CHETHAN.S
Department of Management
1
MANAGEMENT PROCESS
2 Marks:-[SECTION-A]
1. Expand POSDCORB.
Planning, Organizing, Staffing, Directing, Co-coordinating,
Reporting and Budgeting.
2. What do you mean by Ethics?
Moral principles that govern a person's behavior or the
conducting of an activity. And it tells what is good and what is
bad.
3. Define Staffing.
The term ‘Staffing’ relates to the recruitment, selection,
development, training and compensation of the managerial
personnel. Staffing, like all other managerial functions, is the
duty which the apex management performs at all times.
4. State two merits of oral communication.
 Sudden Feedback can be collected.
 Faster.
5. What is planning Premises?
Premises refer to making assumptions regarding future. Premises
are the base on which plans are made. It is a kind of forecast
made keeping in view existing plans and any past information
about various policies.
6. Distinguish between MBO and MBE.
Management by objectives(MBO) Management by Exception (MBE)
1. It attempts to devise a common objective that
is acceptable for both the management and
employees.
1.It provides the objectives for
employees only.
2. The clarity of personal responsibility
towards organizational goals is better.
2. The clarity of personal
responsibility towards organizational
CHETHAN.S
Department of Management
2
goals is not clear.
3. Dependency on one department or group
is less.
3. Dependency on one department or
group is more.
4. The active involvement of whole
organization in decision making is required.
4. The active involvement of whole
organization in decision making is
not required.
7. Mention any two types of Organization.
 Formal Organization.
 Informal Organization.
 Line Organization.
 Matrix Organization.
8. What do you mean by decision making?
Decision–making is a selection process and is concerned with
selecting the best type of alternative.
It is concerned with the detailed study of the available
alternatives for finding the best possible alternative.
9. Define Management.
According to Harold Koontz,
"Management is the art of getting things done through and with
people in formally organized groups."
10. What is PERT?
It is a network technique which is appropriate for planning and
controlling the complex and unique projects.
11. What do you mean by Business Ethics?
According to CSV.Murthy, “Application of ethics in
business is called as Business Ethics”.
12. What is Hindu Undivided Firm?
According to Henery Maine, “The Hindu joint family is a group
constituted of known ancestors and adopted sons and relatives
related to these sons through marriage.
CHETHAN.S
Department of Management
3
13. What is Management by Objectives?
Management by objective can be defined as “a management model
that attempts to devise a common objective that is acceptable for
both the management and employees, which will improve the
overall performance of the organization.
14. State any 4 sources of Recruitment.
 Transfers
 Promotions
 Present Employees
 Advertisement
 Employment Exchanges
 Schools, Colleges and Universities
15. What do you mean by Departmentation?
‘Departmentation’ or ‘Departmentalisation’ is the process of
grouping the activities of an enterprise into several units for the
purpose of administration at all levels.
16. Define Placement.
This is a final step. A suitable job is allocated to the appointed
candidate so that they can get the whole idea about the nature of
the job. They can get adjusted to the job and perform well in
future with all capacities and strengths.
17. State any two essentials of Sound Control System.
 Simplicity.
 Flexibility.
 Accuracy.
 Promptness.
CHETHAN.S
Department of Management
4
18. What is Promotion?
Promotion results in enhancements in pay, position,
responsibility and authority. The important requirement for
implementation of the promotion policy is that the terms, condi-
tions, rules and regulations should be well-defined.
19. Give the meaning of Performance appraisal.
Performance appraisal is a method of evaluating the behaviour and
performance of employees in the workplace. This includes appraisal
of both qualitative and quantitative aspects of job performance.
20. What is Decentralization?
Decentralization refers to the dissemination of powers by the top
management to the middle or low-level management. It is the
delegation of authority, at all the levels of management.
21. Name the 4 Functions of Management.
 Planning.
 Organizing.
 Staffing.
 Directing.
 Controlling.
22. What is Scalar Chain?
Managers in hierarchies are part of a chain like authority scale.
Each manager, from the first line supervisor to the president,
possess certain amounts of authority. The President possesses
the most authority; the first line supervisor the least. Lower level
managers should always keep upper level managers informed of
their work activities.
23. What is control?
Control can be defined as the process of analysing whether
actions are being taken as planned and taking corrective actions
to make these to confirm to planning.
CHETHAN.S
Department of Management
5
24. What is Centralization?
Centralization of authority means the power of planning and
decision making are exclusively in the hands of top
management. It alludes to the concentration of all the powers at
the apex level.
25. What is Job Specification?
Job specification refers to the human qualities required for
performing the job. The preparation of job specification is not as
simple as that of job description. These qualifications are essential
for the successful performance of a job.
26. What is Grapevine?
Grapevine is an informal, unofficial and personal communication
channel or system that takes place within the organization as a
result of rumor and gossip. It is a complex web of oral information
flow linking all the members of the organization.
27. What is planning?
Planning can be defined as “thinking in advance what is to be
done, when it is to be done, how it is to be done and by whom it
should be done”. In simple words we can say, planning bridges the
gap between where we are standing today and where we want to
reach.
28. Define Organization.
Louis A. Allen:“Organization is the process of identifying and
grouping the works to be performed, defining and delegating
responsibility and authority and establishing relationship for the
purpose of enabling people to work more effectively together in
accomplishing objectives.”
CHETHAN.S
Department of Management
6
29. What is Motivation?
Motivation is an important element of direction. Motivation is a
factor which encourages persons to give their best performance and
help in achieving enterprise goals. A strong positive motivation will
enable the increased output of employees.
30. What is Recruitment?
It is an operative function of human resource management coming
under the managerial function called organizing. In the words of
Edwin Flippo, ‘recruitment is the process of searching for
prospective employees and stimulating them to apply for jobs in the
organisation’.
31. What is CPM?
The PERT/CPM is convenient and useful tool in the hands of
particularly the top level manager who has the whole managerial
responsibility of a project. It is also helpful in solving the problems
of scheduling the activities of one-time projects, that is, the projects
which are not formulated on routine basis.
32. What is Autocratic Leadership?
It is also known as leader centered style. Under this style of
leadership there is complete centralization of authority in the
leader i.e. authority is centered in the leader himself. He has all the
powers to make decisions. There is no two ways communication,
only downward communication is used.
33. What is span of control?
Span of control defines clearly the number of the subordinates
can be effectively control by the manager.
CHETHAN.S
Department of Management
7
34. What is democratic leadership?
This style of leadership is also known as group centered or
consultative leadership. Under this style leaders consult the group
and solicit their opinion and participation from the following in
decision making process.
35. Mention 4 features of a Profession.
 Great responsibility.
 Accountability.
 Based on specialized, theoretical knowledge.
 Institutional preparation.
 Autonomy.
6 Marks:- [SECTION-B]
1. Briefly explain the functions of top level Management.
o Planning,
o Organization
o Staffing.
o Directing,
o Coordinating, and
o Controlling.
2. What do you mean by Communication? Explain the
types of Communication.
Communication:-
Communication might be defined as the transfer of – facts,
information, ideas, suggestions, orders, requests, grievances etc.
from one person to another so as to impart a complete
understanding of the subject matter of communication to the
recipient thereof; the desired response from the recipient to such
communication.
CHETHAN.S
Department of Management
8
Forms/Types of Communication:
There are two forms of organizational communication:
i. Formal Communication; and
ii. Informal Communication.
1. Formal communication:
i. Downward Communication.
ii. Upward Communication.
iii. Horizontal Communication.
iv. Diagonal Communications.
2. Informal Communication:
But the common networks of informal communication are:
1. Gossip.
2. Clusters.
3. Single Strand.
4. Probability.
5. Grapevine.
3. Explain four Merits and Demerits of Planning.
IMPORTANCE/SIGNIFICANCE/MERITS OF PLANNING:
1. Planning provides Direction.
2. Planning Reduces the risk of uncertainties.
3. Planning reduces over lapping and wasteful activities.
4. Planning Promotes innovative ideas.
5. Planning Facilitates Decision Making.
6. Planning establishes standard for controlling.
7. Focuses attention on objectives of the company.
CHETHAN.S
Department of Management
9
LIMITATIONS OF PLANNING:
1. Planning leads to rigidity.
2. Planning may not work in dynamic environment.
3. It reduces creativity.
4. Planning involves huge Cost.
5. It is a time consuming process.
6. Planning does not guarantee success.
7. Lack of accuracy.
4. Distinguish between Management and Administration.
Basis Management Administration
Meaning Management is an art of
getting things done through
others by directing their
efforts towards achievement
of pre-determined goals.
It is concerned with
formulation of broad
objectives, plans & policies.
Nature Management is an executing
function.
Administration is a
decision-making function.
Process Management decides who
should as it & how should he
dot it.
Administration decides
what is to be done & when
it is to be done.
Function Management is a doing
function because managers
get work done under their
supervision.
Administration is a
thinking function because
plans & policies are
determined under it.
Skills Technical and Human skills Conceptual and Human
skills
Level Middle & lower level function Top level function
CHETHAN.S
Department of Management
10
5. Explain in brief the various objectives of business.
The objectives of business may be classified as;
A. Economic Objectives
B. Social Objectives
C. Human Objectives
D. National Objectives
E. Global Objectives
Now, we shall discuss all these objectives in detail.
