SlideShare a Scribd company logo
MOHAMED ROSHDI MIHAMED
ELSAYED
Project Manager
18th
Feb 1965
Cairo, Egypt
Current Project: Al-Burullus Combined
Cycle
Power Plant (CPP)
Mobile: +201018733999
+201206598787
E-mails: mimmonino@yahoo.com
mohamedroshdi18@yahoo.com
Nationality: Egyptian
Marital Status: Married
A trilingual Project Manager who’s never missed up the academic engineering and fundamentals with that long
career timeline and dozens of experiences, up to two decades of engineering national and international experience
in both power plants and oil & gas projects; troubleshooting any technical obstacles with a complete
consideration of safety and quality concepts, managing my team to the great milestones. And it still remains; a
new project, a new challenge.
EMPLOYMENT TIMELINE
IREAM SPA
Job Title: Site Manager
Project: AlBurullus Combined cycle [4800MW]
Category: Power Plants
Overall responsibility for the combined cycle
.Installation of GAS, Steam turbine, HRSG,
BOP.Responsible for the site constructions.
Managing the team to achieve the accurate milestones
designed for the project Responsible for the pre-
commissioning procedures first fire and commissioning
1Agoust 2016 To Jan 2017
Location : Alburullus , Egypt
GE / Orascom JV
Job Title: General Construction Manager
Project: Assiut Combined Cycle [8X125]MW.
Category: Power Plants
17th
January 2015 to June 2016
Location: Assiut, Egypt
 Responsible for the site constructions. pre-commissioning procedures first fire and commissioning
 Accomplishing the milestones in time. Outage calibration, functional checks Troubleshooting
 Disassembly, Inspection, Reassembly Procedure Writing
 Problem Solving Technical Assistance Planning / Scheduling Turbine Auxiliary Systems Lube Oil System Hydraulic
supple, Cooling and Sealing Air System Fuel Gas System Fuel Oil System Fuel Forwarding System NOx Control
System Atomizing Air System Inlet Guide Vane System Compressor Cleaning System Inlet System Starting System
Protection System
Al-Hashemiah International Contracting Group
(HICC)
Job Title: Project Manager
Project: Ain EL Sokhna super critical power plant
Category: coal-fired Power Plants
February 2013 to October 2014
Location: Benha, Egypt
 Installation and commissioning of two steam turbine Mitsubishi oil flashing 2*650 MW
 Responsible for erection and commissioning of two boiler super critical
 Installation piping critical noncritical SS pipe and all the hydro test Bop Equipment Feed water pump condensate
pump cwp pump
 Travelling water screen and all Bop piping doing hydro test chemical clean
 Steam blow finishing until Responsible for the pre-commissioning Procedures hydro test steam blow and
commissioning
KahroMecha Misr for Mechanical & Electrical Projects
Job Title: Site Manager
Project: Ismailia Power Plant Gas Turbine GE Frame 9E
[8X125] MW
Category: Power Plants
August 2011 to December 2012
Location: Ismailia, Egypt
Responsible for all site constructions for the simple cycle PP under GE supervisor
Commissioning responsibility with received TOC .
. Outage calibration, functional checks Troubleshooting
•Disassembly, Inspection, Reassembly Procedure Writing
•Problem Solving Technical Assistance Planning / Scheduling Turbine Auxiliary Systems Lube Oil System Hydraulic
supple, Cooling and Sealing Air System Fuel Gas System Fuel Oil System Fuel Forwarding System NOx Control
System Atomizing Air System Inlet Guide Vane System Compressor Cleaning System Inlet System Starting System
Protection System
KahroMecha Misr for Mechanical & Electrical Projects
Job Title: Site Manager.
Project: Cairo west power plant [2X375]MW
Category: Coal Fire Power Plants
January 2009 to August 2011
Location: Cairo, Egypt
 Installation and commissioning of two steam turbine Mitsubishi oil flashing
 Responsible for erection and commissioning of two boiler Hitachi
 Installation piping critical noncritical SS pipe and all the hydro test
 Bop Equipment Feed water pump condensate pump cwp pump
 Travelling water screen and all Bop piping doing hydro test chemical clean
 Steam blow finishing until
Consolidated Contractors Company
Job Title: Section head engineer. Qatar
August 2008 to Jan 2009
Location: Cairo, Egypt
Project: Liquid Natural Gas Turbine for N2CU3 Mixer [6X125] MW
Category: Power Plants
 Installation of 6 turbines with all their auxiliaries in time under CTJV supervision.
 Installation of [1300-1500] P compressors coming up with all activities.
DEMAJ Italy August 2003 to November 2007
Location: Italy
 Workshop fabrication overhead crane.
 Responsible for all mechanical and electrical works.
 Responsible for maintenance procedures.
TECHINT CIMI MONTUBI
Job Title: Lead mechanical engineer.
Project: Franz Thermal Power Plant [2X650] MW
Category: Power Plants
July 2002 to July 2003
Location: Italy
 Installation of steam turbines.
 Responsibility of commissioning procedures
 Installation of all auxiliary pumps, feed water pumps, and pump hoses.
TECHINT CIMI MONTUBI
Job Title: Lead site engineer.
Project: Petrochemical Ain EL Sokhna.
Category: Oil & Gas
December 1999 to October 2001
Location: Ain sokhna, Egypt
 Installation of equipment pumps.
 Installation of gas compressors and static equipment.
 Commissioning all auxiliary pumps.
ACADEMIC BACKGROUND
B.Sc. in Mechanical Power Engineering 6th
of October University, Egypt
Graduation year: 1996 Overall Grade: Good
Graduation Project: Central Air Conditioning, Industrial water chiller Project Grade: Excellent
LANGUAGE SKILLS
ARABIC ENGLISH ITALY
Native Very Good Very Good
OVERALL MANAGING RESPONSIBILIES
• Managing and leading the project team.
• Recruiting project staff.
• Managing co-ordination of the partners and working groups engaged in project work.
• Detailed project planning and control budgeting.
• Developing and maintaining a detailed project plan.
• Managing project deliverables in line with the project plan.
• Recording and managing project issues and escalating where necessary.
• Resolving cross-functional issues at project level.
• Managing project scope and change control and escalating issues where necessary.
• Monitoring project progress and performance.
• Managing project training within the defined budget.  Liaises with, and updates progress to
management.
• Final approval of the design specification.
• Working closely with users to ensure the project meets business needs.
• Identifying user training needs and devising and managing user training programs.
• Field assistance and supervision in construction phase for equipment installation, Pre Commissioning,
Turn Over, Commissioning and Start Up.
OTHER INFORMATION
Fully conversant with European and American standards
Following engineering and supervisor’s instructions and typed procedures
EN ASME AP
I
AWS NACE AS
NT
ISO 9001:2008 OHSAS 18001
REFERENCES
Available upon request

