The Parkmerced Vision is a 20-25 long range development project in San Francisco, CA. A Resident Meeting was held on May 9, 2016 to discuss updates on the Project's implementation.
This document provides an update on the vision plan for Parkmerced. It outlines the topics that will be discussed which include the construction overview, project website, resident relocation and parking updates, and operations. It reviews the phasing of the project over 20-25 years and details of subphases 1A and 1B which involve street improvements and construction on blocks 1, 6, and 20. Details are given on the construction schedule, mitigations, and the resident relocation and parking relocation processes. The presentation concludes with information on new amenities and a Q&A.
This document summarizes an agenda for a resident meeting at Parkmerced. The agenda covers an overview of the vision plan, resident and parking relocation plans, and construction plans for subphases 1A and 1B. It discusses upcoming community upgrades and renovations as well as the construction schedule. Residents will have a chance to ask questions and receive information on how the renovations may impact them and the community.
The vision plan meeting overview included phases 1A and 1B of construction as well as resident relocation and parking relocation. Phase 1A construction will include blocks 1, 6, 20, and 22 starting in Q3 2017 through 2019. It will involve the replacement of 56 existing homes in block 1 and 957 new homes across all blocks. Resident relocation options and the parking relocation plan from various lots to the Higuera garage were also discussed. A Q&A session followed the presentation.
The Parkmerced Vision is a 20-25 long range development project in San Francisco, CA. A Resident Meeting was held on September 25, 2017 to discuss updates on the Project's implementation, resident amenity improvements, and construction sequencing.
Lee District 2018 Paving and Restriping: Public Information Meeting-March 7, ...Fairfax County
This document summarizes a public information meeting held on March 7, 2018 about proposed paving and restriping projects in the Lee District. It discusses VDOT's paving program overview and allocation amounts from 2013-2018. It then reviews proposed modifications to striping on several roads to add bicycle facilities like bike lanes and shared lane markings, while maintaining existing on-street parking. Community feedback is requested on specific locations by March 23rd to help finalize the plans.
On January 31st at the Parkmerced Clubhouse/Resident Lounge, a meeting was held with some of the neighbors of Parkmerced, which was attended by representatives of St Thomas More School, Brandeis School of San Francisco, Calvary Armenian Congregational Church, Holy Trinity Greek Orthodox Church, Summit 800, and the Merced Extension Triangle Neighborhood Association . During the meeting we discussed an overview of the Parkmerced Vision, a construction overview of Subphases 1A/1B, and Street Improvements along Brotherhood Way.
The agenda/presentation slide deck shown during the March 9, 2021 Bicycle Pedestrian Advisory Committee (BPAC) virtual workshop. The meeting video can be viewed at https://youtu.be/vAHM4B6Ew1k
This document provides an update on the vision plan for Parkmerced. It outlines the topics that will be discussed which include the construction overview, project website, resident relocation and parking updates, and operations. It reviews the phasing of the project over 20-25 years and details of subphases 1A and 1B which involve street improvements and construction on blocks 1, 6, and 20. Details are given on the construction schedule, mitigations, and the resident relocation and parking relocation processes. The presentation concludes with information on new amenities and a Q&A.
This document summarizes an agenda for a resident meeting at Parkmerced. The agenda covers an overview of the vision plan, resident and parking relocation plans, and construction plans for subphases 1A and 1B. It discusses upcoming community upgrades and renovations as well as the construction schedule. Residents will have a chance to ask questions and receive information on how the renovations may impact them and the community.
The vision plan meeting overview included phases 1A and 1B of construction as well as resident relocation and parking relocation. Phase 1A construction will include blocks 1, 6, 20, and 22 starting in Q3 2017 through 2019. It will involve the replacement of 56 existing homes in block 1 and 957 new homes across all blocks. Resident relocation options and the parking relocation plan from various lots to the Higuera garage were also discussed. A Q&A session followed the presentation.
The Parkmerced Vision is a 20-25 long range development project in San Francisco, CA. A Resident Meeting was held on September 25, 2017 to discuss updates on the Project's implementation, resident amenity improvements, and construction sequencing.
Lee District 2018 Paving and Restriping: Public Information Meeting-March 7, ...Fairfax County
This document summarizes a public information meeting held on March 7, 2018 about proposed paving and restriping projects in the Lee District. It discusses VDOT's paving program overview and allocation amounts from 2013-2018. It then reviews proposed modifications to striping on several roads to add bicycle facilities like bike lanes and shared lane markings, while maintaining existing on-street parking. Community feedback is requested on specific locations by March 23rd to help finalize the plans.
On January 31st at the Parkmerced Clubhouse/Resident Lounge, a meeting was held with some of the neighbors of Parkmerced, which was attended by representatives of St Thomas More School, Brandeis School of San Francisco, Calvary Armenian Congregational Church, Holy Trinity Greek Orthodox Church, Summit 800, and the Merced Extension Triangle Neighborhood Association . During the meeting we discussed an overview of the Parkmerced Vision, a construction overview of Subphases 1A/1B, and Street Improvements along Brotherhood Way.
The agenda/presentation slide deck shown during the March 9, 2021 Bicycle Pedestrian Advisory Committee (BPAC) virtual workshop. The meeting video can be viewed at https://youtu.be/vAHM4B6Ew1k
What: A low density Modern Minimalist themed high-rise enclave in Quezon City.
