SlideShare a Scribd company logo
Page | 1
Ahmed Abdul Hamid Attia
Power Mechanical Engineer
Egypt
Current Residence: Cairo › New Cairo City › South Lotus District
Area11› Block-94 › 1st floor- Flat No.C12
Cell Phone: 002-01006200647
002-01227799604
Email: ahmed_atyia@yahoo.com
LinkedIn: linkedin.com/in/ahmed-attia-bbb52135
EDUCATION
B.Sc. Degree in Mechanical Power Engineering from faculty of Engineering, Tanta University JUN
2003.
CURRENT POSITION
Lead HRSG Mech. Commissioning Engineer
SUMMARY
My Career objective and target is to carry on in the pre-commissioning, start-up and commissioning
field in order to gain more good experience, using team work and the application of the appropriate
knowledge, codes and standards. I am a highly motivated Mechanical Engineer of 15 years of
experience, Worked in Power Generation Projects and participated so far in the generation of
over than 10000 MW in Simple, Combined Cycle and Thermal Power Plants EPC Projects in the
field of commissioning.
SKILLS
▪ Process facility commissioning, operations, troubleshooting and maintenance.
▪ Develop Plant Systemization and Commissioning plans.
▪ Development of pre-commissioning method statements and commissioning procedures.
▪ Commissioning and testing of large capacity Gas Turbine, Utility steam generators,
HRSG, Steam turbines, large high pressure pumps, pipelines and vessels.
▪ Pre-commissioning and commissioning of condensate recovery systems, Feed water systems,
gas treatment units.
▪ Perform and manage chemical cleaning, flushing and blowing piping systems
▪ Manage interfaces between commissioning and all other disciplines.
▪ Mechanical Equipment’s specifications ( Steam turbines, Gas turbines ,Pipeline, Pressure
Vessels, Boilers, Heat exchanger, Pumps , Compressors).
▪ Management and delivery of pressure / pneumatic test, hydro test, vacuum test and post weld
heat treatment.
▪ Manage and deliver chemical cleaning, flushing, blowing and leak testing.
Page | 2
MAIN ACHIEVEMENTS
◼ Ensured HSE awareness on the job to ensure full buy-in of the HSE policies by all staff which
helped achieving the set HSE targets.
◼ Manage pre-commissioning and commissioning activities for large size projects with pipe lines,
CCPP, Thermal PP, etc.… Ensured through pre-commissioning tests were conducted and
witnessed against the design which resulted in a 1st time right results without delays to
project.
◼ Monitor commissioning performance, train client staff as required and ensure safe work
practices at site.
◼ Developed systemization and package completions according to client standard procedures
and completion system.
◼ Manage system cleaning packs such as chemical cleaning, flushing and blowing for Pipelines.
◼ Managing construction and commissioning activities for static equipment (Tanks, Vessels,
Pipelines, etc...) as well as large size rotating equipment such as Steam turbines, Gas turbines,
Pumps and Compressors.
◼ Manage vendor representative pre-commissioning activities.
◼ Ensure all pre-commissioning and commissioning documentation are maintained and
procedures complied with during execution.
◼ Develop individual tasks and durations for pre-commissioning and commissioning
activities to meet overall project plan.
◼ Manage interfaces with construction disciplines, vendors, QC and client to ensure task
completion on time in line with.
◼ Managed the planning and resourcing required to execute completion and conducted daily
follow-up meetings with all parties involved to track progress and introduce recovery measures
when needed.
◼ Managed QC during procurement cycle and site activities though enforcing ITP and
client specification compliance.
◼ Preparing Organizational chart to the CMMS SAP, Functional location (FL), Preventive
Maintenance (PM) and Bill of material (BOM) for mechanical Systems.
◼ Organize and execute training sessions for PP10CC Project between SEC and
Vendors.
◼ Organize and coordinate weekly plan and load profiles for PP10CC Project.
EMPLOYMENT EXPERIENCE
EMPLOYER : GE POWER COMPANY.
PROJECT : Combined Cycle Power Sabiya CCGT-1 750 MW.