More Related Content

What's hot

Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv new
karl davis
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad
 
Eng.mahmoud salah c.v correct
Eng.mahmoud salah c.v correctEng.mahmoud salah c.v correct
Eng.mahmoud salah c.v correctmahmoud salah
 
Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Toni AZAR
 
Omni Job Openings Dec 2101
Omni Job Openings Dec 2101Omni Job Openings Dec 2101
Omni Job Openings Dec 2101
maquinjay
 
Rajnish_Yadav_-_Curriculum_Vitae
Rajnish_Yadav_-_Curriculum_VitaeRajnish_Yadav_-_Curriculum_Vitae
Rajnish_Yadav_-_Curriculum_VitaeRajnish Kumar Yadav
 
50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECTTilal Ahmed
 

What's hot (20)

Ahmed.Hassan_CV
Ahmed.Hassan_CVAhmed.Hassan_CV
Ahmed.Hassan_CV
 
CV6
CV6CV6
CV6
 
cv amr
cv amrcv amr
cv amr
 
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv new
 
EidHarb
EidHarbEidHarb
EidHarb
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
Eng.mahmoud salah c.v correct
Eng.mahmoud salah c.v correctEng.mahmoud salah c.v correct
Eng.mahmoud salah c.v correct
 
Ibrahim's Resume
Ibrahim's ResumeIbrahim's Resume
Ibrahim's Resume
 
MA CV
MA CVMA CV
MA CV
 
Mohaideen CV
Mohaideen CVMohaideen CV
Mohaideen CV
 
Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1
 
A_vivek
A_vivekA_vivek
A_vivek
 
CV
CVCV
CV
 
afzal c.v
afzal c.vafzal c.v
afzal c.v
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 
Omni Job Openings Dec 2101
Omni Job Openings Dec 2101Omni Job Openings Dec 2101
Omni Job Openings Dec 2101
 