How: That offers intimate and tranquil environment with lush landscapes.
Who: For the discerning and growing upper middle-income families.
Why: Seeking to live in a private, secured, and serviced neighborhood.
Where: Within reach from city’s activity and business centers
When: In a time of increasing cramped living spaces in the city.
The Land Development Agency (LDA) presented an update on the Furzer Street Precinct project to the Woden Valley Community Council. Construction is scheduled to begin in March/April 2015 to develop sections 3 and 9, including intersection upgrades, civil works, and landscape and park works. Community engagement efforts include presentations, letters, emails, and signage to make local residents and businesses aware of the upcoming construction work.
This document provides an overview of the SM City Sucat Complex residential development project located in Sucat, Parañaque City, Philippines. The key details include that it will consist of 10 buildings ranging from 8-12 floors each, with various residential unit types. Amenities will include a clubhouse, multiple pools, gardens, and sports facilities. The developer reserves the right to modify the project details without prior notice.
The agenda/presentation slide deck shown during the February 9, 2021 Bicycle Pedestrian Advisory Committee (BPAC) virtual workshop. The meeting video can be viewed at https://youtu.be/F8F-dJd4kk8
Fairfax County Old Courthouse Road Walkway Improvements August 2020Fairfax County
Old Courthouse Rd. walkway improvements were substantially completed on July 15, 2020. 1,300 linear feet of concrete sidewalk and other related improvements are included in this project.
Fairfax County Little River Turnpike Walkway August 2020Fairfax County
The Little River Turnpike walkway pedestrian improvement project was completed on June 29, 2020. The project increases pedestrian safety from Columbia Rd. to Mayhunt Ct. with 2580 linear feet of 5-foot wide concrete sidewalk.
Silverbrook Road at Monacan Road Walkway ProjectFairfax County
The scope of this project included 460 feet of five-foot wide concrete sidewalk and curb and gutter along the west side of Silverbrook Road south of Monacan Road connecting to the existing sidewalk. The improvements provide a new pedestrian access to the sidewalk, trails, signage, pavement markings and two new curb ramps along with a crosswalk at the Silverbrook Road and Monacan Road intersection.
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...Fairfax County
The document summarizes six bus stop safety and accessibility improvement projects that were completed in October 2015 in the Springfield and Mount Vernon districts of Fairfax County, Virginia. The projects improved pedestrian safety by installing concrete pads, sidewalks, and other items at bus stops along Rolling Road, Fairfax County Parkway, Mount Vernon Memorial Highway, South Run Road. The project team that completed the work is also listed.
Recreational Facilities and Amenities
–Events Area
•Enclosed clubhouse and poolside area for Events and Functions
•Entertainment / Conference Room
–Kids Area
•Three (3) Kiddie pools
•Open playfield
–Adults Area
•Three (3) Adult Swimming Pools
•Meditation Area
–Family Area
•Themed Gardens
•Picnic Area
–Sports and Recreation
•Basketball Court
•Badminton Courts
•Jogging Trail
The document provides information about the proposed adaptive reuse of the former United Stamping building in Emeryville, California into an arts center. It will include renovating and rehabilitating the existing building structure, interior improvements, and landscaping. The project will add a new cafe addition, entrance, and rooftop dwelling unit. It provides details on the existing building features, proposed uses, code compliance, site and floor plans, and renderings of the proposed renovations.
This document summarizes an available office space for lease in Bracknell, UK. The property is located in the Circa building in the heart of Bracknell town centre. It has a lease expiring in March 2023 and the available space includes a self-contained ground floor suite and the whole second floor, totaling over 10,000 square feet. The property offers amenities like air conditioning, raised floors, suspended ceilings, and on-site parking.
Route 1 Northbound - Virginia Lodge to Huntington AvenueFairfax County
The document summarizes a road construction project on Route 1 Northbound from Virginia Lodge to Huntington Avenue in Fairfax County, Virginia. The project included installing 1,320 feet of sidewalk, modifying signals, extending a box culvert, repairing cracks in an existing culvert, adding guard rails, and relocating a water main. The project was substantially completed in March 2020 through a design-bid-build contract with Sagres Construction Corporation overseeing construction. Before and after photos documented the improvements made through the project.
Pohick Road - South Run Road Walkway Pedestrian ImprovementsFairfax County
The scope of this project included construction of concrete sidewalk, curb and gutter, curb-cut ramps, concrete bus pads, pavement mill and overlay, pavement marking and signings, drainage improvements, watermain relocation, guardrail system improvements, and pedestrian signals.
Dead Run Force Main Rehabilitation ProjectFairfax County
The document summarizes a project to rehabilitate an existing 14-inch cast iron force main in Fairfax County, Virginia. The project involved lining the 2,700 linear feet of force main with cured-in-place pipe lining, installing storm culverts under five driveways to improve drainage, replacing an existing concrete culvert, restoring ditches and driveways, and adding safety measures. The project was substantially completed in September 2016 to repair the 60-year old force main running from Dead Run Drive to Dolly Madison Boulevard.
This project installed an 8-inch PVC gravity sanitary sewer line to serve five residents in McLean, Virginia. It involved constructing 580 feet of sewer line through an easement and installing five manholes. The project team included members from the Utilities Design and Construction Division and Land Acquisition Division. Ashburn Contracting Corp was the contractor. The project was substantially completed on January 10, 2014 and included tree and ground restoration as well as road paving.