A. Economic Objectives:
(a) Profit Earning.
(b) Creation of customers.
(c) Regular innovations.
(d) Best possible use of resources.
B. Social Objectives:
(i) Production and Supply of Quality Goods and Services.
(ii) Adoption of Fair Trade Practices.
(iii) Contribution to the General Welfare of the Society.
С. Human Objectives:
(i) Economic Well-being of the Employees.
(ii) Social and Psychological Satisfaction of Employees.
(iii) Development of Human Resources.
(iv) Well-being of Socially and Economically Backward
People.
CHETHAN.S
Department of Management
11
D. National Objectives:
(i)Creation of Employment.
(ii) Promotion of Social Justice.
(iii) Production According to National Priority.
(iv) Contribute to the Revenue of the Country.
(v) Self-sufficiency and Export Promotion.
E. Global Objectives:
(i) Raise General Standard of Living.
(ii) Reduce Disparities among Nations.
(iii) Make Available Globally Competitive Goods and
Services.
6. Explain the different types of plan.
 Standing plans.
 Single-use plans.
 Corporate planning.
 Strategic planning.
 Tactical planning.
 Functional planning.
 Formal planning.
 Informal planning.
CHETHAN.S
Department of Management
12
7. Differentiate between formal and informal
Organization.
BASIS FOR
COMPARISON
FORMAL
ORGANIZATION
INFORMAL
ORGANIZATION
1.Meaning An organization type in
which the job of each
member is clearly defined,
whose authority,
responsibility and
accountability are fixed is
formal organization.
An organization formed
within the formal
organization as a network of
interpersonal relationship,
when people interact with
each other, is known as
informal communication.
2.Creation Deliberately by top
management.
Spontaneously by members.
3.Purpose To fulfill, the ultimate
objective of the
organization.
To satisfy their social and
psychological needs.
4.Nature Stable, it continues for a
long time.
Not stable
5.Communication Official communication Grapevine
6.Control
mechanism
Rules and Regulations Norms, values and beliefs
7.Focus on Work performance Interpersonal relationship
8.Authority Members are bound by
hierarchical structure.
All members are equal.
9.Size Large Small
CHETHAN.S
Department of Management
13
8. Give a note on Maslow’s theory of Motivation.
Maslow’s Need Hierarchy Theory:
It is probably safe to say that the most well-known theory of
motivation is Maslow’s need hierarchy theory Maslow’s theory is based
on the human needs. Drawing chiefly on his clinical experience, he
classified all human needs into a hierarchical manner from the lower
to the higher order.
In essence, he believed that once a given level of need is satisfied, it no
longer serves to motivate man. Then, the next higher level of need has
to be activated in order to motivate the man. Maslow identified five
levels in his need hierarchy.
CHETHAN.S
Department of Management
14
9. Explain the various types of decisions of business.
TYPES OF DECISIONS:
1. Programmed decision:
 structured or routine decision.
 frequent and repetitive in nature.
 short term impact.
2.Non-programmed decision:
 unstructured decision.
 unusual or non-routine problems.
3.Major decision:
• purchase of land,building,etc.
• by top level management people.
4.Minor decision:
• purchase of stationary goods.
• By lower level management people.
5. Operative decision:
• Day-to-day operations.
• Mainly by people working at supervisory level.
6. Personal decision:
• taken for personal life.
• does not affect the functioning of an organization.
7. Group decision:
• By group of people (or) committee.
8. Departmental decision:
• By department head.
• Mainly for that particular department & has no impact on
other department.
9. Non economic decision:
 Does not incur any expenses.
CHETHAN.S
Department of Management
15
10. Crisis decision:
 Spot decision.
 Unexpected situation.
11. Problem decision:
• To solve a problem.
• Expected or unexpected one.
12. Certainty decision:
• Complete information.
• Accurate outcome.
13.Uncertainty decision:
• Incomplete information.
• Not accurate outcome.
10. Discuss the principles of effective communication.
Principles of Communication:
1. Clarity.
2. Adequacy and Consistency.
3. Integration.
4. Economy.
5. Feedback.
6. Need for Communication Network.
7. Attention.
CHETHAN.S
Department of Management
16
11. State the advantages and disadvantages of line
organization.
Merits of Line Organization:
1. Simplicity.
2. Identification of Authority and Responsibility.
3. Co-ordination.
4. Effective Communication.
5. Economical.
6. Quick Decisions.
7. Unity of Command.
8. Effective Control and Supervision.
9. Executive Development.
10. Flexibility.
Demerits of Line Organization:
1. Excess Work.
2. Lack of Specialization.
3. Lack of Co-ordination.
4. Improper Communication.
5. Lack of Initiative.
6. Favoritism.
7. Instability.
12. State the advantages and disadvantages of line and
staff organization.
Merits of Line and Staff Organisation:
1. There is a planned specialization.
2. There is a well defined authority and responsibility.
3. There is bifurcation of conceptual and executive function.
CHETHAN.S
Department of Management
17
4. The staff with its expert knowledge provides opportunities to the
line officers for adopting a rational multidimensional view towards a
problem.
5. This type of organisation nourishes organisation growth as each
man grows in his own speciality. It also helps co-ordination through
co-operation and leadership.
Demerits of Line and Staff Organisation:
1. There are bound to be occasions when line and staff may differ in
opinion. This may result conflict of interest & prevents a harmonies
relationship.
2. There is a misinterpretation of expert advice by incompetent line
executives.
3. The staff people feel themselves status-less without authority.
4. Staff becomes ineffective in absence of authority.
13. Explain the importance and steps of decision making.
IMPORTANCE OF DECISION MAKING:
1. Pervasive Function.
2. Indispensable Component.
3. Evaluation of Managerial Function.
4. Selection of Best Alternatives.
5. Establishment of Plans and Policies.
6. Successful Operation of Business.
CHETHAN.S
Department of Management
18
STEPS INVOLVED IN DECISION MAKING PROCESS:
1. Define the problem.
2. Analyzing the problem.
3. Developing alternative solutions.
4. Selecting the best type of alternative.
5. Implementation of the decision.
6. Follow up.
7. Monitoring and feedback.
14. Explain the advantages of Planning.
ADVANTAGES OF PLANNING:
1. Planning provides Direction.
2. Planning Reduces the risk of uncertainties.
3. Planning reduces over lapping and wasteful activities.
4. Planning Promotes innovative ideas.
5. Planning Facilitates Decision Making.
6. Planning establishes standard for controlling.
7. Focuses attention on objectives of the company.
15. Explain the sources of recruitment.
(A) Internal Sources:
1. Transfers
2. Promotions
3. Present Employees
CHETHAN.S
Department of Management
19
(B) External Sources:
1. Advertisement
2. Employment Exchanges
3. Schools, Colleges and Universities
4. Recommendation of Existing Employees
5. Factory Gates
6. Casual Callers
7. Central Application File
8. Labour Unions
9. Labour Contractors
10. Former Employees
16. What is leadership? What are the good Qualities of a
food leader?
Leadership is the ability to build up confidence and zeal among people
and to create an urge in them to be led. To be a successful leader, a
manager must possess the qualities of foresight, drive, initiative, self-
confidence and personal integrity. Different situations may demand
different types of leadership.
Some of the qualities of a good leader are as follows:
1. Good personality.
2. Emotional stability.
3. Sound education and professional competence.
4. Initiatives and creative thinking.
5. Sense of purpose and responsibility.
CHETHAN.S
Department of Management
20
6. Ability to guide and teach.
7. Good understanding and sound judgment.
8. Communicating skill.
9. Sociable.
10. Objective and flexible approach.
11. Honesty and integrity of character.
12. Self confidence, diligence and industry.
13. Courage to accept responsibility
17. Explain the various principles of Co-ordination.
Principles of Co-ordination:
1. Direct Contact.
2. Early Beginning.
3. Continuity.
4. Reciprocal Relationship.
5. Pervasiveness.
6. Leadership.
7. Timing.
8. Balancing.
9. Integrating.
CHETHAN.S
Department of Management
21
18. What is communication? Explain its Importance.
Communication might be defined as the transfer of – facts,
information, ideas, suggestions, orders, requests, grievances etc. from
one person to another so as to impart a complete understanding of
the subject matter of communication to the recipient thereof; the
desired response from the recipient to such communication.
Importance of Communication:
1. Act as basis of Coordination and Cooperation.
2. Act as basis for Decision Making.
3. Increase managerial efficiency.
4. Establish effective leadership.
5. Helps in Process of Motivation and Morale Development.
6. Helps in Smooth Working of an Enterprise.
7. Promotes Cooperation and Peace.
19. What are the essentials of Sound Control System?
Essentials of an Effective and Efficient Control System
1. Simplicity.
2. Objectivity.
3. Promptness.
4. Economy.
5. Flexibility.
6. Accuracy.
7. Suitability.
8. Forward-looking Nature.
9. Focus on Strategic Points.
10. Motivating.
11. Reflection of Organisation Pattern.
12. Corrective Action.
CHETHAN.S
Department of Management
22
14 Marks:- [SECTION-C]
1. Explain Maslow’s theory of Motivation.
1.Maslow’s Need Hierarchy Theory:
It is probably safe to say that the most well-known theory of
motivation is Maslow’s need hierarchy theory Maslow’s theory is based
on the human needs. Drawing chiefly on his clinical experience, he
classified all human needs into a hierarchical manner from the lower
to the higher order.
