SlideShare a Scribd company logo
Resume
Mohamed Roshdi Mohamed Elsayed
General Construction Manager
E-mail:
mimmonino@yahoo.com, mohamedroshdi18@yahoo.com
EGY #00201018733999, 00201206598787
B.Sc. Engineering.First UniversityDegree
6th
of October university.University
Facultyof Engineering.Faculty
Mechanical Power Engineering.Department
Good.General Grade
Central Air Conditioning.Project Title
Industrial WaterChiller.Project Description
Excellent.Project Grade
1996.GraduationYear
18 2 1965Date OfBirth
Cairo,Egypt.Place OfBirth
Egyptian.Nationality
Married.Social Status
Exempted.MilitaryService
Objective
A challenging and responsible position where skills, education and years of practical
engineering experience as Construction will be utilized in an atmosphere for continued
career growth.
Education
Bachelor Degree in Mechanical Power Engineering, Faculty of Engineering, 6th
of October -
Egypt
Qualifications
my experience in construction and pre commissioning and have too much
experience from maint I started my career as a site engineer ,I was involved in a
construction for Cement mills in (Helwan Cement company) for one year, I
worked as site engineer in construction for steam turbine and Bop for thermal plant
(1*350 MW) in Assuit power plant.
Then I transferred to the new project in (Cairo west power plant) (2*350 MW)
thermal plant to follow the construction for turbine and BOP.
and I employed in (Assuit thermal power plant (1*350 MW) as site engineer
responsible for the construction and pre-commissioning for steam turbine and BOP
Then I transferred to the new project in( ELKORIMAT power plant (2*650 MW)as
site lead mechanical engineer responsible for the construction and pre-commissioning for
steam turbine and BOP
Then I transferred to the new project in (sidi karair power plant 2*375M W ) as site lead
Engineer responsible for the construction and pre-commissioning for steam turbine and
BOP all my Qualification is all the power plant sample cycle and combined cycle also
steam turbine some project petrochemicals and petroleum in Egypt enance all the pump
compressors and turbine
Client / Project: assiut power plant project Gas Turbine GE frame ( 9E 8*125 MW )
Duration: Jan 17 2015 UN til now
Location: Egypt
Position: general construction manager
Company: orascom construction industrial and GE(General electric )
Client / Project: Banha power plant (1*750)
Duration: FEB 2013 To act 2014
Location: Egypt
Position: project manager
Company : Elhasamiah group
Responsibility: construction 2 HSRG 250MW and pre commissioning
Client / Project: Ismailiyah power plant GAS Turbine GE Frame (9E 8*125)
Duration: Ayg2011 TO Dec 2012
Location: Egypt
Position: Site manager
Company: Kahromika mechanical and electric under super vison G E
Responsibility: All the site construction for sample cycle power plants and
commissioning with receive T O C
Client / Project: Cairo west power plant( 2*375 MW )steam turbine MHI
(Mitsubishi)
Duration: Jen 2009 TO Aug 2011
Location: Egypt
Position: Site manager
Company: Kahromika mechanical and electric under super vision mitsubishi
Responsibility: insulation two steam turbine un tell receive TOC
Client / Project: Qatar liquid natural Gas turbine for (N 2 CU3 mixer) 6*125 MW
Duration: Aug 2008 TO Jen 2009
Location: Egypt
Position: Section head engineer with
Company: C C C under supervision CTJV
Responsibility: Installing 6 turbine *125 and compressor 1300 --- 1500 p all the
activity
Client / Project: fabrication overhead crane( DEMAJ )
Duration: AUG 2003 TO NOV 2007
Location: Italy
Position: mechanical supervisor
Company: DEMAJ Italy
Responsibility: work shop fabrication overhead crane for everything mechanical
and electric also maintenance
Client / Project: Franz thermal power plant 2*650 MW
Duration: Jul2002 TO JUL 2003
Location: Italy
Position: mechanical supervisor
Company: TECHNIT CIMI MONTUBI
Responsibility: in stallion Steam Turbine and commissioning also all auxiliary
pumps feed water pump --- pump hose
Client / Project: EAST port said power plant 2*350 MW
Duration: oct 2001 TO May 2002
Location: Egypt
Position: lead site engineer
Company: TECHNIT CIMI MONTUBI
Responsibility: in stallion Steam Turbine and commissioning also all auxiliary