This document provides project details for a proposed 90-unit affordable housing development located at 3600, 3610, and 3620 San Pablo Avenue in Emeryville, California. The project would consist of a 5-story building with ground floor retail and 90 affordable rental units above. It includes plans, elevations, sections, and renderings depicting the design. Project data tables compare the proposed development to the city's zoning regulations for metrics like density, parking, open space, and more.
1,2 & 3 BHK Apartments in Kanakapura Road | Provident Central Park | Luxury A...varshinisweet
1 BHK Apartment in Kanakapura Road - Take a look at the majestic Provident Central Park, luxury apartments on Kanakapura Road. 2 & 3 BHK flats are for sale with the best of amenities and global brands in the apartment.
https://www.providenthousing.com/projects/bangalore/provident-central-park
1 BHK Apartment in Kanakapura Road, 2 BHK Flat in Judicial Layout, 3 BHK Flats in Kanakapura Road
May 11, 2015 Parkmerced Vision Update and Tenant Relocation Planparkmercedvision
May 11, 2015 Parkmerced Vision Update and Tenant Relocation Plan
Development Phase 1 Application and Tenant Relocation Plan for existing Blocks 37W, 34, and 19.
The newsletter provides updates on the Parkmerced Vision redevelopment project, which will renovate the property in phases over 20-30 years. Preparations for the first phase of construction in spring/summer 2016 are underway, including tree removal, surveys, and relocating residents and parking. Residents in the first blocks to be demolished will meet in early 2016 to learn about the relocation process and choose their replacement units.
The document proposes reimagining Devonian Square at Ryerson University to improve the student experience. It outlines plans to pedestrianize the area, commit to design excellence, and intensify urban development. The reimagined space would provide increased student space, versatility, visual consistency, income generation, and a focal point for campus. Potential drawbacks include costs, permitting challenges, and community concerns. Comparable projects elsewhere have been successful in achieving similar goals.
19th Ave Transit Study Fall 2013 Presentation and SurveySFCTA
This presentation contains information about the 19th Avenue Transit Study, a feasibility Study being led by the San Francisco County Transportation Authority that considers changes to the M-Ocean View light rail and 19th Avenue corridor in southwest San Francisco. The presentation is being used to assist with public outreach being conducted in Fall 2013. After viewing the presentation, you are invited to complete a short survey at: https://www.surveymonkey.com/s/19thsurvey
What: A low density Modern Minimalist themed high-rise enclave in Quezon City.
How: That offers intimate and tranquil environment with lush landscapes.
Who: For the discerning and growing upper middle-income families.
Why: Seeking to live in a private, secured, and serviced neighborhood.
Where: Within reach from city’s activity and business centers
When: In a time of increasing cramped living spaces in the city.
The Land Development Agency (LDA) presented an update on the Furzer Street Precinct project to the Woden Valley Community Council. Construction is scheduled to begin in March/April 2015 to develop sections 3 and 9, including intersection upgrades, civil works, and landscape and park works. Community engagement efforts include presentations, letters, emails, and signage to make local residents and businesses aware of the upcoming construction work.
This document provides an overview of the SM City Sucat Complex residential development project located in Sucat, Parañaque City, Philippines. The key details include that it will consist of 10 buildings ranging from 8-12 floors each, with various residential unit types. Amenities will include a clubhouse, multiple pools, gardens, and sports facilities. The developer reserves the right to modify the project details without prior notice.
The agenda/presentation slide deck shown during the February 9, 2021 Bicycle Pedestrian Advisory Committee (BPAC) virtual workshop. The meeting video can be viewed at https://youtu.be/F8F-dJd4kk8
Fairfax County Old Courthouse Road Walkway Improvements August 2020Fairfax County
Old Courthouse Rd. walkway improvements were substantially completed on July 15, 2020. 1,300 linear feet of concrete sidewalk and other related improvements are included in this project.
Fairfax County Little River Turnpike Walkway August 2020Fairfax County
The Little River Turnpike walkway pedestrian improvement project was completed on June 29, 2020. The project increases pedestrian safety from Columbia Rd. to Mayhunt Ct. with 2580 linear feet of 5-foot wide concrete sidewalk.
Silverbrook Road at Monacan Road Walkway ProjectFairfax County
The scope of this project included 460 feet of five-foot wide concrete sidewalk and curb and gutter along the west side of Silverbrook Road south of Monacan Road connecting to the existing sidewalk. The improvements provide a new pedestrian access to the sidewalk, trails, signage, pavement markings and two new curb ramps along with a crosswalk at the Silverbrook Road and Monacan Road intersection.
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...Fairfax County
The document summarizes six bus stop safety and accessibility improvement projects that were completed in October 2015 in the Springfield and Mount Vernon districts of Fairfax County, Virginia. The projects improved pedestrian safety by installing concrete pads, sidewalks, and other items at bus stops along Rolling Road, Fairfax County Parkway, Mount Vernon Memorial Highway, South Run Road. The project team that completed the work is also listed.