In essence, he believed that once a given level of need is satisfied, it no
longer serves to motivate man. Then, the next higher level of need has
to be activated in order to motivate the man. Maslow identified five
levels in his need hierarchy as shown in figure 17.2.
These are now discussed one by one:
CHETHAN.S
Department of Management
23
1. Physiological Needs:
These needs are basic to human life and, hence, include food,
clothing, shelter, air, water and necessities of life. These needs relate
to the survival and maintenance of human life. They exert tremendous
influence on human behaviour. These needs are to be met first at least
partly before higher level needs emerge. Once physiological needs are
satisfied, they no longer motivate the man.
2. Safety Needs:
After satisfying the physiological needs, the next needs felt are called
safety and security needs. These needs find expression in such desires
as economic security and protection from physical dangers. Meeting
these needs requires more money and, hence, the individual is
prompted to work more. Like physiological needs, these become
inactive once they are satisfied.
3. Social Needs:
Man is a social being. He is, therefore, interested in social interaction,
companionship, belongingness, etc. It is this socialising and
belongingness why individuals prefer to work in groups and especially
older people go to work.
4. Esteem Needs:
These needs refer to self-esteem and self-respect. They include such
needs which indicate self-confidence, achievement, competence,
knowledge and independence. The fulfillment of esteem needs leads to
self-confidence, strength and capability of being useful in the
organisation. However, inability to fulfill these needs results in feeling
like inferiority, weakness and helplessness.
CHETHAN.S
Department of Management
24
5. Self-Actualisation Needs:
This level represents the culmination of all the lower, intermediate,
and higher needs of human beings. In other words, the final step
under the need hierarchy model is the need for self-actualization. This
refers to fulfillment.
The term self-actualization was coined by Kurt Goldstein and means
to become actualized in what one is potentially good at. In effect, self-
actualization is the person’s motivation to transform perception of self
into reality.
2. Herzberg’s Motivation Hygiene Theory:
The psychologist Frederick Herzberg extended the work of Maslow and
propsed a new motivation theory popularly known as Herzberg’s
Motivation Hygiene (Two-Factor) Theory.
Herzberg conducted a widely reported motivational study on 200
accountants and engineers employed by firms in and around Western
Pennsylvania.
He asked these people to describe two important incidents at
their jobs:
(1) When did you feel particularly good about your job, and
(2) When did you feel exceptionally bad about your job? He used the
critical incident method of obtaining data.
The responses when analysed were found quite interesting and fairly
consistent. The replies respondents gave when they felt good about
CHETHAN.S
Department of Management
25
their jobs were significantly different from the replies given when they
felt bad. Reported good feelings were generally associated with job
satisfaction, whereas bad feeling with job dissatisfaction. Herzberg
labelled the job satisfiers motivators, and he called job dissatisfies
hygiene or maintenance factors. Taken together, the motivators and
hygiene factors have become known as Herzberg’s two-factor theory of
motivation
According to Herzberg, the opposite of satisfaction is not
dissatisfaction. The underlying reason, he says, is that removal of
dissatisfying characteristics from a job does not necessarily make the
job satisfying. He believes in the existence of a dual continuum. The
opposite of ‘satisfaction’ is ‘no satisfaction’ and the opposite of
‘dissatisfaction’ is ‘no dissatisatisfaction’.
CHETHAN.S
Department of Management
26
According to Herzberg, today’s motivators are tomorrow’s hygiene
because the latter stop influencing the behaviour of persons when
they get them. Accordingly, one’s hygiene may be the motivator of
another.
3. McGregor’s Participation Theory:
Douglas McGregor formulated two distinct views of human being
based on participation of workers. The first basically negative, labeled
Theory X, and the other basically positive, labled Theory Y.
Theory X is based on the following assumptions:
1. People are by nature indolent. That is, they like to work as little as
possible.
2. People lack ambition, dislike responsibility, and prefer to be
directed by others.
3. People are inherently self-centered and indifferent to organisational
needs and goals.
4. People are generally gullible and not very sharp and bright.
On the contrary, Theory Y assumes that:
1. People are not by nature passive or resistant to organisational
goals.
2. They want to assume responsibility.
3. They want their organisation to succeed.
CHETHAN.S
Department of Management
27
4. People are capable of directing their own behaviour.
5. They have need for achievement.
2. Discuss the various barriers to Communication. What
measures would you suggest to overcome them?
Barriers to Effective Communication:
Sometimes the message sent by sender does not reach the receiver in
the same manner as expected by the sender.
This filtration, misrepresentation of communication may cause
misunderstanding. Therefore it is important for a manager to identify
these barriers and take measures to overcome these.
The barriers can be grouped in following categories:
1. Semantic Barriers:
(i) Badly expressed message.
(ii) Symbols with different meanings.
(iii) Faulty Translations.
(iv) Un-clarified Assumptions.
(v) Technical Jargon.
(vi) Body language and gesture decoding.
2. Psychological Barriers:
(i) Premature Evaluation.
(ii) Lack of Attention.
(iii) Loss by Transmission and Poor Retention.
(iv) Distrust.
CHETHAN.S
Department of Management
28
3. Organisational Barriers:
(i) Organisational Policy.
(ii) Rules and Regulations.
(iii) Status Difference.
(iv) Complex organization.
(v) Organisational Facilities.
4. Personal Barriers:
(i) Lack of Confidence of Superior in his subordinates.
(ii) Lack of incentives.
(iii) Fear of Authority.
Improving Communication Effectiveness:
1. Clarify the idea before communication.
2. Communication according to the need of the receiver.
3. Consult others before communicating.
4. Use of proper language, tone and contents of message.
5. Proper feedback.
6. Communication for the present as well as for future.
7. Follow up communication.
8. Good listener.
9. Open mind.
10. Completeness of message.
CHETHAN.S
Department of Management
29
3. Explain the various principles of organization.
Principles of an Organization:-
1. Principle of Objective.
2. Principle of Specialisation.
3. Principles of Co-ordination.
4. Principle of Authority and Responsibility.
5. Principle of Definition.
6. Span of Control.
7. Principle of Balance.
8. Principle of Continuity.
9. Principle of Uniformity.
10. Principle of Unity of Command.
11. Principle of Exception.
12. Principle of Simplicity.
13. Principle of Efficiency.
14. Scalar Principle.
4. Briefly explain the steps in planning process.
PLANNING PROCESS:
1. Setting up of the objectives.
2. Developing premises.
3. Listing the various alternatives for achieving the objectives.
4. Evaluation of different alternatives.
5. Selecting an alternative.
6. Implement the plan.
7. Follow-up.
CHETHAN.S
Department of Management
30
5. Management is science, art and profession. Analyze.
Management as a Science:
Science can be defined as a systematic and organised body of
knowledge based on logically observed findings, facts and
events.
Main characteristics/features of science are:
1. Systematic body of knowledge.
2. Scientific principles are derived on the basis of logical and
scientific observations.
3. Principles are based on repeated experiments.
4. Universal Validity.
5. Replication is possible.
Management as an Art:
Art can be defined as systematic body of knowledge which
requires skill, creativity and practice to get perfection.:
The main features of art are:
1. Systematic body of knowledge/Existence of theoretical
knowledge.
2. Personalised application.
3. Based on Practice and creativity.
Management as a Profession:
Profession can be defined as an occupation backed by
specialised knowledge and training, in which entry is
restricted.
The main features of profession are:
1. Well defined Body of knowledge.
2. Restricted Entry.
3. Presence of professional associations.
4. Existence of ethical codes.
5. Service Motive.
CHETHAN.S
Department of Management
31
6. Define Joint Stock Company. State its merits and
demerits.
“A Joint Stock Company is a voluntary association
of individuals for profit, having a capital divided into
transferable shares, the ownership of which is the
condition of membership.”
Advantages of Joint Stock Company:-
1. Accumulation of Large Resources.
2. Limited Liability.
3. Continuity of Existence.
4. Efficient Management.
5. Economies of Large Scale Production.
6. Transferability of Shares.
7. Ability to Cope with Changing Business Environments.
8. Diffused Risk.
9. Democratic Set-up.
10. Social Benefits.
Disadvantages of Joint Stock Company:-
1. Difficulty of Formation.
2. Separation of Ownership and Management.
3. Evils of Factory System.
4. Speculation in Shares.
5. Fraudulent Management.
6. Lack of Secrecy.
CHETHAN.S
Department of Management
32
7. Delay in Decision-making.
8. Concentration of Economic Power.
9. Excessive State Regulations.
7. What is selection? State the various steps involved in
Selection.
Finding the interested candidates who have submitted their
profiles for a particular job is the process of recruitment, and
choosing the best and most suitable candidates among them
is the process of selection. It results in elimination of
unsuitable candidates. It follows scientific techniques for the
appropriate choice of a person for the job.