Rajnish_Yadav_-_Curriculum_Vitae
Rajnish_Yadav_-_Curriculum_VitaeRajnish_Yadav_-_Curriculum_Vitae
Rajnish_Yadav_-_Curriculum_Vitae
 
Mohamed_Quandeel_Quandeel
Mohamed_Quandeel_QuandeelMohamed_Quandeel_Quandeel
Mohamed_Quandeel_Quandeel
 
50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 

Viewers also liked

Co.incidir 37 marzo 2017
Co.incidir 37  marzo 2017Co.incidir 37  marzo 2017
Co.incidir 37 marzo 2017
maliciapino
 
Processo de venda ativa
Processo de venda ativaProcesso de venda ativa
Processo de venda ativa
Addae do carmo
 
¿Qué es el Aluminio?
¿Qué es el Aluminio? ¿Qué es el Aluminio?
¿Qué es el Aluminio?
Luis Ángel Valente Ramírez
 
Cash flow
Cash flowCash flow
Cash flow
Arbi Pramuji
 
BernhardLieglresumeJan2017
BernhardLieglresumeJan2017BernhardLieglresumeJan2017
BernhardLieglresumeJan2017Bernhard Liegl
 
BSAD 372 SPRING 2017 CH 8
BSAD 372 SPRING 2017 CH 8BSAD 372 SPRING 2017 CH 8
BSAD 372 SPRING 2017 CH 8
Janice Robinson
 
URDU KAY RASAM-ul-KHAT KI TABDILI KA MASLA
URDU KAY RASAM-ul-KHAT KI TABDILI KA  MASLA URDU KAY RASAM-ul-KHAT KI TABDILI KA  MASLA
URDU KAY RASAM-ul-KHAT KI TABDILI KA MASLA
maqsood hasni
 
Cardiopatías Congénitas en el Adulto - CIA y CIV
Cardiopatías Congénitas en el Adulto - CIA y CIVCardiopatías Congénitas en el Adulto - CIA y CIV
Cardiopatías Congénitas en el Adulto - CIA y CIV
FAMEN
 
Do DevOps Right with New Relic
Do DevOps Right with New RelicDo DevOps Right with New Relic
Do DevOps Right with New Relic
New Relic
 
Haitham cv
Haitham cvHaitham cv
Haitham cv
Haitham Mohammed
 
Cv thierry maysounabe 022017
Cv thierry maysounabe 022017Cv thierry maysounabe 022017
Cv thierry maysounabe 022017
Thierry Maysounabe
 
DevOps explained
DevOps explainedDevOps explained
DevOps explained
Jérôme Kehrli
 
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineercv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_EngineerHanishkumar Lad
 

Viewers also liked (15)

Co.incidir 37 marzo 2017
Co.incidir 37  marzo 2017Co.incidir 37  marzo 2017
Co.incidir 37 marzo 2017
 
Processo de venda ativa
Processo de venda ativaProcesso de venda ativa
Processo de venda ativa
 
¿Qué es el Aluminio?
¿Qué es el Aluminio? ¿Qué es el Aluminio?
¿Qué es el Aluminio?
 
Cash flow
Cash flowCash flow
Cash flow
 
SAFIUDDIN SOHOT CV
SAFIUDDIN SOHOT CV SAFIUDDIN SOHOT CV
SAFIUDDIN SOHOT CV
 
CV JMCNAB
CV JMCNABCV JMCNAB
CV JMCNAB
 
BernhardLieglresumeJan2017
BernhardLieglresumeJan2017BernhardLieglresumeJan2017
BernhardLieglresumeJan2017
 
BSAD 372 SPRING 2017 CH 8
BSAD 372 SPRING 2017 CH 8BSAD 372 SPRING 2017 CH 8
BSAD 372 SPRING 2017 CH 8
 
URDU KAY RASAM-ul-KHAT KI TABDILI KA MASLA
URDU KAY RASAM-ul-KHAT KI TABDILI KA  MASLA URDU KAY RASAM-ul-KHAT KI TABDILI KA  MASLA
URDU KAY RASAM-ul-KHAT KI TABDILI KA MASLA
 
Cardiopatías Congénitas en el Adulto - CIA y CIV
Cardiopatías Congénitas en el Adulto - CIA y CIVCardiopatías Congénitas en el Adulto - CIA y CIV
Cardiopatías Congénitas en el Adulto - CIA y CIV
 