2 GT (SGT5-4000F-250 MW) + 2 HRSG (ALSTOM) +1 STG (GE-250MW).
DURATION : February 2019 – Present.
LOCATION : Sabiya, Kuwait.
POSITION : LEAD HRSG COMMISSIONING ENGINEER-TFA.
RESPONSIBILITY : Follow up the completion of the construction activities; manage the pre-
commissioning, start-up and commissioning “Chemical Cleaning,
Protection Test, first heat and Steam Blowing activates”.
Page | 3
EMPLOYER : SIEMENS- HTT COMPANY.
PROJECT : Combined Cycle Power Plant New Capital four Blocks 4800 MW.
8 GT (SGT-8000H-400 MW) + 8 HRSG (NEM) +4 STG (SST-5000-
400MW) + 4 ACCs Air Cooled Condenser.
DURATION : February 2018 – January 2019.
LOCATION : New Capital, Cairo, Egypt.
POSITION : LEAD HRSG COMMISSIONING ENGINEER-TFA
RESPONSIBILITY : Follow up the completion of the construction activities; manage the pre-
commissioning, start-up and commissioning “Chemical Cleaning,
Protection Test, first heat and Steam Blowing activates”.
EMPLOYER : ARABIAN BEMCO CONTRACTING CO. LTD.
PROJECT : Combined Cycle Power Plant PP10 five Blocks 4600 MW.
40 GTs (GE-7EA-65 MW) + 40HRSGs (NEM) +10STGs (GE-SC4-
128MW) + 10 ACCs Air Cooled Condenser (RCDC).
DURATION : August 2015 – January 2018 .
LOCATION : Al-Kharj, Riyadh, Saudi Arabia.
POSITION : ZONE COMMISSIONING MANAGER
RESPONSIBILITY : Follow up the completion of the construction activities; manage the pre-
commissioning, start-up, commissioning and synchronization of the STG
Units in the Power Blocks till the Handing over the units to the client.
EMPLOYER : ARABIAN BEMCO CONTRACTING CO. LTD.
PROJECT : Combined Cycle Power Plant PP10 five Blocks 4600 MW.
40 GTs (GE-7EA-65 MW) + 40HRSGs (NEM) +10STGs (GE-SC4-
128MW) + 10 ACCs Air Cooled Condenser (RCDC).
DURATION : April 2013 - August 2015
LOCATION : Al-Kharj, Riyadh, Saudi Arabia.
POSITION : LEAD MECHANICAL COMMISSIONING ENGINEER
RESPONSIBILITY : Follow up the completion of the construction activities; Manage the pre-
commissioning, start-up and commissioning activates till the Handing over
the systems to operation.
Page | 4
EMPLOYER : AVIC INTERNATIONAL SHENZHEN COMPANY LTD.
PROJECT : ABU-QIR THERMAL POWER PLANT UNITS 6&7 (2*650 MW).
GAS/OIL FIRED UNITS; 2 STG (MITSUBISHI-TC4F -650 MW) +2 HRSGS
(ANSALDO)
DURATION : August 2011 - March 2013
LOCATION : Abu-Qir, Alexandria Governorate, Egypt
POSITION : LEAD MECHANICAL COMMISSIONING ENGINEER
RESPONSIBILITY : Follow up the completion of the construction activities; Manage the pre-
commissioning, start-up and commissioning activates till the Handing over
the systems to operation.
EMPLOYER : INITEC ENERGÍA COMPANY.
PROJECT : COMBINED CYCLE MODULE III 750MW.
2 GTS (GE-9FA-250 MW) + 2 HRSGS (STF) + 1 STG (ALSTOM- 250 MW)
DURATION : October 2009 – July 2011
LOCATION : Nubariyya, Beheira Governorate, Egypt.
POSITION : MECHANICAL COMMISSIONING ENGINEER
RESPONSIBILITY : Follow up the completion of the construction activities; Manage the pre-
commissioning, start-up and commissioning activates till the Handing over
the systems to operation.
EMPLOYER : WEATHERFORD PETROLEUM DRILLING COMPANY.
PROJECT : RIG 143, WORK OVER.
DURATION : August 2007 - October 2009
LOCATION : North Sinai Governorate, Egypt.
POSITION : MECHANICAL MAINTENANCE ENGINEER
RESPONSIBILITY : Maintain A.C engines; also maintain mud pump, Centrifugal pumps, Triplex
pumps and Air compressors and service for there.
EMPLOYER : MILITARY ARMY WORKSHOPS.
PROJECT : TURBO ENGINE WORKSHOPS
DURATION : September 2005 - January 2007
LOCATION : Suez Governorate, Egypt.
POSITION : MECHANICAL MAINTENANCE ENGINEER
RESPONSIBILITY : Maintain Vehicle engine i.e. Turbo engine, Diesel engine and Gasoline
engine and to raise their efficiency.
Page | 5
Language and computer skills
• Language :Arabic: Mother tongue English: Fluent
▪ Computer : MS- office, Good knowledge with internet applications.
PERSONAL DATA
Nationality : Egyptian.
Place of Birth : Egypt.
Date of Birth : 25, July1981.
Military status : Completed.
Marital Status : Married (Two children)
Driver’s license : Available, also Saudi: available.
Passport No. : A23121121
Hint: Any certified documents will be provided upon request.