Recreational Facilities and Amenities
–Events Area
•Enclosed clubhouse and poolside area for Events and Functions
•Entertainment / Conference Room
–Kids Area
•Three (3) Kiddie pools
•Open playfield
–Adults Area
•Three (3) Adult Swimming Pools
•Meditation Area
–Family Area
•Themed Gardens
•Picnic Area
–Sports and Recreation
•Basketball Court
•Badminton Courts
•Jogging Trail
The document provides information about the proposed adaptive reuse of the former United Stamping building in Emeryville, California into an arts center. It will include renovating and rehabilitating the existing building structure, interior improvements, and landscaping. The project will add a new cafe addition, entrance, and rooftop dwelling unit. It provides details on the existing building features, proposed uses, code compliance, site and floor plans, and renderings of the proposed renovations.
This document summarizes an available office space for lease in Bracknell, UK. The property is located in the Circa building in the heart of Bracknell town centre. It has a lease expiring in March 2023 and the available space includes a self-contained ground floor suite and the whole second floor, totaling over 10,000 square feet. The property offers amenities like air conditioning, raised floors, suspended ceilings, and on-site parking.
Route 1 Northbound - Virginia Lodge to Huntington AvenueFairfax County
The document summarizes a road construction project on Route 1 Northbound from Virginia Lodge to Huntington Avenue in Fairfax County, Virginia. The project included installing 1,320 feet of sidewalk, modifying signals, extending a box culvert, repairing cracks in an existing culvert, adding guard rails, and relocating a water main. The project was substantially completed in March 2020 through a design-bid-build contract with Sagres Construction Corporation overseeing construction. Before and after photos documented the improvements made through the project.
Pohick Road - South Run Road Walkway Pedestrian ImprovementsFairfax County
The scope of this project included construction of concrete sidewalk, curb and gutter, curb-cut ramps, concrete bus pads, pavement mill and overlay, pavement marking and signings, drainage improvements, watermain relocation, guardrail system improvements, and pedestrian signals.
Dead Run Force Main Rehabilitation ProjectFairfax County
The document summarizes a project to rehabilitate an existing 14-inch cast iron force main in Fairfax County, Virginia. The project involved lining the 2,700 linear feet of force main with cured-in-place pipe lining, installing storm culverts under five driveways to improve drainage, replacing an existing concrete culvert, restoring ditches and driveways, and adding safety measures. The project was substantially completed in September 2016 to repair the 60-year old force main running from Dead Run Drive to Dolly Madison Boulevard.
This project installed an 8-inch PVC gravity sanitary sewer line to serve five residents in McLean, Virginia. It involved constructing 580 feet of sewer line through an easement and installing five manholes. The project team included members from the Utilities Design and Construction Division and Land Acquisition Division. Ashburn Contracting Corp was the contractor. The project was substantially completed on January 10, 2014 and included tree and ground restoration as well as road paving.
This document provides project details for a proposed 90-unit affordable housing development located at 3600, 3610, and 3620 San Pablo Avenue in Emeryville, California. The project would consist of a 5-story building with ground floor retail and 90 affordable rental units above. It includes plans, elevations, sections, and renderings depicting the design. Project data tables compare the proposed development to the city's zoning regulations for metrics like density, parking, open space, and more.
1,2 & 3 BHK Apartments in Kanakapura Road | Provident Central Park | Luxury A...varshinisweet
1 BHK Apartment in Kanakapura Road - Take a look at the majestic Provident Central Park, luxury apartments on Kanakapura Road. 2 & 3 BHK flats are for sale with the best of amenities and global brands in the apartment.
https://www.providenthousing.com/projects/bangalore/provident-central-park
1 BHK Apartment in Kanakapura Road, 2 BHK Flat in Judicial Layout, 3 BHK Flats in Kanakapura Road
May 11, 2015 Parkmerced Vision Update and Tenant Relocation Planparkmercedvision
May 11, 2015 Parkmerced Vision Update and Tenant Relocation Plan
Development Phase 1 Application and Tenant Relocation Plan for existing Blocks 37W, 34, and 19.
The newsletter provides updates on the Parkmerced Vision redevelopment project, which will renovate the property in phases over 20-30 years. Preparations for the first phase of construction in spring/summer 2016 are underway, including tree removal, surveys, and relocating residents and parking. Residents in the first blocks to be demolished will meet in early 2016 to learn about the relocation process and choose their replacement units.
The document proposes reimagining Devonian Square at Ryerson University to improve the student experience. It outlines plans to pedestrianize the area, commit to design excellence, and intensify urban development. The reimagined space would provide increased student space, versatility, visual consistency, income generation, and a focal point for campus. Potential drawbacks include costs, permitting challenges, and community concerns. Comparable projects elsewhere have been successful in achieving similar goals.
19th Ave Transit Study Fall 2013 Presentation and SurveySFCTA
This presentation contains information about the 19th Avenue Transit Study, a feasibility Study being led by the San Francisco County Transportation Authority that considers changes to the M-Ocean View light rail and 19th Avenue corridor in southwest San Francisco. The presentation is being used to assist with public outreach being conducted in Fall 2013. After viewing the presentation, you are invited to complete a short survey at: https://www.surveymonkey.com/s/19thsurvey
The document summarizes plans for the redevelopment of the 369-acre former US Steel plant site in Chicago into a new mixed-use neighborhood called Chicago Lakeside. Key points include:
- The site will include over 13,000 new housing units, retail, and commercial space estimated to bring 50,000 new residents and $4 billion to the local economy.
