SlideShare a Scribd company logo
1 of 26
Download to read offline
2040 Southeast Florida
Regional Freight Plan
Presented to
Miami-Dade Freight Transportation Advisory Committee (FTAC)
Presented by
Michael Williamson, Principal
Cambridge Systematics, Inc.
February 11, 2015
Our 2014 Southeast Regional Freight Plan
Update is Positioning Us for Continued Growth
ā€¢ Screens regional highway network
for key freight bottlenecks
ā€¢ Reviews capital needs for our airports,
seaports and railroads
ā€¢ Provides updated list of prioritized
freight needs
ā€¢ Estimates economic impacts
generated by the freight industry
ā€¢ Summarizes and incorporates key freight and logistics initiatives to help
position the region as a global logistics hub
ā€¢ Tells our freight story
2
Freight Program has been Built in Cooperation
with Key Partners
ā€¢ Regional Freight
Advisory Committee
ā€¢ Stakeholder interviews
ā€¢ Truck company survey
ā€¢ Outreach at regional
conferences and
committees
3
Southeast Florida Has Made
Significant Investments
ā€¢ SR 826/836 Interchange
ā€¢ Eller Drive Overpass
ā€¢ 595 Truck Stop
ā€¢ Port Miami Tunnel
ā€¢ Martin Luther King Blvd
ā€¢ Port Miami Dredging
ā€¢ Centurionā€™s new 800K sqft air cargo centre at MIA
ā€¢ NW 25th St Viaduct Phase II
ā€¢ ICTF at Port Everglades and Port Miami
ā€¢ Port of Palm Beach Slip Redevelopments
ā€¢ Post Panamax Cranes
ā€¢ South Port Turning Notch
ā€¢ FLL Runway Extension
4
MPOs are Stepping Up Freight Investments
ā€¢ 3 MPOs are looking at new ways to invest in freight projects
ā€“ Broward MPO has a freight commitment of $338M in its 2040 LRTP Update for
highway projects that benefit freight mobility (excluding major state investments)
ā€“ Miami-Dade MPO has a freight set aside of $127M in its 2040 LRTP Update
specifically for freight only projects (quick fix, low cost) and over $3B in highway
capacity projects that benefit both freight and passenger mobility
ā€“ Palm Beach MPO has a freight commitment of $1.3B
in its 2040 LRTP Update for highway projects that
benefit freight mobility (including major state investments)
2040 Freight Set Aside
(Millions)
2020 2021-2025 2026-2030 2031-2040 Total
TMA (5%) $ 1.7 $ 8.4 $ 8.4 $ 16.8 $ 35.3
Other Arterials (5%) $ 4.8 $ 21.5 $ 20.3 $ 44.4 $ 91.0
TRIP (5%) $ ā€“ $ 0.3 $ 0.3 $ 0.6 $ 1.2
Total $ 6.5 $ 30.2 $ 29.0 $ 61.8 $ 127.5
5
MAP-21 and National Freight Network Provides
Southeast Florida with Opportunity and Challenge
ā€¢ MAP-21 requires USDOT to establish a national
freight network
ā€¢ New freight policy brings new funding
opportunities
ā€¢ Key facilities in South Florida are missing
ā€“ No seaport, airport, or rail yard connectors have
been designated
ā€“ Key Interstates and expressways are not
contiguous
ā€“ Key expressway connections are missing
ā€¢ FHWA current reviewing comments
ā€¢ FHWA also working with MPOs on urban freight
network needs
6
Southeast Floridaā€™s Freight Program is Consistent
with Key Statewide Initiatives
ā€¢ Floridaā€™s Transportation Plan
ā€¢ Floridaā€™s Strategic Intermodal System Plan
ā€¢ Florida Freight Mobility & Trade Plan
ā€¢ Florida Trade and Logistics Study
7
Southeast Floridaā€™s
Freight System
ā€¢ Expressways
ā€¢ State highways
ā€¢ Connectors to freight activity
centers
ā€¢ 3 International airports
ā€¢ 3 Deep water seaports
ā€¢ 3 Freight railroads
ā€¢ Miami River
ā€¢ New River
8
Truck Percent
ā€¢ Trucks represent more than
5 percent of total traffic
for much of the regionā€™s
state highway system
ā€¢ This percent increases as
you move south into Miami-
Dade County
9
PortMiami Is Growing
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Tons
ā€¢ Economic recover underway
ā€¢ Major infrastructures
investments complete or
underway
ā€¢ Forecasts suggest doubling or
tripling of cargo over 20
years
10
Port Everglades is Growing
9
Petroleum
0
50
100
150
200
250
300
350
400
ThousandsofBarrelsPerDay
Gasoline Jet & Kerosene Diesel Fuel Oil Other
Source: Port Everglades (2000-2012),USACE, DOE, IHS Estimates Note 2013 utilizes fiscal year 2013 data to April provided by Port Everglades
Historic Forecasted
5
Containers
1,631,967
1,710,612
949,262
1,987,953
-
500,000
1,000,000
1,500,000
2,000,000
2,500,000
TotalTEUs
Actual Baseline @ 2.7% Baseline Plus @ 3.0% High @ 3.7%
ā€¢ Serves as gateway for petroleum products consumed
in 14 South Florida counties
ā€¢ Major infrastructures investments complete or
underway to grow containers, petroleum, breakbulk
and cruise passenger business
ā€¢ Forecasts suggest doubling of containerized cargo
over 20 years
11
Port of Palm Beach is Growing
ā€¢ Serves as a niche container port serving
smaller ports in the Caribbean and
Central America
ā€¢ Infrastructures investments underway and
planned to grow capacity
ā€¢ Forecasts suggest steady growth for
next 10 years
12
Southeast Florida
Rail System
ā€¢ Three rail operators serving the
region
ā€¢ Key connections planned and
underway
ā€¢ Possible new corridor under
consideration
3
FREIGHT RATIONALIZATION OPPORTUNITIES
Between FEC and CSX
NORTHWOOD
CONNECTION
In Design Phase Thru 2014
POMPANO
CONNECTION
Not Funded
IRIS
CONNECTION
In Design Phase Thru 2014
FEC CORRIDOR
CSX
SCFE
CSX
FEC
13
Miami International is Growing
ā€¢ Major cargo investment plan
largely complete
ā€¢ Centurionā€™s new 800K sqft air
cargo centre at MIA open for
business
ā€¢ NW 25th St Viaduct Phase I
complete and Phase II under
construction
ā€¢ Forecasts call for significant
growth over next 20 years
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
International Domestic
14
Miami River is Growing with Expanded
Opportunities
ā€¢ Designated as emerging SIS
waterway in 2014
ā€¢ Access to core industrial area
under study with proposed
improvements
ā€¢ Continued growth of niche
markets anticipated
0
100
200
300
400
500
600
2006 2007 2008 2009 2010 2011
ShortTons
Inbound Outbound
15
Truck Parking Remains a Key Consideration
ā€¢ 595 Truck Stop is South Floridaā€™s only
full service facility
ā€¢ Miami-Dade MPO has completed two
phases of a truck parking study to
identify the need for truck parking
ā€¢ FDOT has study under way to
investigate feasibility of full service
truck stop/parking on state owned
land at one identified site at the
northwest corner of Turnpike
and NW 12th St
ā€¢ Other private developers
remain interested Auto
Truck
16
Investments in Intermodal Logistics Centers is
Expanding Our Supply Chain Capacity
ā€¢ FDOT ILC Grant Program
ā€“ $5 Million a year to support ILC
development
ā€¢ Existing and Proposed ILCs
ā€“ FECIā€™s South Florida Logistics Center (underway)
ā€“ Key Master Planned ILCs in Palm Beach, St. Lucie, Glades, and
Hendry Counties
17
South Bay/Belle Glade Opportunities Include a
Logistics Campus/ILC
18
Creation of the Florida Perishables Trade Coalition
has Opened New Markets to Southeast Florida
ā€¢ Many perishable goods are imported through Pennsylvania and trucked to
Florida due to medfly concerns
ā€¢ Cold treating products properly eliminates this risk
ā€¢ FPTC formed to increase trade in perishable
products through Floridaā€™s airports and seaports
ā€¢ Phase I of a pilot program successfully completed
allowing grapes and blueberries from Peru and Uruguay
ā€¢ Phase II will allow more products through more approved ports
ā€¢ Phase III will allow for cold treatment to occur in Florida for any shipments
which may fail
19
Top 25 Prioritized Highway Needs
20
RANK Facility From To Project Type Description
Total
Points
1 SR 826/Palmetto Expressway NW 87th Avenue on I-75 SR 836 Freeway Capacity Improvements Add managed lanes 86
1 SR 826/SR 836 NW 25th Street to SW 8th Street
NW 87th Avenue to 57th
Avenue Freeway Capacity Improvements Interchange/Add lanes - DT2495811 86
3 I-95 Managed Lanes System South Palm Beach County Line Linton Blvd Freeway Capacity Improvements 4 Managed Lanes/widening I-95 85