More Related Content

What's hot

Improve fired heaters performance and reliabilty
Improve fired heaters performance and reliabiltyImprove fired heaters performance and reliabilty
Improve fired heaters performance and reliabilty
Ashutosh Garg
 
Steam generator part 2
Steam generator part 2Steam generator part 2
Steam generator part 2
Mohammad Shoeb Siddiqui
 
Heat exchanger types and hydro testing
Heat exchanger types and hydro testingHeat exchanger types and hydro testing
Heat exchanger types and hydro testing
waqarahmed445
 
Boiler safety protection
Boiler  safety protectionBoiler  safety protection
Boiler safety protection
VEERABHADRA SWAMY
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam Boiler
Vaibhav Paydelwar
 
flare system design.pdf
flare system design.pdfflare system design.pdf
flare system design.pdf
JahanzaibKhan553038
 
SOOT BLOWERS - Copy.pptx
SOOT BLOWERS - Copy.pptxSOOT BLOWERS - Copy.pptx
SOOT BLOWERS - Copy.pptx
anujgupta862927
 
Ge Combined Cycle
Ge Combined CycleGe Combined Cycle
Ge Combined Cycle
AmericanMillwright
 
Gas Flare Stack Process
Gas Flare Stack ProcessGas Flare Stack Process
Gas Flare Stack Process
Shad Ibrahim
 
Fired Heater and Combustion Optimization From Yokogawa
Fired Heater and Combustion Optimization From YokogawaFired Heater and Combustion Optimization From Yokogawa
Fired Heater and Combustion Optimization From Yokogawa
Miller Energy, Inc.
 
Boiler explosion at exxon mobil singapore
Boiler explosion at exxon mobil singaporeBoiler explosion at exxon mobil singapore
Boiler explosion at exxon mobil singapore
Saudi International Petrochemical Company
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & Working
Tahoor Alam Khan
 
Boiler Drum And Its Internals
Boiler Drum And Its InternalsBoiler Drum And Its Internals
Boiler Drum And Its Internals
Ashrant Dass
 
Comparision between NFPA and TAc rules for Power plants
Comparision between NFPA and TAc rules for Power plantsComparision between NFPA and TAc rules for Power plants
Comparision between NFPA and TAc rules for Power plantsvakil jagdish
 
Basic training water based fire protection
Basic training  water based fire protectionBasic training  water based fire protection
Basic training water based fire protection
Sabrul Jamil
 
Boiler Maintenance & Safety
Boiler Maintenance & SafetyBoiler Maintenance & Safety
Boiler Operation
Boiler OperationBoiler Operation
Boiler Operation
Susovan Sensharma
 
Steam blowing procedure
Steam blowing procedure Steam blowing procedure
Steam blowing procedure
Vaibhav Paydelwar
 

What's hot (20)

Improve fired heaters performance and reliabilty
Improve fired heaters performance and reliabiltyImprove fired heaters performance and reliabilty
Improve fired heaters performance and reliabilty
 
Steam generator part 2
Steam generator part 2Steam generator part 2
Steam generator part 2
 
Heat exchanger types and hydro testing
Heat exchanger types and hydro testingHeat exchanger types and hydro testing
Heat exchanger types and hydro testing
 
Boiler safety protection
Boiler  safety protectionBoiler  safety protection
Boiler safety protection
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam Boiler
 
flare system design.pdf
flare system design.pdfflare system design.pdf
flare system design.pdf
 
SOOT BLOWERS - Copy.pptx
SOOT BLOWERS - Copy.pptxSOOT BLOWERS - Copy.pptx
SOOT BLOWERS - Copy.pptx
 
