Larry Hebert has over 30 years of experience as a senior electrical and controls engineer working on projects in industries including oil and gas pipelines, mining, manufacturing, semiconductor fabrication, and cleanrooms. He has extensive experience designing electrical systems, instrumentation and control systems, and substations for facilities and projects across North America and Asia. Some of his representative projects include serving as the electrical lead for pump stations on the Enbridge Wood Buffalo Extension Project in Alberta, Canada and high voltage substation design for the Enbridge Alberta Clipper project pipeline connecting Alberta to Chicago.