Eng. Osama Hussein
OsamaMohamedMohamedHussein
Personal Information:
Address : Cairo, 17 El Tahrir St, El Amiria, El Zayton.
Mobile : +2-01003529745
E-mail Address : osama.hussein@asecautomation.com
husseinosama@gmail.com
Date of Birth : 6 Mar -1978
Marital Status : Married.
Nationality : Egyptian.
Military Service : Completed.
Languages : Arabic (mother tongue),
English (very good reading, writing & spoken)
Education:
B.S. of Electrical Engineering - Electrical Power & Machines Dept.
Faculty of Engineering
Helwan University, 2002
Years of Experience:
12 Year
Main Field of Experience:
Cement & Waste Water & Chemical Industry
Page 2/4
Eng. Osama Hussein
Summary of Capabilities:
ď‚· Carrying out of the design, workshop drawings, load estimation, following-up of Electrical
installations, Commissioning and handing over for the Project.
 Issuing PR’s for all Material Related to Project,
ď‚· Working as a Project Team Leader from Tendering Phase up to Start up Phase, Leading a Team
of Engineers and Technicians during Engineering and Commissioning Activities.
ď‚· Reporting to Technical and Project Manager.
ď‚· Following up the Project Management Skills and Procedure to Fulfill the Project Target (Cost
and Time).
ď‚· Having solid background in using software packages directly related to my field, such as
AutoCAD, Microsoft Package, applications for electrical engineering, design and calculation
software.
ď‚· Sharing and Leading for a lot of Projects in Cement field inside and outside Egypt.
ď‚· Working in With Different Clients Like
LAFARGE– CEMEX - ITALCEMENT – CIMPOR TEC – KHD – TITAN -
ď‚· Ability to Work in foreign Countries.
Page 3/4
Eng. Osama Hussein
Professional Experience:
From January 2006 till now:
ď‚· Company: ASEC Automation ASA (Arab Swiss Engineering Company) (ASEC Group)
ď‚· Division: Technical Department (Design Office)
ď‚· Job Title: Electrical Team Leader Engineer.
Responsibilities:
Lead a Team of Electrical Engineer to Perform the Following Jobs:
Design Office Activities:
ď‚· Define, design and implement project specifications.
ď‚· Issuing the Purchasing Requests for all material related to the Electrical Design and the
Project Standard.
ď‚· Preparing the Electrical Design & Technical Drawing for the Cement Industry Projects
(MCC, ACC, MP (Digital / Analogue), PLC Panel, Trouble Shooting Diagram, etc…)
ď‚· Ensure project work is done within defined standards and guidelines.
ď‚· Preparing FAT and SAT Test.
ď‚· Commissioning and Start up of the Projects.
ď‚· AS Built and Handing Over for the Projects.
Site Erection, Commissioning and Start Up:
ď‚· Reviewing and Insuring that the Erection Work as Per Design Engineering.
ď‚· Commissioning for Power transformers.
ď‚· Energizing Electrical Panels MCC, ACC, Lighting, UPS, IO, Battery Charger Systems.
ď‚· Power Cable Continuity and Meggering Test.
ď‚· Control Cables Continuity Test.
ď‚· Motor Cold Run Test.
ď‚· Motor Hot Run Test.
ď‚· Digital and Analogue Sensor Test.
ď‚· Sequence Test.
ď‚· Starting Up.
Page 4/4
Eng. Osama Hussein
From Jan. 2005 Till Jan.2006
ď‚· Company: ASEC Automation ASA (Arab Swiss Engineering Company) (ASEC Group)
ď‚· Division: Technical Department (Design Office)
ď‚· Job Title: Procurement Engineer.
ď‚·
ď‚· Responsibilities:
ď‚· Studying purchase requests and defining manufacturers and suppliers which fulfill the
required technical specifications.
ď‚· Find alternatives according to technical requirements.
ď‚· Comparing and evaluating offers from different suppliers to Select the best one, achieving
Technical and commercial requirements according to our contract, authorized budget
and Project schedule.
ď‚· Preparing purchase orders for local and foreigner suppliers including technical specs and
Commercial conditions.
From Sep 2003 to Dec 2004
ď‚· Company: CEGELEC
ď‚· Division: Technical Department.
ď‚· Job Title: Electrical Site Engineer
ď‚· Project : WASTE WATER TREATMENT PROJ _ EL GABAL EL ASFAR _ CONTRACT 19
ď‚· Responsibilities:
Leading a team of Super visors and Technician to do the following:
ď‚· Installation of Electrical Panels.
ď‚· Pulling Power and Control Cables according to Design Route.
ď‚· Electro mechanical Coordination for installation of fire Fighting, plumping, HVAC Systems.