Ge Combined Cycle
Ge Combined CycleGe Combined Cycle
Ge Combined Cycle
 
Gas Flare Stack Process
Gas Flare Stack ProcessGas Flare Stack Process
Gas Flare Stack Process
 
Fired Heater and Combustion Optimization From Yokogawa
Fired Heater and Combustion Optimization From YokogawaFired Heater and Combustion Optimization From Yokogawa
Fired Heater and Combustion Optimization From Yokogawa
 
Ere ction manual bhel
Ere ction manual bhelEre ction manual bhel
Ere ction manual bhel
 
Boiler explosion at exxon mobil singapore
Boiler explosion at exxon mobil singaporeBoiler explosion at exxon mobil singapore
Boiler explosion at exxon mobil singapore
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & Working
 
Boiler Drum And Its Internals
Boiler Drum And Its InternalsBoiler Drum And Its Internals
Boiler Drum And Its Internals
 
Comparision between NFPA and TAc rules for Power plants
Comparision between NFPA and TAc rules for Power plantsComparision between NFPA and TAc rules for Power plants
Comparision between NFPA and TAc rules for Power plants
 
Basic training water based fire protection
Basic training  water based fire protectionBasic training  water based fire protection
Basic training water based fire protection
 
GBH Enterprises Overview
GBH Enterprises OverviewGBH Enterprises Overview
GBH Enterprises Overview
 
Boiler Maintenance & Safety
Boiler Maintenance & SafetyBoiler Maintenance & Safety
Boiler Maintenance & Safety
 
Boiler Operation
Boiler OperationBoiler Operation
Boiler Operation
 
Steam blowing procedure
Steam blowing procedure Steam blowing procedure
Steam blowing procedure
 

Similar to Lead HRSG Commissioning TFA

site manager /construction manager
site manager /construction managersite manager /construction manager
site manager /construction manager
Mohamed Roshdy
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
James Ct
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
aqeel shaikh CV IRAQ
aqeel shaikh CV IRAQaqeel shaikh CV IRAQ
aqeel shaikh CV IRAQAqeel Shaikh
 
Ward, George Resume
Ward, George ResumeWard, George Resume
Ward, George ResumeGeorge Ward
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan
 
Magdy hussine cv
Magdy hussine cvMagdy hussine cv
Magdy hussine cv
Magdy Hussine
 

Similar to Lead HRSG Commissioning TFA (20)

Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
MNC-14
MNC-14MNC-14
MNC-14
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Nizami cv
Nizami cvNizami cv
Nizami cv
 
site manager /construction manager
site manager /construction managersite manager /construction manager
site manager /construction manager
 
Khalil Awwad
Khalil AwwadKhalil Awwad
Khalil Awwad
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Resume Murali 1
Resume Murali 1 Resume Murali 1
Resume Murali 1
 
aqeel shaikh CV IRAQ
aqeel shaikh CV IRAQaqeel shaikh CV IRAQ
aqeel shaikh CV IRAQ
 
Saw Qualification1
Saw Qualification1Saw Qualification1
Saw Qualification1
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
C.V.-Mohamed Alsharkawy-2016
C.V.-Mohamed Alsharkawy-2016 C.V.-Mohamed Alsharkawy-2016
C.V.-Mohamed Alsharkawy-2016
 
Ward, George Resume
Ward, George ResumeWard, George Resume
Ward, George Resume
 
kiran New
kiran Newkiran New
kiran New
 
KASHF ALI
KASHF ALIKASHF ALI
KASHF ALI
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
 
Magdy hussine cv
Magdy hussine cvMagdy hussine cv
Magdy hussine cv
 

Recently uploaded

Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 

Recently uploaded (20)

Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 

Lead HRSG Commissioning TFA

  • 1. Page | 1 Ahmed Abdul Hamid Attia Power Mechanical Engineer Egypt Current Residence: Cairo › New Cairo City › South Lotus District Area11› Block-94 › 1st floor- Flat No.C12 Cell Phone: 002-01006200647 002-01227799604 Email: ahmed_atyia@yahoo.com LinkedIn: linkedin.com/in/ahmed-attia-bbb52135 EDUCATION B.Sc. Degree in Mechanical Power Engineering from faculty of Engineering, Tanta University JUN 2003. CURRENT POSITION Lead HRSG Mech. Commissioning Engineer SUMMARY My Career objective and target is to carry on in the pre-commissioning, start-up and commissioning field in order to gain more good experience, using team work and the application of the appropriate knowledge, codes and standards. I am a highly motivated Mechanical Engineer of 15 years of experience, Worked in Power Generation Projects and participated so far in the generation of over than 10000 MW in Simple, Combined Cycle and Thermal Power Plants EPC Projects in the field of commissioning. SKILLS ▪ Process facility commissioning, operations, troubleshooting and maintenance. ▪ Develop Plant Systemization and Commissioning plans. ▪ Development of pre-commissioning method statements and commissioning procedures. ▪ Commissioning and testing of large capacity Gas Turbine, Utility steam generators, HRSG, Steam turbines, large high pressure pumps, pipelines and vessels. ▪ Pre-commissioning and commissioning of condensate recovery systems, Feed water systems, gas treatment units. ▪ Perform and manage chemical cleaning, flushing and blowing piping systems ▪ Manage interfaces between commissioning and all other disciplines. ▪ Mechanical Equipment’s specifications ( Steam turbines, Gas turbines ,Pipeline, Pressure Vessels, Boilers, Heat exchanger, Pumps , Compressors). ▪ Management and delivery of pressure / pneumatic test, hydro test, vacuum test and post weld heat treatment. ▪ Manage and deliver chemical cleaning, flushing, blowing and leak testing.
  • 2. Page | 2 MAIN ACHIEVEMENTS ◼ Ensured HSE awareness on the job to ensure full buy-in of the HSE policies by all staff which helped achieving the set HSE targets. ◼ Manage pre-commissioning and commissioning activities for large size projects with pipe lines, CCPP, Thermal PP, etc.… Ensured through pre-commissioning tests were conducted and witnessed against the design which resulted in a 1st time right results without delays to project. ◼ Monitor commissioning performance, train client staff as required and ensure safe work practices at site. ◼ Developed systemization and package completions according to client standard procedures and completion system. ◼ Manage system cleaning packs such as chemical cleaning, flushing and blowing for Pipelines. ◼ Managing construction and commissioning activities for static equipment (Tanks, Vessels, Pipelines, etc...) as well as large size rotating equipment such as Steam turbines, Gas turbines, Pumps and Compressors. ◼ Manage vendor representative pre-commissioning activities. ◼ Ensure all pre-commissioning and commissioning documentation are maintained and procedures complied with during execution. ◼ Develop individual tasks and durations for pre-commissioning and commissioning activities to meet overall project plan. ◼ Manage interfaces with construction disciplines, vendors, QC and client to ensure task completion on time in line with. ◼ Managed the planning and resourcing required to execute completion and conducted daily follow-up meetings with all parties involved to track progress and introduce recovery measures when needed. ◼ Managed QC during procurement cycle and site activities though enforcing ITP and client specification compliance. ◼ Preparing Organizational chart to the CMMS SAP, Functional location (FL), Preventive Maintenance (PM) and Bill of material (BOM) for mechanical Systems. ◼ Organize and execute training sessions for PP10CC Project between SEC and Vendors. ◼ Organize and coordinate weekly plan and load profiles for PP10CC Project. EMPLOYMENT EXPERIENCE EMPLOYER : GE POWER COMPANY. PROJECT : Combined Cycle Power Sabiya CCGT-1 750 MW. 2 GT (SGT5-4000F-250 MW) + 2 HRSG (ALSTOM) +1 STG (GE-250MW). DURATION : February 2019 – Present. LOCATION : Sabiya, Kuwait. POSITION : LEAD HRSG COMMISSIONING ENGINEER-TFA. RESPONSIBILITY : Follow up the completion of the construction activities; manage the pre- commissioning, start-up and commissioning “Chemical Cleaning, Protection Test, first heat and Steam Blowing activates”.