- Plans emphasize sustainable design with compact neighborhoods, connectivity to transit including four nearby Metra stations, over 90 acres of new parks, and stormwater management returning water to Lake Michigan.
- The neighborhood will be organized into six distinct areas connected by new streets and parks, preserving historical ore walls and adding new cultural amenities.
- Re
This document provides information about the Lakeside at Lake Georgetown community including amenities, schools, shopping, and hospitals in the area. It lists association fees, taxes, and school district information. It also includes an artist's rendering of the community layout and locations of features. Finally, it details the standard features and designs of the homes being built in the community.
Zorah is a Canadian manufacturer of high-end organic cosmetics. They use 100% natural, organic, and fair-trade ingredients. Zorah invests heavily in research and development to create products that are highly effective without using synthetic ingredients. Their products undergo rigorous testing and must receive a 95% effectiveness score before being released. Zorah has become a leader in the natural cosmetics industry in Canada and is expanding internationally. They offer a wide range of skincare and makeup products to satisfy all skin types.
1. The proposal removes the upper deck of the Gardiner Expressway to create a new boulevard called Lakeshore Boulevard, reconnecting the city to the waterfront.
2. A new transit hub called the Transferium is proposed at the intersection of key transit lines to increase transportation connectivity and unlock growth.
3. Several new districts such as the Arts District and Heritage Market are planned along Lakeshore Boulevard to promote development and link cultural points across the city.
1) The document discusses an urban community commercial neighborhood project in Olaia Street precinct in Riyadh, Saudi Arabia.
2) Riyadh is one of the fastest growing cities in the world with a population of 4.9 million people within an area of 2435 square kilometers.
3) The specific area being analyzed is located in the Olaia neighborhood in the center of Riyadh, which has a commercial strip that is the heart of business and interface for city visitors.
The document provides an overview of the Parkmerced Vision Plan including:
- The plan will redevelop 152 acres of apartments constructed in 1940-1952 into a mixed-use neighborhood with 10,000 homes, retail and amenities over 20-30 years.
- Phases 1A, 1B, 1C and 1D will construct 1,438 new homes, provide replacement homes for 250 existing residents, and include improvements to streets, infrastructure and open spaces.
- The redevelopment will include mobility options like a resident shuttle and bike share, and protections for existing residents including replacement homes and relocation assistance.
Parkmerced Resident Meeting presentation held at St. Thomas More Church on May 15th 2017. Meeting discussed the Parkmerced Vision, Construction Updates for Subphases 1A/1B, Resident Relocation, Parking Relocation, and Community Updates
The document summarizes a public meeting held on January 11, 2016 to discuss planned improvements to the Bloor Street East streetscape from St. Paul's Square to Parliament Street in Toronto. The improvements are scheduled to take place in 2017 as part of an asphalt resurfacing project. The meeting provided information on project background, goals and opportunities, the study area, timeline, existing site conditions, proposed tree planting, streetscape opportunities including enhanced sidewalks and planted bump-outs, and preliminary design concepts. Feedback from the public meeting would help inform the final design.
This document provides an overview of the St. Thomas More Vision Plan including phases 1A and 1B. It discusses street improvements, community amenities, construction timelines and processes for resident relocation and parking. Phase 1A involves 4 buildings with 401 homes and phase 1B involves 4 buildings with 612 homes. It details the construction schedule, mitigations, mobility plans including shuttles and bike share, and the process for moving residents into new homes. The presentation aims to inform residents about upcoming infrastructure changes and address questions.
This document provides notice of an Architectural Review Board meeting to consider a final design review of a proposed mixed-use development project located at 5500 & 5514 Broadway St and 200, 202, & 206 Ellwood in Alamo Heights, Texas. The project includes 150 luxury apartment units, 5,000 square feet of retail space, and underground parking accessed from a basement level. Plans for the project will be available to view online and at the Community Development Services Department prior to the June 20, 2017 meeting. The ARB will make a recommendation that will be forwarded to the City Council for final approval.
02 cta yellow line station evanston cc 04.16.12cityofevanston
The document summarizes a feasibility study for adding a Yellow Line station in Evanston, Illinois. It recommends Asbury Avenue as the preferred location over Dodge Avenue. Key findings are that an Asbury station would improve local access and mobility, support community and economic development along Howard Street, and have fewer physical and environmental constraints than a Dodge station. The estimated capital cost is $23 million, and the station is projected to serve 840 passengers daily. Next steps include pursuing state and federal funding and identifying local financing options.
The agenda/presentation slide deck shown during the April 13, 2021 Bicycle Pedestrian Advisory Committee (BPAC) virtual workshop. The workshop video can be viewed at https://youtu.be/pw_e3_vU5IE
The document provides an overview of the Parkmerced Vision Plan including Phases 1A and 1B. Key points include:
- Phases 1A and 1B involve street improvements, replacement of 4 buildings with 401 homes, and community amenities like gardens and play areas.
- Construction will start on replacement buildings in Q1 2019 and be completed by Q2/Q3 2020. Street improvements will also be done.
- The plan addresses parking relocation, with the first notices going out in Q4 2018 for some lots, and a shuttle and bike share program launching then.