4 I-95 Managed Lanes I-595 Palm Beach County Line Freeway Capacity Improvements 4 Managed Lanes/widening I-95 82
5 SR 826/Palmetto Expressway US 27/Okeechobee Road SR 874 Freeway Capacity Improvements Interchange improvements 81
6 NW 12th Street NW 107th Avenue SR 826 Arterial Capacity Improvements
Widen from 4 lanes to 6 lanes, improve signal
coordination 79
6 NW 20th Street NW 27th Avenue I-95 Arterial Capacity Improvements Roadway infrastructure improvements 79
6 SR 826/Palmetto Expressway Golden Glades Dadeland
Freeway Capacity Improvements
(Unfunded)
Create separate barriered truck lane with
manageable entry/exit 79
6 Florida's Turnpike HEFT Griffin Road Freeway Capacity Improvements Widen from 6 to 8 lanes 79
10
Medley Bridge/Canal
Improvement Program
NW 121st Way, NW 116th Way,
NW 105th Way, NW 79th Avenue Corridor Traffic Ops. Improvements
Improve the connections between Okeechobee
Rd and Medley through a combination of bridge
widening and canal improvements (NW 121 Way,
NW 116 Way, NW 105 Way, NW 79 Ave) 78
10 NW 25th Street NW 89th Court SR 826 Arterial Capacity Improvements Widen from 4 to 6 lanes 78
10 NW South River Drive NW 107th Avenue NW 74th Avenue Arterial Capacity Improvements
Widen North River Drive to include shoulders and
improved access management 78
10 SR 25/Okeechobee Road/US 27 Krome Avenue NW 79th Avenue Arterial Capacity Improvements
Expressway Conversion - Construct Grade
Separated Overpasses at Major Intersections.
New Interchange at NW 79th Avenue, Krome
Avenue / SR-997, NW 103rd Street / NW 87th
Avenue 78
10 SR 25/Okeechobee Road/US 27 Krome Avenue SR 826 Arterial Capacity Improvements Conversion to limited access toll facility 78
10 SR 821/HEFT Kendall Drive I-75 Freeway Capacity Improvements Widen from 6/8 lanes to 10 lanes 78
10 SR 821/HEFT Eureka Drive Kendall Drive Freeway Capacity Improvements Widen to 8-, 10-, 12-lanes plus auxiliary lanes 78
10 SR 821/HEFT SW 216th Street Eureka Drive
Freeway Capacity Improvements
(Unfunded) Widen from 6 to 10 lanes 78
10 Florida's Turnpike Griffin Road Palm Beach County Line ITS Improvements Implement Open Road Tolling 78
19 I-95 South Broward County Line
North Broward County
Line ITS Improvements ITS - Freeway Management 77
19 I-95
All I-95 interchanges in Broward
County Freeway Capacity Improvements
Interchange Improvements as recommended in I-
95 IMP 77
19 I-95 South Palm Beach County Line
North Palm Beach County
Line ITS Improvements ITS - Freeway Management 77
19 I-95 South Palm Beach County Line
North Palm Beach County
Line ITS Improvements ITS - Severe Incident Response Vehicle 77
23 NW 25th Street Viaduct NW 87th Court SR 826 Arterial Capacity Improvements
Phase 2 - construction of Viaduct from SR 826 to
NW 87th Court 76
23
SR 826/Palmetto Expressway
(NB) Okeechobee Road NW 103rd Street Freeway Traffic Ops. Improvements Add 1 NB auxiliary lane 76
25
NW 21st Street/NW 32nd
Avenue NW 37th Avenue NW 28th Street
Arterial Capacity Improvements
(Unfunded) Construct high level bridge 75
Top 25 Prioritized Seaport Needs
Seaport Projects Total Score Rank
Port Everglades ACOE Deepening and Widening-Design 90 1
Port Everglades Turning Notch Extension 90 1
Port Miami Purchase 4 Additional Gantry Container Cranes 80 3
Port Everglades Slip 1 New Bulkheads and Reconfiguration - (Berths 9 & 10) 80 3
Port Everglades ACOE Deepening and Widening-Construction 80 3
Port Everglades Neo-Bulk Storage Yard 80 3
Port Everglades Phase IX-A Container Yard 80 3
Port Everglades Phase IX-B Container Yard 80 3
Port Everglades Super Post Panamax Cranes (2) 80 3
Port of Palm Beach Intermodal Cargo Transfer/Passenger Service Facility 75 10
Port Miami Development of MDC ILC Facility 70 11
Port Everglades Slip 1 New Bulkheads and Reconfiguration - (Berths 7 & 8) 70 11
Port Everglades Super Post Panamax Crane (3) 70 11
Port of Palm Beach Tropical Reefer Line Expansion 70 11
Port Miami Reefer Expansion Project 65 15
Port Everglades Slip 3 New Bulkheads and Widening 65 15
Port Everglades Westlake Mitigation 65 15
Port Everglades McIntosh Road Gate Lane Addition 60 18
Port of Palm Beach Off Port Intermodal Rail Improvements 60 18
Port of Palm Beach On Port Intermodal Rail Improvements 60 18
Port Miami Wharves V & VI Curved Gantry Crane Rail 55 21
Port Miami Crane 12 Relocation 55 21
Port Miami Crane Electrification 4, 5, 6, 7, 11, 12 55 21
Port Miami Relocation of Cranes 4, 5, 6, 7 55 21
Port Miami RPM Rails for Cargo Yards 55 21
Port Miami Runway/Rails for Future RTG in Cargo Yards 55 21
Port Everglades Demolish RORO Berths and Lengthen Berth 33 55 21
Port Everglades Upland Enhancement 55 21
Port Everglades Slip 2 New Bulkheads and Widening 55 21
Port of Palm Beach Berth 17 Enhancement 55 21
Port of Palm Beach Harbor & Channel Improvements 55 21
Port of Palm Beach Waterside Cargo Terminal Redevelopment 55 21
Port of Palm Beach Berth 1 Expansion 55 2121
Prioritized Rail Needs
22
Rail Projects Total Rank
CSX/FEC CSX TO FEC Pompano Connection 75 1
CSX/FEC
IRIS Connection from CSX Mainline to FEC Mainline (FECR movement
south from Tri-Rail's rail yard to FECR Hialeah yard) 75 1
FEC FEC Miami Freight Forwarding Yard 70 3
FEC FEC N. Miami to Ojus Double Track 70 3
FEC
NE 203rd St & NE 215th St Intersection Improvements between US-1
& W Dixie Hwy 60 5
SFRC MR MIC Double Track Last Mile of SFRC 60 5
FEC FEC N. Miami to Little River Track Upgrade 55 7
SCFE South Central FL Express Cane Block 55 7
FEC C-15 Hidden Valley Canal Rail Bridge (between Yamato and Linton) 55 7
CSX CSXT Positive Train Control 50 10
CSX
SFRC R/R Bridge over S Fork New River Replace Existing Bridge
BR#869924 45 11
Prioritized Airport Needs
Airport Project Total Score Rank
MIA Additional Air Cargo Apron 100 1
PBI Palm Beach International Cargo Facilities Access 75 2
FLL Runway 9R/27L Extension (8,000ā€™ x 150ā€™) 65 3
MIA Fuel Tanker Parking Facility 55 4
MIA Perimeter Road Widening & Realignment 55 4
MIA Miami-Dade Aviation GPS Landing System 55 4
FLL ILS for Runway 9R-27L 55 4
FLL Cross-field taxiways from 9R-27L 55 4
FXE Construct Customs Building And Apron 55 4
FXE Construct Eastern Perimeter Road 55 4
MIA Northeast Apron And Drainage Improvements 50 11
MIA Acquisition Of FODequipment 50 11
MIA Taxiway S Rehabilitation 50 11
MIA Taxiway T Rehabilitation 50 11
Opa-Locka Rehab Aprons 50 11
Opa-Locka Opf Taxiway Repair 50 11
FXE Taxiway C, E, F, S Rehab 50 11
FXE Runway 8/26 & 13/31 Pavement Rehab 50 11
FXE Rehab Airfield Lighting 50 11
PBI Taxiway C Rehab 50 11
LNA Rehab Itinerant Apron 50 11
23
Key Strategies
ā€¢ Promote economic contributions of freight and logistics industry
ā€¢ Maximize use of available funding programs
ā€¢ Evaluate the effectiveness of the freight system
ā€¢ Support advancement of solutions for missing freight links
ā€¢ Engage the freight community in the identification of freight bottlenecks
ā€¢ Ensure trade and logistics remain targeted industries
ā€¢ Support work force development programs
ā€¢ Leverage investments through public private partnerships
ā€¢ Continue to develop, test and expand pilot programs
ā€¢ Monitor ILC developments and partner as appropriate
ā€¢ Promote regional freight mobility
24
Our Ability to Incorporate Freight Priorities into
Our Regional Plan is Critical to Our Future
ā€¢ South Florida is home to as well established,
globally competitive logistics industry
ā€¢ Billions of dollars have been invested over
last several years to ensure we remain
competitive
ā€¢ We are well positioned to for significant
growth as global trade patterns continue
to shift
ā€¢ Our economic prosperity and the sustainability
of our communities will be strengthened and
driven by our successful as a global logistics hub
OPEN
FOR BUSINESS
25
Questions?
Paul Flavien
Broward MPO
flavienp@browardmpo.org
Michael Williamson
Cambridge Systematics, Inc.
mwilliamson@camsys.com
26