  • 3. Page | 3 EMPLOYER : SIEMENS- HTT COMPANY. PROJECT : Combined Cycle Power Plant New Capital four Blocks 4800 MW. 8 GT (SGT-8000H-400 MW) + 8 HRSG (NEM) +4 STG (SST-5000- 400MW) + 4 ACCs Air Cooled Condenser. DURATION : February 2018 – January 2019. LOCATION : New Capital, Cairo, Egypt. POSITION : LEAD HRSG COMMISSIONING ENGINEER-TFA RESPONSIBILITY : Follow up the completion of the construction activities; manage the pre- commissioning, start-up and commissioning “Chemical Cleaning, Protection Test, first heat and Steam Blowing activates”. EMPLOYER : ARABIAN BEMCO CONTRACTING CO. LTD. PROJECT : Combined Cycle Power Plant PP10 five Blocks 4600 MW. 40 GTs (GE-7EA-65 MW) + 40HRSGs (NEM) +10STGs (GE-SC4- 128MW) + 10 ACCs Air Cooled Condenser (RCDC). DURATION : August 2015 – January 2018 . LOCATION : Al-Kharj, Riyadh, Saudi Arabia. POSITION : ZONE COMMISSIONING MANAGER RESPONSIBILITY : Follow up the completion of the construction activities; manage the pre- commissioning, start-up, commissioning and synchronization of the STG Units in the Power Blocks till the Handing over the units to the client. EMPLOYER : ARABIAN BEMCO CONTRACTING CO. LTD. PROJECT : Combined Cycle Power Plant PP10 five Blocks 4600 MW. 40 GTs (GE-7EA-65 MW) + 40HRSGs (NEM) +10STGs (GE-SC4- 128MW) + 10 ACCs Air Cooled Condenser (RCDC). DURATION : April 2013 - August 2015 LOCATION : Al-Kharj, Riyadh, Saudi Arabia. POSITION : LEAD MECHANICAL COMMISSIONING ENGINEER RESPONSIBILITY : Follow up the completion of the construction activities; Manage the pre- commissioning, start-up and commissioning activates till the Handing over the systems to operation.
  • 4. Page | 4 EMPLOYER : AVIC INTERNATIONAL SHENZHEN COMPANY LTD. PROJECT : ABU-QIR THERMAL POWER PLANT UNITS 6&7 (2*650 MW). GAS/OIL FIRED UNITS; 2 STG (MITSUBISHI-TC4F -650 MW) +2 HRSGS (ANSALDO) DURATION : August 2011 - March 2013 LOCATION : Abu-Qir, Alexandria Governorate, Egypt POSITION : LEAD MECHANICAL COMMISSIONING ENGINEER RESPONSIBILITY : Follow up the completion of the construction activities; Manage the pre- commissioning, start-up and commissioning activates till the Handing over the systems to operation. EMPLOYER : INITEC ENERGÍA COMPANY. PROJECT : COMBINED CYCLE MODULE III 750MW. 2 GTS (GE-9FA-250 MW) + 2 HRSGS (STF) + 1 STG (ALSTOM- 250 MW) DURATION : October 2009 – July 2011 LOCATION : Nubariyya, Beheira Governorate, Egypt. POSITION : MECHANICAL COMMISSIONING ENGINEER RESPONSIBILITY : Follow up the completion of the construction activities; Manage the pre- commissioning, start-up and commissioning activates till the Handing over the systems to operation. EMPLOYER : WEATHERFORD PETROLEUM DRILLING COMPANY. PROJECT : RIG 143, WORK OVER. DURATION : August 2007 - October 2009 LOCATION : North Sinai Governorate, Egypt. POSITION : MECHANICAL MAINTENANCE ENGINEER RESPONSIBILITY : Maintain A.C engines; also maintain mud pump, Centrifugal pumps, Triplex pumps and Air compressors and service for there. EMPLOYER : MILITARY ARMY WORKSHOPS. PROJECT : TURBO ENGINE WORKSHOPS DURATION : September 2005 - January 2007 LOCATION : Suez Governorate, Egypt. POSITION : MECHANICAL MAINTENANCE ENGINEER RESPONSIBILITY : Maintain Vehicle engine i.e. Turbo engine, Diesel engine and Gasoline engine and to raise their efficiency.
  • 5. Page | 5 Language and computer skills • Language :Arabic: Mother tongue English: Fluent ▪ Computer : MS- office, Good knowledge with internet applications. PERSONAL DATA Nationality : Egyptian. Place of Birth : Egypt. Date of Birth : 25, July1981. Military status : Completed. Marital Status : Married (Two children) Driver’s license : Available, also Saudi: available. Passport No. : A23121121 Hint: Any certified documents will be provided upon request.