- Residents have options for relocating that include a replacement apartment, relocation payment, or interim housing during
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...Fairfax County
The Fairfax County Department of Public Works and Environmental Services completed five bus stop safety and accessibility improvement projects in September 2015. The projects installed concrete pads, sidewalks, and other items to improve pedestrian safety at bus stops located on Lawyers Road, Coffer Woods Road, Old Keene Mill Road, and Telegraph Road. The document provides details on the project locations, teams, and contact information for additional questions.
Operational Analysis of Dulles Toll Road Ramps to TysonsFairfax County
This document provides an operational analysis of ramp options from the Dulles Toll Road to Tysons, Virginia. It summarizes traffic analyses of two options - Option 1 includes collector distributor roads and additional ramps, while Option 2 includes urban frontage roads and ramps. Both options improve traffic flow but Option 1 is less expensive. The document also outlines project timelines and next steps to further study the options.
Great Falls St. Sidewalk Improvements December 2020Fairfax County
In Fairfax County, from North West Street to Osborn Street, the project provides pedestrian access improvements including installation of concrete sidewalk, curb and gutter, curb ramps, driveway reconstruction, gravity retaining walls, drainage improvements, watermain relocation, paving, pavement marking and signage.
Campbellford Bridge Detailed Design Council Update.pdfKatrinaMcCullough2
The document provides an update on the detailed design of the new Campbellford Bridge. It discusses the project history and community engagement process that has occurred. The design update section outlines the key design elements including the new bridge and surrounding road network, roundabouts, intersection improvements, and a new parkette area. The next steps are to finalize the detailed design and prepare for construction.
The Quander Road Walkway project in Fairfax County, Virginia involved constructing 1,800 feet of sidewalk, curb and gutter, a refuge island with ramps, drainage improvements, and road widening along Quander Road between Emmett Drive and Stokes Lane. The project was completed in June 2021 to provide safer connectivity for schools and neighborhoods. It was delivered using a design-bid-build approach and included relocating utilities, laying concrete, and replacing landscaping.
This document summarizes a study of alternatives for reconfiguring the Gardiner Expressway East and Lake Shore Boulevard in Toronto. Four alternatives are considered: Maintain, Improve, Replace, and Remove the existing elevated expressway structure. The alternatives are evaluated based on transportation infrastructure, urban design, environmental, economic, and other criteria. Preliminary results indicate that completely Removing the expressway scores highest, while Maintaining the existing structure scores lowest. Next steps include developing and consulting on hybrid proposals and alternative designs before selecting a final recommended option.
Mount Vernon District 2018 Paving and RestripingFairfax County
This document summarizes a public information meeting held on February 12, 2018 about proposed paving and restriping projects in the Mount Vernon District. Representatives from VDOT and Fairfax County DOT presented information on the district's paving program and conditions, proposed striping modifications to improve safety for bicyclists and pedestrians, and specific projects planned for roads like Hooes Road, Pohick Road, Armistead Road, Richmond Highway, Telegraph Road, Pole Road, and Frye Road. The presentation included existing road configurations, planned improvements, and proposed restriping designs. Community feedback was requested by March 2nd on issues like speeding, priority crossings, crosswalk striping, and median refuges.
Public Forum 3 - Presentation (Feb 6_2014)GardinerEast
The document provides information from a public information centre regarding options being studied to reconfigure the Gardiner Expressway East and Lake Shore Boulevard in Toronto. Four alternatives are being evaluated: Maintain, Improve, Replace, and Remove the existing elevated expressway. Evaluation criteria include transportation and infrastructure impacts, environmental impacts, urban design considerations, and economics. Transportation modeling assumes growth in downtown Toronto by 2031 and the need for new transit regardless of the alternative chosen. Public consultation has provided feedback used to refine the alternatives and criteria.
Mammoth Lakes HSIP 2013 (Application and Attachments)Carson Quam
This document provides details on a proposed Highway Safety Improvement Program (HSIP) grant application from the Town of Mammoth Lakes, California. The project involves safety improvements along Main Street between Sierra Boulevard and Minaret Road, including adding sidewalks 10 feet wide, widening shoulders to 8 feet, and installing street lighting at 75 foot intervals. An existing retaining wall will be reconstructed to provide additional space for the sidewalk and shoulder. The application includes vicinity maps, project maps, photos of existing conditions, collision diagrams showing accident data and locations, cost estimates broken down by construction item and countermeasure, and a letter of support from Caltrans District 9.
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-RampFairfax County
Reston Parkway at Dulles Toll Road EB and WB provides pedestrian access improvement at the intersection of Reston Parkway at Dulles Toll Road and to the intersection of Fairfax County Parkway and Sunset Hills Road.
Reston Parkway at Dulles Toll Road EB off-ramp and Reston Parkway at Dulles Toll Road WB on-ramp was substantially completed on October 6, 2021. Due to COVID-19 Pandemic, some of pedestrian signal electrical hardware and software supply delayed and created huge gap from the substantial completion date to the full activation of the project. The scope of this project was construction of concrete median islands, curb ramps, curb and gutter, and full replacement of asphalt trail, asphalt mill/overlay, signs and new pedestrian signals installation.
The agenda/presentation slide deck shown during the July 21, 2021 Transportation Aesthetics Review Committee (TARC) virtual workshop. The workshop video can be viewed at https://youtu.be/SFhhrvNqh40
Similar to May 9, 2016 Parkmerced Vision Update (20)
Discover Yeni Eyup Evleri 2, nestled among the rising values of Eyupsultan, offering the epitome of modern living in Istanbul.