Steps Involved in Selection Procedure:
1. Inviting applications.
2. Receiving applications.
3. Scrutiny of applications.
4. Written tests.
5. Psychological tests.
6. Personal interview.
7. Reference check.
8. Medical examination.
9. Final selection.
10. Placement.
CHETHAN.S
Department of Management
33
8. What is co-ordination? Discuss the various techniques
of co-ordination.
It is a process by which the manager achieves harmonious
group efforts and unity of actions through balancing the
activities of different individuals and groups of individuals
and reconciling their differences in interest or approach, for
the attainment of common goals.
Techniques of Effective Co-ordination:
1. Simplified Organisation.
2. Harmonized Programmes and Policies.
3. Well-designed Methods of Communication.
4. Special Coordinators.
5. Co-ordination by Committees.
6. Group Discussion.
7. Voluntary Co-ordination.
8. Co-ordination through Supervision.
9. Define control. Explain the various steps involved in
effective control system.
Control can be defined as the process of analysing whether
actions are being taken as planned and taking corrective
actions to make these to confirm to planning.
CHETHAN.S
Department of Management
34
Steps Involved in Control Process
There are four steps in control process:
(1) Setting of control standards.
(2) Measurement of actual performance.
(3) Comparing actual and standard performance.
(4) Taking corrective action.
10. Explain the significance of leadership management.
Describe the nature of Autocratic and democratic style
of leadership.
Leadership:
Leadership is the ability to build up confidence and zeal
among people and to create an urge in them to be led. To be a
successful leader, a manager must possess the qualities of
foresight, drive, initiative, self-confidence and personal
integrity. Different situations may demand different types of
leadership.
Nature and Characteristics of Leadership:
1. Leadership is a personal quality.
2. It exists only with followers. If there are no followers, there
is no leadership?
3. It is the willingness of people to follow that makes person a
leader.
CHETHAN.S
Department of Management
35
4. Leadership is a process of influence. A leader must be able
to influence the behaviour, attitude and beliefs of his
subordinates.
5. It exists only for the realization of common goals.
6. It involves readiness to accept complete responsibility in all
situations.
7. Leadership is the function of stimulating the followers to
strive willingly to attain organizational objectives.
8. Leadership styles do change under different
circumstances.
9. Leadership is neither bossism nor synonymous with;
management.
Importance of Leadership in Management:
1. It Improves Motivation and Morale.
2. It Acts as a Motive Power to Group Efforts.
3. It Acts as an Aid to Authority.
4. It is Needed at All Levels of Management.
5. It Rectifies the Imperfectness of the Formal Organisational
Relationships.
6. It Provides the Basis for Co-operation.
CHETHAN.S
Department of Management
36
Leadership Styles
(1) Autocratic Leadership Style
(2) Democratic Leadership Style
(3) Laissez-faire Leadership Style
(1) Autocratic Leadership Style
This style is also known as the leader-centred style. Under
this style, the leader keeps all the authority centred in his
hands and the employees have to perform the work exactly as
per his orders. If any employee is careless in his work
performance, he is punished.
Characteristics
(i) Centralised Authority.
(ii) Single-man Decisions.
(iii) Wrong Belief regarding Employees.
(iv) Only Downward Communication.
Advantages
(i) Quick and Clear Decisions.
(ii) Satisfactory Work.
(iii) Necessary for Less Educated Employees.
CHETHAN.S
Department of Management
37
Disadvantages
(i) Lack of Motivation.
(ii) Agitation by Employees.
(iii) Possibility of Partiality.
(2) Democratic Leadership Style
This style is also known as group-centered leadership style.
These days this leadership style is very much in vogue. Under
this style, decisions regarding different works are not taken
by the manager alone but they are taken in consultation with
the employees.
Characteristics
(i) Cooperative Relations.
(ii) Belief in Employees.
(iii) Open Communication.
Advantages
(i) High Morale.
(ii) Creation of More Efficiency and Productivity.
(iii) Availability of Sufficient Time for Constructive Work.
CHETHAN.S
Department of Management
38
Disadvantages
(i) Requirement of Educated Subordinates.
(ii) Delay in Decisions.
(iii) Lack of Responsibility in Managers.
(3) Laissez-faire or Free-rein Leadership Style
This leadership style is also described as Individual- centered
style. In this style, the manager or the leader takes little
interest in managerial functions and the subordinates are left
on their own. It refers to that leadership style in which the
leader gives his subordinates complete freedom to make
decisions.
Characteristics
(i) Full Faith in Subordinates.
(ii) Independent Decision-making System.
(iii) Decentralisation of Authority.
(iv) Self-directed, Supervisory and Controlled.
Advantages
(i) Development of Self-confidence in Subordinates.
(ii) High-level Motivation.
(iii) Helpful in Development and Extension of the Enterprise.
CHETHAN.S
Department of Management
39
Disadvantages
(i) Difficulty in Cooperation.
(ii) Lack of Importance of Managerial Post.
(iii) Suitable only for Highly Educated Employees.
11. Explain briefly the various functional areas of
Management.
The following activities are covered under the scope
of management:
(i) Planning,
(ii) Organization
(iii) Staffing.
(iv) Directing,
(v) Coordinating, and
(vi) Controlling.
The operational aspects of business management, called the
branches of management, are as follows:
1. Production Management
2. Marketing Management
3. Financial Management.
4. Personnel Management and
5. Office Management.
CHETHAN.S
Department of Management
40
12. Explain the Principles of Management as stated by
Henry Fayol.
1. Division Of Work
2. Authority
3. Discipline
4. Unity Of Command
5. Unity Of Direction
6. Subordination Of Individual Interests To The General Interests
7. Remuneration
8. Centralization
9. Scalar Chain
10. Order
11. Equity
12. Stability Of Tenure Of Personnel.
13. Initiative
14. Espirit De Corps
13. What is staffing? Explain the procedure involved in
Selection of a Candidate?
The term ‘Staffing’ relates to the recruitment, selection,
development, training and compensation of the managerial
personnel.
CHETHAN.S
Department of Management
41
Steps Involved in Selection Procedure:
1. Inviting applications.
2. Receiving applications.
3. Scrutiny of applications.
4. Written tests.
5. Psychological tests.
6. Personal interview.
7. Reference check.
8. Medical examination.
9. Final selection.
10. Placement.
14. Write a note on:
a. Maslow’s need hierarchy theory. (Refer Section-C,
Question no:01)
b. MC Gregor’s theory X and Theory Y. (Refer Section-C,
Question no:01)
15. Define communication. Explain the various barriers to
Communication.
Communication:-
Communication might be defined as the transfer of – facts,
information, ideas, suggestions, orders, requests, grievances etc.
from one person to another.
CHETHAN.S
Department of Management
42
Barriers to Effective Communication:
Sometimes the message sent by sender does not reach the receiver in
the same manner as expected by the sender.
This filtration, misrepresentation of communication may cause
misunderstanding. Therefore it is important for a manager to identify
these barriers and take measures to overcome these.
1. Semantic Barriers:
(i) Badly expressed message.
(ii) Symbols with different meanings.
(iii) Faulty Translations.
(iv) Un-clarified Assumptions.
(v) Technical Jargon.
(vi) Body language and gesture decoding.
2. Psychological Barriers:
(i) Premature Evaluation.
(ii) Lack of Attention.
(iii) Loss by Transmission and Poor Retention.
(iv) Distrust.
3. Organisational Barriers:
(i) Organisational Policy.
(ii) Rules and Regulations.
(iii) Status Difference.
(iv) Complex organization.
(v) Organisational Facilities.
CHETHAN.S
Department of Management
43
4. Personal Barriers:
(i) Lack of Confidence of Superior in his subordinates.
(ii) Lack of incentives.
(iii) Fear of Authority.
16. What is decision making? Explain the process of
decision making.
Decision–making is a selection process and is concerned
with selecting the best type of alternative.
It is concerned with the detailed study of the available
alternatives for finding the best possible alternative.
STEPS INVOLVED IN DECISION MAKING PROCESS:
1. Define the problem.
2. Analyzing the problem.
3. Developing alternative solutions.
4. Selecting the best type of alternative.
5. Implementation of the decision.
6. Follow up.
7. Monitoring and feedback.
17. Explain the importance of Organization.
Importance and Significance of Organization:
1. Facilitates administration.
2. Encourages growth and diversification.
3. Optimum utilization of technology.
4. Stimulates innovation and creativity.
5. Encourages good human relation.
6. Ensures continuity of enterprise.
CHETHAN.S
Department of Management
44
18. What is controlling? Explain the steps involved in
controlling process.
Control can be defined as the process of analysing
whether actions are being taken as planned and taking
corrective actions to make these to confirm to planning.
Steps Involved in Control Process
There are four steps in control process:
(1) Setting of control standards.
(2) Measurement of actual performance.
(3) Comparing actual and standard performance.
(4) Taking corrective action.
19. Give an Explanatory note on Organization’s Social
Responsibility.
CHETHAN.S
Department of Management
45
1. Responsibility to Shareholders.
2. Responsibility to Employees.
3. Responsibility to Consumers.
4. Obligation towards the Environment.
5. Responsibility to Society in General.
20. Explain the various techniques of Controlling.
Controlling is one of the managerial functions and it is an important
element of the management process. After the planning, organising,
staffing and directing have been carried out, the final managerial
function of controlling assures that the activities planned are being
accomplished or not.