More Related Content

What's hot

VDRPT Route 1 Multimodal Alternatives Analysis
VDRPT Route 1 Multimodal Alternatives AnalysisVDRPT Route 1 Multimodal Alternatives Analysis
VDRPT Route 1 Multimodal Alternatives AnalysisFairfax County
Ā 
Ecmhi m95 washburn
Ecmhi m95 washburnEcmhi m95 washburn
Ecmhi m95 washburnStephanie Camay
Ā 
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016Fairfax County
Ā 
Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...
Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...
Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...Fairfax County
Ā 
Mobile Food Vending within VDOT Right-of-Way
Mobile Food Vending within VDOT Right-of-WayMobile Food Vending within VDOT Right-of-Way
Mobile Food Vending within VDOT Right-of-WayFairfax County
Ā 
Silver Line Update July 2016
Silver Line Update July 2016Silver Line Update July 2016
Silver Line Update July 2016Fairfax County
Ā 
Update on Tysons Transportation Projects: Board Transportation Committee: Feb...
Update on Tysons Transportation Projects: Board Transportation Committee: Feb...Update on Tysons Transportation Projects: Board Transportation Committee: Feb...
Update on Tysons Transportation Projects: Board Transportation Committee: Feb...Fairfax County
Ā 
Fairfax County Bicycle Master Plan
Fairfax County Bicycle Master PlanFairfax County Bicycle Master Plan
Fairfax County Bicycle Master PlanFairfax County
Ā 
Dulles Corridor Air Rights Study Investigation
Dulles Corridor Air Rights Study InvestigationDulles Corridor Air Rights Study Investigation
Dulles Corridor Air Rights Study InvestigationFairfax County
Ā 
Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...Fairfax County
Ā 
Reston Transportation Funding Plan: Funding Scenarios and Advisory Group Work...
Reston Transportation Funding Plan: Funding Scenarios and Advisory Group Work...Reston Transportation Funding Plan: Funding Scenarios and Advisory Group Work...
Reston Transportation Funding Plan: Funding Scenarios and Advisory Group Work...Fairfax County
Ā 
Tysons Trails: Snow Removal & Lighting July 2016
Tysons Trails: Snow Removal & Lighting July 2016Tysons Trails: Snow Removal & Lighting July 2016
Tysons Trails: Snow Removal & Lighting July 2016Fairfax County
Ā 
Reston Transportation Funding Plan: Updates and Recommendations: Jan. 19, 2017
Reston Transportation Funding Plan: Updates and Recommendations: Jan. 19, 2017Reston Transportation Funding Plan: Updates and Recommendations: Jan. 19, 2017
Reston Transportation Funding Plan: Updates and Recommendations: Jan. 19, 2017Fairfax County
Ā 
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next StepsVDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next StepsFairfax County
Ā 
Reston Transportation Funding Plan: Updates and Recommendation-Community Meet...
Reston Transportation Funding Plan: Updates and Recommendation-Community Meet...Reston Transportation Funding Plan: Updates and Recommendation-Community Meet...
Reston Transportation Funding Plan: Updates and Recommendation-Community Meet...Fairfax County
Ā 
Countywide Transit Network Study: Introductory Public Meeting
Countywide Transit Network Study: Introductory Public MeetingCountywide Transit Network Study: Introductory Public Meeting
Countywide Transit Network Study: Introductory Public MeetingFairfax County
Ā 
Introductory presentation & SSS Past,Present,Future (pics updated)
Introductory presentation & SSS Past,Present,Future (pics updated)Introductory presentation & SSS Past,Present,Future (pics updated)
Introductory presentation & SSS Past,Present,Future (pics updated)Mark Yonge
Ā 
Discussion of Converting Roads from the Secondary System to the Primary Syste...
Discussion of Converting Roads from the Secondary System to the Primary Syste...Discussion of Converting Roads from the Secondary System to the Primary Syste...
Discussion of Converting Roads from the Secondary System to the Primary Syste...Fairfax County
Ā 
Silver Line Phase 1 Status Report
Silver Line Phase 1 Status ReportSilver Line Phase 1 Status Report
Silver Line Phase 1 Status ReportFairfax County
Ā 

What's hot (20)