With its spacious living areas, contemporary architecture, and meticulous details, Yeni Eyup Evleri 2 is poised to be the star of your happiest moments. Situated in the new favorite district of Eyupsultan, claim your spot and unlock the doors to a peaceful life alongside your loved ones. Nestled next to the historical and natural beauties of Eyupsultan, embrace the comfort of modern living and rediscover life.
Social Amenities:
Yeni Eyup 2 offers a life filled with joy with its green landscaping areas, gym, sauna, children’s play areas, café, outdoor pool, and basketball court. Reserve your place for unforgettable moments!
Reliable Structure:
With 1+1, 2+1, and 3+1 apartment options, Yeni Eyup Evleri 2 is designed with first-class materials and craftsmanship. The doors to a safe and comfortable life are here! Choose the option that suits you best and step into your dream home.
Project:
Yeni Eyup 2 is conveniently located, with Istanbul Airport just 26 minutes away, the Mecidiyeköy Metro Line 4 minutes away, and the Tram Stop 5 minutes away, making your life easier with its central location.
Location:
Your home is positioned in a privileged location, providing easy access to the city center, shopping malls, restaurants, schools, and other important places.
Yeni Eyup 2 offers 1+1, 2+1, and 3+1 apartment options designed to meet different needs. Find an option suitable for every lifestyle and open the doors to a comfortable life in your dream home.
https://listingturkey.com/property/yeni-eyup-evleri-2/
Serviced Apartment Ho Chi Minh For RentalGVRenting
GVRenting is the leading rental real estate company in Vietnam. We help you to find a serviced apartment for rent in Ho Chi Minh & Saigon. Discover our broad range of rental properties in Vietnam.
For more details https://gvrenting.com/
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing TurkeyListing Turkey
Looking for a new home in Istanbul? Look no further than Avrupa Konutlari Esentepe! Our beautifully designed homes provide the perfect blend of luxury and comfort, making them the perfect choice for anyone looking for a high-quality home in the city.
With a wide range of apartment types available, from 1+1 to 4+1, we have something to suit every need and budget. Each apartment is designed with attention to detail and features spacious and bright living areas, making them the perfect place to relax and unwind after a long day.
One of the things that sets Avrupa Konutlari Esentepe apart from other developments is our focus on creating a community that is both comfortable and convenient. Our homes are surrounded by lush green spaces, perfect for enjoying a peaceful stroll or having a picnic with friends and family. Additionally, our complex includes a variety of social and recreational amenities, such as swimming pools, sports fields, and playgrounds, making it easy for residents to stay active and socialize with their neighbors.
https://listingturkey.com/property/avrupa-konutlari-esentepe/
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...knox groups real estate
welcome to knox groups real estate company in Bangalore. best farm land for sale near Bangalore and madhugiri . Managed farmland near Kanakapura and Chickkabalapur get know more details about the projects .Knox groups is a leading real estate company dedicated to helping individuals and businesses navigate the dynamic real estate market. With our extensive knowledge, experience, and commitment to excellence, we deliver exceptional results for our clients. Discover the perfect foundation for your agricultural aspirations with KNOX Groups' prime farm lands. These aren't just plots; they're the fertile grounds where vibrant crops flourish, livestock thrives, and unique agricultural ventures come to life. At KNOX, we go beyond selling land we curate sustainable ecosystems, ensuring that your journey toward agricultural success is seamless and prosperous.
Recent Trends Fueling The Surge in Farmhouse Demand in IndiaFarmland Bazaar
Embarking on the journey to acquire a farmhouse for sale is just the beginning; the real investment lies in crafting an environment that contributes to our mental and physical well-being while satisfying the soul. At Farmlandbazaar.com, India’s leading online marketplace dedicated to farm land, farmhouses, and agricultural lands, we understand the importance of transforming a humble farmland into a warm and inviting sanctuary. Let's explore the fundamental aspects that can elevate your farmhouse into a tranquil haven.
The SVN® organization shares a portion of their new weekly listings via their SVN Live® Weekly Property Broadcast. Visit https://svn.com/svn-live/ if you would like to attend our weekly call, which we open up to the brokerage community.