Top 14 Techniques of Control Business Management
1. Personal Observation:
2. Budgetary Control:
3. Break-even Analysis:
4. Ratio Analysis:
5. Cost Control:
6. Internal Audit:
7. Statistical Reports:
8. Management Audit:
9. Return on Investment:
10. Network Techniques:
11. Responsibility Accounting:
12. Zero-Base Budgeting:
13. Performance Budgeting:
14. Management Information System:

Management Process important questions

  • 1.
    CHETHAN.S Department of Management 1 MANAGEMENTPROCESS 2 Marks:-[SECTION-A] 1. Expand POSDCORB. Planning, Organizing, Staffing, Directing, Co-coordinating, Reporting and Budgeting. 2. What do you mean by Ethics? Moral principles that govern a person's behavior or the conducting of an activity. And it tells what is good and what is bad. 3. Define Staffing. The term ‘Staffing’ relates to the recruitment, selection, development, training and compensation of the managerial personnel. Staffing, like all other managerial functions, is the duty which the apex management performs at all times. 4. State two merits of oral communication.  Sudden Feedback can be collected.  Faster. 5. What is planning Premises? Premises refer to making assumptions regarding future. Premises are the base on which plans are made. It is a kind of forecast made keeping in view existing plans and any past information about various policies. 6. Distinguish between MBO and MBE. Management by objectives(MBO) Management by Exception (MBE) 1. It attempts to devise a common objective that is acceptable for both the management and employees. 1.It provides the objectives for employees only. 2. The clarity of personal responsibility towards organizational goals is better. 2. The clarity of personal responsibility towards organizational
  • 2.
    CHETHAN.S Department of Management 2 goalsis not clear. 3. Dependency on one department or group is less. 3. Dependency on one department or group is more. 4. The active involvement of whole organization in decision making is required. 4. The active involvement of whole organization in decision making is not required. 7. Mention any two types of Organization.  Formal Organization.  Informal Organization.  Line Organization.  Matrix Organization. 8. What do you mean by decision making? Decision–making is a selection process and is concerned with selecting the best type of alternative. It is concerned with the detailed study of the available alternatives for finding the best possible alternative. 9. Define Management. According to Harold Koontz, "Management is the art of getting things done through and with people in formally organized groups." 10. What is PERT? It is a network technique which is appropriate for planning and controlling the complex and unique projects. 11. What do you mean by Business Ethics? According to CSV.Murthy, “Application of ethics in business is called as Business Ethics”. 12. What is Hindu Undivided Firm? According to Henery Maine, “The Hindu joint family is a group constituted of known ancestors and adopted sons and relatives related to these sons through marriage.
  • 3.
    CHETHAN.S Department of Management 3 13.What is Management by Objectives? Management by objective can be defined as “a management model that attempts to devise a common objective that is acceptable for both the management and employees, which will improve the overall performance of the organization. 14. State any 4 sources of Recruitment.  Transfers  Promotions  Present Employees  Advertisement  Employment Exchanges  Schools, Colleges and Universities 15. What do you mean by Departmentation? ‘Departmentation’ or ‘Departmentalisation’ is the process of grouping the activities of an enterprise into several units for the purpose of administration at all levels. 16. Define Placement. This is a final step. A suitable job is allocated to the appointed candidate so that they can get the whole idea about the nature of the job. They can get adjusted to the job and perform well in future with all capacities and strengths. 17. State any two essentials of Sound Control System.  Simplicity.  Flexibility.  Accuracy.  Promptness.
  • 4.
    CHETHAN.S Department of Management 4 18.What is Promotion? Promotion results in enhancements in pay, position, responsibility and authority. The important requirement for implementation of the promotion policy is that the terms, condi- tions, rules and regulations should be well-defined. 19. Give the meaning of Performance appraisal. Performance appraisal is a method of evaluating the behaviour and performance of employees in the workplace. This includes appraisal of both qualitative and quantitative aspects of job performance. 20. What is Decentralization? Decentralization refers to the dissemination of powers by the top management to the middle or low-level management. It is the delegation of authority, at all the levels of management. 21. Name the 4 Functions of Management.  Planning.  Organizing.  Staffing.  Directing.  Controlling. 22. What is Scalar Chain? Managers in hierarchies are part of a chain like authority scale. Each manager, from the first line supervisor to the president, possess certain amounts of authority. The President possesses the most authority; the first line supervisor the least. Lower level managers should always keep upper level managers informed of their work activities. 23. What is control? Control can be defined as the process of analysing whether actions are being taken as planned and taking corrective actions to make these to confirm to planning.
  • 5.
    CHETHAN.S Department of Management 5 24.What is Centralization? Centralization of authority means the power of planning and decision making are exclusively in the hands of top management. It alludes to the concentration of all the powers at the apex level. 25. What is Job Specification? Job specification refers to the human qualities required for performing the job. The preparation of job specification is not as simple as that of job description. These qualifications are essential for the successful performance of a job. 26. What is Grapevine? Grapevine is an informal, unofficial and personal communication channel or system that takes place within the organization as a result of rumor and gossip. It is a complex web of oral information flow linking all the members of the organization. 27. What is planning? Planning can be defined as “thinking in advance what is to be done, when it is to be done, how it is to be done and by whom it should be done”. In simple words we can say, planning bridges the gap between where we are standing today and where we want to reach. 28. Define Organization. Louis A. Allen:“Organization is the process of identifying and grouping the works to be performed, defining and delegating responsibility and authority and establishing relationship for the purpose of enabling people to work more effectively together in accomplishing objectives.”
  • 6.
    CHETHAN.S Department of Management 6 29.What is Motivation? Motivation is an important element of direction. Motivation is a factor which encourages persons to give their best performance and help in achieving enterprise goals. A strong positive motivation will enable the increased output of employees. 30. What is Recruitment? It is an operative function of human resource management coming under the managerial function called organizing. In the words of Edwin Flippo, ‘recruitment is the process of searching for prospective employees and stimulating them to apply for jobs in the organisation’. 31. What is CPM? The PERT/CPM is convenient and useful tool in the hands of particularly the top level manager who has the whole managerial responsibility of a project. It is also helpful in solving the problems of scheduling the activities of one-time projects, that is, the projects which are not formulated on routine basis. 32. What is Autocratic Leadership? It is also known as leader centered style. Under this style of leadership there is complete centralization of authority in the leader i.e. authority is centered in the leader himself. He has all the powers to make decisions. There is no two ways communication, only downward communication is used. 33. What is span of control? Span of control defines clearly the number of the subordinates can be effectively control by the manager.
  • 7.
    CHETHAN.S Department of Management 7 34.What is democratic leadership? This style of leadership is also known as group centered or consultative leadership. Under this style leaders consult the group and solicit their opinion and participation from the following in decision making process. 35. Mention 4 features of a Profession.  Great responsibility.  Accountability.  Based on specialized, theoretical knowledge.  Institutional preparation.  Autonomy. 6 Marks:- [SECTION-B] 1. Briefly explain the functions of top level Management. o Planning, o Organization o Staffing. o Directing, o Coordinating, and o Controlling. 2. What do you mean by Communication? Explain the types of Communication. Communication:- Communication might be defined as the transfer of – facts, information, ideas, suggestions, orders, requests, grievances etc. from one person to another so as to impart a complete understanding of the subject matter of communication to the recipient thereof; the desired response from the recipient to such communication.
  • 8.
    CHETHAN.S Department of Management 8 Forms/Typesof Communication: There are two forms of organizational communication: i. Formal Communication; and ii. Informal Communication. 1. Formal communication: i. Downward Communication. ii. Upward Communication. iii. Horizontal Communication. iv. Diagonal Communications. 2. Informal Communication: But the common networks of informal communication are: 1. Gossip. 2. Clusters. 3. Single Strand. 4. Probability. 5. Grapevine. 3. Explain four Merits and Demerits of Planning. IMPORTANCE/SIGNIFICANCE/MERITS OF PLANNING: 1. Planning provides Direction. 2. Planning Reduces the risk of uncertainties. 3. Planning reduces over lapping and wasteful activities. 4. Planning Promotes innovative ideas. 5. Planning Facilitates Decision Making. 6. Planning establishes standard for controlling. 7. Focuses attention on objectives of the company.
  • 9.
    CHETHAN.S Department of Management 9 LIMITATIONSOF PLANNING: 1. Planning leads to rigidity. 2. Planning may not work in dynamic environment. 3. It reduces creativity. 4. Planning involves huge Cost. 5. It is a time consuming process. 6. Planning does not guarantee success. 7. Lack of accuracy. 4. Distinguish between Management and Administration. Basis Management Administration Meaning Management is an art of getting things done through others by directing their efforts towards achievement of pre-determined goals. It is concerned with formulation of broad objectives, plans & policies. Nature Management is an executing function. Administration is a decision-making function. Process Management decides who should as it & how should he dot it. Administration decides what is to be done & when it is to be done. Function Management is a doing function because managers get work done under their supervision. Administration is a thinking function because plans & policies are determined under it. Skills Technical and Human skills Conceptual and Human skills Level Middle & lower level function Top level function
  • 10.