Do DevOps Right with New Relic
Do DevOps Right with New RelicDo DevOps Right with New Relic
Do DevOps Right with New Relic
 
Haitham cv
Haitham cvHaitham cv
Haitham cv
 
Cv thierry maysounabe 022017
Cv thierry maysounabe 022017Cv thierry maysounabe 022017
Cv thierry maysounabe 022017
 
DevOps explained
DevOps explainedDevOps explained
DevOps explained
 
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineercv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
 

Similar to site manager /construction manager

Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFA
AhmedAttia136
 
Ahmed zain -mechanical engineer
Ahmed zain -mechanical engineerAhmed zain -mechanical engineer
Ahmed zain -mechanical engineerahmed zain
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
Mohammed Reda
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
Mohammed Reda
 
e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015mahmoud gaber
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed El Banna
 

Similar to site manager /construction manager (20)

Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFA
 
CV Ahmed1
CV Ahmed1CV Ahmed1
CV Ahmed1
 
M.adel_CV
M.adel_CVM.adel_CV
M.adel_CV
 
M.adel_CV
M.adel_CVM.adel_CV
M.adel_CV
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy
 
Mahmoud
MahmoudMahmoud
Mahmoud
 
Mustafa_original CV
Mustafa_original CV Mustafa_original CV
Mustafa_original CV
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
 
ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 
Ahmed zain -mechanical engineer
Ahmed zain -mechanical engineerAhmed zain -mechanical engineer
Ahmed zain -mechanical engineer
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
 
M.Reda CV
M.Reda CVM.Reda CV
M.Reda CV
 
elsayed cv last
elsayed cv lastelsayed cv last
elsayed cv last
 
HD CV SHORT WORD rev 03
HD CV SHORT WORD rev 03HD CV SHORT WORD rev 03
HD CV SHORT WORD rev 03
 
Wichai B_CV_2016
Wichai B_CV_2016Wichai B_CV_2016
Wichai B_CV_2016
 
e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
 

Recently uploaded

Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 

Recently uploaded (20)

Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 

site manager /construction manager

  • 1. MOHAMED ROSHDI MIHAMED ELSAYED Project Manager 18th Feb 1965 Cairo, Egypt Current Project: Al-Burullus Combined Cycle Power Plant (CPP) Mobile: +201018733999 +201206598787 E-mails: mimmonino@yahoo.com mohamedroshdi18@yahoo.com Nationality: Egyptian Marital Status: Married A trilingual Project Manager who’s never missed up the academic engineering and fundamentals with that long career timeline and dozens of experiences, up to two decades of engineering national and international experience in both power plants and oil & gas projects; troubleshooting any technical obstacles with a complete consideration of safety and quality concepts, managing my team to the great milestones. And it still remains; a new project, a new challenge. EMPLOYMENT TIMELINE IREAM SPA Job Title: Site Manager Project: AlBurullus Combined cycle [4800MW] Category: Power Plants Overall responsibility for the combined cycle .Installation of GAS, Steam turbine, HRSG, BOP.Responsible for the site constructions. Managing the team to achieve the accurate milestones designed for the project Responsible for the pre- commissioning procedures first fire and commissioning 1Agoust 2016 To Jan 2017 Location : Alburullus , Egypt GE / Orascom JV Job Title: General Construction Manager Project: Assiut Combined Cycle [8X125]MW. Category: Power Plants 17th January 2015 to June 2016 Location: Assiut, Egypt  Responsible for the site constructions. pre-commissioning procedures first fire and commissioning  Accomplishing the milestones in time. Outage calibration, functional checks Troubleshooting  Disassembly, Inspection, Reassembly Procedure Writing  Problem Solving Technical Assistance Planning / Scheduling Turbine Auxiliary Systems Lube Oil System Hydraulic supple, Cooling and Sealing Air System Fuel Gas System Fuel Oil System Fuel Forwarding System NOx Control System Atomizing Air System Inlet Guide Vane System Compressor Cleaning System Inlet System Starting System Protection System Al-Hashemiah International Contracting Group (HICC) Job Title: Project Manager Project: Ain EL Sokhna super critical power plant Category: coal-fired Power Plants February 2013 to October 2014 Location: Benha, Egypt
  • 2.  Installation and commissioning of two steam turbine Mitsubishi oil flashing 2*650 MW  Responsible for erection and commissioning of two boiler super critical  Installation piping critical noncritical SS pipe and all the hydro test Bop Equipment Feed water pump condensate pump cwp pump  Travelling water screen and all Bop piping doing hydro test chemical clean  Steam blow finishing until Responsible for the pre-commissioning Procedures hydro test steam blow and commissioning KahroMecha Misr for Mechanical & Electrical Projects Job Title: Site Manager Project: Ismailia Power Plant Gas Turbine GE Frame 9E [8X125] MW Category: Power Plants August 2011 to December 2012 Location: Ismailia, Egypt Responsible for all site constructions for the simple cycle PP under GE supervisor Commissioning responsibility with received TOC . . Outage calibration, functional checks Troubleshooting •Disassembly, Inspection, Reassembly Procedure Writing •Problem Solving Technical Assistance Planning / Scheduling Turbine Auxiliary Systems Lube Oil System Hydraulic supple, Cooling and Sealing Air System Fuel Gas System Fuel Oil System Fuel Forwarding System NOx Control System Atomizing Air System Inlet Guide Vane System Compressor Cleaning System Inlet System Starting System Protection System KahroMecha Misr for Mechanical & Electrical Projects Job Title: Site Manager. Project: Cairo west power plant [2X375]MW Category: Coal Fire Power Plants January 2009 to August 2011 Location: Cairo, Egypt  Installation and commissioning of two steam turbine Mitsubishi oil flashing  Responsible for erection and commissioning of two boiler Hitachi  Installation piping critical noncritical SS pipe and all the hydro test  Bop Equipment Feed water pump condensate pump cwp pump  Travelling water screen and all Bop piping doing hydro test chemical clean  Steam blow finishing until Consolidated Contractors Company Job Title: Section head engineer. Qatar August 2008 to Jan 2009 Location: Cairo, Egypt
  • 3. Project: Liquid Natural Gas Turbine for N2CU3 Mixer [6X125] MW Category: Power Plants  Installation of 6 turbines with all their auxiliaries in time under CTJV supervision.  Installation of [1300-1500] P compressors coming up with all activities. DEMAJ Italy August 2003 to November 2007 Location: Italy  Workshop fabrication overhead crane.  Responsible for all mechanical and electrical works.  Responsible for maintenance procedures. TECHINT CIMI MONTUBI Job Title: Lead mechanical engineer. Project: Franz Thermal Power Plant [2X650] MW Category: Power Plants July 2002 to July 2003 Location: Italy  Installation of steam turbines.  Responsibility of commissioning procedures  Installation of all auxiliary pumps, feed water pumps, and pump hoses. TECHINT CIMI MONTUBI Job Title: Lead site engineer. Project: Petrochemical Ain EL Sokhna. Category: Oil & Gas December 1999 to October 2001 Location: Ain sokhna, Egypt  Installation of equipment pumps.  Installation of gas compressors and static equipment.  Commissioning all auxiliary pumps. ACADEMIC BACKGROUND B.Sc. in Mechanical Power Engineering 6th of October University, Egypt Graduation year: 1996 Overall Grade: Good Graduation Project: Central Air Conditioning, Industrial water chiller Project Grade: Excellent LANGUAGE SKILLS ARABIC ENGLISH ITALY Native Very Good Very Good OVERALL MANAGING RESPONSIBILIES • Managing and leading the project team.
  • 4. • Recruiting project staff. • Managing co-ordination of the partners and working groups engaged in project work. • Detailed project planning and control budgeting. • Developing and maintaining a detailed project plan. • Managing project deliverables in line with the project plan. • Recording and managing project issues and escalating where necessary. • Resolving cross-functional issues at project level. • Managing project scope and change control and escalating issues where necessary. • Monitoring project progress and performance. • Managing project training within the defined budget.  Liaises with, and updates progress to management. • Final approval of the design specification. • Working closely with users to ensure the project meets business needs. • Identifying user training needs and devising and managing user training programs. • Field assistance and supervision in construction phase for equipment installation, Pre Commissioning, Turn Over, Commissioning and Start Up. OTHER INFORMATION Fully conversant with European and American standards Following engineering and supervisor’s instructions and typed procedures EN ASME AP I AWS NACE AS NT ISO 9001:2008 OHSAS 18001 REFERENCES Available upon request