer
CV Muhammed Salahuddeen, Fire Protection Engineer
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
MEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr ResumeMEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr Resume
 

Similar to Hvac engineer

RESUME
RESUMERESUME
RESUME
Pranesh Khan
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5
Ramiz Siddiq
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
Equbal Ahmad
 
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMEngr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Muhammad Awais
 
Mohamed Fazil CV
Mohamed Fazil CVMohamed Fazil CV
Mohamed Fazil CV
Mohamed Fazil
 
Akshay Updated CV
Akshay Updated CVAkshay Updated CV
Akshay Updated CV
Akshay Ajbani ( Brahmbhatt)
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY AROKIAM
 
Venkatesh- planning CV
Venkatesh- planning CVVenkatesh- planning CV
Venkatesh- planning CV
Venkatesh -
 
CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016
Seeni Mohamed A
 
Resume 1
Resume 1Resume 1
Cv project manager
Cv project managerCv project manager
Shiva-CV
Shiva-CVShiva-CV
Resume 1
Resume 1Resume 1
Hedayatullah CV
Hedayatullah CVHedayatullah CV
Hedayatullah CV
Hedayat Shaikh
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin Shajahan
Shabin Shajahan
 
Ranjith_Kumar R - CV
Ranjith_Kumar R - CVRanjith_Kumar R - CV
Ranjith_Kumar R - CV
Ranjith Kumar Ravindran
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CV
muhammad abdullah
 
NIZAM UDDIN UPDATED CV
NIZAM UDDIN UPDATED CVNIZAM UDDIN UPDATED CV
NIZAM UDDIN UPDATED CV
nizamuddin uddin
 
Jabir CV
Jabir CVJabir CV
Jabir CV
Jabir Sharif
 
SULTAN CV 2016 MAY
SULTAN CV 2016 MAYSULTAN CV 2016 MAY
SULTAN CV 2016 MAY
sultan said
 

Similar to Hvac engineer (20)

RESUME
RESUMERESUME
RESUME
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMEngr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
 
Mohamed Fazil CV
Mohamed Fazil CVMohamed Fazil CV
Mohamed Fazil CV
 
Akshay Updated CV
Akshay Updated CVAkshay Updated CV
Akshay Updated CV
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
 
Venkatesh- planning CV
Venkatesh- planning CVVenkatesh- planning CV
Venkatesh- planning CV
 
CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016
 
Resume 1
Resume 1Resume 1
Resume 1
 
Cv project manager
Cv project managerCv project manager
Cv project manager
 
Shiva-CV
Shiva-CVShiva-CV
Shiva-CV
 
Resume 1
Resume 1Resume 1
Resume 1
 
Hedayatullah CV
Hedayatullah CVHedayatullah CV
Hedayatullah CV
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin Shajahan
 
Ranjith_Kumar R - CV
Ranjith_Kumar R - CVRanjith_Kumar R - CV
Ranjith_Kumar R - CV
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CV
 
NIZAM UDDIN UPDATED CV
NIZAM UDDIN UPDATED CVNIZAM UDDIN UPDATED CV
NIZAM UDDIN UPDATED CV
 
Jabir CV
Jabir CVJabir CV
Jabir CV
 
SULTAN CV 2016 MAY
SULTAN CV 2016 MAYSULTAN CV 2016 MAY
SULTAN CV 2016 MAY
 

Recently uploaded

basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
PauloRodrigues104553
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
Madhumitha Jayaram
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 

Recently uploaded (20)

basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 

Hvac engineer

  • 1. PUNEETH H (HVAC Project Engineer-6years of experiencein Gulfand India) Email :puneethsagardbit@gmail.com. Contact no :(+91) 9148204235 PROFESSIONAL SUMMARY  Mechanical Engineer with 6 years of work experience in middle east and in India in installation ,Testing & Commissioning of HVAC services  Specialist in HVAC& Mechanical Infrastructure project executions. KEY EXPERTISE  Budget Analysis and Cost Control of Project  Vendor Relations /Material Management  HVAC Installation ,Inspection ,Testing & Commissioning  Strategic planning and scheduling site supervision and coordination  Safety Producers/ Quality Control  Customer relations specialist .  Project scheduling shop and as built drawing ACADEMIC QUALIFICATIONS Bachelor in Mechanical Engineering | VisveshwariaTechnological university Completed B.E from DBIT (Don Bosco Institution of technology) Passing in Year 2013 Professional training program in HVAC| ACE HVAC Training Institute 2013 Completed professional training in HVAC system design, project and maintenance as per ASHRAE standards. PROFESSIONAL EXPERIENCE Companies worked with:  General Electric & Trading CO LLC , Oman . Working as HVAC Project Engineer from May 2016 – May 2019  Generic Pvt Ltd, Bangalore, India. Worked as Mechanical Engineer -- from July 2013 to April 2016. Personal Data Data of Birth : 29/03/1986 Passport no : L3389904 Issued at : Bangalore Date of issue : 19/07/2013 Date of expire : 18/07/2023 Driving License : Oman Languages Known English ,Hindi,Tamil & kannada Driving License Holding valid Oman driving license Acheivements & Extra Curriculars 1)Certificate of Appreciation for dedication and hardwork in ensuring growth of Genetco business in 2017. 2)Captained team to championship in the college VTU Tournament (2011) )Attended Installation &Troubleshooting of GREE VRV system
  • 2. Major Projects Handled in Genetco LLC 1)HVAC PROJECT ENGINEER GENETCO LLC ,OMAN MUSCAT May 2016 – May 2019 (3years) Construction of Administrative Headquarters Building Client: Salah Free Zone Consultant /Engineer:Development Techno Power Project valve:715,000/-R.O This office area served with VRF System. Here we Installed Duct able units & Commissioned Successfully. Rozan Restaurant Client: Mr. Mohammed Al Taie Consultant /Engineer:M/S Manarat Muscat Group of Companies Project Valve: 132,097/-R.O This office area served with Package unit and VRF System. Here we installed spilt ac, package unit, vrf Duct able units and Commissioned Successfully. Muscat Electricity Distribution Centre Client: MEDC Consultant /Engineer:M/S MA Design Consultant Project Valve: 75000/-R.O This office area served with VRF System and Package unit. Here we Installed Vrf Duct able units and Commissioned Successfully. Development of Majan college Client: Majan College (University college) Consultant /Engineer:M/s Kamal Ismail Consultant Project Valve: 164,000/-R.O This office area served with VRF System. Here we installed spilt unit & Duct able units and Commissioned Successfully. Work duties :  Monitoring the quantities of every item as per BOQ, Certifying the bills and Coordinating with finance department in advance for further Involved in preliminary site inspections and Scheduling the project. Selection of vendors and suppliers.  Inspection of current activities and facilitate the contractor to proceed further works as per schedule and make them to full fill the requirements of Drawings, Technical & Contractual Specifications.  Preparing and analyzing the schedule of work with respect to contractual time frame and alarming the contractor well in advance to keep up every milestone without any slippage due to shortage of material, Manpower and improper planning.  cash flow.  Presentation of documents to make everybody understand the present situation/ status of project by briefing with progress chart for every item.
  • 3.  Organizing for periodical review / progress meetings with Contractor, Consultants and Architects – representatives to look in to overall schedule, status of schedule in current period, progress, backlog and clarifications in drawings if any.  Ordering material required for commissioning, make sure all technical sides were in good condition to carryout commissioning.  Preparation of as-built drawings, handing over documents, final bills, raising invoices.  Preparation of variation statement and actual debit incurred for the project.  Major Projects Handed in Generic pvt ltd Bangalore 2)HVAC PROJECT ENGINEER July 2013 – April 2016 (3years) GENERIC PVT LTD ,BANGALORE  M. Moser Associates (Office Area) This office area served with 32HP VRF System. Here we Installed Duct able units and Commissioned Successfully.  RNS MOTORS YASHWANTHPUR BANGALORE (Residential Area) 80 HP VRV Systems. Installation, Testing & Commissioning done successful  KANTEERAVA STADIUM BANGALORE (State Govt. Project) Installation of Air Handling Units of Total Capacity 320TR. BLUE STAR UNITS DECLARATION I hereby declare that above mentioned details are true to best of my knowledge and I bear the responsibility for correctness of the above mentioned particulars. (PUNEETH H )