VDRPT Route 1 Multimodal Alternatives Analysis
VDRPT Route 1 Multimodal Alternatives AnalysisVDRPT Route 1 Multimodal Alternatives Analysis
VDRPT Route 1 Multimodal Alternatives Analysis
Ā 
Ecmhi m95 washburn
Ecmhi m95 washburnEcmhi m95 washburn
Ecmhi m95 washburn
Ā 
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Ā 
Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...
Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...
Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...
Ā 
Mobile Food Vending within VDOT Right-of-Way
Mobile Food Vending within VDOT Right-of-WayMobile Food Vending within VDOT Right-of-Way
Mobile Food Vending within VDOT Right-of-Way
Ā 
Silver Line Update July 2016
Silver Line Update July 2016Silver Line Update July 2016
Silver Line Update July 2016
Ā 
Update on Tysons Transportation Projects: Board Transportation Committee: Feb...
Update on Tysons Transportation Projects: Board Transportation Committee: Feb...Update on Tysons Transportation Projects: Board Transportation Committee: Feb...
Update on Tysons Transportation Projects: Board Transportation Committee: Feb...
Ā 
Fairfax County Bicycle Master Plan
Fairfax County Bicycle Master PlanFairfax County Bicycle Master Plan
Fairfax County Bicycle Master Plan
Ā 
Dulles Corridor Air Rights Study Investigation
Dulles Corridor Air Rights Study InvestigationDulles Corridor Air Rights Study Investigation
Dulles Corridor Air Rights Study Investigation
Ā 
Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...
Ā 
Reston Transportation Funding Plan: Funding Scenarios and Advisory Group Work...
Reston Transportation Funding Plan: Funding Scenarios and Advisory Group Work...Reston Transportation Funding Plan: Funding Scenarios and Advisory Group Work...
Reston Transportation Funding Plan: Funding Scenarios and Advisory Group Work...
Ā 
Tysons Trails: Snow Removal & Lighting July 2016
Tysons Trails: Snow Removal & Lighting July 2016Tysons Trails: Snow Removal & Lighting July 2016
Tysons Trails: Snow Removal & Lighting July 2016
Ā 
Reston Transportation Funding Plan: Updates and Recommendations: Jan. 19, 2017
Reston Transportation Funding Plan: Updates and Recommendations: Jan. 19, 2017Reston Transportation Funding Plan: Updates and Recommendations: Jan. 19, 2017
Reston Transportation Funding Plan: Updates and Recommendations: Jan. 19, 2017
Ā 
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next StepsVDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
Ā 
Reston Transportation Funding Plan: Updates and Recommendation-Community Meet...
Reston Transportation Funding Plan: Updates and Recommendation-Community Meet...Reston Transportation Funding Plan: Updates and Recommendation-Community Meet...
Reston Transportation Funding Plan: Updates and Recommendation-Community Meet...
Ā 
Countywide Transit Network Study: Introductory Public Meeting
Countywide Transit Network Study: Introductory Public MeetingCountywide Transit Network Study: Introductory Public Meeting
Countywide Transit Network Study: Introductory Public Meeting
Ā 
2015 March 16 ASCE TTG - I-405 Improvement Project
2015 March 16   ASCE TTG - I-405 Improvement Project 2015 March 16   ASCE TTG - I-405 Improvement Project
2015 March 16 ASCE TTG - I-405 Improvement Project
Ā 
Introductory presentation & SSS Past,Present,Future (pics updated)
Introductory presentation & SSS Past,Present,Future (pics updated)Introductory presentation & SSS Past,Present,Future (pics updated)
Introductory presentation & SSS Past,Present,Future (pics updated)
Ā 
Discussion of Converting Roads from the Secondary System to the Primary Syste...
Discussion of Converting Roads from the Secondary System to the Primary Syste...Discussion of Converting Roads from the Secondary System to the Primary Syste...
Discussion of Converting Roads from the Secondary System to the Primary Syste...
Ā 
Silver Line Phase 1 Status Report
Silver Line Phase 1 Status ReportSilver Line Phase 1 Status Report
Silver Line Phase 1 Status Report
Ā 

Viewers also liked

JA CHRODIS: Workshop on chronic disease mangement.
JA CHRODIS: Workshop on chronic disease mangement.JA CHRODIS: Workshop on chronic disease mangement.
JA CHRODIS: Workshop on chronic disease mangement.EU_CHRODIS
Ā 
Code of interpersonal communication.10 tips.
Code of interpersonal communication.10 tips.Code of interpersonal communication.10 tips.
Code of interpersonal communication.10 tips.comeniusmontesion
Ā 
Top1% Sales & Marketing Leader
Top1% Sales & Marketing LeaderTop1% Sales & Marketing Leader
Top1% Sales & Marketing LeaderDavid Nicholson
Ā 
Rpt tahun 1 kssr rpt bahasa melayu (sk) tahun 1
Rpt tahun 1 kssr  rpt bahasa melayu (sk) tahun 1Rpt tahun 1 kssr  rpt bahasa melayu (sk) tahun 1
Rpt tahun 1 kssr rpt bahasa melayu (sk) tahun 1zarinamb
Ā 

Viewers also liked (20)

Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Ā 
Web marketing 301
Web marketing 301Web marketing 301
Web marketing 301
Ā 
beach corridor pec presentation
beach corridor pec presentationbeach corridor pec presentation
beach corridor pec presentation
Ā 
Atlanta Peer-to-Peer Freight
Atlanta Peer-to-Peer FreightAtlanta Peer-to-Peer Freight
Atlanta Peer-to-Peer Freight
Ā 
JA CHRODIS: Workshop on chronic disease mangement.
JA CHRODIS: Workshop on chronic disease mangement.JA CHRODIS: Workshop on chronic disease mangement.
JA CHRODIS: Workshop on chronic disease mangement.
Ā 
Rapid Transit Corridors Workshop, January 8, 2015
Rapid Transit Corridors Workshop, January 8, 2015Rapid Transit Corridors Workshop, January 8, 2015
Rapid Transit Corridors Workshop, January 8, 2015
Ā 
value of reliability for the freight industry
value of reliability for the freight industryvalue of reliability for the freight industry
value of reliability for the freight industry
Ā 
nw 12th street heft truck parking study
nw 12th street heft truck parking studynw 12th street heft truck parking study
nw 12th street heft truck parking study
Ā 
Miami-Dade MPO 2015 Transportation Summit Presentation
Miami-Dade MPO 2015 Transportation Summit PresentationMiami-Dade MPO 2015 Transportation Summit Presentation
Miami-Dade MPO 2015 Transportation Summit Presentation
Ā 
Reputation management
Reputation managementReputation management
Reputation management
Ā 
Downtown Miami Freight Mobility Update, August 27, 2014
Downtown Miami Freight Mobility Update, August 27, 2014Downtown Miami Freight Mobility Update, August 27, 2014
Downtown Miami Freight Mobility Update, August 27, 2014
Ā 
Code of interpersonal communication.10 tips.
Code of interpersonal communication.10 tips.Code of interpersonal communication.10 tips.
Code of interpersonal communication.10 tips.
Ā 
Top1% Sales & Marketing Leader
Top1% Sales & Marketing LeaderTop1% Sales & Marketing Leader
Top1% Sales & Marketing Leader
Ā 
csx east-west rail feasibility study presentation
csx east-west rail feasibility study presentationcsx east-west rail feasibility study presentation
csx east-west rail feasibility study presentation
Ā 
SHABIR CV
SHABIR   CVSHABIR   CV
SHABIR CV
Ā 
Rpt tahun 1 kssr rpt bahasa melayu (sk) tahun 1
Rpt tahun 1 kssr  rpt bahasa melayu (sk) tahun 1Rpt tahun 1 kssr  rpt bahasa melayu (sk) tahun 1
Rpt tahun 1 kssr rpt bahasa melayu (sk) tahun 1
Ā 
REMES
REMESREMES
REMES
Ā 
sr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e studysr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e study
Ā 
golden glades multimodal facility-truck travel center
golden glades multimodal facility-truck travel centergolden glades multimodal facility-truck travel center
golden glades multimodal facility-truck travel center
Ā 
mpo fiscal priorities committee - building the future transportation system p...
mpo fiscal priorities committee - building the future transportation system p...mpo fiscal priorities committee - building the future transportation system p...
mpo fiscal priorities committee - building the future transportation system p...
Ā 

Similar to Southeast Florida's 2040 Regional Freight Plan

2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal linkascemiami-dade
Ā 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal linkascemiami-dade
Ā 
Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Fairfax County
Ā 
Fairfax Commercial and Industrial Property Tax for Transportation
Fairfax Commercial and Industrial Property Tax for TransportationFairfax Commercial and Industrial Property Tax for Transportation
Fairfax Commercial and Industrial Property Tax for TransportationFairfax County
Ā 
UNF Case Competition
UNF Case Competition UNF Case Competition
UNF Case Competition catalina_q07
Ā 
UNF Powerpoint Slides (1) (1)
UNF Powerpoint Slides (1) (1)UNF Powerpoint Slides (1) (1)
UNF Powerpoint Slides (1) (1)Mary Catherine
Ā 
Fairfax County Commercial and Industrial Property Tax for Transportation
Fairfax County Commercial and Industrial Property Tax for TransportationFairfax County Commercial and Industrial Property Tax for Transportation
Fairfax County Commercial and Industrial Property Tax for TransportationFairfax County
Ā 
Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)AGC of California
Ā 
Michigan Competitive Logistics and Benchmarking
Michigan Competitive Logistics and BenchmarkingMichigan Competitive Logistics and Benchmarking
Michigan Competitive Logistics and BenchmarkingBusiness Leaders for Michigan
Ā 

Similar to Southeast Florida's 2040 Regional Freight Plan (20)

2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal link
Ā 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal link
Ā 
2040 RTP Rollout Event Presentation
2040 RTP Rollout Event Presentation2040 RTP Rollout Event Presentation
2040 RTP Rollout Event Presentation
Ā 
Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)
Ā 
MDX 2015-2019 Work Program Overview presentation, October 22, 2014
MDX 2015-2019 Work Program Overview presentation, October 22, 2014MDX 2015-2019 Work Program Overview presentation, October 22, 2014
MDX 2015-2019 Work Program Overview presentation, October 22, 2014
Ā 
Fairfax Commercial and Industrial Property Tax for Transportation
Fairfax Commercial and Industrial Property Tax for TransportationFairfax Commercial and Industrial Property Tax for Transportation
Fairfax Commercial and Industrial Property Tax for Transportation
Ā 
September 14, 2020 TPC Virtual Meeting
September 14, 2020 TPC Virtual Meeting September 14, 2020 TPC Virtual Meeting
September 14, 2020 TPC Virtual Meeting
Ā 
UNF Case Competition
UNF Case Competition UNF Case Competition
UNF Case Competition
Ā 
UNF Powerpoint Slides (1) (1)
UNF Powerpoint Slides (1) (1)UNF Powerpoint Slides (1) (1)
UNF Powerpoint Slides (1) (1)
Ā 
May 11, 2020 TPC Virtual Meeting
May 11, 2020 TPC Virtual MeetingMay 11, 2020 TPC Virtual Meeting
May 11, 2020 TPC Virtual Meeting
Ā 
Fairfax County Commercial and Industrial Property Tax for Transportation
Fairfax County Commercial and Industrial Property Tax for TransportationFairfax County Commercial and Industrial Property Tax for Transportation
Fairfax County Commercial and Industrial Property Tax for Transportation
Ā 
Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)
Ā 
TeamTX Austin 2015 Presentations
TeamTX Austin 2015 PresentationsTeamTX Austin 2015 Presentations
TeamTX Austin 2015 Presentations
Ā 
State of the City of Norman
State of the City of NormanState of the City of Norman
State of the City of Norman
Ā 
port miami tunnel impact on downtown miami traffic
port miami tunnel impact on downtown miami trafficport miami tunnel impact on downtown miami traffic
port miami tunnel impact on downtown miami traffic
Ā 
Michigan Competitive Logistics and Benchmarking
Michigan Competitive Logistics and BenchmarkingMichigan Competitive Logistics and Benchmarking
Michigan Competitive Logistics and Benchmarking
Ā 
July 14, 2021 FTAC Virtual Workshop
July 14, 2021 FTAC Virtual WorkshopJuly 14, 2021 FTAC Virtual Workshop
July 14, 2021 FTAC Virtual Workshop
Ā 
SMART Plan Corridors' PD&Es Update
SMART Plan Corridors' PD&Es UpdateSMART Plan Corridors' PD&Es Update
SMART Plan Corridors' PD&Es Update
Ā 
May 6, 2020 CTAC Virtual Meeting
May 6, 2020 CTAC Virtual MeetingMay 6, 2020 CTAC Virtual Meeting
May 6, 2020 CTAC Virtual Meeting
Ā 
mpo fiscal priorities committee - ptp then and now
mpo fiscal priorities committee - ptp then and nowmpo fiscal priorities committee - ptp then and now
mpo fiscal priorities committee - ptp then and now
Ā 

More from Miami-Dade Transportation Planning Organization

More from Miami-Dade Transportation Planning Organization (20)

SMART STEP Project: SE 8th Street & Brickell Avenue
SMART STEP Project: SE 8th Street & Brickell AvenueSMART STEP Project: SE 8th Street & Brickell Avenue
SMART STEP Project: SE 8th Street & Brickell Avenue
Ā 
November 3, 2021 CTAC Virtual Workshop
November 3, 2021 CTAC Virtual WorkshopNovember 3, 2021 CTAC Virtual Workshop
November 3, 2021 CTAC Virtual Workshop
Ā 
September 15, 2021 TARC Virtual Workshop
September 15, 2021 TARC Virtual WorkshopSeptember 15, 2021 TARC Virtual Workshop
September 15, 2021 TARC Virtual Workshop
Ā 
July 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual WorkshopJuly 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual Workshop
Ā 
July 13, 2021 BPAC Virtual Workshop
July 13, 2021 BPAC Virtual WorkshopJuly 13, 2021 BPAC Virtual Workshop
July 13, 2021 BPAC Virtual Workshop
Ā 
June 16, 2021 TARC Virtual Workshop
June 16, 2021 TARC Virtual WorkshopJune 16, 2021 TARC Virtual Workshop
June 16, 2021 TARC Virtual Workshop
Ā 
June 15, 2021 BPAC Virtual Workshop
June 15, 2021 BPAC Virtual Workshop June 15, 2021 BPAC Virtual Workshop
June 15, 2021 BPAC Virtual Workshop
Ā 
May 19, 2021 TARC Virtual Workshop
May 19, 2021 TARC Virtual WorkshopMay 19, 2021 TARC Virtual Workshop
May 19, 2021 TARC Virtual Workshop
Ā 
May 11, 2021 BPAC Virtual Workshop
May 11, 2021 BPAC Virtual WorkshopMay 11, 2021 BPAC Virtual Workshop
May 11, 2021 BPAC Virtual Workshop
Ā 
April 14, 2021 FTAC Virtual Workshop
April 14, 2021 FTAC Virtual Workshop April 14, 2021 FTAC Virtual Workshop
April 14, 2021 FTAC Virtual Workshop
Ā 
April 13, 2021 BPAC Virtual Workshop
April 13, 2021 BPAC Virtual WorkshopApril 13, 2021 BPAC Virtual Workshop
April 13, 2021 BPAC Virtual Workshop
Ā 
April 12, 2021 TPC Virtual Workshop
April 12, 2021 TPC Virtual WorkshopApril 12, 2021 TPC Virtual Workshop
April 12, 2021 TPC Virtual Workshop
Ā 
April 7, 2021 CTAC Virtual Workshop
April 7, 2021 CTAC Virtual Workshop April 7, 2021 CTAC Virtual Workshop
April 7, 2021 CTAC Virtual Workshop
Ā 
March 17, 2021 TARC Virtual Workshop
March 17, 2021 TARC Virtual Workshop March 17, 2021 TARC Virtual Workshop
March 17, 2021 TARC Virtual Workshop
Ā 
March 9, 2021 BPAC Virtual Workshop
March 9, 2021 BPAC Virtual Workshop March 9, 2021 BPAC Virtual Workshop
March 9, 2021 BPAC Virtual Workshop
Ā 
March 3, 2021 CTAC Virtual Workshop
March 3, 2021 CTAC Virtual WorkshopMarch 3, 2021 CTAC Virtual Workshop
March 3, 2021 CTAC Virtual Workshop
Ā 
February 10, 2021 FTAC Virtual Workshop
February 10, 2021 FTAC Virtual WorkshopFebruary 10, 2021 FTAC Virtual Workshop
February 10, 2021 FTAC Virtual Workshop
Ā 
February 9, 2021 BPAC Virtual Workshop
February 9, 2021 BPAC Virtual Workshop February 9, 2021 BPAC Virtual Workshop
February 9, 2021 BPAC Virtual Workshop
Ā 
February 3, 2021 CTAC Virtual Workshop
February 3, 2021 CTAC Virtual Workshop February 3, 2021 CTAC Virtual Workshop
February 3, 2021 CTAC Virtual Workshop
Ā 
January 20, 2021 TARC Virtual Workshop
January 20, 2021 TARC Virtual WorkshopJanuary 20, 2021 TARC Virtual Workshop
January 20, 2021 TARC Virtual Workshop
Ā 

