CASE STUDY
CARLTON PARK SUBSTATION
LOCATION : Enderby, Leicestershire | DESIGN DURATION : 10 Weeks | VALUE : £50k
OVERALL PROJECT VALUE : circa £4.2M
Delivering what we promise
OVERVIEW
Santander UK established two new data centres at the Carlton Park site near
Enderby, Leicester, necessitating a dedicated 39MW connection from the host
DNO, Western Power Distribution.
PROJECT DETAILS
The project was competitively tendered and won by Morrison Utility Services,
allowing Morrison Engineering Services to undertake the complete design for the
project.
At Carlton Park, a new 132/11kV Substation was established which was connected
to two discrete 11kV switchboards to supply the customers demand. Due to
enhanced system security requirements, duplicate 11kV switchboards with
duplicate SCADA, 110v DC and 48v DC systems were installed within the switch
room, providing further redundancy.
Two new 630mm
2
Al 132kV underground cable circuits supplied a new 132/11kV
Substation on the Carlton Park site from Enderby 400/132kV Substation.
Morrison Engineering Services were responsible for the design, specification and
procurement of the cable, plus joints and accessories.
Following energisation of the transformers and a short period on soak to ensure no
issues arose, the customers outgoing 11kV cabling was connected, allowing them
to commence commissioning of the sites.
BENEFITS
• By managing the complete suite of design in house, MES was able to work
closer with our suppliers and delivery teams.
• The overall coordination of design interfaces across disciplines was easier to
manage and control.
• Single point of contact established
DESIGN DETAILS
The works undertaken by Morrison
Engineering Services included;
Detailed Civil Design -
• 132/11kV Transformer Bunds
• 132kV Structure Bases
• 11kV Switch / Control Room
• Roadways & Drainage
• Structural Engineering
• Specification of materials
• Reinforcement Schedules
• Geotechnical site investigation &
soils analysis
Detailed Electrical Design -
• Earthing Survey & Layout
• Plant / Equipment layout
• Conduit / Multicore cable layout
• 132kV Structure Design
• Bus Bar / Clamps Specification
• Electrical Clearance
• Plant & Equipment specification
Detailed P&C Design –
• Main C&P Design
• SCADA
• Multicore Schedules
• AC / DC Scheme Integration
• 110v Distribution
• Electrical & Mechanical
Interlocking
• Relay Specification & Relay Panel
Design
• Protection coordination / settings
report

More Related Content

What's hot

C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
PETER MAIDENS
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.docAbdul Razzaq
 
TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016Terry Evans
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Holland Kendall
 
Robert Resume 8-26-15
Robert Resume 8-26-15Robert Resume 8-26-15
Robert Resume 8-26-15Robert Thomas
 
Resume Edward Maszczak linkedin
Resume  Edward Maszczak linkedinResume  Edward Maszczak linkedin
Resume Edward Maszczak linkedinEdward Maszczak
 
EMFN Kelley Resume
EMFN Kelley ResumeEMFN Kelley Resume
EMFN Kelley ResumeCody Kelley
 
Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects
Gensol Engineering Limited
 
Larry Hebert Resume
Larry Hebert ResumeLarry Hebert Resume
Larry Hebert ResumeLarry Hebert
 
Nexans submarine technology-1
Nexans submarine technology-1Nexans submarine technology-1
Nexans submarine technology-1thinknice
 

What's hot (20)

dharmapandian
dharmapandiandharmapandian
dharmapandian
 
Gabriel Gichinga Gen tech
Gabriel Gichinga Gen techGabriel Gichinga Gen tech
Gabriel Gichinga Gen tech
 
Wind Power EPCM
Wind Power EPCMWind Power EPCM
Wind Power EPCM
 
Ir. Unggang CV latest
Ir. Unggang CV latestIr. Unggang CV latest
Ir. Unggang CV latest
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.doc
 
ajit-cv-updated
ajit-cv-updatedajit-cv-updated
ajit-cv-updated
 
TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016
 
Cemb
CembCemb
Cemb
 
TOSH
TOSHTOSH
TOSH
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1
 
Robert Resume 8-26-15
Robert Resume 8-26-15Robert Resume 8-26-15
Robert Resume 8-26-15
 
Resume Edward Maszczak linkedin
Resume  Edward Maszczak linkedinResume  Edward Maszczak linkedin
Resume Edward Maszczak linkedin
 
