Mohamed Mustafa Mohamed El-Anwar is applying for a Technical Support position. He has over 15 years of experience as a General Lifting Supervisor and Lifting Plan Designer for his current employer PSP ELSEWEDY ELECTRIC POWER SYSTEM PROJECTS. Previously he has worked as a Piping Engineer, TO Engineer, and Lifting Plan designer for various power and industrial plants in Egypt. He has a Bachelor's degree in Quality Control of Production and is proficient in English and several engineering software programs.
Dear Sir
I am pleased to attach herein my personal CV, hopping to joint your respectable company. This is my phone number (00201018733999------00201206598787)
Please accept my best regard
Mohamed Roshdi
Dear Sir
I am pleased to attach herein my personal CV, hopping to joint your respectable company. This is my phone number (00201018733999------00201206598787)
Please accept my best regard
Mohamed Roshdi
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting plan designer
1. Cover Letter
Mohamed Mustafa Mohamed El-Anwar
General Lifting Supervisor & Lifting Plan Designer
+2 01225156161
67 (B) . Mustafa Fahmy St. West of Helwan, Cairo, Egypt
(Postal Code: 11421)
Dear Sir,
I am writing to enquire whether you have a vacancy in your company for a Technical
Support. I enclose a copy of my CV for your consideration.
As you will see from my CV, I am currently working for PSP ELSEWEDY ELECTRIC POWER
SYSTEM PROJECTS as the General Lifting Supervisor & Lifting Plan Designer,
In my present position (General Lifting Supervisor) I am responsible for managing all technical
and site needs.
I would be grateful if you would contact me when my resume met your acceptance, or keep
my information on file in case of future opportunities. I would welcome hearing from you.
Yours sincerely,
Mohamed Mustafa El Anwar.
2. C.V
Personal Information:
Name : Mohamed Mustafa Mohamed El-Anwar
Gender : Male
Address : 67 (B) Mustafa Fahmy St. Helwan –Egypt.
Military Status : Exempted
Marital Status : Single
Email : mohamed.el-anwar@hotmail.com
Mobile No : +02 - 0122 515 6161
Date of Birth : October 6th 1982
Education:
Bachelor of Quality Control of Production.
(Division of Technological Development),
Academy of Specialized Studies.
year of graduation 2003 (Good)
The Project is Design & Manufacturing of GUIDE & FIXING.
(98%).
Career Objective
To manage and coordinate the T.O/Site functions of Technical Office department with
specific focus on Company and Policies, Quality Management System and Safety
Management System in order to provide a superior service to all clients; both internal and
external.
Language:
Arabic : Mother Tongue.
English : Fluent (Speaking – Writing).
Computer Skills:
Pro-Structure.
Auto Spool.
Tekla Structure.
Auto CAD.
SOLIDWORKS 2016.
SAP 2000.
Primavera P6.
Microsoft office (word, excel, access, power point).
3. Industrial Engineering Courses
Production Planning (Forecasting, Inventory Management).
Operation Research.
Quality Planning & Management and Quality Assurance.
API 570, 577, 578 & 574.
ASME B31.1, B16.5 , Section IX & Section V.
Primavera.
(FE)Fundamental of engineer. [Self Study]
PDMS [Self Study].
Industrial Safety.
Manufacturing Engineering Courses
Simulation Modeling.
Manufacturing Processes (metal cutting, metal casting, welding, and measurement).
Material Science.
CAD.
Experience
** From Aug of 2016 till now
Company: PSP ELSEWEDY ELECTRIC POWER SYSTEM
PROJECTS
Location: BENI-SUEF Power Plant 4X1200 MW Combined
Cycle POWER PLANT
Job Title: General Lifting Supervisor & Lifting Plan Designer
Duties:
- Lifting plan designer.
- Review the lifting plan submitted from all subcontractors
** From Oct of 2015 to Aug of 2016
Company : GS Engineering & Construction (GS E&C)
Location : Workshop "2nd
Area” 10th
of Ramadan
Job Title : Piping Engineer (Auto Spool Operator)
Duties:
- Preparing as built for small bore, large bore and pipe support.
- Issuing Isometric from layout and P&ID.
- Material Take-off (MTO)
- Quantity Survey.
4. ** From 2013 to Oct of 2015
Company : The Egyptian Germany Company “DSD FERROMETALCO”
Location : Factory "The Head Office"
Job Title : T.O Engineer (Lifting Plan Study)
Duties:
- Preparing and issuing steel structure as built drawings.