pumps feed water pump --- pump hose
Client / Project: petro chemical AIN EL SOKHNA project
Duration: DEC 1999 TO OCT 2001
Location: Egypt
Position: lead site engineer
Company: TECHNIT CIMI MONTUBI
Responsibility: in stallion equipment pumps gas compressor and static
equipment and commissioning also all auxiliary pumps
Client / Project :ANSDK (Alex. National iron & steel CO
Duration: JUN 1998 TO NOV 1999
Location: Egypt
Position: Mechanical site Engineer
Company: SIMENS
Responsibility: in stallion equipment pumps gas compressor and static
equipment and commissioning also all auxiliary pumps
Client / Project: SIDIKRER thermal power plant 2*320 MW
Duration: NOV 1997 TO oct 1998
Location: Egypt
Position: Mechanical site Engineer
Company: NOVA CIMiMONTOUBI
Responsibility: Construction, commissioning ,operation and maintenance for
steam turbine ,boiler feed water pumps ,cooling sys and distillation
power plant.
Client / Project: elkuriemat thermal power plant 2*650MW
Duration: JEN 1995 TO OCT 1997
Location: Egypt
Position: Mechanical site Engineer
company NOVA CIMiMONTOUBI
Responsibility: Construction, commissioning, operation and maintenance for
steam turbine, boiler feed water pumps ,cooling sys and distillation
power plant
Client / Project: assiut thermal power plant 1*320
Duration: dec1993 TO JEN1995
Location: Egypt
Position: Mechanical supervisor
Company :A B B sa sadalmi
Responsibility: : Construction, commissioning, operation and maintenance for
steam turbine, boiler feed water pumps ,cooling sys and distillation
power plant
Client / Project: Cairo west power plant 1*320
Duration: JEN 1992 TO DEC1993
Location: Egypt
Position: Mechanical supervisor
Company NOVA CHIMIMONTUBI
Responsibility: : Construction, commissioning, operation and maintenance for
steam turbine, boiler feed water pumps ,cooling sys and distillation
power plant
Client / Project: assiut thermal power plant 1*320
Duration: JUL1990TO JEN1992
Location: Egypt
Position: Mechanical supervisor
Company : TOSHIBA
Responsibility: Construction, commissioning, operation and maintenance for
steam turbine, boiler feed water pumps, cooling system
Client / Project: CEMENT PORTALAND HELWAN
Duration: JUL1989TO JUL1990
Location: Egypt
Position: Mechanical supervisor
Company : TOSHIBA
Responsibility: Construction, commissioning, operation and maintenance for
steam turbine, boiler feed water pumps, cooling system
Engineering Skills
- Development Planning scheduling, conducting and co-coordinating the technical
aspects of projects, and Programs for following and forecast all Project
Engineering activities using planning software.
- Assist of preparations, review; follow up of engineering project/technical proposals
for Rotating Equipment , Pumps, ESP (Electric Submersible) Pumps, Turbines,
fans and piping)
- Development with Process Engineering the Systematization and Prioritization
Utilities and Process Systems in order to establish responsible Owners for Pre
Commissioning, Commissioning and Start Up.
- Coordination with operation personnel al the Documentation and Procedures for
Commissioning and Start Up.
- Develop of KPI’s (Key Performance Indicators) for monitoring performance in
equipment operations and take corrective actions.
- Software packages (Windows Office )
- Field assistance and supervision in construction phase for equipment installation,
Pre Commissioning, Turn Over, Commissioning and Start Up.
- Coordination meetings with Operations, and Sub Contractors.
Computer Skills
Operating Systems.
- Office Systems.
- Adobe Acrobat Professional.
- Microsoft Office Word.
- Microsoft Excel
Utilities.
- Utilities Programs.
- Internet
Personal skills
- Interactive and fast enough to learn new technologies and Languages.
- Highly Communication Skills.
- Leadership Abilities.
- Self-Motivated.
- Desire to succeed and willing to learn.
- Hard working.
- Ability to work in a group or individually according to the job
requirements.
- Good time-management and organizational skills.
- Willing to take any courses or tasks that can help to improve my skills &
getting the out of me.
Languages
- Native Language: Arabic.
- Very good Command of Spoken & Written English.

