Morrison Utility Services designed and built a new £4.2 million 132/11kV substation for Santander UK's two new data centers near Enderby, Leicestershire. The substation included duplicate 11kV switchboards and systems to supply the 39MW connection from Western Power Distribution. Morrison Engineering Services handled the full design of the substation, including civil, electrical, and protection & control aspects. The substation was successfully energized, allowing the data centers to commence commissioning.
As Balpara plans ahead for 2016, take a look at our project highlights of 2015. We thank our partners for the opportunities of the past and look forward to engineering a bright future.
As Balpara plans ahead for 2016, take a look at our project highlights of 2015. We thank our partners for the opportunities of the past and look forward to engineering a bright future.
Design & Engineering is an integral part of the implementation of Solar Projects.
Engineering drawings & documents convey specifications, construction methodology, dimensions, tolerances etc capturing the scope of works and presenting a first-hand idea on the final by product that would be constructed.
Design & Engineering is an integral part of the implementation of Solar Projects.
Engineering drawings & documents convey specifications, construction methodology, dimensions, tolerances etc capturing the scope of works and presenting a first-hand idea on the final by product that would be constructed.
Zinfra Group Australia: Power BrochureZinfra Group
Zinfra is a leading power, gas, water and telco infrastructure service provider. We offer a comprehensive range of engineering, construction and maintenance services to the utility infrastructure industry.
Zinfra knows power. We have emergedfrom an entity that managed services on more than $9 billion of Australian utility assets, including transmission, substations and distribution.Our clients include asset owners, transmission and distribution managers, mining companies and land owners.
We deliver our work, manage our projects and fulfil our contracts using the skill and commitment of over 1,500 passionate Zinfra staff, nationwide.
Felix Langley, Network Technical Head at Network Rail, gave an insight into the diverse array of power engineering on the UK Railway, including AC/DC electrification, SCADA systems and the non-traction power supplies that feed signalling systems, points heating and level crossings.
Zinfra Renewables Capability StatementZinfra Group
Zinfra has the capability to deliver entire Electrical Balance of Plant (EBoP) solutions in the renewables sector, including underground cable networks, padmounts, collector substations and overhead transmission lines.
1. CASE STUDY
CARLTON PARK SUBSTATION
LOCATION : Enderby, Leicestershire | DESIGN DURATION : 10 Weeks | VALUE : £50k
OVERALL PROJECT VALUE : circa £4.2M
Delivering what we promise
OVERVIEW
Santander UK established two new data centres at the Carlton Park site near
Enderby, Leicester, necessitating a dedicated 39MW connection from the host
DNO, Western Power Distribution.
PROJECT DETAILS
The project was competitively tendered and won by Morrison Utility Services,
allowing Morrison Engineering Services to undertake the complete design for the
project.
At Carlton Park, a new 132/11kV Substation was established which was connected
to two discrete 11kV switchboards to supply the customers demand. Due to
enhanced system security requirements, duplicate 11kV switchboards with
duplicate SCADA, 110v DC and 48v DC systems were installed within the switch
room, providing further redundancy.
Two new 630mm
2
Al 132kV underground cable circuits supplied a new 132/11kV
Substation on the Carlton Park site from Enderby 400/132kV Substation.
Morrison Engineering Services were responsible for the design, specification and
procurement of the cable, plus joints and accessories.
Following energisation of the transformers and a short period on soak to ensure no
issues arose, the customers outgoing 11kV cabling was connected, allowing them
to commence commissioning of the sites.
BENEFITS
• By managing the complete suite of design in house, MES was able to work
closer with our suppliers and delivery teams.
• The overall coordination of design interfaces across disciplines was easier to
manage and control.
• Single point of contact established
DESIGN DETAILS
The works undertaken by Morrison
Engineering Services included;
Detailed Civil Design -
• 132/11kV Transformer Bunds
• 132kV Structure Bases
• 11kV Switch / Control Room
• Roadways & Drainage
• Structural Engineering
• Specification of materials
• Reinforcement Schedules
• Geotechnical site investigation &
soils analysis
Detailed Electrical Design -
• Earthing Survey & Layout
• Plant / Equipment layout
• Conduit / Multicore cable layout
• 132kV Structure Design
• Bus Bar / Clamps Specification
• Electrical Clearance
• Plant & Equipment specification
Detailed P&C Design –
• Main C&P Design
• SCADA
• Multicore Schedules
• AC / DC Scheme Integration
• 110v Distribution
• Electrical & Mechanical
Interlocking
• Relay Specification & Relay Panel
Design
• Protection coordination / settings