ď‚· Technical Meeting with consultant.
ď‚· Solving site Problems
Finally I would like to thank you for reading my resume
Eng.Osama Hussein

Osama Hussein CV.

  • 1.
    Page 1/4 Eng. OsamaHussein OsamaMohamedMohamedHussein Personal Information: Address : Cairo, 17 El Tahrir St, El Amiria, El Zayton. Mobile : +2-01003529745 E-mail Address : osama.hussein@asecautomation.com husseinosama@gmail.com Date of Birth : 6 Mar -1978 Marital Status : Married. Nationality : Egyptian. Military Service : Completed. Languages : Arabic (mother tongue), English (very good reading, writing & spoken) Education: B.S. of Electrical Engineering - Electrical Power & Machines Dept. Faculty of Engineering Helwan University, 2002 Years of Experience: 12 Year Main Field of Experience: Cement & Waste Water & Chemical Industry
  • 2.
    Page 2/4 Eng. OsamaHussein Summary of Capabilities:  Carrying out of the design, workshop drawings, load estimation, following-up of Electrical installations, Commissioning and handing over for the Project.  Issuing PR’s for all Material Related to Project,  Working as a Project Team Leader from Tendering Phase up to Start up Phase, Leading a Team of Engineers and Technicians during Engineering and Commissioning Activities.  Reporting to Technical and Project Manager.  Following up the Project Management Skills and Procedure to Fulfill the Project Target (Cost and Time).  Having solid background in using software packages directly related to my field, such as AutoCAD, Microsoft Package, applications for electrical engineering, design and calculation software.  Sharing and Leading for a lot of Projects in Cement field inside and outside Egypt.  Working in With Different Clients Like LAFARGE– CEMEX - ITALCEMENT – CIMPOR TEC – KHD – TITAN -  Ability to Work in foreign Countries.
  • 3.
    Page 3/4 Eng. OsamaHussein Professional Experience: From January 2006 till now:  Company: ASEC Automation ASA (Arab Swiss Engineering Company) (ASEC Group)  Division: Technical Department (Design Office)  Job Title: Electrical Team Leader Engineer. Responsibilities: Lead a Team of Electrical Engineer to Perform the Following Jobs: Design Office Activities:  Define, design and implement project specifications.  Issuing the Purchasing Requests for all material related to the Electrical Design and the Project Standard.  Preparing the Electrical Design & Technical Drawing for the Cement Industry Projects (MCC, ACC, MP (Digital / Analogue), PLC Panel, Trouble Shooting Diagram, etc…)  Ensure project work is done within defined standards and guidelines.  Preparing FAT and SAT Test.  Commissioning and Start up of the Projects.  AS Built and Handing Over for the Projects. Site Erection, Commissioning and Start Up:  Reviewing and Insuring that the Erection Work as Per Design Engineering.  Commissioning for Power transformers.  Energizing Electrical Panels MCC, ACC, Lighting, UPS, IO, Battery Charger Systems.  Power Cable Continuity and Meggering Test.  Control Cables Continuity Test.  Motor Cold Run Test.  Motor Hot Run Test.  Digital and Analogue Sensor Test.  Sequence Test.  Starting Up.
  • 4.
    Page 4/4 Eng. OsamaHussein From Jan. 2005 Till Jan.2006 ď‚· Company: ASEC Automation ASA (Arab Swiss Engineering Company) (ASEC Group) ď‚· Division: Technical Department (Design Office) ď‚· Job Title: Procurement Engineer. ď‚· ď‚· Responsibilities: ď‚· Studying purchase requests and defining manufacturers and suppliers which fulfill the required technical specifications. ď‚· Find alternatives according to technical requirements. ď‚· Comparing and evaluating offers from different suppliers to Select the best one, achieving Technical and commercial requirements according to our contract, authorized budget and Project schedule. ď‚· Preparing purchase orders for local and foreigner suppliers including technical specs and Commercial conditions. From Sep 2003 to Dec 2004 ď‚· Company: CEGELEC ď‚· Division: Technical Department. ď‚· Job Title: Electrical Site Engineer ď‚· Project : WASTE WATER TREATMENT PROJ _ EL GABAL EL ASFAR _ CONTRACT 19 ď‚· Responsibilities: Leading a team of Super visors and Technician to do the following: ď‚· Installation of Electrical Panels. ď‚· Pulling Power and Control Cables according to Design Route. ď‚· Electro mechanical Coordination for installation of fire Fighting, plumping, HVAC Systems. ď‚· Technical Meeting with consultant. ď‚· Solving site Problems Finally I would like to thank you for reading my resume Eng.Osama Hussein