More Related Content

What's hot

ahamd ezz eng cv 2015
ahamd ezz eng cv 2015ahamd ezz eng cv 2015
ahamd ezz eng cv 2015Ahmed Ezz
 
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed El-Anwar
 
SRI MECHANICAL DEPARTMENT
SRI MECHANICAL DEPARTMENTSRI MECHANICAL DEPARTMENT
SRI MECHANICAL DEPARTMENT
SRI Datia
 
CV_Alaa Eldin_Mech
CV_Alaa Eldin_MechCV_Alaa Eldin_Mech
CV_Alaa Eldin_MechAlaa El Deen
 
Mohmoud-Abdelrahem----------
Mohmoud-Abdelrahem----------Mohmoud-Abdelrahem----------
Mohmoud-Abdelrahem----------Mahmoud Elsharafy
 
Eng mostafa magdy cv
Eng mostafa magdy cvEng mostafa magdy cv
Eng mostafa magdy cvmostafa magdy
 
mohamed salem cv final
mohamed salem cv finalmohamed salem cv final
mohamed salem cv finalmohamed salem
 
Bassem Nabegh Boshra
Bassem Nabegh Boshra Bassem Nabegh Boshra
Bassem Nabegh Boshra Bassem Boshra
 
Resume Mech. Eng-Mohamed Zaher
Resume Mech. Eng-Mohamed ZaherResume Mech. Eng-Mohamed Zaher
Resume Mech. Eng-Mohamed ZaherEng Mohamed Zaher
 

What's hot (20)

C.V-Moisés Pedro1
C.V-Moisés Pedro1C.V-Moisés Pedro1
C.V-Moisés Pedro1
 
ahamd ezz eng cv 2015
ahamd ezz eng cv 2015ahamd ezz eng cv 2015
ahamd ezz eng cv 2015
 
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
 
SRI MECHANICAL DEPARTMENT
SRI MECHANICAL DEPARTMENTSRI MECHANICAL DEPARTMENT
SRI MECHANICAL DEPARTMENT
 
CV
CVCV
CV
 
CV_Alaa Eldin_Mech
CV_Alaa Eldin_MechCV_Alaa Eldin_Mech
CV_Alaa Eldin_Mech
 
Ahmad-Adnan cv
Ahmad-Adnan cvAhmad-Adnan cv
Ahmad-Adnan cv
 
cv 16
cv 16cv 16
cv 16
 
resume-
resume-resume-
resume-
 
Mohmoud-Abdelrahem----------
Mohmoud-Abdelrahem----------Mohmoud-Abdelrahem----------
Mohmoud-Abdelrahem----------
 
Eng mostafa magdy cv
Eng mostafa magdy cvEng mostafa magdy cv
Eng mostafa magdy cv
 
mohamed salem cv final
mohamed salem cv finalmohamed salem cv final
mohamed salem cv final
 
C.v
C.vC.v
C.v
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
Bassem Nabegh Boshra
Bassem Nabegh Boshra Bassem Nabegh Boshra
Bassem Nabegh Boshra
 
A_vivek
A_vivekA_vivek
A_vivek
 
Resume Mech. Eng-Mohamed Zaher
Resume Mech. Eng-Mohamed ZaherResume Mech. Eng-Mohamed Zaher
Resume Mech. Eng-Mohamed Zaher
 
OMRAN CV
OMRAN CVOMRAN CV
OMRAN CV
 
Cv qc (002)
Cv qc (002)Cv qc (002)
Cv qc (002)
 
Amgad Cv 2014
Amgad Cv 2014Amgad Cv 2014
Amgad Cv 2014
 

Viewers also liked

Global Technical Services - Company Profile
Global Technical Services - Company ProfileGlobal Technical Services - Company Profile
Global Technical Services - Company Profile
sherif fathy
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Mohamed Mustafa
 
CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...
CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...
CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...Alaa abdelkader
 
Ali Khater's Resume
Ali Khater's ResumeAli Khater's Resume
Ali Khater's ResumeAli Khater
 
Mechanical engineer cv
Mechanical engineer cvMechanical engineer cv
Mechanical engineer cvmustafaghazy
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cv
saryhasabadly
 

Viewers also liked (10)

walid
walidwalid
walid
 
M.Reda CV
M.Reda CVM.Reda CV
M.Reda CV
 
Mahmoud
MahmoudMahmoud
Mahmoud
 
Global Technical Services - Company Profile
Global Technical Services - Company ProfileGlobal Technical Services - Company Profile
Global Technical Services - Company Profile
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
CV
CV CV
CV
 
CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...
CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...
CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...
 
