1
Mohamed Farid El-Sayed Gom’a
Mobile: +201090932152 El-Agamy, Alexandria
Email: eng.mohamedfarid3@gmail.com El Obour City, Cairo
CareerSynopsis:
 4 years of work experience as a Steel Structure Engineer in Thermal Power Plants
Projects in Egypt and State of Qatar.
 I have a work experience as Site Engineer at Project Services Company - Qatar
(PSCQ)from August 2016 till January 2017.
 El Masria Construction Contract (MCC) from April 2016 till August 2016.
 Site & ProductionProject Services Company (PSC)from May 2014 till April 2016.
 Maintenance Engineer DSD Ferrometalco from Sep.2013 till April 2014.
Profile Summary:
 Working within large companies system, work in a team, working with different
people with different cultures.
 Strong problem solving, organizational and time management skills.
 Preparing of Lifting Plan & Method of Statement with T.O. department and HSE
department.
 Expertise in managing the entire team including technicians and productionworkers
for completion of assignment.
Personalinformation:
 Date of Birth: 15/06/1991
 Nationality: Egyptian
 Marital status: Married
 Military service: Exempted
 Driving license: Yes
Education:
BSc. of Mechanical Power Engineering, Faculty of Engineering –Alexandria
University.
Graduation Year: 2013
Graduation grade: Good.
2
Employment History:
1) From 21/08/2016till 23/01/2017
Working at Project Services Company (PSCQ), El Wakra - Qatar:
Job Title: Steel Structure Engineer
Project:Umm EL-Houl Combined Cycle Power Plant (2200 MW)
Client: SAMSUNG for Engineering and Construction
Job Purpose: Erection Gas Turbine Building for Module 10, 20, 30 (Steel Structure)
Roles and Responsibilities:
 Follow up Erection Work progress.
 Prepare Daily report Progress for fit-up and Welding Progress.
 Provide the planning department with the daily progress for the erection work.
 Prepare the material request for the material control department.
 Preparing Lifting Plan with the technical office department and HSE department.
 Attend of daily meeting with the client to discuss the progress of the erection work.
2) From 5/4/2016 till 16/08/2016
Working at El Masria ConstructionContract(MCC), Benisuef – Egypt:
Job Title: Steel Structure Engineer
Project:BeniSuef Combined Cycle Power Plant (4800 MW)
Client: Power System Projects Company (PSP)
Job Purpose: Erection of Diffuser and Exhaust Bypass Stack (Area 31)
Roles and Responsibilities:
 Follow up Erection Work progress.
 Prepare Daily report Progress for fit-up and Welding Progress.
 Provide the planning department with the daily progress for the erection work.
 Prepare the material request for the material control department.
 Preparing Lifting Plan with the technical office department and HSE department.
 Attend of daily meeting with the client to discuss the progress of the erection work.
3
3) From May 2014 till April 2016
3. A) From 30/07/2015 to 01/04/2016
Working at ProjectServices Company (Factory), Alexandria-Egypt:
Job Title: Production Engineer
Job Purpose: Fabrication of Steel Structure and Piping.
Roles and Responsibilities:
 Follow up fit up and welding progress.
 Prepare Daily report Progress for fit-up and Welding Progress.
 Provide the planning department with the Daily Progress for the fabrication work.
 Evaluation of the workers monthly.
 Prepare the material request for the material control department.
3. B) from 09/01/2015 till 30/07/2015
Working at ProjectServices Company, North Giza – Egypt:
Job Title: Steel Structure Engineer
Project:Giza North 2250 MW Combined Cycle Power Project.
Client: STF
Job Purpose:Erection of Six Heat Recovery Steam Generator (HRSG) Steel Structure.
Roles and Responsibilities:
 Follow up Erection Work progress.
 Prepare Daily report Progress for fit-up and Welding Progress.
 Provide the planning department with the daily progress for the erection work.
 Prepare the material request for the material control department.
 Preparing Lifting Plan with the technical office department and HSE department.
 Attend of daily meeting with the client to discuss the progress of the erection work.
4
3. C) From Sep. 2014 till Jan.2015
Working at ProjectServices Company(PSCQ), El Doha – Qatar:
Job Title: Steel Structure Engineer
Project:National Museum of Qatar (NMOQ)
Client: HYUNDAI Engineering &Construction
Job Purpose: Erection of Secondary Steel
Roles and Responsibilities:
 Prepare Daily report Progress for fit-up and Welding Progress.