    CHETHAN.S Department of Management 10 5.Explain in brief the various objectives of business. The objectives of business may be classified as; A. Economic Objectives B. Social Objectives C. Human Objectives D. National Objectives E. Global Objectives Now, we shall discuss all these objectives in detail. A. Economic Objectives: (a) Profit Earning. (b) Creation of customers. (c) Regular innovations. (d) Best possible use of resources. B. Social Objectives: (i) Production and Supply of Quality Goods and Services. (ii) Adoption of Fair Trade Practices. (iii) Contribution to the General Welfare of the Society. С. Human Objectives: (i) Economic Well-being of the Employees. (ii) Social and Psychological Satisfaction of Employees. (iii) Development of Human Resources. (iv) Well-being of Socially and Economically Backward People.
  • 11.
    CHETHAN.S Department of Management 11 D.National Objectives: (i)Creation of Employment. (ii) Promotion of Social Justice. (iii) Production According to National Priority. (iv) Contribute to the Revenue of the Country. (v) Self-sufficiency and Export Promotion. E. Global Objectives: (i) Raise General Standard of Living. (ii) Reduce Disparities among Nations. (iii) Make Available Globally Competitive Goods and Services. 6. Explain the different types of plan.  Standing plans.  Single-use plans.  Corporate planning.  Strategic planning.  Tactical planning.  Functional planning.  Formal planning.  Informal planning.
  • 12.
    CHETHAN.S Department of Management 12 7.Differentiate between formal and informal Organization. BASIS FOR COMPARISON FORMAL ORGANIZATION INFORMAL ORGANIZATION 1.Meaning An organization type in which the job of each member is clearly defined, whose authority, responsibility and accountability are fixed is formal organization. An organization formed within the formal organization as a network of interpersonal relationship, when people interact with each other, is known as informal communication. 2.Creation Deliberately by top management. Spontaneously by members. 3.Purpose To fulfill, the ultimate objective of the organization. To satisfy their social and psychological needs. 4.Nature Stable, it continues for a long time. Not stable 5.Communication Official communication Grapevine 6.Control mechanism Rules and Regulations Norms, values and beliefs 7.Focus on Work performance Interpersonal relationship 8.Authority Members are bound by hierarchical structure. All members are equal. 9.Size Large Small
  • 13.
    CHETHAN.S Department of Management 13 8.Give a note on Maslow’s theory of Motivation. Maslow’s Need Hierarchy Theory: It is probably safe to say that the most well-known theory of motivation is Maslow’s need hierarchy theory Maslow’s theory is based on the human needs. Drawing chiefly on his clinical experience, he classified all human needs into a hierarchical manner from the lower to the higher order. In essence, he believed that once a given level of need is satisfied, it no longer serves to motivate man. Then, the next higher level of need has to be activated in order to motivate the man. Maslow identified five levels in his need hierarchy.
  • 14.
    CHETHAN.S Department of Management 14 9.Explain the various types of decisions of business. TYPES OF DECISIONS: 1. Programmed decision:  structured or routine decision.  frequent and repetitive in nature.  short term impact. 2.Non-programmed decision:  unstructured decision.  unusual or non-routine problems. 3.Major decision: • purchase of land,building,etc. • by top level management people. 4.Minor decision: • purchase of stationary goods. • By lower level management people. 5. Operative decision: • Day-to-day operations. • Mainly by people working at supervisory level. 6. Personal decision: • taken for personal life. • does not affect the functioning of an organization. 7. Group decision: • By group of people (or) committee. 8. Departmental decision: • By department head. • Mainly for that particular department & has no impact on other department. 9. Non economic decision:  Does not incur any expenses.
  • 15.
    CHETHAN.S Department of Management 15 10.Crisis decision:  Spot decision.  Unexpected situation. 11. Problem decision: • To solve a problem. • Expected or unexpected one. 12. Certainty decision: • Complete information. • Accurate outcome. 13.Uncertainty decision: • Incomplete information. • Not accurate outcome. 10. Discuss the principles of effective communication. Principles of Communication: 1. Clarity. 2. Adequacy and Consistency. 3. Integration. 4. Economy. 5. Feedback. 6. Need for Communication Network. 7. Attention.
  • 16.
    CHETHAN.S Department of Management 16 11.State the advantages and disadvantages of line organization. Merits of Line Organization: 1. Simplicity. 2. Identification of Authority and Responsibility. 3. Co-ordination. 4. Effective Communication. 5. Economical. 6. Quick Decisions. 7. Unity of Command. 8. Effective Control and Supervision. 9. Executive Development. 10. Flexibility. Demerits of Line Organization: 1. Excess Work. 2. Lack of Specialization. 3. Lack of Co-ordination. 4. Improper Communication. 5. Lack of Initiative. 6. Favoritism. 7. Instability. 12. State the advantages and disadvantages of line and staff organization. Merits of Line and Staff Organisation: 1. There is a planned specialization. 2. There is a well defined authority and responsibility. 3. There is bifurcation of conceptual and executive function.
  • 17.
    CHETHAN.S Department of Management 17 4.The staff with its expert knowledge provides opportunities to the line officers for adopting a rational multidimensional view towards a problem. 5. This type of organisation nourishes organisation growth as each man grows in his own speciality. It also helps co-ordination through co-operation and leadership. Demerits of Line and Staff Organisation: 1. There are bound to be occasions when line and staff may differ in opinion. This may result conflict of interest & prevents a harmonies relationship. 2. There is a misinterpretation of expert advice by incompetent line executives. 3. The staff people feel themselves status-less without authority. 4. Staff becomes ineffective in absence of authority. 13. Explain the importance and steps of decision making. IMPORTANCE OF DECISION MAKING: 1. Pervasive Function. 2. Indispensable Component. 3. Evaluation of Managerial Function. 4. Selection of Best Alternatives. 5. Establishment of Plans and Policies. 6. Successful Operation of Business.
  • 18.
    CHETHAN.S Department of Management 18 STEPSINVOLVED IN DECISION MAKING PROCESS: 1. Define the problem. 2. Analyzing the problem. 3. Developing alternative solutions. 4. Selecting the best type of alternative. 5. Implementation of the decision. 6. Follow up. 7. Monitoring and feedback. 14. Explain the advantages of Planning. ADVANTAGES OF PLANNING: 1. Planning provides Direction. 2. Planning Reduces the risk of uncertainties. 3. Planning reduces over lapping and wasteful activities. 4. Planning Promotes innovative ideas. 5. Planning Facilitates Decision Making. 6. Planning establishes standard for controlling. 7. Focuses attention on objectives of the company. 15. Explain the sources of recruitment. (A) Internal Sources: 1. Transfers 2. Promotions 3. Present Employees
  • 19.
    CHETHAN.S Department of Management 19 (B)External Sources: 1. Advertisement 2. Employment Exchanges 3. Schools, Colleges and Universities 4. Recommendation of Existing Employees 5. Factory Gates 6. Casual Callers 7. Central Application File 8. Labour Unions 9. Labour Contractors 10. Former Employees 16. What is leadership? What are the good Qualities of a food leader? Leadership is the ability to build up confidence and zeal among people and to create an urge in them to be led. To be a successful leader, a manager must possess the qualities of foresight, drive, initiative, self- confidence and personal integrity. Different situations may demand different types of leadership. Some of the qualities of a good leader are as follows: 1. Good personality. 2. Emotional stability. 3. Sound education and professional competence. 4. Initiatives and creative thinking. 5. Sense of purpose and responsibility.
  • 20.
    CHETHAN.S Department of Management 20 6.Ability to guide and teach. 7. Good understanding and sound judgment. 8. Communicating skill. 9. Sociable. 10. Objective and flexible approach. 11. Honesty and integrity of character. 12. Self confidence, diligence and industry. 13. Courage to accept responsibility 17. Explain the various principles of Co-ordination. Principles of Co-ordination: 1. Direct Contact. 2. Early Beginning. 3. Continuity. 4. Reciprocal Relationship. 5. Pervasiveness. 6. Leadership. 7. Timing. 8. Balancing. 9. Integrating.
  • 21.
    CHETHAN.S Department of Management 21 18.What is communication? Explain its Importance. Communication might be defined as the transfer of – facts, information, ideas, suggestions, orders, requests, grievances etc. from one person to another so as to impart a complete understanding of the subject matter of communication to the recipient thereof; the desired response from the recipient to such communication. Importance of Communication: 1. Act as basis of Coordination and Cooperation. 2. Act as basis for Decision Making. 3. Increase managerial efficiency. 4. Establish effective leadership. 5. Helps in Process of Motivation and Morale Development. 6. Helps in Smooth Working of an Enterprise. 7. Promotes Cooperation and Peace. 19. What are the essentials of Sound Control System? Essentials of an Effective and Efficient Control System 1. Simplicity. 2. Objectivity. 3. Promptness. 4. Economy. 5. Flexibility. 6. Accuracy. 7. Suitability. 8. Forward-looking Nature. 9. Focus on Strategic Points. 10. Motivating. 11. Reflection of Organisation Pattern. 12. Corrective Action.
  • 22.