Ali Khater's Resume
Ali Khater's ResumeAli Khater's Resume
Ali Khater's Resume
 
Mechanical engineer cv
Mechanical engineer cvMechanical engineer cv
Mechanical engineer cv
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cv
 

Similar to Moh roshdy curriculum vitae docxaaa

ENG- AhmedHussien _ CV
ENG- AhmedHussien _ CVENG- AhmedHussien _ CV
ENG- AhmedHussien _ CVAhmed Hussien
 
SITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - CopySITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - Copyyoussef youssef
 
instrument supervisor
instrument supervisorinstrument supervisor
instrument supervisorhosam issa
 
eng. khaled sonbol (cv)
eng. khaled sonbol (cv)eng. khaled sonbol (cv)
eng. khaled sonbol (cv)khaled sonbol
 
Mohamed Ahmed Gado
Mohamed Ahmed GadoMohamed Ahmed Gado
Mohamed Ahmed Gadomohamed Gado
 
CV OF AHMED AHMED ELSAED 27 OCT 2015
CV OF AHMED AHMED ELSAED 27 OCT 2015CV OF AHMED AHMED ELSAED 27 OCT 2015
CV OF AHMED AHMED ELSAED 27 OCT 2015ahmed elsyed
 
AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04Ahmed gemeiy
 
Eng.mahmoud salah c.v correct
Eng.mahmoud salah c.v correctEng.mahmoud salah c.v correct
Eng.mahmoud salah c.v correctmahmoud salah
 
e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015mahmoud gaber
 
Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFA
AhmedAttia136
 

Similar to Moh roshdy curriculum vitae docxaaa (20)

ENG- AhmedHussien _ CV
ENG- AhmedHussien _ CVENG- AhmedHussien _ CV
ENG- AhmedHussien _ CV
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
 
100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy
 
mohamed rabea CV
mohamed rabea CVmohamed rabea CV
mohamed rabea CV
 
SITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - CopySITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - Copy
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
elsayed cv last
elsayed cv lastelsayed cv last
elsayed cv last
 
instrument supervisor
instrument supervisorinstrument supervisor
instrument supervisor
 
eng. khaled sonbol (cv)
eng. khaled sonbol (cv)eng. khaled sonbol (cv)
eng. khaled sonbol (cv)
 
mohamed abdel atye (3) (1)
mohamed abdel atye (3) (1)mohamed abdel atye (3) (1)
mohamed abdel atye (3) (1)
 
Mohamed Ahmed Gado
Mohamed Ahmed GadoMohamed Ahmed Gado
Mohamed Ahmed Gado
 
M.adel_CV
M.adel_CVM.adel_CV
M.adel_CV
 
M.adel_CV
M.adel_CVM.adel_CV
M.adel_CV
 
CV OF AHMED AHMED ELSAED 27 OCT 2015
CV OF AHMED AHMED ELSAED 27 OCT 2015CV OF AHMED AHMED ELSAED 27 OCT 2015
CV OF AHMED AHMED ELSAED 27 OCT 2015
 
AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04
 
HD CV SHORT WORD rev 03
HD CV SHORT WORD rev 03HD CV SHORT WORD rev 03
HD CV SHORT WORD rev 03
 
Eng.mahmoud salah c.v correct
Eng.mahmoud salah c.v correctEng.mahmoud salah c.v correct
Eng.mahmoud salah c.v correct
 
e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015
 
C.V.-Mohamed Alsharkawy-2016
C.V.-Mohamed Alsharkawy-2016 C.V.-Mohamed Alsharkawy-2016
C.V.-Mohamed Alsharkawy-2016
 
Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFA
 

Recently uploaded

LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 

Recently uploaded (20)

LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 

Moh roshdy curriculum vitae docxaaa

  • 1. Resume Mohamed Roshdi Mohamed Elsayed General Construction Manager E-mail: mimmonino@yahoo.com, mohamedroshdi18@yahoo.com EGY #00201018733999, 00201206598787 B.Sc. Engineering.First UniversityDegree 6th of October university.University Facultyof Engineering.Faculty Mechanical Power Engineering.Department Good.General Grade Central Air Conditioning.Project Title Industrial WaterChiller.Project Description Excellent.Project Grade 1996.GraduationYear 18 2 1965Date OfBirth Cairo,Egypt.Place OfBirth Egyptian.Nationality Married.Social Status Exempted.MilitaryService
  • 2. Objective A challenging and responsible position where skills, education and years of practical engineering experience as Construction will be utilized in an atmosphere for continued career growth. Education Bachelor Degree in Mechanical Power Engineering, Faculty of Engineering, 6th of October - Egypt Qualifications my experience in construction and pre commissioning and have too much experience from maint I started my career as a site engineer ,I was involved in a construction for Cement mills in (Helwan Cement company) for one year, I worked as site engineer in construction for steam turbine and Bop for thermal plant (1*350 MW) in Assuit power plant. Then I transferred to the new project in (Cairo west power plant) (2*350 MW) thermal plant to follow the construction for turbine and BOP. and I employed in (Assuit thermal power plant (1*350 MW) as site engineer responsible for the construction and pre-commissioning for steam turbine and BOP Then I transferred to the new project in( ELKORIMAT power plant (2*650 MW)as site lead mechanical engineer responsible for the construction and pre-commissioning for steam turbine and BOP Then I transferred to the new project in (sidi karair power plant 2*375M W ) as site lead Engineer responsible for the construction and pre-commissioning for steam turbine and BOP all my Qualification is all the power plant sample cycle and combined cycle also steam turbine some project petrochemicals and petroleum in Egypt enance all the pump compressors and turbine
  • 3. Client / Project: assiut power plant project Gas Turbine GE frame ( 9E 8*125 MW ) Duration: Jan 17 2015 UN til now Location: Egypt Position: general construction manager Company: orascom construction industrial and GE(General electric ) Client / Project: Banha power plant (1*750) Duration: FEB 2013 To act 2014 Location: Egypt Position: project manager Company : Elhasamiah group Responsibility: construction 2 HSRG 250MW and pre commissioning Client / Project: Ismailiyah power plant GAS Turbine GE Frame (9E 8*125) Duration: Ayg2011 TO Dec 2012 Location: Egypt Position: Site manager Company: Kahromika mechanical and electric under super vison G E Responsibility: All the site construction for sample cycle power plants and commissioning with receive T O C
  • 4. Client / Project: Cairo west power plant( 2*375 MW )steam turbine MHI (Mitsubishi) Duration: Jen 2009 TO Aug 2011 Location: Egypt Position: Site manager Company: Kahromika mechanical and electric under super vision mitsubishi Responsibility: insulation two steam turbine un tell receive TOC Client / Project: Qatar liquid natural Gas turbine for (N 2 CU3 mixer) 6*125 MW Duration: Aug 2008 TO Jen 2009 Location: Egypt Position: Section head engineer with Company: C C C under supervision CTJV Responsibility: Installing 6 turbine *125 and compressor 1300 --- 1500 p all the activity Client / Project: fabrication overhead crane( DEMAJ ) Duration: AUG 2003 TO NOV 2007 Location: Italy Position: mechanical supervisor Company: DEMAJ Italy Responsibility: work shop fabrication overhead crane for everything mechanical and electric also maintenance