- Preparing and issuing the study of Lifting Plan consist for :
a) Pressure Vessel Total Weight is 66 tons (Normal lifting)
b) Pressure Vessel Total Weight is 87 tons (Normal lifting)
c) Tower Total weight is 310 tons (critical lifting)
d) Roof of Nitric Aside Tank Total Weight is 22 Tons "Lifting One Shot"
e) Roof of Water Tank Total Weight is 120 Tons "Lifting Segment by Segment with King post "
f) Roof of Water Tank Total Weight is 120 Tons "Lifting One Shot"
g) Roof of Ammonia Tank Total Weight is 350 Tons "Lifting One Shot"
- Preparing and issuing the Transportation Sketch.
- Design and issuing the Shipping Frame Drawing.
- Quantity Survey.
** From 2010 to 2013
Company : The Egyptian Germany Company “DSD FERROMETALCO”
Location : Abu Qir Thermal Power Plant 2 X 650 MW Gas / Mazout Fired
Unites.
Job Title : T.O Engineer
Duties:
- Preparing and issuing steel structure as built drawings.
- Quantity Survey.
Preparing and issuing the study of Lifting Plan consist for :
a) From 10 tons to 50 tons. (Normal lifting), I prepared 77 lifting plan
b) More than 50 tons (critical lifting) “Bechtel U.S.A reviewing necessary
prepared 15 lifting study.
- Preparing the material card.
- Preparing & checking the shop drawings part lists & bill of material.
- Following up the project fabricating and solving the technical problems.
** From 2009 to 2010
Company : The Egyptian Germany Company “DSD FERROMETALCO”
Location : Eltibbien Thermal Power Plant 2 X 350 MW Gas / Mazout Fired
Unites.
Job Title : T.O Engineer
- issuing Layout & Erection drawings
- Preparing as built for small bore, large bore and pipe support (Power Plants).
- Issuing Isometric from layout and P&ID.
- Material Take-off (MTO)
- Quantity Survey.
5. ** From 2008 to 2009
Company : The Egyptian Germany Company “DSD FERROMETALCO”
Location : Factory "The Head Office"
Job Title : T.O Engineer
Duties:
- Studying the client basic drawings and preparing the material take off for the project.
- Preparing & checking the 3D modeling for detailing using the Pro-steel program
same as the 2D detailing shop drawings.
- Use model 3D layout, single part and group.
** From 2004 to 2008
Company : Nasr City for Trading and Contractors
Location :
- Alkorain (1 Main Station, 3 Substations), Alshrqia
- Alazyzya (Water Treatment Station), Alshrqia
- Port Fouad (Waste Water Treatment Station), Port-said
- Arment (1 Main Station, 2 Substations), Luxor
- Albrageel (Waste Water Main Station), Giza
Job Title : T.O Engineer
Duties:
- Preparing & checking the 3D modeling for detailing using the Pro-steel program
- Preparing & checking the shop drawings part lists & bill of material.
- issuing Layout & Erection drawings
Projects Handled
-POWER STATION ( AGHADA – STAYTHARP –GREEN)
-NEW DOHA INTERNATIONAL AIRPORT (N D I A)
-El Tebbin Thermal Power Plant Project
Client: ANSALDO caldaie
Scope: Fabrication and Erection for 2 Boilers
(250MWX2)
-Abu Qir Thermal Power Plant Project
Client: ANSALDO caldaie
Scope: Fabrication and Erection for 2 Boilers
(650MWX2)
Gabal El-Zayt Wind Farm
Client: Gamesa
Scope: Fabrication
Manufacturing of 50 Tubular Steel Towers
(G80-60M) 200 MW - KFW Project
Ethydco Ethylene Project Egypt
Client: Toyo
6. Scope: Fabrication
Manufacturing of 12 tank
Egyptian Propylene & Polypropylene Company (EPPC)
Client: Uhde
Scope: Erection
Lifting for
a) Pressure Vessel Total Weight is 66 tons.
b) Pressure Vessel Total Weight is 87 tons.
c) Tower Total weight is 310 tons.
Egypt Hydrocarbon Company Ammonium Nitrate Plant
Client: Uhde
Scope: Fabrication and Erection “Lifting with MAMMOET”
Manufacturing of 4 tank
Egyptian Refining Company (ERC) located in the
Mostorod Petroleum Complex
Client: Egyptian Refining Company (ERC)
Scope: Fabrication and Erection
BENI-SUEF Power Plant 4X1200 MW Combined Cycle
POWER PLANT
Scope: Erection for 4X1200 MW Combined Cycle POWER
PLANT
Highlights
- Worked for major Clients: ANSALDO Caldaie Successfully handled Clients point for the
site technical support.
- Good Knowledge in preparing T.O. Documents/Drawings like Lifting Plan, TQR and other
drawings
- Achieved goal of bringing about heightened recognition of the benefits of Technical
Support.
- Responsible for the receipt and recording of all incoming vendor data, its distribution within
the office and to various sites.
- Effectively coordinated with Engineering & Procurement departments to check the
requirements of T.O. and approvals, in order to avoid discrepancies.
Thank you.
Sincerely,