    CHETHAN.S Department of Management 22 14Marks:- [SECTION-C] 1. Explain Maslow’s theory of Motivation. 1.Maslow’s Need Hierarchy Theory: It is probably safe to say that the most well-known theory of motivation is Maslow’s need hierarchy theory Maslow’s theory is based on the human needs. Drawing chiefly on his clinical experience, he classified all human needs into a hierarchical manner from the lower to the higher order. In essence, he believed that once a given level of need is satisfied, it no longer serves to motivate man. Then, the next higher level of need has to be activated in order to motivate the man. Maslow identified five levels in his need hierarchy as shown in figure 17.2. These are now discussed one by one:
  • 23.
    CHETHAN.S Department of Management 23 1.Physiological Needs: These needs are basic to human life and, hence, include food, clothing, shelter, air, water and necessities of life. These needs relate to the survival and maintenance of human life. They exert tremendous influence on human behaviour. These needs are to be met first at least partly before higher level needs emerge. Once physiological needs are satisfied, they no longer motivate the man. 2. Safety Needs: After satisfying the physiological needs, the next needs felt are called safety and security needs. These needs find expression in such desires as economic security and protection from physical dangers. Meeting these needs requires more money and, hence, the individual is prompted to work more. Like physiological needs, these become inactive once they are satisfied. 3. Social Needs: Man is a social being. He is, therefore, interested in social interaction, companionship, belongingness, etc. It is this socialising and belongingness why individuals prefer to work in groups and especially older people go to work. 4. Esteem Needs: These needs refer to self-esteem and self-respect. They include such needs which indicate self-confidence, achievement, competence, knowledge and independence. The fulfillment of esteem needs leads to self-confidence, strength and capability of being useful in the organisation. However, inability to fulfill these needs results in feeling like inferiority, weakness and helplessness.
  • 24.
    CHETHAN.S Department of Management 24 5.Self-Actualisation Needs: This level represents the culmination of all the lower, intermediate, and higher needs of human beings. In other words, the final step under the need hierarchy model is the need for self-actualization. This refers to fulfillment. The term self-actualization was coined by Kurt Goldstein and means to become actualized in what one is potentially good at. In effect, self- actualization is the person’s motivation to transform perception of self into reality. 2. Herzberg’s Motivation Hygiene Theory: The psychologist Frederick Herzberg extended the work of Maslow and propsed a new motivation theory popularly known as Herzberg’s Motivation Hygiene (Two-Factor) Theory. Herzberg conducted a widely reported motivational study on 200 accountants and engineers employed by firms in and around Western Pennsylvania. He asked these people to describe two important incidents at their jobs: (1) When did you feel particularly good about your job, and (2) When did you feel exceptionally bad about your job? He used the critical incident method of obtaining data. The responses when analysed were found quite interesting and fairly consistent. The replies respondents gave when they felt good about
  • 25.
    CHETHAN.S Department of Management 25 theirjobs were significantly different from the replies given when they felt bad. Reported good feelings were generally associated with job satisfaction, whereas bad feeling with job dissatisfaction. Herzberg labelled the job satisfiers motivators, and he called job dissatisfies hygiene or maintenance factors. Taken together, the motivators and hygiene factors have become known as Herzberg’s two-factor theory of motivation According to Herzberg, the opposite of satisfaction is not dissatisfaction. The underlying reason, he says, is that removal of dissatisfying characteristics from a job does not necessarily make the job satisfying. He believes in the existence of a dual continuum. The opposite of ‘satisfaction’ is ‘no satisfaction’ and the opposite of ‘dissatisfaction’ is ‘no dissatisatisfaction’.
  • 26.
    CHETHAN.S Department of Management 26 Accordingto Herzberg, today’s motivators are tomorrow’s hygiene because the latter stop influencing the behaviour of persons when they get them. Accordingly, one’s hygiene may be the motivator of another. 3. McGregor’s Participation Theory: Douglas McGregor formulated two distinct views of human being based on participation of workers. The first basically negative, labeled Theory X, and the other basically positive, labled Theory Y. Theory X is based on the following assumptions: 1. People are by nature indolent. That is, they like to work as little as possible. 2. People lack ambition, dislike responsibility, and prefer to be directed by others. 3. People are inherently self-centered and indifferent to organisational needs and goals. 4. People are generally gullible and not very sharp and bright. On the contrary, Theory Y assumes that: 1. People are not by nature passive or resistant to organisational goals. 2. They want to assume responsibility. 3. They want their organisation to succeed.
  • 27.
    CHETHAN.S Department of Management 27 4.People are capable of directing their own behaviour. 5. They have need for achievement. 2. Discuss the various barriers to Communication. What measures would you suggest to overcome them? Barriers to Effective Communication: Sometimes the message sent by sender does not reach the receiver in the same manner as expected by the sender. This filtration, misrepresentation of communication may cause misunderstanding. Therefore it is important for a manager to identify these barriers and take measures to overcome these. The barriers can be grouped in following categories: 1. Semantic Barriers: (i) Badly expressed message. (ii) Symbols with different meanings. (iii) Faulty Translations. (iv) Un-clarified Assumptions. (v) Technical Jargon. (vi) Body language and gesture decoding. 2. Psychological Barriers: (i) Premature Evaluation. (ii) Lack of Attention. (iii) Loss by Transmission and Poor Retention. (iv) Distrust.
  • 28.
    CHETHAN.S Department of Management 28 3.Organisational Barriers: (i) Organisational Policy. (ii) Rules and Regulations. (iii) Status Difference. (iv) Complex organization. (v) Organisational Facilities. 4. Personal Barriers: (i) Lack of Confidence of Superior in his subordinates. (ii) Lack of incentives. (iii) Fear of Authority. Improving Communication Effectiveness: 1. Clarify the idea before communication. 2. Communication according to the need of the receiver. 3. Consult others before communicating. 4. Use of proper language, tone and contents of message. 5. Proper feedback. 6. Communication for the present as well as for future. 7. Follow up communication. 8. Good listener. 9. Open mind. 10. Completeness of message.
  • 29.
    CHETHAN.S Department of Management 29 3.Explain the various principles of organization. Principles of an Organization:- 1. Principle of Objective. 2. Principle of Specialisation. 3. Principles of Co-ordination. 4. Principle of Authority and Responsibility. 5. Principle of Definition. 6. Span of Control. 7. Principle of Balance. 8. Principle of Continuity. 9. Principle of Uniformity. 10. Principle of Unity of Command. 11. Principle of Exception. 12. Principle of Simplicity. 13. Principle of Efficiency. 14. Scalar Principle. 4. Briefly explain the steps in planning process. PLANNING PROCESS: 1. Setting up of the objectives. 2. Developing premises. 3. Listing the various alternatives for achieving the objectives. 4. Evaluation of different alternatives. 5. Selecting an alternative. 6. Implement the plan. 7. Follow-up.
  • 30.
    CHETHAN.S Department of Management 30 5.Management is science, art and profession. Analyze. Management as a Science: Science can be defined as a systematic and organised body of knowledge based on logically observed findings, facts and events. Main characteristics/features of science are: 1. Systematic body of knowledge. 2. Scientific principles are derived on the basis of logical and scientific observations. 3. Principles are based on repeated experiments. 4. Universal Validity. 5. Replication is possible. Management as an Art: Art can be defined as systematic body of knowledge which requires skill, creativity and practice to get perfection.: The main features of art are: 1. Systematic body of knowledge/Existence of theoretical knowledge. 2. Personalised application. 3. Based on Practice and creativity. Management as a Profession: Profession can be defined as an occupation backed by specialised knowledge and training, in which entry is restricted. The main features of profession are: 1. Well defined Body of knowledge. 2. Restricted Entry. 3. Presence of professional associations. 4. Existence of ethical codes. 5. Service Motive.
  • 31.
    CHETHAN.S Department of Management 31 6.Define Joint Stock Company. State its merits and demerits. “A Joint Stock Company is a voluntary association of individuals for profit, having a capital divided into transferable shares, the ownership of which is the condition of membership.” Advantages of Joint Stock Company:- 1. Accumulation of Large Resources. 2. Limited Liability. 3. Continuity of Existence. 4. Efficient Management. 5. Economies of Large Scale Production. 6. Transferability of Shares. 7. Ability to Cope with Changing Business Environments. 8. Diffused Risk. 9. Democratic Set-up. 10. Social Benefits. Disadvantages of Joint Stock Company:- 1. Difficulty of Formation. 2. Separation of Ownership and Management. 3. Evils of Factory System. 4. Speculation in Shares. 5. Fraudulent Management. 6. Lack of Secrecy.
  • 32.
    CHETHAN.S Department of Management 32 7.Delay in Decision-making. 8. Concentration of Economic Power. 9. Excessive State Regulations. 7. What is selection? State the various steps involved in Selection. Finding the interested candidates who have submitted their profiles for a particular job is the process of recruitment, and choosing the best and most suitable candidates among them is the process of selection. It results in elimination of unsuitable candidates. It follows scientific techniques for the appropriate choice of a person for the job. Steps Involved in Selection Procedure: 1. Inviting applications. 2. Receiving applications. 3. Scrutiny of applications. 4. Written tests. 5. Psychological tests. 6. Personal interview. 7. Reference check. 8. Medical examination. 9. Final selection. 10. Placement.
  • 33.