4. WINTER 2014 Resident Meeting
SPRING 2015 Newsletter & Resident Meeting
Development Phase 1 Application Approved
SUMMER 2015 Informational Planning Commission Hearing
FALL 2015 Newsletter & Resident Meeting
Tentative Subdivision Maps Approved
Design Review Applications Buildings Approved
WINTER 2015/16 Building Permits Submitted
Newsletter & Resident Meeting
Privately Owned/Maintained Tree Removal
History, Outreach, and Communication
5. SUMMER 2016 Outdoor Resident Amenity Center Opens
Quarterly Newsletter and Resident Meeting
FALL 2016 Playground Closure (310/350 Arballo, 810 Gonzalez, 55 Chumasero)
Resident Shuttle and Bike Share Launch
Existing Tenant Notices to first 56 Apartments
Quarterly Newsletter and Resident Meeting
Parking Relocation for Felix Garage, Arballo Circle, and Galindo Lot F
Construction Start for Subphases 1A and 1B Street Improvements
Construction Start for Blocks 1, 6, and 20
SPRING 2017 Parking Relocation for Galindo Garage
Construction Start Block 22
Look Ahead
8. Existing Homes to Remain 1,683 Tower Apartments
Existing Homes to be Replaced 1,538 Garden Apartments
New Homes 5,679 Net New Homes
TOTAL HOMES 8,900
Neighborhood Retail 230,00 square feet
Office 80,000 square feet
School 25,000 square feet
Community Center 64,000 square feet
Open Space & Parks 68 acres
Residential
Commercial, School, Recreation, and Open Space
Build Out Summary by the Numbers
9. 10 Min. Walk 4 Min. Walk
Neighborhood
Retail & Amenities
Grocery Store
Daycare/ K-5
Community Center
Neighborhood
Commons
Community Amenities
9
11. M OCEANVIEW
To Daly City BART
S TO WESTLAKE
S TO STONESTOWN
Bike Share Car Share Shuttle Service Muni ImprovementsTransportation
Coordinator
Transportation
13. Subphases 1A & 1B
LAKEMERCEDBLVD
BROTHERHOOD WAY
VIDAL DR
ACEVEDO AVE
HIGUERA AVE Juan Bautista
Circle
ARBALLODR
PINTO AVE
Leasing
SFSU
Community Enhancements
Landscape and Hardscape
Children’s Play Areas
Flexible Open Space
Community Gardens
Car Share
Bike Share
Resident Shuttle
Wayfinding Signage
1
2
3
3
4
4
5
1
2
3 4
5
199 VIDAL
300 ARBALLO
455 SERRANO
850 GONZALEZ
1208-1218 J. SERRA
95-99 CHUMASERO
14. Subphases 1A & 1B
LAKEMERCEDBLVD
BROTHERHOOD WAY
VIDAL DR
ACEVEDO AVE
HIGUERA AVE Juan Bautista
Circle
ARBALLODR
PINTO AVE
Leasing
SFSU
Street Improvements
Enhanced Quality of Life
“Better Streets Plan” Elements
Promote Public Safety
Wider Sidewalks and Bulb Outs
Increased Accessibility for All
Improved Transit Access
Bicycle Infrastructure
New and Upgraded Utilities
Street Improvements: Reconstruction of portions of the public
right-of-way including any sidewalk curb, gutter, parking strip,
parkway, driveway, etc.
17. Block 1 Community Improvements
Community
Gardens
Car & Bike Share
Play Area
Landmark Tree
Reconfigured
Driveway
199 VIDAL
300 Arballo
Landscaping
New
Intersection
21. Block 20 Community Improvements
125
CAMBON
Community
Gardens
Community
Green
Play Area
Tower Entries
Tree Farm
Chumasero/
J. Serra
Bike Share
Car Share
29. Blocks 20 & 22 – Font, Chumasero, J. Serra, Brotherhood
Construction Fence
1208-1218 J. Serra
95-99 Chumasero
125
Cambon
150
Font
100
Font
50
Chumaser
o
55
Chumaser
o
30. SFSU
FONT BLVD
SUBPHASE 1A
B1
B6
B2O
B22
SUBPHASE 1B
Construction Mitigations
Noise Air Quality Resources
Construction Hours
Noise Barriers
Equipment Selection
Dedicated Truck Routes
Noise Coordinator
Regular Vehicle Service
Shut Down Engines
EPA Standards
Vehicle Selection
Dust Control
Monitoring
Traffic Management
Bird Surveys
Tree Protection
Tree Removal
Tree Replacement
33. All Townhome Residents
Long-Term Existing Residents
prior to July 9, 2001
Brand New
Replacement
Apartment
Relocation
Payment
Benefits
Interim
Replacement
Apartment
Options for Relocation
34. Subphase 1A & 1B Relocation Map
Juan Bautista
Circle
Leasing
SFSU
Interim Replacement
37E 36 29
LAKEMERCEDBLVD
BROTHERHOOD WAY
VIDAL DR
ACEVEDO AVE
HIGUERA AVE
ARBALLODR
PINTO AVE
GARCES DR
300 Arballo
199 Vidal
39. GALINDO GARAGE
& SURFACE LOTS
FELIX GARAGE
GALINDO
LOT F
ARBALLO CIRCLE
HIGUERA GARAGE
Parking Relocation
Felix Garage 08/22/16
Arballo Circle 10/12/16
Galindo Lot F 11/08/16
Galindo Garage 04/04/17
Earliest Dates and Subject to Delay
RelocationLocation
40. Guaranteed Replacement Space in
Higuera
Parking Rent Reduction
If Paying $0, Base Rent Reduction
60-Day Notice
Special Accommodation Requests
Free Resident Shuttle
Staggered Relocation
After Hour Service (Non-Shuttle Hours)
Improving Higuera Garage Experience
Carshare, Bikeshare, and Bike Racks
Special Accommodations in New Garages
Parking Relocation Plan
Felix Garage
Galindo Garage & Surface Lots
Galindo Lot F
Arballo Circle
Parking Relocation Overview
41. Resident BART/Shopper Shuttle (In Planning Stage)
To Daly City
BART
& Westlake
HIGUERA GARAGE
Higuera North
Higuera South
355 Serrano
750 Gonzalez
JBC
Leasing Center
125 Cambon
100 Font
50 Chumasero
Monday-Friday 5AM-12AM
Weekends 7AM-10PM
Commute Hours: Every 10 Minutes
Gonzalez at Font