 Provide the planning department with the daily progress for the erection work.
 Prepare the material request for the material control department.
 Preparing Lifting Plan with the technical office department and HSE department.
 Attend of daily meeting with the client to discuss the progress of the erection work.
3. D) From May 2014 till Sep. 2014
Working at ProjectServices Company, North Giza – Egypt:
Job Title: Steel Structure Engineer
Project:Giza North 2250 MW Combined Cycle Power Project
Client: STF
Job Purpose: Erection of Six Heat Recovery Steam Generator (HRSG) Steel Structure
Roles and Responsibilities:
 Follow up Erection Work progress.
 Prepare Daily report Progress for fit-up and Welding Progress.
 Provide the planning department with the daily progress for the erection work.
 Prepare the material request for the material control department.
 Preparing Lifting Plan with the technical office department and HSE department.
 Attend of daily meeting with the client to discuss the progress of the erection work.
5
4) From Sep.2013 till April 2014
Working at DSD Ferrometalco, Abukir – Alexandria:
Job Title: Maintenance Engineer
Project:ABUQIR Power Station (2X 650 MW).
Client: ANSALDO CALDAIE S.P.A
Job Purpose:
 Erection of Pipelines Modifications.
 Installing of new Burners Modification & Maintenance of the Valves and FD fan.
SpecialSkills and Language:
Computer Skills:
 Using surfing Internet.
 Using MS Office 2010(MS Word, MS Excel, MS PowerPoint).
 Using Access and Outlook.
 Using AutoCAD 2D & 3D.
Language Skills:
 Arabic: Mother tongue.
 English: Very Good.
Soft Skills:
 Communication Skills.
 Teamwork and Collaboration.
 Problem solving.
 Adaptability.
 Critical observation.
Training, Certificates andExtensive Studies:
 Pipeline Construction
 Tanks Construction
 AutoCAD 2D & 3D
 Visual inspection test (VT) SNT-TC-1A ( Level II )
 Liquid Penetrate test (PT) SNT-TC-1A ( Level II )
 Magnetic Particle test (MT) SNT-TC-1A ( Level II )
 Summer 2010:Training in El Tebbin Power Station (DSD Ferrometalco)
 Summer 2012:Training in ABUQIR Power Station (DSD Ferrometalco)

Mohamed Farid Gomaa

  • 1.
    1 Mohamed Farid El-SayedGom’a Mobile: +201090932152 El-Agamy, Alexandria Email: eng.mohamedfarid3@gmail.com El Obour City, Cairo CareerSynopsis:  4 years of work experience as a Steel Structure Engineer in Thermal Power Plants Projects in Egypt and State of Qatar.  I have a work experience as Site Engineer at Project Services Company - Qatar (PSCQ)from August 2016 till January 2017.  El Masria Construction Contract (MCC) from April 2016 till August 2016.  Site & ProductionProject Services Company (PSC)from May 2014 till April 2016.  Maintenance Engineer DSD Ferrometalco from Sep.2013 till April 2014. Profile Summary:  Working within large companies system, work in a team, working with different people with different cultures.  Strong problem solving, organizational and time management skills.  Preparing of Lifting Plan & Method of Statement with T.O. department and HSE department.  Expertise in managing the entire team including technicians and productionworkers for completion of assignment. Personalinformation:  Date of Birth: 15/06/1991  Nationality: Egyptian  Marital status: Married  Military service: Exempted  Driving license: Yes Education: BSc. of Mechanical Power Engineering, Faculty of Engineering –Alexandria University. Graduation Year: 2013 Graduation grade: Good.
  • 2.
    2 Employment History: 1) From21/08/2016till 23/01/2017 Working at Project Services Company (PSCQ), El Wakra - Qatar: Job Title: Steel Structure Engineer Project:Umm EL-Houl Combined Cycle Power Plant (2200 MW) Client: SAMSUNG for Engineering and Construction Job Purpose: Erection Gas Turbine Building for Module 10, 20, 30 (Steel Structure) Roles and Responsibilities:  Follow up Erection Work progress.  Prepare Daily report Progress for fit-up and Welding Progress.  Provide the planning department with the daily progress for the erection work.  Prepare the material request for the material control department.  Preparing Lifting Plan with the technical office department and HSE department.  Attend of daily meeting with the client to discuss the progress of the erection work. 2) From 5/4/2016 till 16/08/2016 Working at El Masria ConstructionContract(MCC), Benisuef – Egypt: Job Title: Steel Structure Engineer Project:BeniSuef Combined Cycle Power Plant (4800 MW) Client: Power System Projects Company (PSP) Job Purpose: Erection of Diffuser and Exhaust Bypass Stack (Area 31) Roles and Responsibilities:  Follow up Erection Work progress.  Prepare Daily report Progress for fit-up and Welding Progress.  Provide the planning department with the daily progress for the erection work.  Prepare the material request for the material control department.  Preparing Lifting Plan with the technical office department and HSE department.  Attend of daily meeting with the client to discuss the progress of the erection work.