    CHETHAN.S Department of Management 33 8.What is co-ordination? Discuss the various techniques of co-ordination. It is a process by which the manager achieves harmonious group efforts and unity of actions through balancing the activities of different individuals and groups of individuals and reconciling their differences in interest or approach, for the attainment of common goals. Techniques of Effective Co-ordination: 1. Simplified Organisation. 2. Harmonized Programmes and Policies. 3. Well-designed Methods of Communication. 4. Special Coordinators. 5. Co-ordination by Committees. 6. Group Discussion. 7. Voluntary Co-ordination. 8. Co-ordination through Supervision. 9. Define control. Explain the various steps involved in effective control system. Control can be defined as the process of analysing whether actions are being taken as planned and taking corrective actions to make these to confirm to planning.
  • 34.
    CHETHAN.S Department of Management 34 StepsInvolved in Control Process There are four steps in control process: (1) Setting of control standards. (2) Measurement of actual performance. (3) Comparing actual and standard performance. (4) Taking corrective action. 10. Explain the significance of leadership management. Describe the nature of Autocratic and democratic style of leadership. Leadership: Leadership is the ability to build up confidence and zeal among people and to create an urge in them to be led. To be a successful leader, a manager must possess the qualities of foresight, drive, initiative, self-confidence and personal integrity. Different situations may demand different types of leadership. Nature and Characteristics of Leadership: 1. Leadership is a personal quality. 2. It exists only with followers. If there are no followers, there is no leadership? 3. It is the willingness of people to follow that makes person a leader.
  • 35.
    CHETHAN.S Department of Management 35 4.Leadership is a process of influence. A leader must be able to influence the behaviour, attitude and beliefs of his subordinates. 5. It exists only for the realization of common goals. 6. It involves readiness to accept complete responsibility in all situations. 7. Leadership is the function of stimulating the followers to strive willingly to attain organizational objectives. 8. Leadership styles do change under different circumstances. 9. Leadership is neither bossism nor synonymous with; management. Importance of Leadership in Management: 1. It Improves Motivation and Morale. 2. It Acts as a Motive Power to Group Efforts. 3. It Acts as an Aid to Authority. 4. It is Needed at All Levels of Management. 5. It Rectifies the Imperfectness of the Formal Organisational Relationships. 6. It Provides the Basis for Co-operation.
  • 36.
    CHETHAN.S Department of Management 36 LeadershipStyles (1) Autocratic Leadership Style (2) Democratic Leadership Style (3) Laissez-faire Leadership Style (1) Autocratic Leadership Style This style is also known as the leader-centred style. Under this style, the leader keeps all the authority centred in his hands and the employees have to perform the work exactly as per his orders. If any employee is careless in his work performance, he is punished. Characteristics (i) Centralised Authority. (ii) Single-man Decisions. (iii) Wrong Belief regarding Employees. (iv) Only Downward Communication. Advantages (i) Quick and Clear Decisions. (ii) Satisfactory Work. (iii) Necessary for Less Educated Employees.
  • 37.
    CHETHAN.S Department of Management 37 Disadvantages (i)Lack of Motivation. (ii) Agitation by Employees. (iii) Possibility of Partiality. (2) Democratic Leadership Style This style is also known as group-centered leadership style. These days this leadership style is very much in vogue. Under this style, decisions regarding different works are not taken by the manager alone but they are taken in consultation with the employees. Characteristics (i) Cooperative Relations. (ii) Belief in Employees. (iii) Open Communication. Advantages (i) High Morale. (ii) Creation of More Efficiency and Productivity. (iii) Availability of Sufficient Time for Constructive Work.
  • 38.
    CHETHAN.S Department of Management 38 Disadvantages (i)Requirement of Educated Subordinates. (ii) Delay in Decisions. (iii) Lack of Responsibility in Managers. (3) Laissez-faire or Free-rein Leadership Style This leadership style is also described as Individual- centered style. In this style, the manager or the leader takes little interest in managerial functions and the subordinates are left on their own. It refers to that leadership style in which the leader gives his subordinates complete freedom to make decisions. Characteristics (i) Full Faith in Subordinates. (ii) Independent Decision-making System. (iii) Decentralisation of Authority. (iv) Self-directed, Supervisory and Controlled. Advantages (i) Development of Self-confidence in Subordinates. (ii) High-level Motivation. (iii) Helpful in Development and Extension of the Enterprise.
  • 39.
    CHETHAN.S Department of Management 39 Disadvantages (i)Difficulty in Cooperation. (ii) Lack of Importance of Managerial Post. (iii) Suitable only for Highly Educated Employees. 11. Explain briefly the various functional areas of Management. The following activities are covered under the scope of management: (i) Planning, (ii) Organization (iii) Staffing. (iv) Directing, (v) Coordinating, and (vi) Controlling. The operational aspects of business management, called the branches of management, are as follows: 1. Production Management 2. Marketing Management 3. Financial Management. 4. Personnel Management and 5. Office Management.
  • 40.
    CHETHAN.S Department of Management 40 12.Explain the Principles of Management as stated by Henry Fayol. 1. Division Of Work 2. Authority 3. Discipline 4. Unity Of Command 5. Unity Of Direction 6. Subordination Of Individual Interests To The General Interests 7. Remuneration 8. Centralization 9. Scalar Chain 10. Order 11. Equity 12. Stability Of Tenure Of Personnel. 13. Initiative 14. Espirit De Corps 13. What is staffing? Explain the procedure involved in Selection of a Candidate? The term ‘Staffing’ relates to the recruitment, selection, development, training and compensation of the managerial personnel.
  • 41.
    CHETHAN.S Department of Management 41 StepsInvolved in Selection Procedure: 1. Inviting applications. 2. Receiving applications. 3. Scrutiny of applications. 4. Written tests. 5. Psychological tests. 6. Personal interview. 7. Reference check. 8. Medical examination. 9. Final selection. 10. Placement. 14. Write a note on: a. Maslow’s need hierarchy theory. (Refer Section-C, Question no:01) b. MC Gregor’s theory X and Theory Y. (Refer Section-C, Question no:01) 15. Define communication. Explain the various barriers to Communication. Communication:- Communication might be defined as the transfer of – facts, information, ideas, suggestions, orders, requests, grievances etc. from one person to another.
  • 42.
    CHETHAN.S Department of Management 42 Barriersto Effective Communication: Sometimes the message sent by sender does not reach the receiver in the same manner as expected by the sender. This filtration, misrepresentation of communication may cause misunderstanding. Therefore it is important for a manager to identify these barriers and take measures to overcome these. 1. Semantic Barriers: (i) Badly expressed message. (ii) Symbols with different meanings. (iii) Faulty Translations. (iv) Un-clarified Assumptions. (v) Technical Jargon. (vi) Body language and gesture decoding. 2. Psychological Barriers: (i) Premature Evaluation. (ii) Lack of Attention. (iii) Loss by Transmission and Poor Retention. (iv) Distrust. 3. Organisational Barriers: (i) Organisational Policy. (ii) Rules and Regulations. (iii) Status Difference. (iv) Complex organization. (v) Organisational Facilities.
  • 43.
    CHETHAN.S Department of Management 43 4.Personal Barriers: (i) Lack of Confidence of Superior in his subordinates. (ii) Lack of incentives. (iii) Fear of Authority. 16. What is decision making? Explain the process of decision making. Decision–making is a selection process and is concerned with selecting the best type of alternative. It is concerned with the detailed study of the available alternatives for finding the best possible alternative. STEPS INVOLVED IN DECISION MAKING PROCESS: 1. Define the problem. 2. Analyzing the problem. 3. Developing alternative solutions. 4. Selecting the best type of alternative. 5. Implementation of the decision. 6. Follow up. 7. Monitoring and feedback. 17. Explain the importance of Organization. Importance and Significance of Organization: 1. Facilitates administration. 2. Encourages growth and diversification. 3. Optimum utilization of technology. 4. Stimulates innovation and creativity. 5. Encourages good human relation. 6. Ensures continuity of enterprise.
  • 44.
    CHETHAN.S Department of Management 44 18.What is controlling? Explain the steps involved in controlling process. Control can be defined as the process of analysing whether actions are being taken as planned and taking corrective actions to make these to confirm to planning. Steps Involved in Control Process There are four steps in control process: (1) Setting of control standards. (2) Measurement of actual performance. (3) Comparing actual and standard performance. (4) Taking corrective action. 19. Give an Explanatory note on Organization’s Social Responsibility.
  • 45.
    CHETHAN.S Department of Management 45 1.Responsibility to Shareholders. 2. Responsibility to Employees. 3. Responsibility to Consumers. 4. Obligation towards the Environment. 5. Responsibility to Society in General. 20. Explain the various techniques of Controlling. Controlling is one of the managerial functions and it is an important element of the management process. After the planning, organising, staffing and directing have been carried out, the final managerial function of controlling assures that the activities planned are being accomplished or not. Top 14 Techniques of Control Business Management 1. Personal Observation: 2. Budgetary Control: 3. Break-even Analysis: 4. Ratio Analysis: 5. Cost Control: 6. Internal Audit: 7. Statistical Reports: 8. Management Audit: 9. Return on Investment: 10. Network Techniques: 11. Responsibility Accounting: 12. Zero-Base Budgeting: 13. Performance Budgeting: 14. Management Information System: