RENEWABLES
BALPARA’S INVOLVEMENT
Design of 66kV line to supply the
52 wind turbines, generating
106.6 megawatts.
THE PROJECT
The Bald Hills Wind Farm is
connected to the national
electricity grid by a new 27km
66kV powerline constructed on
concrete poles.
POWERCORBALD HILLS WINDFARM
UNDERGROUND RESIDENTIAL DISTRIBUTION
PROJECT SCOPE
Balpara successfully provided a
turn-key solution on this URD
project in the Geelong suburb of
Marshall for UP Property.
Balpara performed the electrical
design, which included NBN
requirements, project
management, construction and
detailing of the as-builts.
URDSTATION ST | MARSHALL
UP PROPERTY
PUBLIC LIGHTING
PROJECT SCOPE
Working closely with VicRoads,
Balpara successfully completed the
Dingley Bypass project in 2015.
Balpara was contracted to perform
electrical design, drafting and
surveying of the overhead line
22kV-66kV and undergrounding
LV infrastructure as well as project
management of construction by
LendLease on behalf of ZNX.
DINGLEY BYPASSLEIGHTON CONTRACTORS
VEDN ACCREDITATION
VEDN AUDITING & DETAILING
Balpara continues to be involved in the undergrounding of all the pillars in the
Doncaster Donvale region through the provision of detailing and
VEDN accredited auditing services, both civil and electrical.
DONCASTER PILLARS
ZNX
BUSHFIRE MITIGATION
PROJECT SCOPE
Balpara provided electrical design
and drafting to support Powercor's
bushfire mitigation plan.
Our involvement ensured the
delivery of Armor Rods and
Dampers to all poles within high
risk fire regions, minimising fire risk
and the likelihood of outages.
POWERCORARMOR RODS & DAMPERS
PUBLIC LIGHTING AS3000
THE PROJECT
Hobsons Bay City Council requested
Balpara to investigate the existing lighting
level along Pier Street, Altona and to
provide two possible new lighting
solutions for both existing and proposed
pedestrian crossings, in line with AS 1158.
PIER ST, ALTONAPUBLIC LIGHTINGAS3000
SOLUTION
Balpara’s more expensive solution to
add two new poles and replace
existing was selected as the higher
Lux rating meant that pedestrians
were easier to spot by incoming and
outgoing busy.
SURVEYING
PROJECT SCOPE
Balpara performs the overhead electrical
survey, drafting & detailing services for
AusNet’s conductor replacement project
which is to replace old steel conductors
with new and to replace all copper
conductors with aluminium.
The total project covers 150km.
AUSNET SERVICESCONDUCTOR REPLACEMENT PROGRAM
SUBSTATIONS
THE PROJECT
Balpara was engaged by Multipipe to GPS detail and draft 66kV related assets on the
Richmond Terminal Substation (RTS).
The multi-stage project required multiple site visits and substantial detailing, using
GPS to ensure accuracy under challenging circumstances.
Richmond Terminal Substation is owned by AusNet services and feeds both the
CitiPower and United Energy networks.
RICHMONDTERMINAL SUBSTATIONMULTIPIPE
DETAILING
PROJECT SCOPE
Undergrounding of two new transmission
circuits between North Melbourne - Carlton.
Some impressive figures:
length of cable for 1 circuit 5.145 km
3 cables per circuit
total length of 1 circuit 15.435km
grand total of all circuits 30.87km
The project uses 1,600mm squared
1c 66 kV Cu XLPE Prysmian cables
DALY’S66Kv CBD SECURITY PROJECT
Looking
back at
projects of
2015
We look forward to assisting you
1300 BALPARA

More Related Content

What's hot

CESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORTCESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORT
MAINAK SINGHA BARMA
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Kachinga-Wankunda Phiri
 
Ultra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVACUltra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVAC
Aravind Panasa
 
John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015John Hitt
 
Esia of 220 k v ug transmission line from lalazar to mauripur g.s & 132 ...
Esia of 220 k v ug transmission line from lalazar to  mauripur g.s & 132 ...Esia of 220 k v ug transmission line from lalazar to  mauripur g.s & 132 ...
Esia of 220 k v ug transmission line from lalazar to mauripur g.s & 132 ...
zubeditufail
 
Seawater pumped hydro electric storageppsshow2
Seawater pumped hydro electric storageppsshow2Seawater pumped hydro electric storageppsshow2
Seawater pumped hydro electric storageppsshow2
James Nolan
 
Helicrane
HelicraneHelicrane
Helicrane
Sterlite Power
 
Angelique international limited : Substation Procurement, Underground Cable L...
Angelique international limited : Substation Procurement, Underground Cable L...Angelique international limited : Substation Procurement, Underground Cable L...
Angelique international limited : Substation Procurement, Underground Cable L...
Angelique International Limited
 
Rebecca mills-securing-the-n ts-energy-future
Rebecca mills-securing-the-n ts-energy-futureRebecca mills-securing-the-n ts-energy-future
Rebecca mills-securing-the-n ts-energy-future
james hamilton
 
Why Super Low Loss Amorphous Transformers are a Non-brainer for Britain’s Lea...
Why Super Low Loss Amorphous Transformers are a Non-brainer for Britain’s Lea...Why Super Low Loss Amorphous Transformers are a Non-brainer for Britain’s Lea...
Why Super Low Loss Amorphous Transformers are a Non-brainer for Britain’s Lea...
EMEX
 
Eng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CVEng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CVJALAL ALASFAR
 
Project Summary
Project Summary Project Summary
Project Summary Jinliang Li
 
Moranbah Coal Seam Power Station
Moranbah Coal Seam Power StationMoranbah Coal Seam Power Station
Moranbah Coal Seam Power StationAshley Rogers
 

What's hot (20)

CESC PROJECT
CESC PROJECTCESC PROJECT
CESC PROJECT
 
CESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORTCESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORT
 
CESC Report
CESC ReportCESC Report
CESC Report
 
RENEW
RENEWRENEW
RENEW
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16
 
Ultra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVACUltra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVAC
 
Rankin Units
Rankin UnitsRankin Units
Rankin Units
 
John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015
 
Esia of 220 k v ug transmission line from lalazar to mauripur g.s & 132 ...
Esia of 220 k v ug transmission line from lalazar to  mauripur g.s & 132 ...Esia of 220 k v ug transmission line from lalazar to  mauripur g.s & 132 ...
Esia of 220 k v ug transmission line from lalazar to mauripur g.s & 132 ...
 
Seawater pumped hydro electric storageppsshow2
Seawater pumped hydro electric storageppsshow2Seawater pumped hydro electric storageppsshow2
Seawater pumped hydro electric storageppsshow2
 
Helicrane
HelicraneHelicrane
Helicrane
 
Angelique international limited : Substation Procurement, Underground Cable L...
Angelique international limited : Substation Procurement, Underground Cable L...Angelique international limited : Substation Procurement, Underground Cable L...
Angelique international limited : Substation Procurement, Underground Cable L...
 
Rebecca mills-securing-the-n ts-energy-future
Rebecca mills-securing-the-n ts-energy-futureRebecca mills-securing-the-n ts-energy-future
Rebecca mills-securing-the-n ts-energy-future
 
Why Super Low Loss Amorphous Transformers are a Non-brainer for Britain’s Lea...
Why Super Low Loss Amorphous Transformers are a Non-brainer for Britain’s Lea...Why Super Low Loss Amorphous Transformers are a Non-brainer for Britain’s Lea...
Why Super Low Loss Amorphous Transformers are a Non-brainer for Britain’s Lea...
 