Recently uploaded

13875446-Ballistic Missile Trajectories.ppt
13875446-Ballistic Missile Trajectories.ppt13875446-Ballistic Missile Trajectories.ppt
13875446-Ballistic Missile Trajectories.pptsilvialandin2
Ā 
VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...
VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...
VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...Garima Khatri
Ā 
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urgesnarwatsonia7
Ā 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfyalehistoricalreview
Ā 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...yalehistoricalreview
Ā 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxaaryamanorathofficia
Ā 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Servicenarwatsonia7
Ā 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.Christina Parmionova
Ā 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Christina Parmionova
Ā 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up NumberMs Riya
Ā 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
Ā 
No.1 Call Girls in Basavanagudi ! 7001305949 ā‚¹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ā‚¹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ā‚¹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ā‚¹2999 Only and Free Hotel Delive...narwatsonia7
Ā 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersCongressional Budget Office
Ā 
(多少钱)DalęƕäøščÆå›½å¤–ęœ¬ē§‘学位čƁ
(多少钱)DalęƕäøščÆå›½å¤–ęœ¬ē§‘学位čƁ(多少钱)DalęƕäøščÆå›½å¤–ęœ¬ē§‘学位čƁ
(多少钱)DalęƕäøščÆå›½å¤–ęœ¬ē§‘学位čƁmbetknu
Ā 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
Ā 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhellokittymaearciaga
Ā 
Russian Call Girl Hebbagodi ! 7001305949 ā‚¹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ā‚¹2999 Only and Free Hotel Delivery 2...Russian Call Girl Hebbagodi ! 7001305949 ā‚¹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ā‚¹2999 Only and Free Hotel Delivery 2...narwatsonia7
Ā 

Recently uploaded (20)

13875446-Ballistic Missile Trajectories.ppt
13875446-Ballistic Missile Trajectories.ppt13875446-Ballistic Missile Trajectories.ppt
13875446-Ballistic Missile Trajectories.ppt
Ā 
VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...
VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...
VIP Mumbai Call Girls Andheri West Just Call 9920874524 with A/C Room Cash on...
Ā 
Hot Sexy call girls in Palam ViharšŸ” 9953056974 šŸ” escort Service
Hot Sexy call girls in Palam ViharšŸ” 9953056974 šŸ” escort ServiceHot Sexy call girls in Palam ViharšŸ” 9953056974 šŸ” escort Service
Hot Sexy call girls in Palam ViharšŸ” 9953056974 šŸ” escort Service
Ā 
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Ā 
The Federal Budget and Health Care Policy
The Federal Budget and Health Care PolicyThe Federal Budget and Health Care Policy
The Federal Budget and Health Care Policy
Ā 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
Ā 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Ā 
Model Town (Delhi) 9953330565 Escorts, Call Girls Services
Model Town (Delhi)  9953330565 Escorts, Call Girls ServicesModel Town (Delhi)  9953330565 Escorts, Call Girls Services
Model Town (Delhi) 9953330565 Escorts, Call Girls Services
Ā 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptx
Ā 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Ā 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.
Ā 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.
Ā 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
Ā 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
Ā 
No.1 Call Girls in Basavanagudi ! 7001305949 ā‚¹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ā‚¹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ā‚¹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ā‚¹2999 Only and Free Hotel Delive...
Ā 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists Lawmakers
Ā 
(多少钱)DalęƕäøščÆå›½å¤–ęœ¬ē§‘学位čƁ
(多少钱)DalęƕäøščÆå›½å¤–ęœ¬ē§‘学位čƁ(多少钱)DalęƕäøščÆå›½å¤–ęœ¬ē§‘学位čƁ
(多少钱)DalęƕäøščÆå›½å¤–ęœ¬ē§‘学位čƁ
Ā 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
Ā 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptx
Ā 
Russian Call Girl Hebbagodi ! 7001305949 ā‚¹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ā‚¹2999 Only and Free Hotel Delivery 2...Russian Call Girl Hebbagodi ! 7001305949 ā‚¹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ā‚¹2999 Only and Free Hotel Delivery 2...
Ā 