EMFN Kelley Resume
EMFN Kelley ResumeEMFN Kelley Resume
EMFN Kelley Resume
 
Ahmed Raslan_CV
Ahmed Raslan_CVAhmed Raslan_CV
Ahmed Raslan_CV
 
Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects
 
gamal ghazy svc
gamal ghazy svcgamal ghazy svc
gamal ghazy svc
 
Larry Hebert Resume
Larry Hebert ResumeLarry Hebert Resume
Larry Hebert Resume
 
venkatCV
venkatCVvenkatCV
venkatCV
 
Nexans submarine technology-1
Nexans submarine technology-1Nexans submarine technology-1
Nexans submarine technology-1
 

Viewers also liked

Evaluación Segundo Quimestre ANGEL VERA
Evaluación Segundo Quimestre ANGEL VERAEvaluación Segundo Quimestre ANGEL VERA
Evaluación Segundo Quimestre ANGEL VERA
Angelsteveen
 
UH Project Management certificate
UH Project Management  certificateUH Project Management  certificate
UH Project Management certificateAngela Hsu
 
Don't be MOST people
Don't be MOST peopleDon't be MOST people
Don't be MOST people
Life School
 
Turnuva Basvuru Formu
Turnuva Basvuru FormuTurnuva Basvuru Formu
Turnuva Basvuru Formu
iytespor
 
Kate mc dowell resume (3_9_16)
Kate mc dowell resume (3_9_16)Kate mc dowell resume (3_9_16)
Kate mc dowell resume (3_9_16)
Kate McDowell
 
Auto sugiero LZ
Auto sugiero LZAuto sugiero LZ
Auto sugiero LZ
Lia Berenise Zanarini
 
10noviembre2015
10noviembre201510noviembre2015
embedded system and AVR
embedded system and AVRembedded system and AVR
embedded system and AVR
Urvashi Khandelwal
 

Viewers also liked (13)

Evaluación Segundo Quimestre ANGEL VERA
Evaluación Segundo Quimestre ANGEL VERAEvaluación Segundo Quimestre ANGEL VERA
Evaluación Segundo Quimestre ANGEL VERA
 
Jv 17
Jv 17Jv 17
Jv 17
 
Agosto octubre
Agosto octubreAgosto octubre
Agosto octubre
 
UH Project Management certificate
UH Project Management  certificateUH Project Management  certificate
UH Project Management certificate
 
Certification
CertificationCertification
Certification
 
TRABAJO EN CLASE
TRABAJO EN CLASETRABAJO EN CLASE
TRABAJO EN CLASE
 
Don't be MOST people
Don't be MOST peopleDon't be MOST people
Don't be MOST people
 
Turnuva Basvuru Formu
Turnuva Basvuru FormuTurnuva Basvuru Formu
Turnuva Basvuru Formu
 
Kate mc dowell resume (3_9_16)
Kate mc dowell resume (3_9_16)Kate mc dowell resume (3_9_16)
Kate mc dowell resume (3_9_16)
 
Auto sugiero LZ
Auto sugiero LZAuto sugiero LZ
Auto sugiero LZ
 
10noviembre2015
10noviembre201510noviembre2015
10noviembre2015
 
embedded system and AVR
embedded system and AVRembedded system and AVR
embedded system and AVR
 
MMR vaccine
MMR vaccineMMR vaccine
MMR vaccine
 

Similar to MES Case Study - Carlton Park Substation

Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Abdul Alim Dewan
 
Balpara Electrical Engineering Projects 2017
Balpara Electrical Engineering Projects 2017Balpara Electrical Engineering Projects 2017
Balpara Electrical Engineering Projects 2017
Digna Nichols
 
Hvdc transmission
Hvdc transmissionHvdc transmission
Hvdc transmission
Sajan Sahu
 
Zinfra Group Australia: Power Brochure
Zinfra Group Australia: Power BrochureZinfra Group Australia: Power Brochure
Zinfra Group Australia: Power Brochure
Zinfra Group
 
KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementRay Salmons
 
New Persentation
New PersentationNew Persentation
New PersentationTarek Fagal
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerReza Shah Abadi
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerReza Shah Abadi
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)Engr.ayaz khan
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin Jose
 
Complex connections Rick Chorley
Complex connections Rick ChorleyComplex connections Rick Chorley
Complex connections Rick Chorley
NSW Environment and Planning
 
Engage with...Network Rail
Engage with...Network RailEngage with...Network Rail
Engage with...Network Rail
KTN
 
Zinfra Renewables Capability Statement
Zinfra Renewables Capability StatementZinfra Renewables Capability Statement
Zinfra Renewables Capability Statement
Zinfra Group
 
2012 Network design
2012 Network design2012 Network design
2012 Network designJohn Snoxell
 

Similar to MES Case Study - Carlton Park Substation (20)

Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017
 
Balpara Electrical Engineering Projects 2017
Balpara Electrical Engineering Projects 2017Balpara Electrical Engineering Projects 2017
Balpara Electrical Engineering Projects 2017
 
Mankotia ankit
Mankotia ankitMankotia ankit
Mankotia ankit
 
Hvdc transmission
Hvdc transmissionHvdc transmission
Hvdc transmission
 
Zinfra Group Australia: Power Brochure
Zinfra Group Australia: Power BrochureZinfra Group Australia: Power Brochure
Zinfra Group Australia: Power Brochure
 
KEVIN DAVID MORTON cv
KEVIN DAVID MORTON cvKEVIN DAVID MORTON cv
KEVIN DAVID MORTON cv
 
KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability Statement
 
New Persentation
New PersentationNew Persentation
New Persentation
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
 
Complex connections Rick Chorley
Complex connections Rick ChorleyComplex connections Rick Chorley
Complex connections Rick Chorley
 
CV PF
CV PFCV PF
CV PF
 
Engage with...Network Rail
Engage with...Network RailEngage with...Network Rail
Engage with...Network Rail
 
Zinfra Renewables Capability Statement
Zinfra Renewables Capability StatementZinfra Renewables Capability Statement
Zinfra Renewables Capability Statement
 
Resume
ResumeResume
Resume
 
ameen cv new
ameen cv newameen cv new
ameen cv new
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
2012 Network design
2012 Network design2012 Network design
2012 Network design
 

MES Case Study - Carlton Park Substation

  • 1. CASE STUDY CARLTON PARK SUBSTATION LOCATION : Enderby, Leicestershire | DESIGN DURATION : 10 Weeks | VALUE : £50k OVERALL PROJECT VALUE : circa £4.2M Delivering what we promise OVERVIEW Santander UK established two new data centres at the Carlton Park site near Enderby, Leicester, necessitating a dedicated 39MW connection from the host DNO, Western Power Distribution. PROJECT DETAILS The project was competitively tendered and won by Morrison Utility Services, allowing Morrison Engineering Services to undertake the complete design for the project. At Carlton Park, a new 132/11kV Substation was established which was connected to two discrete 11kV switchboards to supply the customers demand. Due to enhanced system security requirements, duplicate 11kV switchboards with duplicate SCADA, 110v DC and 48v DC systems were installed within the switch room, providing further redundancy. Two new 630mm 2 Al 132kV underground cable circuits supplied a new 132/11kV Substation on the Carlton Park site from Enderby 400/132kV Substation. Morrison Engineering Services were responsible for the design, specification and procurement of the cable, plus joints and accessories. Following energisation of the transformers and a short period on soak to ensure no issues arose, the customers outgoing 11kV cabling was connected, allowing them to commence commissioning of the sites. BENEFITS • By managing the complete suite of design in house, MES was able to work closer with our suppliers and delivery teams. • The overall coordination of design interfaces across disciplines was easier to manage and control. • Single point of contact established DESIGN DETAILS The works undertaken by Morrison Engineering Services included; Detailed Civil Design - • 132/11kV Transformer Bunds • 132kV Structure Bases • 11kV Switch / Control Room • Roadways & Drainage • Structural Engineering • Specification of materials • Reinforcement Schedules • Geotechnical site investigation & soils analysis Detailed Electrical Design - • Earthing Survey & Layout • Plant / Equipment layout • Conduit / Multicore cable layout • 132kV Structure Design • Bus Bar / Clamps Specification • Electrical Clearance • Plant & Equipment specification Detailed P&C Design – • Main C&P Design • SCADA • Multicore Schedules • AC / DC Scheme Integration • 110v Distribution • Electrical & Mechanical Interlocking • Relay Specification & Relay Panel Design • Protection coordination / settings report