  • 3.
    3 3) From May2014 till April 2016 3. A) From 30/07/2015 to 01/04/2016 Working at ProjectServices Company (Factory), Alexandria-Egypt: Job Title: Production Engineer Job Purpose: Fabrication of Steel Structure and Piping. Roles and Responsibilities:  Follow up fit up and welding progress.  Prepare Daily report Progress for fit-up and Welding Progress.  Provide the planning department with the Daily Progress for the fabrication work.  Evaluation of the workers monthly.  Prepare the material request for the material control department. 3. B) from 09/01/2015 till 30/07/2015 Working at ProjectServices Company, North Giza – Egypt: Job Title: Steel Structure Engineer Project:Giza North 2250 MW Combined Cycle Power Project. Client: STF Job Purpose:Erection of Six Heat Recovery Steam Generator (HRSG) Steel Structure. Roles and Responsibilities:  Follow up Erection Work progress.  Prepare Daily report Progress for fit-up and Welding Progress.  Provide the planning department with the daily progress for the erection work.  Prepare the material request for the material control department.  Preparing Lifting Plan with the technical office department and HSE department.  Attend of daily meeting with the client to discuss the progress of the erection work.
  • 4.
    4 3. C) FromSep. 2014 till Jan.2015 Working at ProjectServices Company(PSCQ), El Doha – Qatar: Job Title: Steel Structure Engineer Project:National Museum of Qatar (NMOQ) Client: HYUNDAI Engineering &Construction Job Purpose: Erection of Secondary Steel Roles and Responsibilities:  Prepare Daily report Progress for fit-up and Welding Progress.  Provide the planning department with the daily progress for the erection work.  Prepare the material request for the material control department.  Preparing Lifting Plan with the technical office department and HSE department.  Attend of daily meeting with the client to discuss the progress of the erection work. 3. D) From May 2014 till Sep. 2014 Working at ProjectServices Company, North Giza – Egypt: Job Title: Steel Structure Engineer Project:Giza North 2250 MW Combined Cycle Power Project Client: STF Job Purpose: Erection of Six Heat Recovery Steam Generator (HRSG) Steel Structure Roles and Responsibilities:  Follow up Erection Work progress.  Prepare Daily report Progress for fit-up and Welding Progress.  Provide the planning department with the daily progress for the erection work.  Prepare the material request for the material control department.  Preparing Lifting Plan with the technical office department and HSE department.  Attend of daily meeting with the client to discuss the progress of the erection work.
  • 5.
    5 4) From Sep.2013till April 2014 Working at DSD Ferrometalco, Abukir – Alexandria: Job Title: Maintenance Engineer Project:ABUQIR Power Station (2X 650 MW). Client: ANSALDO CALDAIE S.P.A Job Purpose:  Erection of Pipelines Modifications.  Installing of new Burners Modification & Maintenance of the Valves and FD fan. SpecialSkills and Language: Computer Skills:  Using surfing Internet.  Using MS Office 2010(MS Word, MS Excel, MS PowerPoint).  Using Access and Outlook.  Using AutoCAD 2D & 3D. Language Skills:  Arabic: Mother tongue.  English: Very Good. Soft Skills:  Communication Skills.  Teamwork and Collaboration.  Problem solving.  Adaptability.  Critical observation. Training, Certificates andExtensive Studies:  Pipeline Construction  Tanks Construction  AutoCAD 2D & 3D  Visual inspection test (VT) SNT-TC-1A ( Level II )  Liquid Penetrate test (PT) SNT-TC-1A ( Level II )  Magnetic Particle test (MT) SNT-TC-1A ( Level II )  Summer 2010:Training in El Tebbin Power Station (DSD Ferrometalco)  Summer 2012:Training in ABUQIR Power Station (DSD Ferrometalco)