Eng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CVEng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CV
 
project
projectproject
project
 
Project Summary
Project Summary Project Summary
Project Summary
 
Resume
ResumeResume
Resume
 
Bio-data -MSK
Bio-data -MSKBio-data -MSK
Bio-data -MSK
 
Moranbah Coal Seam Power Station
Moranbah Coal Seam Power StationMoranbah Coal Seam Power Station
Moranbah Coal Seam Power Station
 

Similar to Balpara Project Highlights 2015

Balpara Electrical Engineering Projects 2017
Balpara Electrical Engineering Projects 2017Balpara Electrical Engineering Projects 2017
Balpara Electrical Engineering Projects 2017
Digna Nichols
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerReza Shah Abadi
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerReza Shah Abadi
 
Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015Dennis Kehoe
 
Abergeldie Brochure
Abergeldie BrochureAbergeldie Brochure
Matrix Networks (Renewables) - Muncey & Black Peak PV Farms
Matrix Networks (Renewables) - Muncey & Black Peak PV FarmsMatrix Networks (Renewables) - Muncey & Black Peak PV Farms
Matrix Networks (Renewables) - Muncey & Black Peak PV Farms
Thorne & Derrick International
 
AEP texas project edison award winner
AEP texas project edison award winnerAEP texas project edison award winner
AEP texas project edison award winner
Dave Bryant
 
PECO projects in Philadelphia
PECO projects in PhiladelphiaPECO projects in Philadelphia
PECO projects in Philadelphia
PECO (PECO Energy Company)
 
Craig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA EngineeringCraig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA EngineeringCraig MacIntyre
 
TransGrid - NSW large-scale solar workshop
TransGrid - NSW large-scale solar workshopTransGrid - NSW large-scale solar workshop
TransGrid - NSW large-scale solar workshop
NSW Environment and Planning
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15Greg Clifford
 
Harish aggarwal
Harish aggarwalHarish aggarwal
Harish aggarwal
Harish Agarwal
 
Amp re projects
Amp re projectsAmp re projects
Amp re projects
Jeremy Aston
 
Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Abdul Alim Dewan
 
Renewable Energy Development for the Afghanistan National Security University...
Renewable Energy Development for the Afghanistan National Security University...Renewable Energy Development for the Afghanistan National Security University...
Renewable Energy Development for the Afghanistan National Security University...
Bill Stein, CEM, CEP, CSDP, CMVP, CEA, REP, .
 
Developing a 66 kV infrastructure
Developing a 66 kV infrastructureDeveloping a 66 kV infrastructure
Developing a 66 kV infrastructure
Sandra Himmeldirk
 
Engage with...Network Rail
Engage with...Network RailEngage with...Network Rail
Engage with...Network Rail
KTN
 

Similar to Balpara Project Highlights 2015 (20)

Balpara Electrical Engineering Projects 2017
Balpara Electrical Engineering Projects 2017Balpara Electrical Engineering Projects 2017
Balpara Electrical Engineering Projects 2017
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
 
Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015
 
Abergeldie Brochure
Abergeldie BrochureAbergeldie Brochure
Abergeldie Brochure
 
Matrix Networks (Renewables) - Muncey & Black Peak PV Farms
Matrix Networks (Renewables) - Muncey & Black Peak PV FarmsMatrix Networks (Renewables) - Muncey & Black Peak PV Farms
Matrix Networks (Renewables) - Muncey & Black Peak PV Farms
 
AEP texas project edison award winner
AEP texas project edison award winnerAEP texas project edison award winner
AEP texas project edison award winner
 
PECO projects in Philadelphia
PECO projects in PhiladelphiaPECO projects in Philadelphia
PECO projects in Philadelphia
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
Craig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA EngineeringCraig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA Engineering
 
TransGrid - NSW large-scale solar workshop
TransGrid - NSW large-scale solar workshopTransGrid - NSW large-scale solar workshop
TransGrid - NSW large-scale solar workshop
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15
 
Harish aggarwal
Harish aggarwalHarish aggarwal
Harish aggarwal
 
Amp re projects
Amp re projectsAmp re projects
Amp re projects
 
Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017
 
Renewable Energy Development for the Afghanistan National Security University...
Renewable Energy Development for the Afghanistan National Security University...Renewable Energy Development for the Afghanistan National Security University...
Renewable Energy Development for the Afghanistan National Security University...
 