Southeast Florida's 2040 Regional Freight Plan

  • 1. 2040 Southeast Florida Regional Freight Plan Presented to Miami-Dade Freight Transportation Advisory Committee (FTAC) Presented by Michael Williamson, Principal Cambridge Systematics, Inc. February 11, 2015
  • 2. Our 2014 Southeast Regional Freight Plan Update is Positioning Us for Continued Growth ā€¢ Screens regional highway network for key freight bottlenecks ā€¢ Reviews capital needs for our airports, seaports and railroads ā€¢ Provides updated list of prioritized freight needs ā€¢ Estimates economic impacts generated by the freight industry ā€¢ Summarizes and incorporates key freight and logistics initiatives to help position the region as a global logistics hub ā€¢ Tells our freight story 2
  • 3. Freight Program has been Built in Cooperation with Key Partners ā€¢ Regional Freight Advisory Committee ā€¢ Stakeholder interviews ā€¢ Truck company survey ā€¢ Outreach at regional conferences and committees 3
  • 4. Southeast Florida Has Made Significant Investments ā€¢ SR 826/836 Interchange ā€¢ Eller Drive Overpass ā€¢ 595 Truck Stop ā€¢ Port Miami Tunnel ā€¢ Martin Luther King Blvd ā€¢ Port Miami Dredging ā€¢ Centurionā€™s new 800K sqft air cargo centre at MIA ā€¢ NW 25th St Viaduct Phase II ā€¢ ICTF at Port Everglades and Port Miami ā€¢ Port of Palm Beach Slip Redevelopments ā€¢ Post Panamax Cranes ā€¢ South Port Turning Notch ā€¢ FLL Runway Extension 4
  • 5. MPOs are Stepping Up Freight Investments ā€¢ 3 MPOs are looking at new ways to invest in freight projects ā€“ Broward MPO has a freight commitment of $338M in its 2040 LRTP Update for highway projects that benefit freight mobility (excluding major state investments) ā€“ Miami-Dade MPO has a freight set aside of $127M in its 2040 LRTP Update specifically for freight only projects (quick fix, low cost) and over $3B in highway capacity projects that benefit both freight and passenger mobility ā€“ Palm Beach MPO has a freight commitment of $1.3B in its 2040 LRTP Update for highway projects that benefit freight mobility (including major state investments) 2040 Freight Set Aside (Millions) 2020 2021-2025 2026-2030 2031-2040 Total TMA (5%) $ 1.7 $ 8.4 $ 8.4 $ 16.8 $ 35.3 Other Arterials (5%) $ 4.8 $ 21.5 $ 20.3 $ 44.4 $ 91.0 TRIP (5%) $ ā€“ $ 0.3 $ 0.3 $ 0.6 $ 1.2 Total $ 6.5 $ 30.2 $ 29.0 $ 61.8 $ 127.5 5
  • 6. MAP-21 and National Freight Network Provides Southeast Florida with Opportunity and Challenge ā€¢ MAP-21 requires USDOT to establish a national freight network ā€¢ New freight policy brings new funding opportunities ā€¢ Key facilities in South Florida are missing ā€“ No seaport, airport, or rail yard connectors have been designated ā€“ Key Interstates and expressways are not contiguous ā€“ Key expressway connections are missing ā€¢ FHWA current reviewing comments ā€¢ FHWA also working with MPOs on urban freight network needs 6
  • 7. Southeast Floridaā€™s Freight Program is Consistent with Key Statewide Initiatives ā€¢ Floridaā€™s Transportation Plan ā€¢ Floridaā€™s Strategic Intermodal System Plan ā€¢ Florida Freight Mobility & Trade Plan ā€¢ Florida Trade and Logistics Study 7
  • 8. Southeast Floridaā€™s Freight System ā€¢ Expressways ā€¢ State highways ā€¢ Connectors to freight activity centers ā€¢ 3 International airports ā€¢ 3 Deep water seaports ā€¢ 3 Freight railroads ā€¢ Miami River ā€¢ New River 8
  • 9. Truck Percent ā€¢ Trucks represent more than 5 percent of total traffic for much of the regionā€™s state highway system ā€¢ This percent increases as you move south into Miami- Dade County 9
  • 10. PortMiami Is Growing 0 200,000 400,000 600,000 800,000 1,000,000 1,200,000 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Tons ā€¢ Economic recover underway ā€¢ Major infrastructures investments complete or underway ā€¢ Forecasts suggest doubling or tripling of cargo over 20 years 10
  • 11. Port Everglades is Growing 9 Petroleum 0 50 100 150 200 250 300 350 400 ThousandsofBarrelsPerDay Gasoline Jet & Kerosene Diesel Fuel Oil Other Source: Port Everglades (2000-2012),USACE, DOE, IHS Estimates Note 2013 utilizes fiscal year 2013 data to April provided by Port Everglades Historic Forecasted 5 Containers 1,631,967 1,710,612 949,262 1,987,953 - 500,000 1,000,000 1,500,000 2,000,000 2,500,000 TotalTEUs Actual Baseline @ 2.7% Baseline Plus @ 3.0% High @ 3.7% ā€¢ Serves as gateway for petroleum products consumed in 14 South Florida counties ā€¢ Major infrastructures investments complete or underway to grow containers, petroleum, breakbulk and cruise passenger business ā€¢ Forecasts suggest doubling of containerized cargo over 20 years 11
  • 12. Port of Palm Beach is Growing ā€¢ Serves as a niche container port serving smaller ports in the Caribbean and Central America ā€¢ Infrastructures investments underway and planned to grow capacity ā€¢ Forecasts suggest steady growth for next 10 years 12
  • 13. Southeast Florida Rail System ā€¢ Three rail operators serving the region ā€¢ Key connections planned and underway ā€¢ Possible new corridor under consideration 3 FREIGHT RATIONALIZATION OPPORTUNITIES Between FEC and CSX NORTHWOOD CONNECTION In Design Phase Thru 2014 POMPANO CONNECTION Not Funded IRIS CONNECTION In Design Phase Thru 2014 FEC CORRIDOR CSX SCFE CSX FEC 13
  • 14. Miami International is Growing ā€¢ Major cargo investment plan largely complete ā€¢ Centurionā€™s new 800K sqft air cargo centre at MIA open for business ā€¢ NW 25th St Viaduct Phase I complete and Phase II under construction ā€¢ Forecasts call for significant growth over next 20 years 0 500,000 1,000,000 1,500,000 2,000,000 2,500,000 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 International Domestic 14
  • 15. Miami River is Growing with Expanded Opportunities ā€¢ Designated as emerging SIS waterway in 2014 ā€¢ Access to core industrial area under study with proposed improvements ā€¢ Continued growth of niche markets anticipated 0 100 200 300 400 500 600 2006 2007 2008 2009 2010 2011 ShortTons Inbound Outbound 15
  • 16. Truck Parking Remains a Key Consideration ā€¢ 595 Truck Stop is South Floridaā€™s only full service facility ā€¢ Miami-Dade MPO has completed two phases of a truck parking study to identify the need for truck parking ā€¢ FDOT has study under way to investigate feasibility of full service truck stop/parking on state owned land at one identified site at the northwest corner of Turnpike and NW 12th St ā€¢ Other private developers remain interested Auto Truck 16
  • 17. Investments in Intermodal Logistics Centers is Expanding Our Supply Chain Capacity ā€¢ FDOT ILC Grant Program ā€“ $5 Million a year to support ILC development ā€¢ Existing and Proposed ILCs ā€“ FECIā€™s South Florida Logistics Center (underway) ā€“ Key Master Planned ILCs in Palm Beach, St. Lucie, Glades, and Hendry Counties 17
  • 18. South Bay/Belle Glade Opportunities Include a Logistics Campus/ILC 18
  • 19. Creation of the Florida Perishables Trade Coalition has Opened New Markets to Southeast Florida ā€¢ Many perishable goods are imported through Pennsylvania and trucked to Florida due to medfly concerns ā€¢ Cold treating products properly eliminates this risk ā€¢ FPTC formed to increase trade in perishable products through Floridaā€™s airports and seaports ā€¢ Phase I of a pilot program successfully completed allowing grapes and blueberries from Peru and Uruguay ā€¢ Phase II will allow more products through more approved ports ā€¢ Phase III will allow for cold treatment to occur in Florida for any shipments which may fail 19