  • 5. Client / Project: Franz thermal power plant 2*650 MW Duration: Jul2002 TO JUL 2003 Location: Italy Position: mechanical supervisor Company: TECHNIT CIMI MONTUBI Responsibility: in stallion Steam Turbine and commissioning also all auxiliary pumps feed water pump --- pump hose Client / Project: EAST port said power plant 2*350 MW Duration: oct 2001 TO May 2002 Location: Egypt Position: lead site engineer Company: TECHNIT CIMI MONTUBI Responsibility: in stallion Steam Turbine and commissioning also all auxiliary pumps feed water pump --- pump hose Client / Project: petro chemical AIN EL SOKHNA project Duration: DEC 1999 TO OCT 2001 Location: Egypt Position: lead site engineer Company: TECHNIT CIMI MONTUBI Responsibility: in stallion equipment pumps gas compressor and static equipment and commissioning also all auxiliary pumps
  • 6. Client / Project :ANSDK (Alex. National iron & steel CO Duration: JUN 1998 TO NOV 1999 Location: Egypt Position: Mechanical site Engineer Company: SIMENS Responsibility: in stallion equipment pumps gas compressor and static equipment and commissioning also all auxiliary pumps Client / Project: SIDIKRER thermal power plant 2*320 MW Duration: NOV 1997 TO oct 1998 Location: Egypt Position: Mechanical site Engineer Company: NOVA CIMiMONTOUBI Responsibility: Construction, commissioning ,operation and maintenance for steam turbine ,boiler feed water pumps ,cooling sys and distillation power plant. Client / Project: elkuriemat thermal power plant 2*650MW Duration: JEN 1995 TO OCT 1997 Location: Egypt Position: Mechanical site Engineer company NOVA CIMiMONTOUBI Responsibility: Construction, commissioning, operation and maintenance for steam turbine, boiler feed water pumps ,cooling sys and distillation power plant
  • 7. Client / Project: assiut thermal power plant 1*320 Duration: dec1993 TO JEN1995 Location: Egypt Position: Mechanical supervisor Company :A B B sa sadalmi Responsibility: : Construction, commissioning, operation and maintenance for steam turbine, boiler feed water pumps ,cooling sys and distillation power plant Client / Project: Cairo west power plant 1*320 Duration: JEN 1992 TO DEC1993 Location: Egypt Position: Mechanical supervisor Company NOVA CHIMIMONTUBI Responsibility: : Construction, commissioning, operation and maintenance for steam turbine, boiler feed water pumps ,cooling sys and distillation power plant Client / Project: assiut thermal power plant 1*320 Duration: JUL1990TO JEN1992 Location: Egypt Position: Mechanical supervisor Company : TOSHIBA Responsibility: Construction, commissioning, operation and maintenance for steam turbine, boiler feed water pumps, cooling system
  • 8. Client / Project: CEMENT PORTALAND HELWAN Duration: JUL1989TO JUL1990 Location: Egypt Position: Mechanical supervisor Company : TOSHIBA Responsibility: Construction, commissioning, operation and maintenance for steam turbine, boiler feed water pumps, cooling system
  • 9. Engineering Skills - Development Planning scheduling, conducting and co-coordinating the technical aspects of projects, and Programs for following and forecast all Project Engineering activities using planning software. - Assist of preparations, review; follow up of engineering project/technical proposals for Rotating Equipment , Pumps, ESP (Electric Submersible) Pumps, Turbines, fans and piping) - Development with Process Engineering the Systematization and Prioritization Utilities and Process Systems in order to establish responsible Owners for Pre Commissioning, Commissioning and Start Up. - Coordination with operation personnel al the Documentation and Procedures for Commissioning and Start Up. - Develop of KPI’s (Key Performance Indicators) for monitoring performance in equipment operations and take corrective actions. - Software packages (Windows Office ) - Field assistance and supervision in construction phase for equipment installation, Pre Commissioning, Turn Over, Commissioning and Start Up. - Coordination meetings with Operations, and Sub Contractors. Computer Skills Operating Systems. - Office Systems. - Adobe Acrobat Professional. - Microsoft Office Word. - Microsoft Excel Utilities. - Utilities Programs. - Internet
  • 10. Personal skills - Interactive and fast enough to learn new technologies and Languages. - Highly Communication Skills. - Leadership Abilities. - Self-Motivated. - Desire to succeed and willing to learn. - Hard working. - Ability to work in a group or individually according to the job requirements. - Good time-management and organizational skills. - Willing to take any courses or tasks that can help to improve my skills & getting the out of me. Languages - Native Language: Arabic. - Very good Command of Spoken & Written English.