wathiq alanbaki
wathiq alanbakiwathiq alanbaki
wathiq alanbaki
 
Wind Power EPCM
Wind Power EPCMWind Power EPCM
Wind Power EPCM
 
Developing a 66 kV infrastructure
Developing a 66 kV infrastructureDeveloping a 66 kV infrastructure
Developing a 66 kV infrastructure
 
Engage with...Network Rail
Engage with...Network RailEngage with...Network Rail
Engage with...Network Rail
 

Recently uploaded

weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 

Recently uploaded (20)

weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 

Balpara Project Highlights 2015

  • 1.
  • 2. RENEWABLES BALPARA’S INVOLVEMENT Design of 66kV line to supply the 52 wind turbines, generating 106.6 megawatts. THE PROJECT The Bald Hills Wind Farm is connected to the national electricity grid by a new 27km 66kV powerline constructed on concrete poles. POWERCORBALD HILLS WINDFARM
  • 3. UNDERGROUND RESIDENTIAL DISTRIBUTION PROJECT SCOPE Balpara successfully provided a turn-key solution on this URD project in the Geelong suburb of Marshall for UP Property. Balpara performed the electrical design, which included NBN requirements, project management, construction and detailing of the as-builts. URDSTATION ST | MARSHALL UP PROPERTY
  • 4. PUBLIC LIGHTING PROJECT SCOPE Working closely with VicRoads, Balpara successfully completed the Dingley Bypass project in 2015. Balpara was contracted to perform electrical design, drafting and surveying of the overhead line 22kV-66kV and undergrounding LV infrastructure as well as project management of construction by LendLease on behalf of ZNX. DINGLEY BYPASSLEIGHTON CONTRACTORS
  • 5. VEDN ACCREDITATION VEDN AUDITING & DETAILING Balpara continues to be involved in the undergrounding of all the pillars in the Doncaster Donvale region through the provision of detailing and VEDN accredited auditing services, both civil and electrical. DONCASTER PILLARS ZNX
  • 6. BUSHFIRE MITIGATION PROJECT SCOPE Balpara provided electrical design and drafting to support Powercor's bushfire mitigation plan. Our involvement ensured the delivery of Armor Rods and Dampers to all poles within high risk fire regions, minimising fire risk and the likelihood of outages. POWERCORARMOR RODS & DAMPERS
  • 7. PUBLIC LIGHTING AS3000 THE PROJECT Hobsons Bay City Council requested Balpara to investigate the existing lighting level along Pier Street, Altona and to provide two possible new lighting solutions for both existing and proposed pedestrian crossings, in line with AS 1158. PIER ST, ALTONAPUBLIC LIGHTINGAS3000 SOLUTION Balpara’s more expensive solution to add two new poles and replace existing was selected as the higher Lux rating meant that pedestrians were easier to spot by incoming and outgoing busy.
  • 8. SURVEYING PROJECT SCOPE Balpara performs the overhead electrical survey, drafting & detailing services for AusNet’s conductor replacement project which is to replace old steel conductors with new and to replace all copper conductors with aluminium. The total project covers 150km. AUSNET SERVICESCONDUCTOR REPLACEMENT PROGRAM
  • 9. SUBSTATIONS THE PROJECT Balpara was engaged by Multipipe to GPS detail and draft 66kV related assets on the Richmond Terminal Substation (RTS). The multi-stage project required multiple site visits and substantial detailing, using GPS to ensure accuracy under challenging circumstances. Richmond Terminal Substation is owned by AusNet services and feeds both the CitiPower and United Energy networks. RICHMONDTERMINAL SUBSTATIONMULTIPIPE
  • 10. DETAILING PROJECT SCOPE Undergrounding of two new transmission circuits between North Melbourne - Carlton. Some impressive figures: length of cable for 1 circuit 5.145 km 3 cables per circuit total length of 1 circuit 15.435km grand total of all circuits 30.87km The project uses 1,600mm squared 1c 66 kV Cu XLPE Prysmian cables DALY’S66Kv CBD SECURITY PROJECT
  • 11. Looking back at projects of 2015 We look forward to assisting you 1300 BALPARA