  • 20. Top 25 Prioritized Highway Needs 20 RANK Facility From To Project Type Description Total Points 1 SR 826/Palmetto Expressway NW 87th Avenue on I-75 SR 836 Freeway Capacity Improvements Add managed lanes 86 1 SR 826/SR 836 NW 25th Street to SW 8th Street NW 87th Avenue to 57th Avenue Freeway Capacity Improvements Interchange/Add lanes - DT2495811 86 3 I-95 Managed Lanes System South Palm Beach County Line Linton Blvd Freeway Capacity Improvements 4 Managed Lanes/widening I-95 85 4 I-95 Managed Lanes I-595 Palm Beach County Line Freeway Capacity Improvements 4 Managed Lanes/widening I-95 82 5 SR 826/Palmetto Expressway US 27/Okeechobee Road SR 874 Freeway Capacity Improvements Interchange improvements 81 6 NW 12th Street NW 107th Avenue SR 826 Arterial Capacity Improvements Widen from 4 lanes to 6 lanes, improve signal coordination 79 6 NW 20th Street NW 27th Avenue I-95 Arterial Capacity Improvements Roadway infrastructure improvements 79 6 SR 826/Palmetto Expressway Golden Glades Dadeland Freeway Capacity Improvements (Unfunded) Create separate barriered truck lane with manageable entry/exit 79 6 Florida's Turnpike HEFT Griffin Road Freeway Capacity Improvements Widen from 6 to 8 lanes 79 10 Medley Bridge/Canal Improvement Program NW 121st Way, NW 116th Way, NW 105th Way, NW 79th Avenue Corridor Traffic Ops. Improvements Improve the connections between Okeechobee Rd and Medley through a combination of bridge widening and canal improvements (NW 121 Way, NW 116 Way, NW 105 Way, NW 79 Ave) 78 10 NW 25th Street NW 89th Court SR 826 Arterial Capacity Improvements Widen from 4 to 6 lanes 78 10 NW South River Drive NW 107th Avenue NW 74th Avenue Arterial Capacity Improvements Widen North River Drive to include shoulders and improved access management 78 10 SR 25/Okeechobee Road/US 27 Krome Avenue NW 79th Avenue Arterial Capacity Improvements Expressway Conversion - Construct Grade Separated Overpasses at Major Intersections. New Interchange at NW 79th Avenue, Krome Avenue / SR-997, NW 103rd Street / NW 87th Avenue 78 10 SR 25/Okeechobee Road/US 27 Krome Avenue SR 826 Arterial Capacity Improvements Conversion to limited access toll facility 78 10 SR 821/HEFT Kendall Drive I-75 Freeway Capacity Improvements Widen from 6/8 lanes to 10 lanes 78 10 SR 821/HEFT Eureka Drive Kendall Drive Freeway Capacity Improvements Widen to 8-, 10-, 12-lanes plus auxiliary lanes 78 10 SR 821/HEFT SW 216th Street Eureka Drive Freeway Capacity Improvements (Unfunded) Widen from 6 to 10 lanes 78 10 Florida's Turnpike Griffin Road Palm Beach County Line ITS Improvements Implement Open Road Tolling 78 19 I-95 South Broward County Line North Broward County Line ITS Improvements ITS - Freeway Management 77 19 I-95 All I-95 interchanges in Broward County Freeway Capacity Improvements Interchange Improvements as recommended in I- 95 IMP 77 19 I-95 South Palm Beach County Line North Palm Beach County Line ITS Improvements ITS - Freeway Management 77 19 I-95 South Palm Beach County Line North Palm Beach County Line ITS Improvements ITS - Severe Incident Response Vehicle 77 23 NW 25th Street Viaduct NW 87th Court SR 826 Arterial Capacity Improvements Phase 2 - construction of Viaduct from SR 826 to NW 87th Court 76 23 SR 826/Palmetto Expressway (NB) Okeechobee Road NW 103rd Street Freeway Traffic Ops. Improvements Add 1 NB auxiliary lane 76 25 NW 21st Street/NW 32nd Avenue NW 37th Avenue NW 28th Street Arterial Capacity Improvements (Unfunded) Construct high level bridge 75
  • 21. Top 25 Prioritized Seaport Needs Seaport Projects Total Score Rank Port Everglades ACOE Deepening and Widening-Design 90 1 Port Everglades Turning Notch Extension 90 1 Port Miami Purchase 4 Additional Gantry Container Cranes 80 3 Port Everglades Slip 1 New Bulkheads and Reconfiguration - (Berths 9 & 10) 80 3 Port Everglades ACOE Deepening and Widening-Construction 80 3 Port Everglades Neo-Bulk Storage Yard 80 3 Port Everglades Phase IX-A Container Yard 80 3 Port Everglades Phase IX-B Container Yard 80 3 Port Everglades Super Post Panamax Cranes (2) 80 3 Port of Palm Beach Intermodal Cargo Transfer/Passenger Service Facility 75 10 Port Miami Development of MDC ILC Facility 70 11 Port Everglades Slip 1 New Bulkheads and Reconfiguration - (Berths 7 & 8) 70 11 Port Everglades Super Post Panamax Crane (3) 70 11 Port of Palm Beach Tropical Reefer Line Expansion 70 11 Port Miami Reefer Expansion Project 65 15 Port Everglades Slip 3 New Bulkheads and Widening 65 15 Port Everglades Westlake Mitigation 65 15 Port Everglades McIntosh Road Gate Lane Addition 60 18 Port of Palm Beach Off Port Intermodal Rail Improvements 60 18 Port of Palm Beach On Port Intermodal Rail Improvements 60 18 Port Miami Wharves V & VI Curved Gantry Crane Rail 55 21 Port Miami Crane 12 Relocation 55 21 Port Miami Crane Electrification 4, 5, 6, 7, 11, 12 55 21 Port Miami Relocation of Cranes 4, 5, 6, 7 55 21 Port Miami RPM Rails for Cargo Yards 55 21 Port Miami Runway/Rails for Future RTG in Cargo Yards 55 21 Port Everglades Demolish RORO Berths and Lengthen Berth 33 55 21 Port Everglades Upland Enhancement 55 21 Port Everglades Slip 2 New Bulkheads and Widening 55 21 Port of Palm Beach Berth 17 Enhancement 55 21 Port of Palm Beach Harbor & Channel Improvements 55 21 Port of Palm Beach Waterside Cargo Terminal Redevelopment 55 21 Port of Palm Beach Berth 1 Expansion 55 2121
  • 22. Prioritized Rail Needs 22 Rail Projects Total Rank CSX/FEC CSX TO FEC Pompano Connection 75 1 CSX/FEC IRIS Connection from CSX Mainline to FEC Mainline (FECR movement south from Tri-Rail's rail yard to FECR Hialeah yard) 75 1 FEC FEC Miami Freight Forwarding Yard 70 3 FEC FEC N. Miami to Ojus Double Track 70 3 FEC NE 203rd St & NE 215th St Intersection Improvements between US-1 & W Dixie Hwy 60 5 SFRC MR MIC Double Track Last Mile of SFRC 60 5 FEC FEC N. Miami to Little River Track Upgrade 55 7 SCFE South Central FL Express Cane Block 55 7 FEC C-15 Hidden Valley Canal Rail Bridge (between Yamato and Linton) 55 7 CSX CSXT Positive Train Control 50 10 CSX SFRC R/R Bridge over S Fork New River Replace Existing Bridge BR#869924 45 11
  • 23. Prioritized Airport Needs Airport Project Total Score Rank MIA Additional Air Cargo Apron 100 1 PBI Palm Beach International Cargo Facilities Access 75 2 FLL Runway 9R/27L Extension (8,000ā€™ x 150ā€™) 65 3 MIA Fuel Tanker Parking Facility 55 4 MIA Perimeter Road Widening & Realignment 55 4 MIA Miami-Dade Aviation GPS Landing System 55 4 FLL ILS for Runway 9R-27L 55 4 FLL Cross-field taxiways from 9R-27L 55 4 FXE Construct Customs Building And Apron 55 4 FXE Construct Eastern Perimeter Road 55 4 MIA Northeast Apron And Drainage Improvements 50 11 MIA Acquisition Of FODequipment 50 11 MIA Taxiway S Rehabilitation 50 11 MIA Taxiway T Rehabilitation 50 11 Opa-Locka Rehab Aprons 50 11 Opa-Locka Opf Taxiway Repair 50 11 FXE Taxiway C, E, F, S Rehab 50 11 FXE Runway 8/26 & 13/31 Pavement Rehab 50 11 FXE Rehab Airfield Lighting 50 11 PBI Taxiway C Rehab 50 11 LNA Rehab Itinerant Apron 50 11 23
  • 24. Key Strategies ā€¢ Promote economic contributions of freight and logistics industry ā€¢ Maximize use of available funding programs ā€¢ Evaluate the effectiveness of the freight system ā€¢ Support advancement of solutions for missing freight links ā€¢ Engage the freight community in the identification of freight bottlenecks ā€¢ Ensure trade and logistics remain targeted industries ā€¢ Support work force development programs ā€¢ Leverage investments through public private partnerships ā€¢ Continue to develop, test and expand pilot programs ā€¢ Monitor ILC developments and partner as appropriate ā€¢ Promote regional freight mobility 24
  • 25. Our Ability to Incorporate Freight Priorities into Our Regional Plan is Critical to Our Future ā€¢ South Florida is home to as well established, globally competitive logistics industry ā€¢ Billions of dollars have been invested over last several years to ensure we remain competitive ā€¢ We are well positioned to for significant growth as global trade patterns continue to shift ā€¢ Our economic prosperity and the sustainability of our communities will be strengthened and driven by our successful as a global logistics hub OPEN FOR BUSINESS 25
  • 26. Questions? Paul Flavien Broward MPO flavienp@browardmpo.org Michael Williamson Cambridge Systematics, Inc. mwilliamson@camsys.com 26